DTMB-0415 Advertisement_751_25407.AGY.pdf
PDF 123 KB Posted
- Attached to
- 751/25407. AGY; Seul Choix - Roof Re-shingle
- Solicitation number
- RFQ-171-250000000615-2
- Issued by
- Shiawassee County, Michigan
About this file
This is a Project Advertisement from the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for the Seul Choix Keeper's Dwelling and Boathouse Reshingle project located at 905 S Seul Choix Point Road in Gulliver, Michigan. The project involves removing existing asphalt and metal shingles, eave metal, and felt underlayment on the Keeper's Residence and Boathouse, replacing any rotten materials with treated plywood, and installing new roofing materials including felt, ice and water shield membrane, shingles, drip edge, and flashing. A mandatory prebid meeting is scheduled for September 3rd, 2025, at 1:00 PM ET at the project site, with bids due on September 17th, 2025, at 2:00 PM Eastern time through the SIGMA VSS electronic submission system.
Bidders must provide proof of State Project Registration from the Department of Labor and Economic Opportunity and are limited to submitting a maximum of two attachments (less than 25 MB each). A 5% bid security is required, and the project includes NIGP Codes 90924, 91066, 91200, 91473, and 98863. Questions must be emailed to Julia Cogger at coggerj@michigan.gov by September 5th, 2025, at 2:00 PM Eastern time. Bidders may obtain project documents from the provided SIGMA Michigan website, and the project is being handled by the DNR with contact information at 1990 US Hwy 41 S, Marquette, MI 49855.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0415 (R 3/25)
PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertisement of all construction projects. (1984 PA 431)
DTMB FILE NO. 751/25407.AGY
DATE August 25th, 2025
ADVERTISEMENT DATE
Monday, August 25th, 2025
BID DUE DATE
Wednesday, September 17th, 2025 @ 2:00 p.m.
EASTERN time
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
Seul Choix Keeper’s Dwelling and Boathouse Reshingle 905 S Seul Choix Point Road Gulliver, MI 49840
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
A mandatory prebid meeting will be held at the project site located at 905 South Seul Choix Point Road Gulliver, MI 49840, on September 3rd, 2025, at 1:00PM, ET.
Mandatory Yes No
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
DESCRIPTION OF WORK:
The project consists of the removal of the existing asphalt and metal shingles, eave metal and felt underlayment on the Keeper’s Residence and the Boathouse at Seul Choix. Any rotten material is to be replaced with treated plywood of matching thickness. Remove existing flashing and drip edge. Apply new layer of 15lb felt of entire roof and new layer of ice and water shield membrane at all eaves and valleys. Install new shingles, drip edge and flashing. Flashing, drip edges and eave metal are to be factory finished or painted to match the color of the shingle as closely as possible. Color samples of the proposed shingle, and flashing, drip edge, eave metal finish must be submitted for owner approval before ordering or installing these materials.
Please NOTE:
• All bid responses require proof of State Project Registration from the Department of Labor and Economic Opportunity.
• Bid responses and bid attachments MUST be uploaded to SIGMA VSS.
• Contractors should only submit a maximum of two (2) attachments (both being less than 25 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability)
• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the bid response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Bid Responses should not be emailed to the Project Director.
5% BID SECURITY REQUIRED
NIGP CODES: 90924, 91066, 91200, 91473, 98863
ACCEPTING QUESTIONS UNTIL: Friday, September 5th, 2025
Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Julia Cogger at coggerj@michigan.gov no later than 2:00 p.m., Eastern on September 5th, 2025.
Documents may be obtained from:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
PSC/Agency: DNR
Address: 1990 US Hwy 41 S. Marquette, MI 49855
Phone: 517-420-9749
Email: coggerj@michigan.gov
Approved by:
mailto:coggerj@michigan.gov https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
File details come from the government source that posted it. Updated .