ATTACHMENT 1
DWORSHAK JANITORIAL SERVICES
FACILITIES INVENTORY
This document describes the Dworshak Project Facilities that are serviced under this contract. The sections below correspond with the contract line items. All areas listed are approximate (ft2 = square feet) and represent only horizontal floor surfaces. Floor surfaces reflect time of award and may be changed over the life of the contract.
POWERHOUSE – Total Service Area Approximately 37,653 ft2
Normal Operation:
Mon–Thu 0630–1700; Fri 0630–1600 (excluding holidays) Occupancy = 30
| Location |
| Flooring* |
| Area (ft2) |
| Comments |
Powerhouse Office Areas
| 5th Floor Offices |
| Carpet |
| 1358 |
| Vinyl Tile |
| 307 |
| Landing outside elevator/top of stairs |
| 4th Floor Offices |
| Carpet |
| 328 |
| Terrazzo |
| 949 |
| Lobby, including women’s restroom vestibule/storage |
| 3rd Floor Offices |
| Carpet |
| 593 |
| Includes two offices in modular building, computer lab modular building, and warehouse office |
| Painted Concrete |
| 181 |
| Machine shop office |
| Control Room & Equipment Room |
| Anti-static Carpet |
| 1356 |
| Escort required in these areas |
| 5th Floor Restrooms |
| Ceramic Tile |
| 345 |
| 4th Floor Restrooms |
| Ceramic Tile |
| 343 |
| Includes men’s and women’s restrooms off lobby plus small unisex restroom in Control Room |
| 3rd Floor Restrooms |
| Ceramic Tile |
| 309 |
| Men’s room is primarily ceramic tile; only vestibule is vinyl tile. Women’s room is all vinyl tile. |
| 5th Floor Kitchenette |
| Vinyl Tile |
| 55 |
| 4th Floor Kitchenette |
| Vinyl Tile |
| 40 |
| In Control Room |
| 3rd Floor Lunchroom |
| Vinyl Tile |
| 577 |
| Subtotal - Office Areas |
| 6,902 |
Powerhouse Industrial Areas
| Industrial Areas |
| Terrazzo |
| 15,813 |
| 4th floor Erection Bay and Catwalk, 3rd floor generator bay, common area, electric shop, and Unit 3 stairs |
| Painted Concrete |
| 2,012 |
| Warehouse and outside elevator doors on 1st and 2nd floor |
| Textured Concrete |
| 710 |
| Stairs from 1st floor to one landing above 5th floor |
| Fitness Room |
| Rubber Mat |
| 504 |
| Fitness Room |
| Subtotal – Industrial Areas |
| 18,499 |
Powerhouse Concrete Areas – Sweeping Only
| Sweeping Only |
| Bare Concrete |
| 11,182 |
| 3rd floor utility gallery and gallery to dam; 2nd floor areas level with elevator landing; 1st floor main areas except oil storage room and penstock gallery; stairs from the bridge crane door at the top to and including the landing above th 5th floor |
| Finished Concrete |
| 1,070 |
| Switchgear area between lunchroom and machine shop |
| Subtotal – Concrete Areas |
| 12,252 |
| Total Service Area |
| 37,653 |
The image below shows the erection bay floor. This area receives a great deal of foot and equipment traffic, and sometimes vehicle traffic.
SERVICE BUILDINGS – Total Service Area Approximately 944 ft2
Normal Operation:
Mon–Fri 0630–1700 Occupancy = 5–6
| Service Area |
| Flooring* |
| Area (ft2) |
| Comments |
| Construction Office Trailer |
| Vinyl Tile |
| 320 |
| Normally located next to Service Building but may be relocated, depending on location of construction contract work. |
| SB Offices 2 & 3 |
| Carpet |
| 240 |
| Guard Shack |
| Diamond Plate |
| 144 |
| Includes exterior walls |
DAM – Total Service Area Approximately 23,799 ft2
All service areas, Mon–Thu 0630–1700; Fri 0630–1630 (excluding holidays) Average Occupancy = No office spaces Estimated Visitation/Month = 100
Seasonal Operation: From weekend before Memorial Day through Labor Day Normal Operation plus Sat/Sun 0800–1630 (including holidays) for areas visited by the public (approx. 16,857 ft2) Average Occupancy = No office spaces Estimated Visitation/Month = 1,000
NT = North Tower; ST = South Tower
| Location |
| Flooring* |
| Area (ft2) |
| Comments |
| 1603 Gallery |
| Painted Concrete |
| 13,900 |
| The 1603 Gallery is a hallway about 1/3 of a mile long, averaging about 7.5 feet wide, spanning from the Visitor Center to the Dam North Tower, including an adjacent hallway to exit doors at the face of the dam. |
| NT Public Restrooms |
| Terrazzo |
| 540 |
| 9th Floor |
| NT Diorama Room |
| Carpet |
| 410 |
| 10th floor |
| NT Conference Room |
| Terrazzo |
| 688 |
| 11th floor |
| NT Public Landings |
| Terrazzo |
| 982 |
| 9th, 10th, and 11th floors |
| NT Public Stairs |
| Terrazzo |
| 286 |
| From 9th floor through stairs visible when standing on 11th floor (another flight extends to the elevator machine room) |
| NT Elevators (2) |
| Textured Floors |
| 51 |
| Left/Upstream (P1) and Right/Downstream (P2) |
| Subtotal - Public Areas |
| 16,857 |
| Normal and Seasonal Operation |
| NT Non-public Landings |
| Terrazzo |
| 1,309 |
| 6th, 7th, and 8th floors plus elevator machine room landing |
| Painted Concrete |
| 88 |
| 6th floor gallery extension |
| NT Non-public Stairs |
| Terrazzo |
| 197 |
| From 6th floor to 9th floor and upper half of flight extending to the elevator machine room |
| ST Employee Restroom |
| Terrazzo |
| 216 |
| ST Landings |
| Terrazzo |
| 1252 |
| Includes all landings between and including 5th floor through elevator machine room landing, with or without elevator stop |
| ST Stairs |
| Terrazzo |
| 403 |
| From 5th floor to elevator machine room landing |
| 1005 Gallery |
| Painted Concrete |
| 3,456 |
| The 1005 Gallery is a hallway, eight feet wide by 432 feet long |
| Subtotal – Non-public Areas |
| 6,942 |
| Total Service Area |
| 23,799 |
*At time of award; subject to change
The images below show examples of windows and heater registers that are along the downstream wall. There are 23 sets of windows (69 windows in all) and 100 heater registers along this gallery.
The images below show the 1603 Gallery from the south end (left) and the north end (right), indicating visually how long this gallery is. The 1603 Gallery is part of the tour path for visitors and VIPs and must be inspected and cleaned daily according to the operations schedule. Any leaks/wet spots caused by leaking from the roadway above or from the water lines within the pipe chase behind the blue panels must be mopped up daily. Unusually severe leaks should be reported to the COR.
The images below show three dam windows that are covered by metal screens. Not less than annually, at the beginning of each Period of Performance, these screens must be removed and cleaned, and the windows and spaces behind them cleaned thoroughly inside and out. Removal of the screens requires only standard hand tools such as a flathead screwdriver or wrench.
1603 Gallery South Tower 6th Floor
The images below show the North Tower 11th Floor conference room and viewing deck. The conference room is used intermittently for meetings, trainings, office space, and tours. The viewing deck is part of the public and VIP tour route.
Conference Room
Viewing Deck
RESOURCE MAINTENANCE BUILDING – Total Service Area Approximately 2,988 ft2
All service areas, Mon–Thu 0630–1700; Fri 0630–1600 (excluding holidays) Occupancy = 11–15
| Service Area |
| Flooring* |
| Area (ft2) |
| Comments |
| Tool Room Office |
| Painted Concrete |
| 288 |
| Employee Restrooms |
| Ceramic Tile |
| 264 |
Lunchroom (and hallways)
VISITOR CENTER – Total Service Area Approximately 7,886 ft2
All service areas, Mon–Thu 0630–1700; Fri 0630–1630 (excluding holidays) Average Occupancy = 10 Average Visitation/Month = 200
Seasonal Operation: From weekend before Memorial Day through Labor Day Normal Operation plus Sat/Sun 0800–1630 (including holidays) for areas open to the public (approx. 5,518 ft2) Average Occupancy = 12 Average Visitation/Month = 1350
| Service Area |
| Flooring* |
| Area (ft2) |
| Comments |
| Public Lobbies |
| Carpet |
| 4,028 |
| Includes 16 ft2 elevator |
| Terrazzo |
| 870 |
| Includes stairs from Basement to 2nd Floor |
| Public Restrooms |
| Terrazzo |
| 620 |
| Subtotal – Public Areas |
| 5,518 |
| Normal and Seasonal Operation |
| Employee Offices |
| Carpet |
| 2,088 |
| Employee Lunchroom |
| Terrazzo |
| 144 |
| Employee Stairway |
| Textured Concrete |
| 136 |
| Subtotal – Non-public Areas |
| 2,368 |
| Normal Operation only |
*At time of contract award; subject to change
The image below is the Visitor Center Theater. This area is open to the public throughout the year and hosts large groups of visitors,often groups of children with food, meeting, presentations, and training intermittently.
The two images below show a sample of the size, type, and quantity of external windows that must be maintained at the Visitor Center. Not all windows are represented, and the building has internal glass partitions, as well. All windows in this building must be clean inside and out, year-round.
West side of Visitor Center (main entrance)
Southeast corner of Visitor Center
FISHING ACCESS AREA – Total Service Area Approximately 4,500 ft2
Visitation / Use Varies: Service weekly on the Sunday night shift.
| Service Area |
| Flooring* |
| Area (ft2) |
| Comments |
| Fishing Access Area |
| Asphalt |
| 4,500* |
| Weekly pickup/sweep debris, empty and re-line waste receptacles, and wash cutting boards. Upon request, up to five times in a performance period, hose down asphalt. |