Attachment002.QASP.doc
DOC document 146 KB Posted
- Attached to
- US Department of HUD Business Service Provider (BSP) for Single-Family Asset Management (SFAM)
- Solicitation number
- DU100H-14-R-0002
About this file
Attachment002.QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment004.DU100H14R0002.pdf | ||
| DU100H14R0002.Amend3.pdf | ||
| DU100H14R0002Amend2.ninepages.docx | DOCX document | |
| SF30.DU100H14R0002.amend2.pdf | ||
| DU100H-14-R-0002.AMEND0001.062314.DC.doc | DOC document | |
| SF30.DU100H14R0002.pdf | ||
| Attachment_003.PastPerf.BSP.pdf | ||
| PWS_Attachments_05-27-14.zipx | ZIPX file | |
| DU100H-14-R-0002.06-11.dmc.doc | DOC document | |
| Att_006_-_SB_Participation_Plan.doc.0605.doc | DOC document | |
| Att_005_-BSP_-Prod_Demo_Script_04-09-14_Final.xlsx | XLSX spreadsheet | |
| Att_004_-_Past_Performance_Survey.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
RCS-HU-14-00137/APP-HU-2014-016
BUSINESS SERVICE PROVIDER/REO CASE MANAGEMENT SERVICES
NOTE: The Contractor will be requested to submit information to supplement the draft QASP. In addition, the Procurement Requirement Summary is still being finalized.
TABLE OF CONTENTS
INTRODUCTION
11.1 Purpose
11.2 Performance Management Approach
11.3 Performance Management Strategy
ROLES AND RESPONSIBILITIES
22.1 The Contracting Officer
22.2 The Government’s Technical Representative
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
METHODOLOGIES TO MONITOR PERFORMANCE
24.1 Surveillance Techniques
34.2 Customer Feedback
34.3 Acceptable Quality Levels
QUALITY ASSURANCE DOCUMENTATION
35.1 The Performance Management Feedback Loop
35.2 Monitoring Forms
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
46.1 Determining Performance
46.2 Reporting
46.3 Reviews and Resolution
5ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
6ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled BSP/REO Case Management. This plan sets forth the procedures and guidelines HQ Office of SF Asset Management will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by HQ SF Asset Management to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the government technical representative (GTR) and the contractor. The CO will designate one full-time GTR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
2.2 The Government Technical Representative
The government technical representative is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. GTR limitations are contained in the written appointment letter. The GTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The GTR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The GTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. I
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
· Verified Performance and Delivery of Services – Critical tasks are reviewed by HUD and certified for their completeness, accuracy, and conformance to HUD’s standard.
· Random sampling – The GTR designated inspector performs an inspection of a random sample to determine if the level of overall performance is acceptable.
· 100% Inspection – Each month, the GTR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.
· Periodic Inspection – The GTR typically performs the periodic inspection on a monthly basis using predetermined plans for inspecting work establish by the PWS.
· Validated User Complaints – User complaints will be received through various means of communication, telephone calls, email, forum entries, etc. User complaints will be recorded and maintained by HUD
· Third Party Audit – A third party will inspect and certify products/services for completeness, accuracy, and conformance with acceptable performance levels.
4.2 Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the CO and/or GTR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the GTR. The GTR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 3.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at HQ SF Asset Management.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the GTR will be reported using the monitoring forms in Attachments 2 and 3. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.
5.2.1 The GTR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
6.2.1 At the end of each month, the GTM will prepare a written report for the GTR summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The GTR may require the contractor’s project manager, or a designated alternate, to meet with the CO and/or GTM and other government IPT personnel as deemed necessary to discuss performance evaluation. The GTR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the GTR as often as required or per the contractor’s request. The agenda of the reviews may include:
· Monthly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
· Recommendations for improved efficiency and/or effectiveness
6.3.2 The CO and GTR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The GTR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.
Attachment 1: PERFORMANCE REQUIREMENTS SUMMARY
Incentive/Disincentive – States the outcome for performance above or below the AQL of service.
| Performance Measure |
| Performance Objective |
| Performance Standard |
| Minimum Acceptable Quality Level |
| Surveillance Method |
| Incentive/ Disincentive |
Section 5.1 – Scope of Work (Web Enabled COTS Application) The Contractor shall provide a web-enabled COTS application which shall assist with the management and disposition of SFAM’s REO Portfolio.
| The Contractor’s application shall provide the ability to perform all module requirements stated within 5.2.1 – Asset Management. |
| Zero deviation from performance standard. |
| Periodic Inspection. |
| *See note below |
Section 1.8 – Hours of Operation
(Application Availability)
| The Contractor shall provide an application which assists with the management of SFAM’s Real Estate Owned (REO) portfolio and analysis needs. |
| The Contractor’s application shall be available between the hours of 7:00 AM EST and 9:00 PM EST, Monday through Friday, Saturday 7:00 AM EST and 6:00 PM EST except Federal holidays. |
| 99.5% availability based on the timeframes stated within the PWS. |
| Periodic Inspection. |
| * See note below |
Section 1.8 – Hours of Operation and Section 5.2.2.8.1 - HUD REO Home Listing and Electronic Bid Site (Property Listing and Bid Site Availability)
| The Contractor shall provide an Internet Real Estate Listing process and bid site. |
| The Property Listing and Bid Site shall be accessible seven (7) days twenty four (24) hours day, except for scheduled outages for data updating. |
| 99.5% availability based on the timeframes stated within the PWS. |
| Periodic |
Inspection.
* See note below
| 5.2.3 Interface Control Document |
| The Contractor shall provide an ICD upon the establishment or modification of each internal or external data interface. |
| The Contractor shall submit the ICD in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| Section 5.2.3.2 – Data Exchange - Internal |
| The Contractor shall ensure daily data sync processes with all required systems are completed in accordance with the PWS. |
| Data syncs with all required systems are completed daily. |
| Zero deviation from performance standard. |
| Periodic Inspection. |
| *See note below |
| 5.2.6.1 Project Management Plan (PMP) |
| The Contractor shall provide a Project Management Plan. |
| The Contractor shall submit the PMP in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.6.2 Operations Performance Plan (OPP) |
| The Contractor shall provide an Operations Performance Plan. |
| The Contractor shall submit the OPP in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.6.3 Quality Control Plan (QCP) |
| The Contractor shall provide a QCP. |
| The Contractor shall submit the QCP in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.6.4 Status Meeting Agenda |
| The Contractor shall provide a Status Meeting Agenda. |
| The Contractor shall submit the Status Meeting Agenda in accordance with the established due date stated within the PWS. |
| Zero deviation from performance standard. |
| Periodic Inspection |
| *See note below |
| 5.2.6.4 Status Meeting Minutes |
| The Contractor shall provide Status Meeting Minutes. |
| The Contractor shall submit the Status Meeting Minutes in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.6.4 Project Status Report |
| The Contractor shall provide a Project Status Report. |
| The Contractor shall submit the Project Status Report in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.6.5 Monthly Performance Report |
| The Contractor shall provide a Monthly Performance Report. |
| The Contractor shall submit the Monthly Performance Report in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.7.1 Training Plan |
| The Contractor shall provide a Training Plan. |
| (1) The Contractor shall submit the Training Plan in accordance with the established due date stated within the PWS. |
(2) The Training Plan shall address each element required per Section 5.2.6.1 of the PWS.
(1) Zero deviation from performance standard.
(2) Zero Deviation
| Periodic Inspection |
| *See note below |
| 5.2.7.1 Training Implementation |
| The Contractor shall implement the approved Training Plan. |
| The Contractor shall implement the approved Training Plan in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.7.2 Online User Manuals |
| The Contractor shall provide Online User Manuals. |
| The Contractor shall provide Online User Manuals in accordance with the established due date stated within the PWS. |
| Zero deviation from performance standard. |
| Periodic Inspection |
| *See note below |
| 5.2.8 Help Desk Services |
| The Contractor shall provide Help Desk Procedures. |
| The Contractor shall provide Help Desk Procedures in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.8 Help Desk Services |
| The Contractor shall provide a Help Desk. |
| (1) The Contractor shall provide a Help Desk in accordance with the established due date stated within the PWS. |
(2) Customer inquiries are resolved within 24 hours.
(1) Zero Deviation
(2) Zero Deviation
| Periodic Inspection |
| *See note below |
| 5.2.10 Plan for Data-Fixes and System Enhancements |
| The Contractor shall provide a Plan for Data-Fixes and Enhancements. |
| The Contractor shall provide a Plan for Data-fixes and Enhancements in accordance with the established due date stated within the PWS. |
| Three (3) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.10 Completion of Data-Fixes and System Enhancements |
| The Contractor shall provide complete Data-Fixes and Enhancements. |
| The Contractor shall complete Data-fixes and Enhancements in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.11 FHA Transformation Migration Analysis |
| The Contractor shall provide a Transformation Migration Analysis. |
| The Contractor shall provide a Transformation Migration Analysis in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
| 5.2.12 Transition-Out Plan |
| The Contractor shall provide a Transition-Out Plan. |
| The Contractor shall provide a Transition-Out Plan in accordance with the established due date stated within the PWS. |
| Seven (7) days after the established due date. |
| Periodic Inspection |
| *See note below |
* Incentive/Disincentive: If the Contractor meets or exceeds the required service or performance level, positive performance will be documented in past performance reports (Contractor Performance Assessment Reporting System (CPARS)). Failure to meet the required service or performance level will result in negative performance documented in the monthly GTR reports and past performance reports.
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check):
Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________
DATE: _________________
PAGE
i
File details come from the government source that posted it. Updated .