STATEMENT OF WORK

View the file

Other files

File Type Posted
EA133M-14-RQ-0071.pdf PDF
materials_list.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA Ship Oregon II Dry Lab Habitability Upgrades March 2014

NOAA Ship Oregon II Dry Lab Habitability Upgrades

1.0 SCOPE This specification contains requirements for habitability upgrades for the dry lab.

2.0 References

2.1 NOAA Standard Specification, AMC-000-3C, General Requirements for Small Contract Ship Repairs

2.2 Habitability Materials List Rev K

2.3 Drawing No. OT-S1003 Rev C, “Booklet of General Plans”

3.0 Government Furnished Material

3.1 None

4.0 Requirements

4.1 Contractor shall provide all labor and material to accomplish all work in this specification accordance with reference 2.1

4.2 Habitability Upgrades

4.2.1 Ripout, remove and scrap existing ~20 lineal feet of desk top (See Figures 1 & 2). Install new desk top using butcher block similar to that used for the ships office desk top (see figure 3) with a minimum thickness of 1.5 inches. Use reference 2.2 as a guide for material selection.

Ripout Ripout

Figure 1 Figure 2 Butcher Block Material

Figure 3

4.2.2 New desk top dimensions are as follows: (See sketch Figure 4)

4.2.2.1 Depth (front of desk top to bulkhead): 30 inches.

4.2.2.2 Height (Top of desk top to deck): 30 inches.

4.2.2.3 Length: 18 feet 10 inches.

Figure 4

4.2.3 Fabricate and install bookshelves on outboard (port) bulkhead.

4.2.3.1 Bookshelf dimensions: 12 inches tall, and 12 inches deep.

4.2.3.2 Mount bookshelfs 6 feet above the deck, and spanning the entire outboard bulkhead with the exception in way of the porthole.

4.2.3.3 Install new mounting hardware for five (5) 20 inch computer monitors on the outboard bulkhead.

4.2.4 Remove and scrap existing stand up bookshelf and drawers (See Figure 5). After removals, the rough opening will be approximately 45.75 inches wide, 80.25 inches high and 20 inches deep. Install new stand up book shelf and drawers similar to the ships office stand up bookshelf and drawer’s (see figure 6).

Ripout

Figure 5 Figure 6

4.2.4.1 Install the top of the drawers 34 inches above the deck.

4.2.5 Remove existing chest freezer (Figure 7). Fabricate and install a stowage bench.

Chest Freezer

Figure 7

4.2.5.1 Storage Bench dimensions: 40 inches wide, 18 inches deep and 20 inches tall.

4.2.5.2 Hinge the top of the work bench to provide access to storage.

4.2.5.3 Anchor the storage bench to the bulkhead and deck to prevent movement in rough seas.

4.2.6 Install a storage enclosure for the portable Air Conditioning (AC) unit on the aft bulkhead (See Figure 8)

Portable AC Unit

Figure 8

4.2.6.1 Provide louvers on each side of storage enclosure to provide air flow to the AC unit.

4.2.6.2 Install permanent ducting for exhausting to the exterior of the ship.

4.2.6.3 Install condensate piping to provide drainage with an air gap to the ships gray water drain system.

4.2.7 Install a new COSPOLICH Model F18-2M-ADS(SN) 17.6 cubic feet capacity upright freezer on the aft bulkhead next to the portable AC unit (See Figure 9).

Location for Upright Freezer

Figure 9

4.2.7.1 Prior to procuring the upright freezer, ensure that there is sufficient clearance through ships existing doors to provide access for the freezer.

4.2.7.2 Install new mounting hardware to secure the freezer to the deck and the aft bulkhead to prevent any movement while ship is underway in a seaway.

4.2.8 Remove and scrap existing bookshelf on the aft bulkhead (See Figure 10).

Existing Bookshelf

Figure 10

4.2.8.1 Install a new 32 inch plasma flat panel television and mounting hardware on the aft bulkhead

4.2.8.2 Center the television between the new bookshelf installed on the outboard bulkhead and the new upright freezer.

5.0 Quality Assurance

5.1 Provide samples and obtain approval from the ship’s Commanding Officer and Port Engineer prior to procuring materials for desk tops, bookshelves, storage bench and AC enclosure.

6.0 Notes

6.1 The ship will be available for a ship check on 7 January 2014 at the Gulf Marine Support Facility, 151 Watts Ave, Pascagoula MS 39567. Contact the Port Engineer, Brian Kelly at 228-769-1155 to schedule a ship check.

6.2 The period of performance will be 3 March 2014 – 18 April 2014. The work will be performed at the Gulf Marine Support Facility, 151 Watts Ave, Pascagoula MS 39567.

END OF SPECIFICATION