E_Verify_Tax Compliance_Scrutinized Company F.pdf
PDF 2 MB Posted
- Solicitation number
- PE-50300-RFQC-2026-000000261
- Issued by
- Fulton County, Atlanta City, Georgia
About this file
Summary
This document is a contractor affidavit and compliance package for the Board of Regents of the University System of Georgia for FY2026-2027 Task Order Contracting Services. The package comprises multiple exhibits detailing mandatory compliance requirements and certifications that contractors must complete prior to contract award. While specific project scopes or service descriptions are not detailed in these exhibits, the documentation establishes the framework for contractor qualification and authorization across the University System of Georgia institutions.
The compliance requirements include federal work authorization verification through the E-Verify program, tax compliance certification through the Georgia Department of Revenue (for contracts valued at $100,000 or greater), and scrutinized company certifications regarding operations in Sudan, Russia, Belarus, and China. Contractors must also provide current Certificates of Insurance meeting Board of Regents minimum standards, including commercial general liability coverage of $1,000,000 per occurrence, builders risk coverage equal to 100% of the contract sum, and umbrella liability of $2,000,000 per occurrence or $4,000,000 aggregate for contracts under $5,000,000 (or $2,000,000/$10,000,000 aggregate for larger contracts). All documentation must be notarized where applicable and submitted to the specified state entity for processing in accordance with the Georgia Procurement Manual.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| _2014_26_ FY26_27 GC Task Order RFQ_Final 11_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Affidavit under O.C.G.A. § 13-10-91(b)(1)
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of Board of Regents of the University System of Georgia for the use and benefit of Institution, Using Agency (name of public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number
Date of Authorization
Name of Contractor
FY2026-2027 Task Order Contracting Services Name of Project
Board of Regents of the University System of Georgia for the use and benefit of Institution, Using Agency Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on , , 20 in (city), (state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE DAY OF ,20 .
NOTARY PUBLIC
My Commission Expires:
Exhibit I
Company Name:
Physical Address:
Authorized person handling company tax issues:
Telephone and Email Address:
Federal Identification Number (FEI):
Selling any tangible property or goods? Y / N
What type of service will your company perform?
Ever been registered with Georgia Dept. of Revenue? Y / N
If yes, please provide the following information:
State Taxpayer ID (STI):
Sales and Use Tax No:
Withholding Tax No:
Company Affiliate's Name, if applicable:
Federal Identification (FEI):
State Taxpayer ID (STI):
Sales & Use Tax Number:
Withholding Tax Number:
If there is more than one affiliate, please attach a separate sheet listing the information above.
State Entity: Please submit this page via email to DOR at compliance-state-con@dor.ga.gov for processing in accordance with the Georgia Procurement Manual.
TAX COMPLIANCE
In the event the professional services / contractor is considered for contract award ($100K+), the information provided in the form below will be submitted by the State Entity to the Georgia Department of Revenue (DOR) for a determination as to whether the company is a "prohibited source" as defined by O.C.G.A. 50-5-82 or whether there are any other oustanding tax issues. MISSING, INCOMPLETE, OR ERRONEOUS DATA may delay or prohibit verification of company eligibility for contract award. No prohibited source may receive contract awards.
Therefore, you are strongly encourged to check your tax stsatus now or resolve any outstanding tax liabilities and/or missing tax returns.
Exhibit J
SCRUTINIZED COMPANY
___________________________________ located at ___________________________________
A scrutinized company as defined by…
1. …O.C.G.A. Section 50-5-84?
SUDAN: Any Supplier that currently and/or previously, within the last three years, has had business activities or other operations outside of the United States, must certify that it is not a “scrutinized company.” A scrutinized company is a company conducting business operations in Sudan that is involved in power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, but excludes a company which can demonstrate any of the following exceptions noted in O.C.G.A. Section 50-5-84. False certification hereunder may result in civil penalties, contract termination, ineligibility to bid on state contractors for three or more years, and/or any other available remedy. If the Supplier is a scrutinized company, the Supplier shall not be eligible to bid on or submit a proposal for a contract with the State Entity unless DOAS makes a determination in accordance with O.C.G.A. Section 50-5-84 that it is in the best interests of the State to permit the scrutinized company to submit a bid or proposal. Any scrutinized company desiring DOAS to make such a determination should contact both DOAS and the Issuing Officer immediately.
☐ I certify my company is NOT a “scrutinized company.”
☐ I certify my company is a “scrutinized company.”
☐ I certify I have requested & received written permission from DOAS to submit a response to this Event in accordance with Section 50-5-84.
2. …O.C.G.A. Section 50-5-84.1?
RUSSIA/BELARUS: A scrutinized company is any sole proprietorship, organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company, or other entity or business association, including all wholly owned subsidiaries, majority owned subsidiaries, parent companies, or affiliates of such entities or business associations, that exists for the purpose of making profit owned or operated by the Government of Belarus or the Government of Russia. The Government of Belarus means the Republic of Belarus, and the Government of Russia means the Russian Federation. A scrutinized company is ineligible to submit a response to this solicitation. False certification hereunder may result in a civil penalty in an amount that is equal to the greater of $250,000 or twice the amount of the contract for which a bid or proposal was submitted, contract termination, and any other penalties available under law, rule or policy.
☐ I certify my company is NOT a “scrutinized company.”
☐ I certify my company is a “scrutinized company.”
Exhibit K dvongsouvan Typewritten Text Legal Firm Name dvongsouvan Typewritten Text Physical Address/Location
3. …O.C.G.A. Section 50-5-84.2?
CHINA: A scrutinized company is any sole proprietorship, organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company, or other entity or business association, including all wholly owned subsidiaries, majority owned subsidiaries, parent companies, or affiliates of such entities or business associations, that exists for the purpose of making profit owned or operated by the Government of China. The Government of China means the People’s Republic of China led by the Chinese Communist Party. A scrutinized company is ineligible to submit a bid or proposal in response to this solicitation. False certification hereunder may result in a civil penalty in an amount that is equal to the greater of $250,000 or twice the amount of the contract for which a bid or proposal was submitted, contract termination, and any other penalties available under law, rule, regulation or policy.
☐ I certify my company is NOT a “scrutinized company.”
☐ I certify my company is a “scrutinized company.”
Signature:____________________________________ _______________________
State Entity: Please keep this completed document with the company contract documents. If you are posting and collecting documents via JAGGAER, this form is NOT required as these questions are included.
Exhibit K dvongsouvan Typewritten Text Date dvongsouvan Typewritten Text Print Name/Title of Authorized Signer dvongsouvan Typewritten Text Authorized Signer
Exhibit L
Insurance Requirements
Sample Certificate of Insurance (COI)
(CONTRACTOR – PLEASE ATTACH)
1. Copy of your Firm’s current Certificate of Insurance (COI) that meets or exceeds Board of Regents minimum requirements as outlined in the attached sample certificate. *** Builders Risk coverage or equivalent (when applicable) must be indicated.***
Version 03/01/2024
CERTIFICATE HOLDER
ACORD 25 (2010/05)
AUTHORIZED REPRESENTATIVE
CANCELLATION
DATE (MM/DD/YYYY)CERTIFICATE OF LIABILITY INSURANCE
PRO-
GEN'L AGGREGATE LIMIT APPLIES PER:
GENERAL LIABILITY
PREMISES (Ea occurrence) $
DAMAGE TO RENTED
EACH OCCURRENCE $
MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GENERAL AGGREGATE $
PRODUCTS - COMP/OP AGG $
$RETENTIONDED
CLAIMS-MADE
OCCUR
AGGREGATE $
EACH OCCURRENCE $UMBRELLA LIAB
EXCESS LIAB
INSR
LTR TYPE OF INSURANCE POLICY NUMBER
POLICY EFF
(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY) LIMITS
WC STATU-
TORY LIMITS
OTH-
ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE
E.L. DISEASE - POLICY LIMIT
ANY PROPRIETOR/PARTNER/EXECUTIVE
If yes, describe under DESCRIPTION OF OPERATIONS below
(Mandatory in NH)
OFFICER/MEMBER EXCLUDED?
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY Y / N
AUTOMOBILE LIABILITY
ANY AUTO
ALL OWNED SCHEDULED
HIRED AUTOS
NON-OWNED
AUTOS AUTOS
AUTOS
COMBINED SINGLE LIMIT
BODILY INJURY (Per person)
BODILY INJURY (Per accident)
PROPERTY DAMAGE $
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
ADDL
WVD
SUBR
N / A
(Ea accident)
(Per accident)
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
© 1988-2010 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
INSURED
PHONE
(A/C, No, Ext):
PRODUCER
ADDRESS:
FAX
(A/C, No):
CONTACT
NAME:
NAIC #
INSURER A :
INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
INSURER(S) AFFORDING COVERAGE
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
POLICY LOCJECT
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required)
Policy must contain the following Builder's Risk Endorsement: The following may occur without diminishing, changing, altering or otherwise affecting the coverage and protection afforded the insured under this policy:(i) Furniture and equipment may be delivered to the insured premises and installed in place ready for use; and (ii) Partial or complete occupancy by Owner; and (iii) Performance of work in connection with construction operations insured by the Owner, by agents or lessees or other Contractors of the Owner or Using Agency
Umbrella Liability: Contracts Amounts Less than $5M obtain $2M per occurrence/$4M aggregate; Contract Amounts Equal to or Greater than $5M obtain $2M per occurrence/$10M aggregate When using subcontractors, Contractor must comply with Section 1.5.3.3.1 (Worker's Compensation Insurance) and 1.5.3.3.2 (Employers' Liability Insurance)
AUTHORIZED REPRESENTATIVE
1,000,000
Current Date must list must list must list must list must list must list
Policy Number
Policy Number
Effective Date
Effective Date
Expiration Date
Expiration DateSAMPLE smorgan63 Highlight smorgan63 Highlight smorgan63 Highlight
| Exhibit I_Contractor Affidavit.pdf |
| SECTION 7 – CONTRACT FORMS FORMS INCLUDED: |
| PERFORMANCE BOND |
| Bond No. |
| PAYMENT BOND |
| Bond No. |
| Contractor Affidavit under O.C.G.A. § 13-10-91(b)(1) |
| Subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(3) |
| Sub-subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(4) |
| NON-INFLUENCE AFFIDAVIT |
| STATE OF GEORGIA; COUNTY OF : |
| STATUTORY AFFIDAVIT |
| STATE OF GEORGIA; COUNTY OF : |
| FIVE YEAR BOND ON ROOFS AND WALLS |
| STATE OF GEORGIA; COUNTY OF : |
SPECIMEN CERTIFICATE OF MANUFACTURER
| Exhibit J_Tax Compliance.pdf |
| Part 5 Insurance_CM_October_2023.pdf |
| CONSTRUCTION MANAGEMENT |
| AGREEMENT |
| BETWEEN |
| LEGAL CM Firm Name |
| (CM/GC) |
| AND |
| BOARD OF REGENTS OF THE |
| UNIVERSITY SYSTEM OF GEORGIA |
| Part 5 – Bonds, Indemnity and Insurance |
| SECTION 2 – PRECONSTRUCTION PHASE |
| Part 1 – Preconstruction Phase Services |
| Part 2 – Component Change Orders |
| SECTION 7 – CONTRACT FORMS |
| Five Year Bond on Roofs and Walls |
| CONSTRUCTION MANAGEMENT CONTRACT |
| SECTION 1 – GENERAL |
| Part 1 General |
| Part 2 CM/GC’s General Responsibilities and Duties |
| Part 3 Owner’s Responsibilities and Rights |
| Part 4 Protection of Persons and Property |
| Part 5 Bonds, Indemnity and Insurance |
| Part 6 Hazardous Materials and Conditions |
| Part 7 Miscellaneous Provisions |
| SECTION 2 – PRECONSTRUCTION PHASE |
| Part 1 Preconstruction Phase Services |
| Part 2 Construction Documents and Site Preparation |
| SECTION 3 – CONSTRUCTION PHASE |
| Part 1 Construction Services |
| Part 2 Component Change Orders |
| Part 3 GMP Change Order |
| Part 4 Changes to the Work |
| Part 5 Time |
| Part 6 Correcting of Work; Inspections; Covering and Uncovering Work |
| Part 7 Trade Contractors; Self-Performance |
| SECTION 4 – COMPENSATION |
| Part 1 General |
| Part 2 Payment for Preconstruction Phase Services |
| Part 3 Payment for Construction Phase Services |
| Part 4 Cost of the Work |
| Part 5 Liens |
| SECTION 5 – CONTRACT ADJUSTMENTS, DISPUTES, AND TERMINATION |
| Part 1 Owner’s Right to Suspend the Work |
| Part 2 Contract Adjustments and Disputes |
| Part 3 Termination |
| SECTION 6 – PROJECT COMPLETION |
| Part 1 Material Completion |
| Part 2 Final Completion |
| Part 3 Inspections for Completion of the Work |
| Part 4 Final Documents |
| Part 5 Payment for Material Completion and for Final Payment |
| Part 6 Correction of Work After Final Completion |
SECTION 7 – FORMS
| EXHIBITS |
| SUPPLEMENTARY GENERAL REQUIREMENTS |
| PART 1 GENERAL PROVISIONS |
| 1.1.2 Project Team, Cooperation, Partnering |
| 1.1.3 Constitutional Principles Applicable to State Public Works Projects. |
| 1.1.5 Notice. |
| 1.1.6 Liquidated Damages. |
| 1.1.7 Documents. |
| 1.1.9 Basic Definitions. |
| PART 2 CM/GC’S GENERAL RESPONSIBILITIES AND DUTIES |
| PART 3 OWNER’S RESPONSIBILITIES AND RIGHTS |
| 1.3.2 Design Professional. |
| PART 4 PROTECTION OF PERSONS AND PROPERTY |
| PART 5 BONDS, INDEMNITY AND INSURANCE |
| 1.5.2 Liability and Indemnification. |
| 1.5.3 Insurance Requirements. |
| Part 6 Hazardous Conditions and Materials |
| 1.6.1 Hazardous Materials. |
| PART 7 MISCELLANEOUS PROVISIONS |
| 1.7.9 Women, and Disadvantaged Business Participation. |
| SECTION 2 – PRECONSTRUCTION PHASE |
| PART 1 PRECONSTRUCTION PHASE SERVICES. |
| 2.1.2 Construction Preparation Period |
| 2.1.4 Quality Control Program. |
| 2.1.5 Scheduling Requirements. |
| 2.1.6 CM/GC Design Coordination Activities. |
| 2.1.8 CM/GC Cost Responsibilities. |
| PART 2 CONSTRUCTION DOCUMENTS AND SITE PLAN |
| 2.2.2 Documents at the Project Site. |
| 2.2.3 Completion of Construction Documents Following Acceptance of the GMP Change Order. |
| 2.2.4 Special Situation – New Sole Source Designation. |
| 2.2.7 Site Plan. |
| SECTION 3 – CONSTRUCTION PHASE |
| PART 1 CONSTRUCTION SERVICES |
| 3.1.2 Meetings and Schedule Updates. |
| 3.1.3 Construction Budget. |
| 3.1.4 Coordination of the Work. |
| 3.1.6 Duty to Commence. |
| 3.1.13 Cleaning. |
| PART 2 COMPONENT CHANGE ORDERS |
| 3.2.2 Component Change Order Proposal. |
| 3.2.3 Component Change Order Sum. |
| 3.2.9 Owner's Liability. |
| 3.3.2 Submittal of GMP Change Order. |
| 3.3.3 Acceptance or Rejection of GMP Change Order. |
| 3.3.6 Replacement of GMP with Lump Sum Price. |
| 3.4.4 Form and Execution of Change Orders |
| 3.4.8 Overhead and Profit for Change Orders. |
| 3.4.8.1.4 Second and Lower Tier Subcontractor. Under this contract, the forces of a subcontractor of a subcontractor are deemed to be and are the forces of the subcontractor and the total management markup for overhead and profit for all tiers of subc... |
| 3.4.12 Changes due to Subsurface or Other Unforeseen Conditions. |
| 3.4.16 Sole Source Designation for Change Order Work. |
| PART 5 TIME |
| 3.5.3 Contract Time. |
| 3.5.4 Commencement, Prosecution, and Completion. |
| 3.5.5 Construction Progress Schedule and Overall Project Schedule. |
| 3.5.10 Submission of Claims for Compensable Delay, Extending the Material Completion and Occupancy Date. |
| 3.5.11 Recovery of Schedule Delays. |
| 3.6.2 Correcting the Work. |
| 3.6.4 Inspection of Work. |
| 3.6.5 Covering and Uncovering Work. |
| PART 7 TRADE CONTRACTORS; SELF-PERFORMANCE |
| 3.7.2 Selection. |
| 3.7.8 CM/GC Self-Performance. |
| 3.7.16 Relationship of CM/GC and Trade Contractors. |
| 3.7.17 Assignment of Trade Contracts, Subcontracts. |
| PART 1 GENERAL |
| 4.1.5 Inclusion of Contingency Amounts in GMP. |
| PART 2 PAYMENT FOR PRECONSTRUCTION PHASE SERVICES |
| PART 3 PAYMENT FOR CONSTRUCTION PHASE SERVICES |
| 4.3.5 Retainage. Retainage shall be withheld from each Application for Payment to the CM/GC in the amount of five percent of the sum of the total cost for original Contract Work, Change Order Work, materials stored on the Site and CM/GC Fee earned. |
| 4.3.9 Special Provisions for Payment of CM/GC Fee under a Component or GMP Change Order. |
| 4.3.10 Applications for Payment. |
| PART 4 COST OF THE WORK |
| 4.4.2 Preconstruction Phase Services. |
| 4.4.6 Adjustments to Construction Contingency. |
| 4.4.7 Release of Construction Contingency. |
| PART 5 LIENS |
| SECTION 5 CONTRACT ADJUSTMENTS, DISPUTES AND TERMINATION |
| PART 2 CONTRACT ADJUSTMENTS AND DISPUTES |
| 5.2.2 General Claims for Contract Adjustments and Disputes. |
| PART 3 TERMINATION |
| 5.3.2 Owner’s Right to Declare Default and/or Terminate Contract for Cause. |
| 5.3.3 CM/GC’s Right to Terminate. |
| SECTION 6 - PROJECT COMPLETION |
| PART 1 MATERIAL COMPLETION |
| 6.1.1 Prerequisites. |
| 6.1.2 Material Completion. |
| PART 2 FINAL COMPLETION |
| 6.3.2 Notice of Readiness for Inspection for Material Completion. |
| PART 4 FINAL DOCUMENTS |
| 6.4.1 Final Documents. |
| PART 5 PAYMENT FOR MATERIAL COMPLETION AND FINAL PAYMENT |
| 6.5.2 Application for Payment for Material Completion. |
| 6.5.3 Release of CM/GC’s Retainage. |
| PART 6 CORRECTION OF WORK AFTER FINAL PAYMENT |
| 6.6.3 Warranty Complaint Item Procedure. |
| SECTION 7 – CONTRACT FORMS |
| Five Year Bond on Roofs and Walls |
| KNOW ALL MEN BY THESE PRESENTS: |
| KNOW ALL MEN BY THESE PRESENTS: |
| NON-INFLUENCE AFFIDAVIT |
| STATUTORY AFFIDAVIT |
| FIVE YEAR BOND ON ROOFS AND WALLS |
| Condition of Obligation. The condition of the above obligation is such that WHEREAS CM/GC has entered into a Contract with Owner dated for construction of Project No. Number, Description, and Location. |
| Warranty. WHEREAS, the said CM/GC warrants with respect to the said work that for a period of five years from the date of the execution of the final certificate of the Design Professional, the roofs of the building (or buildings) and roofs of passa... |
| Leaks or Defect. WHEREAS the said CM/GC agrees that should any leaks or defects occur in the roof envelope or wall envelope of the said (Name and Number of Project) the said CM/GC will promptly remedy the said leaks or defects and pay for any damag... |
SPECIMEN CERTIFICATE OF MANUFACTURER
| 1. CONSTRUCTION MANAGER At-RISK’S FEE: |
| A. PRECONSTRUCTION FEE: |
| B. CONSTRUCTION FEE: |
| 2. CM/GC’s EXPENSES AND OVERHEAD COSTS (Preconstruction and Construction): |
| EXHIBIT J |
| CERTIFICATE OF THE CM/GC OR HIS DULY AUTHORIZED REPRESENTATIVE |
| EXHIBIT M |
| BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA |
| Date: Month Day, Year |
| Institution: |
| EXHIBIT N |
| BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA |
| Date: Month Day, Year |
| Institution: |
| Part 5 Insurance_CM_October_2023.pdf |
| CONSTRUCTION MANAGEMENT |
| AGREEMENT |
| BETWEEN |
| LEGAL CM Firm Name |
| (CM/GC) |
| AND |
| BOARD OF REGENTS OF THE |
| UNIVERSITY SYSTEM OF GEORGIA |
| Part 5 – Bonds, Indemnity and Insurance |
| SECTION 2 – PRECONSTRUCTION PHASE |
| Part 1 – Preconstruction Phase Services |
| Part 2 – Component Change Orders |
| SECTION 7 – CONTRACT FORMS |
| Five Year Bond on Roofs and Walls |
| CONSTRUCTION MANAGEMENT CONTRACT |
| SECTION 1 – GENERAL |
| Part 1 General |
| Part 2 CM/GC’s General Responsibilities and Duties |
| Part 3 Owner’s Responsibilities and Rights |
| Part 4 Protection of Persons and Property |
| Part 5 Bonds, Indemnity and Insurance |
| Part 6 Hazardous Materials and Conditions |
| Part 7 Miscellaneous Provisions |
| SECTION 2 – PRECONSTRUCTION PHASE |
| Part 1 Preconstruction Phase Services |
| Part 2 Construction Documents and Site Preparation |
| SECTION 3 – CONSTRUCTION PHASE |
| Part 1 Construction Services |
| Part 2 Component Change Orders |
| Part 3 GMP Change Order |
| Part 4 Changes to the Work |
| Part 5 Time |
| Part 6 Correcting of Work; Inspections; Covering and Uncovering Work |
| Part 7 Trade Contractors; Self-Performance |
| SECTION 4 – COMPENSATION |
| Part 1 General |
| Part 2 Payment for Preconstruction Phase Services |
| Part 3 Payment for Construction Phase Services |
| Part 4 Cost of the Work |
| Part 5 Liens |
| SECTION 5 – CONTRACT ADJUSTMENTS, DISPUTES, AND TERMINATION |
| Part 1 Owner’s Right to Suspend the Work |
| Part 2 Contract Adjustments and Disputes |
| Part 3 Termination |
| SECTION 6 – PROJECT COMPLETION |
| Part 1 Material Completion |
| Part 2 Final Completion |
| Part 3 Inspections for Completion of the Work |
| Part 4 Final Documents |
| Part 5 Payment for Material Completion and for Final Payment |
| Part 6 Correction of Work After Final Completion |
SECTION 7 – FORMS
| EXHIBITS |
| SUPPLEMENTARY GENERAL REQUIREMENTS |
| PART 1 GENERAL PROVISIONS |
| 1.1.2 Project Team, Cooperation, Partnering |
| 1.1.3 Constitutional Principles Applicable to State Public Works Projects. |
| 1.1.5 Notice. |
| 1.1.6 Liquidated Damages. |
| 1.1.7 Documents. |
| 1.1.9 Basic Definitions. |
| PART 2 CM/GC’S GENERAL RESPONSIBILITIES AND DUTIES |
| PART 3 OWNER’S RESPONSIBILITIES AND RIGHTS |
| 1.3.2 Design Professional. |
| PART 4 PROTECTION OF PERSONS AND PROPERTY |
| PART 5 BONDS, INDEMNITY AND INSURANCE |
| 1.5.2 Liability and Indemnification. |
| 1.5.3 Insurance Requirements. |
| Part 6 Hazardous Conditions and Materials |
| 1.6.1 Hazardous Materials. |
| PART 7 MISCELLANEOUS PROVISIONS |
| 1.7.9 Women, and Disadvantaged Business Participation. |
| SECTION 2 – PRECONSTRUCTION PHASE |
| PART 1 PRECONSTRUCTION PHASE SERVICES. |
| 2.1.2 Construction Preparation Period |
| 2.1.4 Quality Control Program. |
| 2.1.5 Scheduling Requirements. |
| 2.1.6 CM/GC Design Coordination Activities. |
| 2.1.8 CM/GC Cost Responsibilities. |
| PART 2 CONSTRUCTION DOCUMENTS AND SITE PLAN |
| 2.2.2 Documents at the Project Site. |
| 2.2.3 Completion of Construction Documents Following Acceptance of the GMP Change Order. |
| 2.2.4 Special Situation – New Sole Source Designation. |
| 2.2.7 Site Plan. |
| SECTION 3 – CONSTRUCTION PHASE |
| PART 1 CONSTRUCTION SERVICES |
| 3.1.2 Meetings and Schedule Updates. |
| 3.1.3 Construction Budget. |
| 3.1.4 Coordination of the Work. |
| 3.1.6 Duty to Commence. |
| 3.1.13 Cleaning. |
| PART 2 COMPONENT CHANGE ORDERS |
| 3.2.2 Component Change Order Proposal. |
| 3.2.3 Component Change Order Sum. |
| 3.2.9 Owner's Liability. |
| 3.3.2 Submittal of GMP Change Order. |
| 3.3.3 Acceptance or Rejection of GMP Change Order. |
| 3.3.6 Replacement of GMP with Lump Sum Price. |
| 3.4.4 Form and Execution of Change Orders |
| 3.4.8 Overhead and Profit for Change Orders. |
| 3.4.8.1.4 Second and Lower Tier Subcontractor. Under this contract, the forces of a subcontractor of a subcontractor are deemed to be and are the forces of the subcontractor and the total management markup for overhead and profit for all tiers of subc... |
| 3.4.12 Changes due to Subsurface or Other Unforeseen Conditions. |
| 3.4.16 Sole Source Designation for Change Order Work. |
| PART 5 TIME |
| 3.5.3 Contract Time. |
| 3.5.4 Commencement, Prosecution, and Completion. |
| 3.5.5 Construction Progress Schedule and Overall Project Schedule. |
| 3.5.10 Submission of Claims for Compensable Delay, Extending the Material Completion and Occupancy Date. |
| 3.5.11 Recovery of Schedule Delays. |
| 3.6.2 Correcting the Work. |
| 3.6.4 Inspection of Work. |
| 3.6.5 Covering and Uncovering Work. |
| PART 7 TRADE CONTRACTORS; SELF-PERFORMANCE |
| 3.7.2 Selection. |
| 3.7.8 CM/GC Self-Performance. |
| 3.7.16 Relationship of CM/GC and Trade Contractors. |
| 3.7.17 Assignment of Trade Contracts, Subcontracts. |
| PART 1 GENERAL |
| 4.1.5 Inclusion of Contingency Amounts in GMP. |
| PART 2 PAYMENT FOR PRECONSTRUCTION PHASE SERVICES |
| PART 3 PAYMENT FOR CONSTRUCTION PHASE SERVICES |
| 4.3.5 Retainage. Retainage shall be withheld from each Application for Payment to the CM/GC in the amount of five percent of the sum of the total cost for original Contract Work, Change Order Work, materials stored on the Site and CM/GC Fee earned. |
| 4.3.9 Special Provisions for Payment of CM/GC Fee under a Component or GMP Change Order. |
| 4.3.10 Applications for Payment. |
| PART 4 COST OF THE WORK |
| 4.4.2 Preconstruction Phase Services. |
| 4.4.6 Adjustments to Construction Contingency. |
| 4.4.7 Release of Construction Contingency. |
| PART 5 LIENS |
| SECTION 5 CONTRACT ADJUSTMENTS, DISPUTES AND TERMINATION |
| PART 2 CONTRACT ADJUSTMENTS AND DISPUTES |
| 5.2.2 General Claims for Contract Adjustments and Disputes. |
| PART 3 TERMINATION |
| 5.3.2 Owner’s Right to Declare Default and/or Terminate Contract for Cause. |
| 5.3.3 CM/GC’s Right to Terminate. |
| SECTION 6 - PROJECT COMPLETION |
| PART 1 MATERIAL COMPLETION |
| 6.1.1 Prerequisites. |
| 6.1.2 Material Completion. |
| PART 2 FINAL COMPLETION |
| 6.3.2 Notice of Readiness for Inspection for Material Completion. |
| PART 4 FINAL DOCUMENTS |
| 6.4.1 Final Documents. |
| PART 5 PAYMENT FOR MATERIAL COMPLETION AND FINAL PAYMENT |
| 6.5.2 Application for Payment for Material Completion. |
| 6.5.3 Release of CM/GC’s Retainage. |
| PART 6 CORRECTION OF WORK AFTER FINAL PAYMENT |
| 6.6.3 Warranty Complaint Item Procedure. |
| SECTION 7 – CONTRACT FORMS |
| Five Year Bond on Roofs and Walls |
| KNOW ALL MEN BY THESE PRESENTS: |
| KNOW ALL MEN BY THESE PRESENTS: |
| NON-INFLUENCE AFFIDAVIT |
| STATUTORY AFFIDAVIT |
| FIVE YEAR BOND ON ROOFS AND WALLS |
| Condition of Obligation. The condition of the above obligation is such that WHEREAS CM/GC has entered into a Contract with Owner dated for construction of Project No. Number, Description, and Location. |
| Warranty. WHEREAS, the said CM/GC warrants with respect to the said work that for a period of five years from the date of the execution of the final certificate of the Design Professional, the roofs of the building (or buildings) and roofs of passa... |
| Leaks or Defect. WHEREAS the said CM/GC agrees that should any leaks or defects occur in the roof envelope or wall envelope of the said (Name and Number of Project) the said CM/GC will promptly remedy the said leaks or defects and pay for any damag... |
SPECIMEN CERTIFICATE OF MANUFACTURER
| 1. CONSTRUCTION MANAGER At-RISK’S FEE: |
| A. PRECONSTRUCTION FEE: |
| B. CONSTRUCTION FEE: |
| 2. CM/GC’s EXPENSES AND OVERHEAD COSTS (Preconstruction and Construction): |
| EXHIBIT J |
| CERTIFICATE OF THE CM/GC OR HIS DULY AUTHORIZED REPRESENTATIVE |
| EXHIBIT M |
| BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA |
| Date: Month Day, Year |
| Institution: |
| EXHIBIT N |
| BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA |
| Date: Month Day, Year |
| Institution: |
File details come from the government source that posted it. Updated .