DTMB-0414 (Addendum 1).pdf

PDF 118 KB Posted

Attached to
551/22226. DPL; Houghton Lake MSP, Parking Lot Replacement
Solicitation number
RFQ - 171 - 240000000030
Issued by
Roscommon County, Michigan

About this file

This document is an Addendum to the Construction Bid for the Michigan State Police (MSP) - Houghton Lake Post Asphalt Replacement project, located in Roscommon County, Michigan. The project is being managed by the Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division. The addendum provides clarification and additional information, including the pre-bid meeting attendance record. The bid opening date is November 15, 2023.

The contract opportunity is for the asphalt replacement work at the MSP Houghton Lake Post location. The bid documents and addendum are available through the SIGMA VSS system. Bidders are instructed to submit all questions via email to the project contact, Quinn Ridley, and not through the SIGMA VSS system. Bid attachments must be uploaded to SIGMA VSS, as hard copies will not be accepted. Bidders experiencing issues with SIGMA VSS are advised to contact the SIGMA Help Desk and notify the Office of Design and Construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 10/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 1

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

11/2/2023

PROJECT NAME

MSP – Houghton Lake Post Asphalt Replacement

FILE NUMBER

551/22226.DPL

PROFESSIONAL

Wade Trim

PROJECT DIRECTOR

David Lenz

BID OPENING DATE:

11/15/2023

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

1. Pre-Bid Meeting attendance record

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: DATE: Click to enter date

APPROVED BY:

PROJECT DIRECTOR: David Lenz, AIA DATE: 11/2/2023 http://www.michigan.gov/SIGMAVSS