SOLICITATION # DTSL55-13-B-C0777

EXPANDED TABLE OF CONTENTS

SECTION C, DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SPECIAL PROVISIONS………………………………………………………………….….6

C.1. DESCRIPTION OF WORK……………………………………………………………6

C.2. SCHEDULE……………………………………………………………………………6

I.SCHEDULE………………………………………………………………………………6
II.EXECUTION……………………………………………………………………………..7
A.WORK DAYS, SCHEDULE AND OFF SCHEDULE WORKDAYS…………………..7
B.EARLY START FOR MOBILIZATION/LIMITED ACCESS………………………….7
C.COORDINATION OF THE CONTRACTOR’S WORK………………………………..7

C.3. DRAWINGS, ATTACHMENTS AND SPECIFICATIONS……………………………7

C.4. WORK SITE REQUIREMENTS, UTLITIES AND OPERATIONS…………………..8

I.GENERAL………………………………………………………………………………..8
A.DESCRIPTION…………………………………………………………………………...8
B.OTHER WORK…………………………………………………………………………..8
II.UTILITIES………………………………………………………………………………..8
A.UTILITIES AND SUPPORT PROVISIONS………………………………………….....8
B.ACCESS AND OPERATING AT CORPORATION FACILITIES…………………......9

C.5. INSPECTION AUTHORITY…………………………………………………………10

C.6. LAYOUT OF WORK………………………………………………………………….11

C.7. CONTRACTOR-FURNISHED MATERIALS AND WORKMANSHIP…………….11

I.GENERAL……………………………………………………………………………….11
II.PRODUCTS……………………………………………………………………………...12
A.MANUFACTURER……………………………………………………………………...12
B.SAMPLES……………………………………………………………………………….12
C.EQUIVILENT QUALITY……………………………………………………………….12
D.FEDERAL SUSTAINABLE ACQUISITION REQUIREMENTS……………………...12

C.8. CORPORATION-FURNISHED SERVICES………………………………………….15

I.CORPORATION-FURNISHED SERVICES……………………………………………15
A.RELOCATION OF ROOF MOUNTED COMMUNICATIONS EQUIPMENT……….15

C.9. CONTRACTOR-FURNISHED PLANT………………………………………………16

C.10. MOBILIZATION……………………………………………………………………..16

I. GENERAL……………………………………………………………………………….16

C.11. ENVIRONMENT PROTECTION……………………………………………………16

I.GENERAL……………………………………………………………………………….16
A.DESCRIPTION…………………………………………………………………………..16
B.ENVIRONMENTAL REPRESENTATIVE……………………………………………..17
C.REFERENCES…………………………………………………………………………..17
D.PROTECTIVE MEASURES…………………………………………………………….17
E.NOTICES………………………………………………………………………...………17
F.ENVIRONMENTAL PROTECTION…………………………………………………...18

C.12. DISPOSITION OF SOLID WASTE………………………………………………….18

I.GENERAL……………………………………………………………………………….18
II.SUBMITTALS…………………………………………………………………………..19

C.13. HAZARDOUS WASTE………………………………………………………………19

I.GENERAL……………………………………………………………………………….19
A.DESCRIPTION………………………………………………………………………….19
B.SUBMITTALS…………………………………………………………………………..19
C.REFERENCES…………………………………………………………………………..19
II.PRODUCTS……………………………………………………………………………..20
III.EXECUTION…………………………………………………………………………….20
A.HANDLING AND DOCUMENTATION……………………………………………….20
B.TRANSPORTATION……………………………………………………………………20
C.RECYCLING, TREATMENT AND DISPOSAL………………………………………20

C.14. SITE VISIT AND EXISTING CONDITIONS……………………………………….20

I.GENERAL……………………………………………………………………………….20
II.EXISTING CONDITIONS………………………………………………………………21
A.ADMINISTRATION BUILDING…..…………………………………………………...21
B.EISENHOWER LOCK..………………………………………………………………...21
C.SNELL LOCK.………………………………………………………………………......22

C.15. DISPOSAL BY BURNING…………………………………………………………..22

C.16. USE OF EXPLOSIVES………………………………………………………………23

C.17. HEALTH AND SAFETY…………………………………………………………….23

I.GENERAL……………………………………………………………………………….23
A.DESCRIPTION……………………………………………………………………….….23
B.HEALTH AND SAFETY OFFICER…………………………………………………….23
C.SUBMITTALS…………………………………………………………………………...23
D.REFERENCES…………………………………………………………………………...23
E.NOTICES AND REPORTING…………………………………………………………..24
F.SITE SAFETY MEETINGS……………………………………………………………..24
II.PRODUCTS……………………………………………………………………………...24
A.MANUFACTURED MATERIALS AND EQUIPMENT……………………………….24
III.EXECUTION…………………………………………………………………………….24
A.ROOF WORK PRECAUTIONS………………………………………………………...24
B.LOCK-OUT-TAG-OUT (LOTO)……………………………………………………….25

C.18. WAGE RATES……………………………………………………………………….25

TECHNICAL PROVISIONS………………………………………………………………..25

C.19. GENERAL……………………………………………………………………………25

C.20. SUBMITTALS……………………………………………………………………….25

I.GENERAL………………………………………………………………………………25
A.BIDDERS………………………………………………………………………………..25
B.CONTRACTORS…………………………………………………………………….….26
C.SUBMITTAL CLASSIFICATIONS AND PURPOSE………………………………....26
D.REFERENCES…………………………………………………………………………..27
II.PRODUCTS……………………………………………………………………………..27
A.SUBMITTALS FOR APPROVAL……………………………………………………...27
B.SUBMITTALS FOR INFORMATION ONLY………………………………………....28
III.EXECUTION…………………………………………………………………………....29
A.PROCESSING, SCHEDULE AND NOTICE………………………………………......29
B.MAINTENANCE OF SUBMITTAL DOCUMENTS…………………………………..30

C.21. ROOFING REMOVAL AND REPLACEMENT……..…………………………….30

I.GENERAL……………………………………………………………………………….30
A.DESCRIPTION…………………………………………………………………………..30
B.REFERENCE DOCUMENTS…………………………………………………………...30
C.JOB SITE PROTECTION AND WORK SEQUENCE…………………………………31
D.ROOFING SYSTEMS WARRANTY AND CONTRACTOR

QUALIFICATIONS…………….…………………………………………..……………31

E.DELEVERY, STORAGE AND HANDLING………………………………………..…32
F.JOB CONDITIONS, CAUTIONS AND WARNINGS……………………………….....32
G.QUALITY ASSURANCE…………………………………………………………….....33
II.PRODUCTS………………………………………………………………………….…..33
A.GENERAL…………………………………………………………………………….....33
B.EPDM ROOFING MEMBRANE AND MEMBRANE APPURTENANCES………….34
C.UNDERLAYMENT/INSULATION AND COVER BOARDS…………………………35
D.FASTENING COMPONENTS………………………………………………………….36
E.FLASHING………………………………………………………………………………36
F.ADHESIVES AND SEALANTS………………………………………………………..36
G.METAL EDGING, COPING MEMBRANE TERMINATIONS AND ROOF

DRAIN ASSEMBLIES………………………………………………………………….36

H.WALKWAYS AND PADS……………………………………………………………..37
I.OTHER MATERIALS…………………………………………………………………..37
III.EXECUTION…………………………………………………………………………….37
A.GENERAL……………………………………………………………………………….37
B.ROOF MOUNTED EQUIPMENT………………………………………………………38
C.ROOF DECK/SUBSTRATE…………………………………………………………….38
D.ROOF DRAINS………………………………………………………………………….38
E.UNDERLAYMENT/INSULATION AND COVER BOARD ATTACHMENT……….38
F.MEMBRANE PLACEMENT, BONDING AND SPLICING…………………………..39
G.FLASHING………………………………………………………………………………39
H.WALKWAYS AND PADS……………………………………………………………...39
I.DAILY SEAL……………………………………………………………………………39

C.22. ACCEPTANCE OF THE WORK…………………………………………………….39

C.23. WARRANTY………………………………………………………………………….40

I.GENERAL..………………………………………………………………………….…..40
II.MANUFACTURER’S WARRANTY (TOTAL ROOFING SYSTEM WARRANY…..40