E. Taylor Road Project Design Evaluation Criteria
This document presents the evaluation criteria for a Request for Statements of Qualifications issued by Volusia County's Office of Recovery and Resiliency for design and engineering services related to flood mitigation improvements on East Taylor Road in DeLand, Florida. The procurement seeks qualified firms to provide comprehensive design and engineering services for a stormwater pump station, force main installation, and water retention expansion within the 1,080-acre Lake Towanda basin to address hurricane-related damage from Hurricane Ian (September 2022) and Hurricane Milton (October 2024). The scope encompasses twenty deliverables including topographic and boundary surveys, environmental review with wetland delineation and endangered species surveys, utility identification, regulatory pre-application meetings with the St. Johns River Water Management District and U.S. Army Corps of Engineers, geotechnical and subsurface utility engineering services, and construction documents at 30%, 60%, 90%, and 100% completion phases. Responses must be submitted electronically through the County's eProcurement Portal by 3:00 p.m. on May 21, 2026, with a question submission deadline of May 7, 2026. The contract will be awarded to one or multiple firms for an initial term through project completion, with the project schedule structured as nine months for final design and permitting, three months for bid advertisement and contractor selection, sixteen months for construction, and two months for grant closeout.
Evaluation of qualifications will be weighted as follows: firm qualifications and assigned personnel (30%), relevant experience with similar projects and regulatory compliance demonstrating a minimum of five years of service in stormwater design, floodplain management, environmental engineering, and state and federal permitting programs (40%), and project approach and methodology (30%). The project is funded through a U.S. Department of Housing and Urban Development Community Development Block Grant for Disaster Recovery (CDBG-DR), with no specific contract value disclosed in available procurement materials. Respondents must comply with federal E-Verify requirements, register with SAM.gov, maintain professional licensing in Florida, provide debarment certifications and human trafficking attestations, and maintain comprehensive insurance including commercial general liability of $1,000,000 each-occurrence and $2,000,000 general aggregate, auto liability of $1,000,000 combined single limits, and professional liability of $2,000,000 per claim with $2,000,000 aggregate, with the County named as an additional insured. No incumbent vendors or current contractors are identified. Compensation may be structured through task assignments on fixed fee, time and materials, cost-plus-fixed-fee, or guaranteed maximum-not-to-exceed bases, with payment made within forty-five business days of invoice receipt.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Evaluation Criteria Each submittal shall be evaluated for conformance as responsive and responsible using the following criteria:
1. That all proposal documentation was submitted timely and in conformance with all requirements of the RSQ.
2. That the following elements of Contractor’s proposal meet or exceed the requirements of this RSQ and cumulatively provide the service and benefits to the County deemed to be in the best interest of the public
3. Scoring (0-5) shall be assigned as follows. Each criteria will have a weight assigned to calculate total points awarded.
· 0- Did not submit
· 1 - Lowest score, did not meet any of the requirements
· 2 - Next lowest score, did not meet most of the requirements
· 3 - Average score, met most of the requirements but not all
· 4 - Above Average, met all requirements
· 5 - Exceeds Expectations, meets and exceeds the requirements.
1. Qualifications of the firm and the employees that will be assigned to the County:
Credentials, qualifications, and years' experience of the staff for both the prime and sub-consultants and key personnel as presented by resumes, education, and training, include number of years prime and subconsultants worked together and quality of performance or previous contracts/services;
Affiliations, memberships, and officers of staff in the professional organization; and the number of professional staff, education, and years’ experience in stormwater design, floodplain management, and environmental engineering including support staff such as GIS specialists, surveyors, geotechnical engineers, stormwater modelers, construction inspectors (CEI), etc.
Scoring Method: 0-5 Points Weight (Points): 30 (30% of Total)
2. Experience Experience in providing similar services / references, including timeliness of performance; to evaluate past performance, all proposers are required to submit three (3) references illustrating a minimum of five (5) years’ relevant service that are the same or similar to the magnitude of this RSQ. For company name and/or ownership changes, appropriate documentation shall be required.
Documented familiarity with stormwater management and flood mitigation projects;
Documented experience with State (Water Management District, DEP) and Federal (EPA, Army Corps.) permitting/regulatory programs;
Documented experience in managing and administering, State (Water Management District, DEP) and Federal (EPA, Army Corps.) grant funding as it relates to stormwater management and flood mitigation projects;
Documented projects (with references) which demonstrate proficiency and experience in the design and permitting of stormwater pump stations and forcemains.
Scoring Method: 0-5 Points Weight (Points): 40 (40% of Total)
3. Project Approach Overall project methodology/approach to support the needs and objectives of the project;
Quality of performance or previous contracts or services;
Whether the firm can perform the contract or provide the service within budget requirements, promptly or within the time specified, without delay or interference;
Quality, availability and adaptability of the contractual services to the particular use required;
Scoring Method: 0-5 Points Weight (Points):
30 (30% of Total)