Amendment_SF_30.pdf

PDF 41 KB Posted

Attached to
COMTECH Advanced High Speed Trunking Modem Federal contract opportunity
Solicitation number
EA-133M-16-RQ-0680
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

Amendment SF-30

View the file

Other files for this federal contract opportunity

Other files attached to COMTECH Advanced High Speed Trunking Modem, newest first.
File Type Posted
updated_STATEMENT_OF_NEED _EX_VSAT_COMTECH_MODEM_V1.pdf PDF
0002_Amendment_SF_30_Trunking_Modem.pdf PDF
BNJ_EX_VSAT_COMTECH_MODEM_(1).pdf PDF
RFQ_Combined_Synopsis_Solicitation_-_Trunking_Modem_as_of_6-20-16.pdf PDF
STATEMENT_OF_NEED _EX_VSAT_COMTECH_MODEM.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages 1 1

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable) 0001 7/14/2016

6. Issued By Code AJ930073 7. Administered By (If other than Item 6) Code NOAA/Eastern Acquisition Division 200 Granby Street, Suite 815 Norfolk, VA 23510

See Block 6

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

EA-133M-16-RQ-0680

9B. Date (See Item 11)

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended x is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amend Soliciation EA-133M-16-RQ-0680 as follows:

A. Brand Name Justification form is posted to this requirement.

• Will the RFQ need to have travel built in for the kickoff with NOAA, or will it be a separate reimbursement?

Travel must be built in.

• Does the government expect any additional follow-on meetings during the period of performance that will need a travel component priced out?

The Government expects follow on meetings. Travel costs should be included or done through other means (teleconference, etc.).

• What is the expectation on how the final design will need to be delivered under to NOAA under the project? Will it be a digital delivery, hard copy mailed, or an in-person delivery that will need to be priced in the RFQ?

Any of these are acceptable. Digital delivery must be able to be opened by AutoCAD. All pricing must be incorporated into the quote.

• Will the complete system need to be enclosed into a safety enclosure, given the specs for amplitude, or will the "payload" component need to be the only portion enclosed in a protective enclosure?

The entire device needs to be in a safety enclosure.

• Will the rotation/movement of the hardware components need to be automated or can it use a variable switch or some other static induction method that is personally controlled?

Automated.

• How long is the contractor anticipated to deliver software updates for the system?

If it works properly, no updates are expected.

• Given that some of the requirements and methodologies are explained in a vague sense in the RFQ, can the contract officer provide a more detailed explanation of how the system will be expected to move, the anticipated requirement for mounting the sensors, and any other technical aspects that will need to be anticipated in pricing the design RFQ?

The product is a design service. All necessary specifications have been provided.

• Instructions to Offerors, page 1 of the solicitation, number 5 requires certifications at FAR 52.212-3 be filled in starting at page 18, however the clause states that –

Offeror Representations and Certifications -- Commercial Items (Apr 2016)

“The offeror shall complete only paragraphs (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov . If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (r) of this provision. “

Since we have an annual SAM registration current, would the government accept a printed copy of the SAM registration rather than have us fill in the certifications and representations contained in full text in the solicitation?

Just check the box in the solicitation.

What are the government’s expectations as to the rough dimensions of the platform?

This is part of the design process. There are no exact dimensions required at this time; however, the expectation is for portability. Portabilitiy is defined as moveable by one person. Therefore, it should be placed on a cabinet or a cart with wheels.

• What is the governments expectation as to the exact degrees of motion required for the platform?

The Desktop Wave Simulator must subject the IMU's to motion in the vertical and horizontal directions such traveling in a circular path provides

• Is the governments expectation that the simulator will be connected to a computer while it is running, or perform the simulator computation on board?

A computer may be attached to the device to record the IMU output.

• Is the amplitude of motion of 0.67m in the vertical direction?

Yes, the amplitude of motion is .67m in the vertical direction.

• Does "rotational period of 2-15 seconds" correspond to the period of the 0.67m motion, or to some other motion/rotation that is intended to be simulated?

Yes, the rotational period of 2-15 secs does correspond to the 0.67m motion.

• We are picturing a horizontally mounted platform housing the 2 IMUs, able to be rotated to fixed angles on each of its two horizontal axes, and able to be actuated up/down. Is this the correct interpretation?

The Desktop Wave Simulator must subject the IMU's to motion in the vertical and horizontal directions such traveling in a circular path provides.

• Also, the specification mentions that the DWS will include a "feedback loop (rotational rate of sensors)". Can you clarify what the intention is? If the intent is to control the motion supplied by the test stand then we wouldn't want to use the signals from the sensors you intend to validate with the testing as control parameters. We can include additional instrumentation controlling the motion if needed, but a simple feed-forward on a stepper motor would be sufficient to produce the 0.67m, 0.5Hz vertical motion to a high degree of precision.

Yes, additional instrumentation controlling the motion is required. An additional sensor would be required for a proper feedback system.

http://www.acquisition.gov/