Amendment_0001_DTMA94Q1600002.docx
DOCX document 1 MB Posted
- Attached to
- Training Ship GOLDEN BEAR Pipe and Pump repair
- Solicitation number
- DTMA94Q1600002
About this file
ATTCHMT 0003 clarification to the work of CLIN's 2 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| dtma94Q160002_0001_2nd_rev_TSGB_pipe_ _pump_.pdf | ||
| wage_determination.pdf | ||
| Pipe_and_Pumps__-__Spring_2016.docx | DOCX document | |
| DTMA94Q160002_TSGB_pipe_and_pump.pdf | ||
| clauses.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship Check Comments and Changes DTMA94Q1600002 – Pipes and Pumps PR No: MAPR617160143 CLIN No 1 – SR No 5189810 – MSW Pump (3) renewal Pages #14 to #16 Job as written does not provide enough information and dimensions and does not agree with the present installed pump Marine Surveyor Suggestion: Cancel this job until proper information is available CLIN No 2 – SR No 5190854 – Sanitary Flushing Pumps (2) renewal Pages #16 to #18
1) Contractor needs to supply 1/4NPT connections for Pump Suction and Discharge Pressure gages
2) Pump information for installation = http://www.gouldspumps.com/ittgp/medialibrary/goulds/website/Literature/Instruction%20and%20Operation%20Manuals/Alphabetical/InstallationOperationMaintenance_iframeNM3196.pdf?ext=.pdf
3) Page #18 – Disregard following statement:
“Contractor to disable only one (1) sanitary flushing pump at a time………..”
Both pumps can be out of service at one time
CLIN No 3 – SR No 0301930 – Air Supply for ME Clutch Panels Pages #18 to #20
1) Discussions with attending contractors are in agreement that piping to be “welded” 316 stainless steel pipe and fittings
2) System sketch to accompany this write-up for the Air supply to ME Clutch Control panels = See below
Jim Sundfors Marine Surveyor
MARAD DPO
11-9-15 image1.emf