This is a Questions and Answers document for the NGP Phase 1B Second RFI (Request for Information).

The document addresses three primary topics relevant to respondents preparing RFI submissions. Regarding the CUI (Controlled Unclassified Information) attachment, there were no material changes from the previous RFI issued in late 2025; however, additional guidance information was provided in three tables. The deadline for requesting access to CUI has been extended to March 18, 2026. On the technical question of Launch Acceptability Region (LAR) generation approach, the government clarified that the weapon system shall generate its own LAR, with the aircraft making the final LAR determination. The weapon system must be compatible with both UAI (Unified Architecture Interface) and non-UAI systems, though more specific details will be provided at a future date to be determined. For page count requirements, the government confirmed that for this RFI, the page count limit is all-inclusive and includes cover sheets, tables of contents, and acronym lists. However, this approach will change for the subsequent RFP, where the page count limit will exclude these parenthetical items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Answers

Did the current RFI CUI attachment have a material change from the CUI attachment that was sent out back in late 2025 with the previous RFI? No material change; additional guidance info was provided in three tables.

a If there was a material change, will you extend the access date for requesting access to the updated CUI to better inform a response or send the updated section? No material change. Requests for CUI has been extended to March 18th 2026.

2 What is the expected platform Launch Acceptability Region (LAR) generation approach:

a Will the platform generate platform internal LARs using offline NGP tail kit simulation results? The weapon system shall generate its own LAR but the aircraft makes the final LAR determination. More specific details will be provided at a future to be determined date.

b Will the weapon system use the UAI “In Weapon LAR” capability? The weapon system shall be compatible with both UAI and non UAI systems. More specific details will be provided at a future to be determined date.

c Will the weapon be required to comply with an existing platform LAR? The weapon system shall generate its own LAR but the aircraft makes the final LAR determination. More specific details will be provided at a future to be determined date.

Is page count all inclusive (i.e. Does the page count limit include cover sheet, table of contents, and acronym list

Yes, this is an RFI. In the RFP, page count limit will not include the parenthetical items listed in the question.