Asbestos_Survey_Report_1998.docx

DOCX document 12 KB Posted

Attached to
DRYDOCK REPAIRS TO NOAA SHIP OREGON II
Solicitation number
EA-133M-16-RP-0082
Issued by

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
Corrected_Schedule_of_Prices.doc DOC document
Amendment_0001.pdf PDF
AMC-300-1 _Overhaul_of_Electrical_Rotating_Machinery_(10_pages).pdf PDF
s2906.pdf PDF
S0100.pdf PDF
Data_Sheet_Simrad_200-28E_855-164022_Rev_B__200kHz_single-beam_transducer_in_robust_housing.pdf PDF
OT-S11-1-1(P)_1.TIF TIF image
OT-S3801-12.pdf PDF
Ocean_Surveyor_Installation_Guide_-_Teledyne.pdf PDF
Installation_Manual_Simrad_Transducers_Installation_Principles_and_Guidelines_-_Echo_Sounder_Transducers_Installation_Manual.pdf PDF
SBE_38_Digital_Oceanographic_Thermometer_Configuration_Details.docx DOCX document
OT-S11-1-1(S)_1.TIF TIF image
Instruction_Manual_Simrad_EK60_Scientific_Echo_Sounder_System_850-164696_Rev._A.pdf PDF
SBE_38_Digital_Oceanographic_Thermometer_Reference_Sheet_Version_4_03-23-11.pdf PDF
POS_MV_V5_Installation_and_Operation_Guide_PUBS-MAN-004291_Rev9_12-3-14.pdf PDF
s1205.pdf PDF
SBE_38_Digital_Oceanographic_Thermometer_Brochure_Apr_09.pdf PDF
FURUNO_USA_A3_GMDSS_Console_RC18XX_Series_Installation_Manual.pdf PDF
OT-S3801-101.pdf PDF
MOC-631-3B _Underwater_Body_Ablative_Coating_System_(6_sheeets).pdf PDF
AMC-505-1B _Valve_Overhaul_and_Test_(4_pages).pdf PDF
Navi-Sailor_NS4000_ECDIS_Version_2.00.323_Installation_Guide.pdf PDF
ASHRAE_Standard_151_-_HVAC_Balancing___Testing.pdf PDF
AMC-997-1A _Drydocking_and_Routine_Drydock_Work_(6_pages).pdf PDF
OR-S9-0-5.pdf PDF
OT_S4803.pdf PDF
SBE_38_to_SBE_21_Interface.docx DOCX document
Reference_4_SBE_38_Digital_Oceanographic_Thermometer_With_RS-232_or_Optional_RS-485_Manual_No._14_4-25-13.pdf PDF
AMC-000-3C.pdf PDF
OT-S11-1-1.pdf PDF
Drawing_871-204451_Rev_A_Clamping_Ring_Transducer_ES200-7C.pdf PDF
Drawing_871-204449_Rev_B_Mounting_Ring_Transducer_ES200-7C.pdf PDF
MOC-631-2D _Coating_Systems_for_Steel_Surfaces_(12_pages).pdf PDF
Drawing_AMC3-332-461-01_Oregon_II_Underhull_Transducer_Arrangement.pdf PDF
AMC-000-2C.pdf PDF
Furuno_Doppler_Sonar_Current_Indicator_Installation_Manual_CI-68 _IME-72520-C_dtd_11-15-11.pdf PDF
Load_Line_Technical_Manual.pdf PDF
OT-S3801-13.pdf PDF
Furuno_Doppler_Sonar_Current_Indicator_Operator's_Manual_CI-68 _OME-72520-B_dtd__11-15-11.pdf PDF
AMC-000-1G _General_Requirements_for_Ship_Repair_Contract_Work_on_NOAA_Ships_(22_pages).pdf PDF
AMC-581-1A _Inspection_and_Preservation_of_Ground_Tackle_(4_sheets).pdf PDF
OT-S22-0-1.pdf PDF
AMC-077-1A.pdf PDF
OT-S3801-1.pdf PDF
OT-S48-1-7.pdf PDF
OT-S43-1-1.pdf PDF
OT-S48-5-4.pdf PDF
s1600.pdf PDF
OT-S48-23-2.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

September 24, 1998

MEMORANDUM FOR:Robert C. Wilmot
Chief, Marine Engineering Division
Atlantic and Pacific Marine Centers
FROM:Lieutenant Commander Steven A. Thompson, NOAA
Commanding Officer, OREGON II

SUBJECT: Annual Asbestos Report

This memorandum documents actions taken during FY98 to remove asbestos-containing materials from the NOAA Ship OREGON II.

From December, 1997, to June, 1998, the NOAA Ship OREGON II was involved in a Major Repair Period at Bender Shipyard, Mobile, Alabama. Item 09 in the contract specified the removal of asbestos containing bulkhead sheathing from the dry lab and chem lab. Item 18 of the contract specified the removal of asbestos containing overheads in the spaces listed below, with the approximate square footage of removed asbestos containing material listed:

Chief Engineer’s Stateroom80 sq. ft.
Ship’s Mess Room256 sq. ft.
Stateroom #145 sq. ft.
Stateroom #277 sq. ft.
Stateroom #391 sq. ft.
Stateroom #470 sq. ft.
Stateroom #596 sq. ft.
Stateroom #688 sq. ft.
Stateroom #796 sq. ft.
Stateroom #996 sq. ft.

Item 19 in the contract specified the removal of asbestos containing overhead panels from the galley. In addition, several additional item requests were added to the contract to remove asbestos from the freezers and generator exhaust insulation.

Following completion of the aforementioned work, the contractor provided documentation in the form of daily project reports, asbestos waste shipment records, and air filter analyses. This documentation is attached. The daily project reports indicate which work was done on a particular day. The total asbestos waste removed and shipped was 39 cubic yards. Air filter analyses were performed in each of the areas where asbestos was removed, and these indicated concentrations less than 0.1 fibers per cubic centimeter in all spaces.

attachments:Coastal Abatement Services’ Daily Project Reports
Asbestos Waste Shipment Records
Air Filter Analysis Summaries

cc: V. Giacchina file:\ops_file\safety\asbestos_rep98.wpd