This document is an Addendum to the bidding documents for the Bellamy Creek Correctional Facility - Paving Improvement Project located in Ionia, Michigan. The project is being managed by the Michigan Department of Technology, Management and Budget (DTMB) and the Design and Construction Division. The addendum provides updates and clarifications to the project, including pre-bid walk-through notes, additional specifications, and other items. The bid opening date is May 10, 2023. The project requires excavation, paving, and landscape work, with all excavation spoils to be deposited at the nearby Handlon facility. Contractors will need to complete the front parking lots in phases while maintaining one-way traffic during construction.

The addendum also includes details on soil preparation and turf and grasses specifications that were inadvertently left out of the original bid documents. Bidders must acknowledge the addendum in their bid submissions. The project is being funded by the State of Michigan, and the winning contractor will be required to follow all applicable state and local regulations and requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 12/17)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 1

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

5/1/2023

PROJECT NAME

Bellamy Creek Correctional Facility – Paving Improvement Project

FILE NUMBER

472/22269.SMD

PROFESSIONAL

Beckett & Raeder, Inc.

PROJECT DIRECTOR

Scott DeKorte

BID OPENING DATE:

5/10/2023

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

Pre-Bid Walk-Through Notes:

1. Bids are due May 10th at 2:00 p.m.

2. Sallyport working hours are 7:00 a.m. to 3:30 p.m. Other areas can have 10 hour work days.

3. Two escorts from the facility are expected to be available for the contractor.

4. Ground Penetrating Radar is required for areas where underground storm sewer, gate and fencing will be installed. If something is found, it shall be hydro-excavated.

5. All excavation spoils can be deposited at the Handlon facility, located across the street at 1728 Bluewater Highway.

6. Contractor shall complete the front parking lots in two or more phases. Alternating one-way traffic shall be maintained at all times during construction.

Other Items:

1. Pre-Bid Sign-In Sheet is attached.

2. Two specifications were inadvertently left out of the contract book. These are included: 329113 Soil Preparation and 329200 Turf and

Grasses.

3. Two PDF files were inadvertently included as part of the bid documents: “00120 Supplementary Instructions - MICHSpec (Rev03-2022)

V1.4 - Bellamy Creek” and “00300 Bid Form - MICHSpec (Rev03-2022) V1.4 - Bellamy Creek”. These shall be ignored.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Kristofer Enlow, P.E., Beckett & Raeder, Inc. DATE: 5/1/2023

APPROVED BY:

PROJECT DIRECTOR: DATE: 5/1/2023

Bellamy Creek Correctional Facility SOM File No. 472/22269.SMD Paving Improvement Project Ionia, Michigan

SOIL PREPARATION

Beckett & Raeder Inc. 32 91 13 - 1

SECTION 32 91 13 – SOIL PREPARATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes re-spreading site stripped topsoil from stockpile.

B. Related Requirements:

1. Section 32 92 00 "Turf and Grasses" for seeding.

1.2 DEFINITIONS

A. Duff Layer: A surface layer of soil, typical of forested areas, that is composed of mostly decayed leaves, twigs, and detritus.

B. Imported Soil: Soil that is transported to Project site for use.

C. Manufactured Soil: Soil produced by blending soils, sand, stabilized organic soil amendments, and other materials to produce planting soil.

D. Planting Soil: Existing, on-site soil; imported soil; or manufactured soil that has been modified as specified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.

E. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or the top surface of a fill or backfill before planting soil is placed.

F. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.

G. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil"; but in disturbed areas such as urban environments, the surface soil can be subsoil.

H. USCC: U.S. Composting Council.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Samples: For each bulk-supplied material in sealed containers labeled with content, source, and date obtained; providing an accurate representation of composition, color, and texture.

Beckett & Raeder Inc. 32 91 13 - 2

1.4 INFORMATIONAL SUBMITTALS

A. Field quality-control reports.

1.5 QUALITY ASSURANCE

A. Testing Agency Qualifications: An independent, state-operated, or university-operated laboratory; experienced in soil science, soil testing, and plant nutrition; with the experience and capability to conduct the testing indicated; and that specializes in types of tests to be performed.

PART 2 - PRODUCTS

2.1 PLANTING SOILS

A. Per Section 815 of the MDOT 2012 Standard Specifications for Construction.

2.2 FERTILIZERS

A. Per Section 815 of the MDOT 2012 Standard Specifications for Construction.

PART 3 - EXECUTION

3.1 GENERAL

A. Place planting soil and fertilizers according to requirements in other Specification Sections.

B. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in planting soil.

3.2 PLACING AND MIXING PLANTING SOIL OVER EXPOSED SUBGRADE

A. General: Apply and mix un-amended soil with amendments on-site to produce required planting soil. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.

B. Subgrade Preparation: Till subgrade to a minimum depth of 4 inches (100 mm). Remove stones larger than 2 inches (50 mm) in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

C. Compaction: Compact each blended lift of planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698 and tested in-place.

D. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

Beckett & Raeder Inc. 32 91 13 - 3

3.3 FIELD QUALITY CONTROL

A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections.

B. Perform the following tests and inspections:

1. Compaction: Test planting-soil compaction after placing each lift and at completion using a densitometer or soil-compaction meter calibrated to a reference test value based on laboratory testing according to ASTM D 698. Space tests at no less than one for each 1000 sq. ft. of in-place soil or part thereof.

C. Soil will be considered defective if it does not pass tests and inspections.

D. Label each sample and test report with the date, location keyed to a site plan or other location system, visible conditions when and where sample was taken, and sampling depth.

3.4 PROTECTION AND CLEANING

A. Protection Zone: Identify protection zones according to Section 015639 "Temporary Tree and Plant Protection."

B. Protect areas of in-place soil from additional compaction, disturbance, and contamination.

Prohibit the following practices within these areas except as required to perform planting operations:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Vehicle traffic.

4. Foot traffic.

5. Erection of sheds or structures.

6. Impoundment of water.

7. Excavation or other digging unless otherwise indicated.

C. Remove surplus soil and waste material including excess subsoil, unsuitable materials, trash, and debris and legally dispose of them off Owner's property unless otherwise indicated.

1. Dispose of excess subsoil and unsuitable materials on-site where directed by Owner.

END OF SECTION 32 91 13

TURF AND GRASSES

32 92 00 - 1

SECTION 32 92 00 – TURF AND GRASSES

PART 1 - GENERAL

1.1 SUMMARY

A. Applicable provisions of this Section for this project Includes:

1. Hydro-Seeding.

2. Fertilizing

1.2 DEFINITIONS

A. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. This includes insecticides, miticides, herbicides, fungicides, rodenticides, and molluscicides. It also includes substances or mixtures intended for use as a plant regulator, defoliant, or desiccant.

B. Planting Soil: Existing, on-site soil; imported soil; or manufactured soil that has been modified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.

See Section 32 91 13 "Soil Preparation" and drawing designations for planting soils.

1.3 INFORMATIONAL SUBMITTALS

A. Certification of grass seed.

1. Certification of each seed mixture for turfgrass sod.

B. Product certificates.

1.4 QUALITY ASSURANCE

A. Installer Qualifications: A qualified landscape Installer whose work has resulted in successful turf establishment.

1. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when work is in progress.

2. Personnel Certifications: Installer's field supervisor shall have certification in one of the following categories from the Professional Landcare Network:

a. Landscape Industry Certified Technician - Exterior.

b. Landscape Industry Certified Lawncare Manager.

c. Landscape Industry Certified Lawncare Technician.

3. Pesticide Applicator: State licensed, commercial.

32 92 00 - 2

1.5 DELIVERY, STORAGE, AND HANDLING

A. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of compliance with state and Federal laws, as applicable.

B. Sod: Harvest, deliver, store, and handle sod according to requirements in "Specifications for Turfgrass Sod Materials" and "Specifications for Turfgrass Sod Transplanting and Installation" sections in TPI's "Guideline Specifications to Turfgrass Sodding." Deliver sod within 24 hours of harvesting and in time for planting promptly. Protect sod from breakage and drying.

PART 2 - PRODUCTS

2.1 SEED

A. Seeded Lawn Mix

Seed Type Proportion Min. Purity Germination

Merit KY Bluegrass 25% 90% 80%

Touchdown KY Bluegrass 20% 90% 80%

Pennfine Perennial Rye 20% 95% 80%

Creeping Red Fescue 35% 90% 80%

2.2 FERTILIZERS

A. Commercial Fertilizer: MDOT Class A

PART 3 - EXECUTION

3.1 TURF AREA PREPARATION

A. General: Prepare planting area for soil placement and mix planting soil according to Section 32 91 13 "Soil Preparation."

B. Moisten prepared area before applying the mulch blanket if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

C. Before planting, obtain Architect's acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading.

3.2 SEEDING

A. Seed and much shall be applied by an approved hydro-seeding operation.

32 92 00 - 3

3.3 TURF MAINTENANCE

A. No maitenance by the Contractor is required after hydro-seeding is complete. The Contractor shall furnish the facility with one 25 pound bag of the specified lawn seed.

END OF SECTION 32 92 00