DUE-SOW-0008_R0.pdf
PDF 2 MB Posted
- Solicitation number
- PR388384
- Issued by
-
Department of Energy
About this file
This document is a Statement of Work (SOW) for a Liquid Nitrogen Bulk System Design, Build, and Installation project for Oak Ridge National Laboratory (ORNL). The project requires designing, fabricating, and delivering a liquid nitrogen (LN2) bulk delivery system with specific technical requirements, including a 2000-liter tank capable of providing high-pressure gaseous nitrogen (150 PSIG, 3500 SCFH maximum) and low-pressure liquid nitrogen (22-25 PSIG, 3 GPM nominal). The system must include vaporization equipment, a pressure reducing phase separator, vacuum-insulated piping, and be located outside and able to withstand seasonal elements.
Key deliverables include comprehensive documentation such as as-built assembly drawings, piping isometric drawings, P&ID in AutoCAD, 3D models, vendor manuals, qualification documents for storage tank and vacuum-insulated piping, and weld inspection reports. The project is part of UT-Battelle, LLC's management of Oak Ridge National Laboratory under a U.S. Department of Energy contract, specifically supporting a test facility's utility functions by providing liquid and gaseous nitrogen. The Statement of Work (DUE-SOW-0008, Revision 0) was issued on 6/19/2025 and requires the supplier to submit a high-level schedule within 30 days of award and provide all documentation prior to system shipment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6/19/2025 lml Stamp lml
DMC
CONTROLLED UNCLASSIFIED INFORMATION
Liquid Nitrogen Bulk System Design, Build, and Installation Statement of Work DUE-SOW-0008, Rev 0
CHANGE HISTORY
REV. DATE DESCRIPTION
REVISION TYPE
Major Minor
0 Initial Issue ☒ ☐6/19/25
CONTENTS
1. INTRODUCTION
2. SCOPE
3. BULK STORAGE TANK DESIGN
4. SYSTEM PIPING DESIGN
5. SYSTEM FABRICATION, PACKAGING AND SHIPMENT
6. APPLICABLE DOCUMENTS
7. ADDITIONAL DETAILS
7.1 Deviations
8. DELIVERABLES
8.1 Submittals
9. ELECTRONIC DOCUMENTS
10. ATTACHMENTS
ATTACHMENT A, SUPPLEMENTAL INFORMATION
ATTACHMENT B, EXAMINATION, TESTING, AND INSPECTIONS
ATTACHMENT C, LN2 GENERAL ARRANGEMENT AND PIPING LAYOUT
1. INTRODUCTION
UT-Battelle, LLC, herein referred to as the COMPANY, is the Management & Operations contractor for the Oak Ridge National Laboratory located in Oak Ridge, TN, under the U.S.
Department of Energy (DOE) Prime Contract No. DE-AC05-00OR22725. To support the laboratory’s mission, a bulk liquid nitrogen system (LN2) is required to support a test facility at the Oak Ridge National Laboratory (ORNL). The system will supply high-pressure gaseous nitrogen and low-pressure liquid nitrogen to the facility for various utility functions.
2. SCOPE
The awarded supplier, herein referred to as SELLER, shall be awarded a Purchase Order to complete the full scope outlined in this statement of work for UT-Battelle, LLC. on behalf of Oak Ridge National Laboratory (ORNL), herein referred to as the COMPANY. Once the design is approved, the SELLER shall design, fabricate, and deliver the system.
This statement of work defines SELLER and COMPANY responsibilities for the design, fabrication, and shipment of a LN2 bulk delivery system for delivery in both the gaseous and liquid phases, including the skid-mounted LN2 storage tank, vaporization equipment for gaseous use, pressure reducing phase separator for liquid use, vacuum-insulated LN2 delivery piping, and any other designed components to provide specified functionality.
3. BULK STORAGE TANK DESIGN
SELLER shall design and fabricate a LN2 and N2 gas delivery system to satisfy the following requirements:
• Capacity: 2000 Liters (for gas and liquid use)
• System Layout: See ATTACHMENT C (Section 10)
• Gas operating pressure: 150 PSIG nominal
• Final gaseous line pressure regulator
• Gas delivery rate: 3500 SCFH maximum
• Vaporization System capable of providing the required gas delivery rate
• Pressure Building System
• Liquid supply pressure 22-25 PSIG
• Liquid use flow: 3 GPM nominal
• Vacuum Insulated Piping (VIP) connections for liquid use valve
• Pressure reducing phase separator for liquid use
• Standard level and pressure measurement instrumentation
• Pressure and thermal relief valves as needed per design
• Back pressure regulator for tank venting during low demand periods
• Tank will be located outside of the laboratory space and must be able to withstand seasonal elements while maintaining functionality.
SELLER shall ensure the tank meets ASME BPVC Section VIII, Div. 1 requirements.
SELLER shall provide detailed engineering drawings outlined in Section 8 Deliverables.
4. SYSTEM PIPING DESIGN
SELLER shall design a vacuum insulated piping (VIP) system to deliver LN2 in the liquid phase.
The piping system shall meet the following requirements:
• Transport LN2 to the facility as shown in Attachment C. Pipe routing alternatives may be submitted for BUYER approval.
• Recommended pipe support types/locations to be provided by SELLER.
• Include a heated, high point vent to release any trapped gases in the delivery system
• Deliver LN2 to a filling station, featuring a flex hose and phase separator
• Include a remote, pneumatically actuated fail-closed emergency shutoff valve.
All piping shall meet ASME B31.3 Process Piping code as applicable.
Piping design should be submitted to the TPO via email, along with other requirements stated in the Purchase Order. TPO to review and provide acceptance in writing within 30 days, prior to commencement of fabrication and material purchasing.
5. SYSTEM FABRICATION, PACKAGING AND SHIPMENT
Delivery of assembly to Oak Ridge National Laboratory in Oak Ridge, Tennessee:
ATTN: Technical Project Officer (TPO) or Equivalent
Oak Ridge National Laboratory
1 Bethel Valley Road
Oak Ridge, TN 37830
The SELLER shall submit a packaging and shipping plan to the TPO for approval before shipment. The packaging and shipping plan shall meet or exceed the following requirements:
SELLER is responsible for cleaning tank and piping systems, capping all piping connections, sealing, securing, and shipping the assembly. Special attention shall be made to protect the assembly from contamination, shock and impact damage.
The outside of the package shall be plainly and permanently labeled with at least the following information:
• Package identification number
• SELLER identification and address
• PROCUREMENT OFFICER’S contract number
• The COMPANY’s shipping address
• Attention: TPO or Equivalent
The SELLER shall notify the TPO of the shipping date not less than 15 business days before shipment.
6. APPLICABLE DOCUMENTS
• ASME.B31.3-Process Piping
• ASME.BPVC.VIII.1 -BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
7. ADDITIONAL DETAILS
7.1 Deviations
When time and/or cost is a consideration, the SELLER may communicate deviation requests directly to the COMPANY’s TPO and provide a copy to the COMPANY’s Procurement Officer.
The COMPANY’s TPO will evaluate the request and make recommendations to the COMPANY’s Procurement Officer, who will communicate acceptance, rejection, or partial acceptance to the SELLER. The request should identify the affected items, a description of the deviation, and justification. The deviation request shall be submitted to the TPO (copy the Procurement Officer) and approved by the TPO prior to making any change. The SELLER shall identify cost and schedule impacts for each deviation.
8. DELIVERABLES
SELLER shall provide a high-level schedule to the TPO within 30 days of award. TPO to provide acceptance in writing.
The TPO grants approval for SELLER to distribute SELLER’s Technical Specification to sub-suppliers for quote and procurement.
8.1 Submittals
8.1.1 As-built assembly drawings including item location balloons for each item, general dimensions for major subassemblies, and general dimensions for final assembly. BOM’s showing item number, quantity, manufacturer, model, and full part number for all parts, components, and sub-assemblies. Detailed drawings with all dimensions, tube weldments, fabrication notes, and component drawings are required.
8.1.2 Piping isometric drawings for LN2 system, including pipe support design and details.
8.1.3 As-built P&ID in AutoCAD 2024 (or earlier version).
8.1.4 All 3D models in .stp (STEP) file format for system design.
8.1.5 All SELLER native files of reports, drawings, calculations, and other submittals.
8.1.6 Vendor manuals for all purchased components (e.g. instruments, heaters, valves, etc.).
8.1.7 All qualification documents related to storage tank certification as a pressure vessel, including the test reports, certification documentation of the test equipment and test technician, and calculations for the safety relief devices.
8.1.8 All qualification documents related to vacuum-insulated piping systems, including certification for welder qualifications, vacuum leak testing results, certification documentation for vacuum leak testing equipment and test technician, and other necessary documentation.
8.1.9 Weld inspection reports as required per welding code.
8.1.10 Packaging and shipping plan with milestone schedule
NOTE: All submittals are to be provided to the TPO and COMPANY’s Procurement Officer prior to shipment of goods via email. TPO to provide acceptance in writing.
9. ELECTRONIC DOCUMENTS
All documentation shall be submitted in English, and in electronic format. Where feasible, documents shall be submitted in searchable Adobe Portable Document Format (PDF) in addition to any other formats typically provided by the SELLER.
10. ATTACHMENTS
Attachment A, Supplemental Information
Attachment B, Examination, Testing, and Inspections
Attachment C, LN2 General Arrangement and Piping Layout
ATTACHMENT A,
SUPPLEMENTAL INFORMATION
ACRONYMS, ABBREVIATIONS, AND INITIALISMS
3D Three-Dimensional
ASME American Society of Mechanical Engineers
BOM Bill of Materials
DOE US Department of Energy
ESED Enrichment Science and Engineering Division ft Foot (feet)
ORNL Oak Ridge National Laboratory
POC Point of Contact psig Pounds Per Square Inch (gauge)
P&ID Piping and Instrumentation Diagram
TPO Technical Project Officer
UTB UT-Battelle, LLC
DEFINITIONS
BUSINESS DAYS Business days are considered to be Monday through Friday, excluding public holidays.
DEVIATION A departure from specified requirements.
SHALL Denotes a requirement.
SHOULD Denotes guidance.
SUPPLIER Any individual or organization who furnishes items or services in accordance with a procurement document. An all-inclusive term used in place of any of the following: vendor, seller, contractor, subcontractor, fabricator, consultant, and their sub-tier levels.
REFERENCES
ASME.B31.3-Process Piping
ASME.BPVC.VIII.1 -BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
ATTACHMENT B,
EXAMINATION, TESTING, AND INSPECTIONS
All inspections or examination reports shall minimally contain the following information:
• Unique report number
• Job title
• Inspection date
• Equipment identification
• Specific inspection or examination, including procedure designation
• Identification of measuring and testing equipment used and the most recent calibration dates
• Results
• Actions taken as the result of discrepancies noted during the inspection
• Signature or initials of the person performing the inspection or examination, the witness if applicable, and their respective qualifications
ATTACHMENT C,
LN2 GENERAL ARRANGEMENT AND PIPING LAYOUT
| 1. INTRODUCTION |
| 2. SCOPE |
| 3. BULK STORAGE TANK DESIGN |
| 4. SYSTEM PIPING DESIGN |
| 5. SYSTEM FABRICATION, PACKAGING AND SHIPMENT |
| 6. APPLICABLE DOCUMENTS |
| 7. ADDITIONAL DETAILS |
| 7.1 Deviations |
| 8. DELIVERABLES |
| 8.1 Submittals |
| 8.1.1 As-built assembly drawings including item location balloons for each item, general dimensions for major subassemblies, and general dimensions for final assembly. BOM’s showing item number, quantity, manufacturer, model, and full part number for ... |
| 8.1.2 Piping isometric drawings for LN2 system, including pipe support design and details. |
| 8.1.3 As-built P&ID in AutoCAD 2024 (or earlier version). |
| 8.1.4 All 3D models in .stp (STEP) file format for system design. |
| 8.1.5 All SELLER native files of reports, drawings, calculations, and other submittals. |
| 8.1.6 Vendor manuals for all purchased components (e.g. instruments, heaters, valves, etc.). |
| 8.1.7 All qualification documents related to storage tank certification as a pressure vessel, including the test reports, certification documentation of the test equipment and test technician, and calculations for the safety relief devices. |
| 8.1.8 All qualification documents related to vacuum-insulated piping systems, including certification for welder qualifications, vacuum leak testing results, certification documentation for vacuum leak testing equipment and test technician, and other ... |
| 8.1.9 Weld inspection reports as required per welding code. |
| 8.1.10 Packaging and shipping plan with milestone schedule |
| 9. ELECTRONIC DOCUMENTS |
| 10. ATTACHMENTS |