EXPANDED_TABLE_OF_CONTENTS.docx
DOCX document 33 KB Posted
- Solicitation number
- DTSL55-13-B-C0777
About this file
Expanded Table of Contents
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WAGE_DETERMINATIONS.mht | MHT file | |
| SOLICITATION_ROOF_REPLACEMENT.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION # DTSL55-13-B-C0777
EXPANDED TABLE OF CONTENTS
SECTION C, DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SPECIAL PROVISIONS………………………………………………………………….….6
C.1. DESCRIPTION OF WORK……………………………………………………………6
C.2. SCHEDULE……………………………………………………………………………6
| I. | SCHEDULE………………………………………………………………………………6 |
| II. | EXECUTION……………………………………………………………………………..7 |
| A. | WORK DAYS, SCHEDULE AND OFF SCHEDULE WORKDAYS…………………..7 |
| B. | EARLY START FOR MOBILIZATION/LIMITED ACCESS………………………….7 |
| C. | COORDINATION OF THE CONTRACTOR’S WORK………………………………..7 |
C.3. DRAWINGS, ATTACHMENTS AND SPECIFICATIONS……………………………7
C.4. WORK SITE REQUIREMENTS, UTLITIES AND OPERATIONS…………………..8
| I. | GENERAL………………………………………………………………………………..8 |
| A. | DESCRIPTION…………………………………………………………………………...8 |
| B. | OTHER WORK…………………………………………………………………………..8 |
| II. | UTILITIES………………………………………………………………………………..8 |
| A. | UTILITIES AND SUPPORT PROVISIONS………………………………………….....8 |
| B. | ACCESS AND OPERATING AT CORPORATION FACILITIES…………………......9 |
C.5. INSPECTION AUTHORITY…………………………………………………………10
C.6. LAYOUT OF WORK………………………………………………………………….11
C.7. CONTRACTOR-FURNISHED MATERIALS AND WORKMANSHIP…………….11
| I. | GENERAL……………………………………………………………………………….11 |
| II. | PRODUCTS……………………………………………………………………………...12 |
| A. | MANUFACTURER……………………………………………………………………...12 |
| B. | SAMPLES……………………………………………………………………………….12 |
| C. | EQUIVILENT QUALITY……………………………………………………………….12 |
| D. | FEDERAL SUSTAINABLE ACQUISITION REQUIREMENTS……………………...12 |
C.8. CORPORATION-FURNISHED SERVICES………………………………………….15
| I. | CORPORATION-FURNISHED SERVICES……………………………………………15 |
| A. | RELOCATION OF ROOF MOUNTED COMMUNICATIONS EQUIPMENT……….15 |
C.9. CONTRACTOR-FURNISHED PLANT………………………………………………16
C.10. MOBILIZATION……………………………………………………………………..16
I. GENERAL……………………………………………………………………………….16
C.11. ENVIRONMENT PROTECTION……………………………………………………16
| I. | GENERAL……………………………………………………………………………….16 |
| A. | DESCRIPTION…………………………………………………………………………..16 |
| B. | ENVIRONMENTAL REPRESENTATIVE……………………………………………..17 |
| C. | REFERENCES…………………………………………………………………………..17 |
| D. | PROTECTIVE MEASURES…………………………………………………………….17 |
| E. | NOTICES………………………………………………………………………...………17 |
| F. | ENVIRONMENTAL PROTECTION…………………………………………………...18 |
C.12. DISPOSITION OF SOLID WASTE………………………………………………….18
| I. | GENERAL……………………………………………………………………………….18 |
| II. | SUBMITTALS…………………………………………………………………………..19 |
C.13. HAZARDOUS WASTE………………………………………………………………19
| I. | GENERAL……………………………………………………………………………….19 |
| A. | DESCRIPTION………………………………………………………………………….19 |
| B. | SUBMITTALS…………………………………………………………………………..19 |
| C. | REFERENCES…………………………………………………………………………..19 |
| II. | PRODUCTS……………………………………………………………………………..20 |
| III. | EXECUTION…………………………………………………………………………….20 |
| A. | HANDLING AND DOCUMENTATION……………………………………………….20 |
| B. | TRANSPORTATION……………………………………………………………………20 |
| C. | RECYCLING, TREATMENT AND DISPOSAL………………………………………20 |
C.14. SITE VISIT AND EXISTING CONDITIONS……………………………………….20
| I. | GENERAL……………………………………………………………………………….20 |
| II. | EXISTING CONDITIONS………………………………………………………………21 |
| A. | ADMINISTRATION BUILDING…..…………………………………………………...21 |
| B. | EISENHOWER LOCK..………………………………………………………………...21 |
| C. | SNELL LOCK.………………………………………………………………………......22 |
C.15. DISPOSAL BY BURNING…………………………………………………………..22
C.16. USE OF EXPLOSIVES………………………………………………………………23
C.17. HEALTH AND SAFETY…………………………………………………………….23
| I. | GENERAL……………………………………………………………………………….23 |
| A. | DESCRIPTION……………………………………………………………………….….23 |
| B. | HEALTH AND SAFETY OFFICER…………………………………………………….23 |
| C. | SUBMITTALS…………………………………………………………………………...23 |
| D. | REFERENCES…………………………………………………………………………...23 |
| E. | NOTICES AND REPORTING…………………………………………………………..24 |
| F. | SITE SAFETY MEETINGS……………………………………………………………..24 |
| II. | PRODUCTS……………………………………………………………………………...24 |
| A. | MANUFACTURED MATERIALS AND EQUIPMENT……………………………….24 |
| III. | EXECUTION…………………………………………………………………………….24 |
| A. | ROOF WORK PRECAUTIONS………………………………………………………...24 |
| B. | LOCK-OUT-TAG-OUT (LOTO)……………………………………………………….25 |
C.18. WAGE RATES……………………………………………………………………….25
TECHNICAL PROVISIONS………………………………………………………………..25
C.19. GENERAL……………………………………………………………………………25
C.20. SUBMITTALS……………………………………………………………………….25
| I. | GENERAL………………………………………………………………………………25 |
| A. | BIDDERS………………………………………………………………………………..25 |
| B. | CONTRACTORS…………………………………………………………………….….26 |
| C. | SUBMITTAL CLASSIFICATIONS AND PURPOSE………………………………....26 |
| D. | REFERENCES…………………………………………………………………………..27 |
| II. | PRODUCTS……………………………………………………………………………..27 |
| A. | SUBMITTALS FOR APPROVAL……………………………………………………...27 |
| B. | SUBMITTALS FOR INFORMATION ONLY………………………………………....28 |
| III. | EXECUTION…………………………………………………………………………....29 |
| A. | PROCESSING, SCHEDULE AND NOTICE………………………………………......29 |
| B. | MAINTENANCE OF SUBMITTAL DOCUMENTS…………………………………..30 |
C.21. ROOFING REMOVAL AND REPLACEMENT……..…………………………….30
| I. | GENERAL……………………………………………………………………………….30 |
| A. | DESCRIPTION…………………………………………………………………………..30 |
| B. | REFERENCE DOCUMENTS…………………………………………………………...30 |
| C. | JOB SITE PROTECTION AND WORK SEQUENCE…………………………………31 |
| D. | ROOFING SYSTEMS WARRANTY AND CONTRACTOR |
QUALIFICATIONS…………….…………………………………………..……………31
| E. | DELEVERY, STORAGE AND HANDLING………………………………………..…32 |
| F. | JOB CONDITIONS, CAUTIONS AND WARNINGS……………………………….....32 |
| G. | QUALITY ASSURANCE…………………………………………………………….....33 |
| II. | PRODUCTS………………………………………………………………………….…..33 |
| A. | GENERAL…………………………………………………………………………….....33 |
| B. | EPDM ROOFING MEMBRANE AND MEMBRANE APPURTENANCES………….34 |
| C. | UNDERLAYMENT/INSULATION AND COVER BOARDS…………………………35 |
| D. | FASTENING COMPONENTS………………………………………………………….36 |
| E. | FLASHING………………………………………………………………………………36 |
| F. | ADHESIVES AND SEALANTS………………………………………………………..36 |
| G. | METAL EDGING, COPING MEMBRANE TERMINATIONS AND ROOF |
DRAIN ASSEMBLIES………………………………………………………………….36
| H. | WALKWAYS AND PADS……………………………………………………………..37 |
| I. | OTHER MATERIALS…………………………………………………………………..37 |
| III. | EXECUTION…………………………………………………………………………….37 |
| A. | GENERAL……………………………………………………………………………….37 |
| B. | ROOF MOUNTED EQUIPMENT………………………………………………………38 |
| C. | ROOF DECK/SUBSTRATE…………………………………………………………….38 |
| D. | ROOF DRAINS………………………………………………………………………….38 |
| E. | UNDERLAYMENT/INSULATION AND COVER BOARD ATTACHMENT……….38 |
| F. | MEMBRANE PLACEMENT, BONDING AND SPLICING…………………………..39 |
| G. | FLASHING………………………………………………………………………………39 |
| H. | WALKWAYS AND PADS……………………………………………………………...39 |
| I. | DAILY SEAL……………………………………………………………………………39 |
C.22. ACCEPTANCE OF THE WORK…………………………………………………….39
C.23. WARRANTY………………………………………………………………………….40
| I. | GENERAL..………………………………………………………………………….…..40 |
| II. | MANUFACTURER’S WARRANTY (TOTAL ROOFING SYSTEM WARRANY…..40 |
File details come from the government source that posted it. Updated .