Vendor quote sheet

View the file

Other files

File Type Posted
DTMA9217Q00005-00001.pdf PDF
DTMA9217Q00005_Conbmined_SynSol.pdf PDF
DTMA9217Q00005_SOW_ATTACH_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE YEAR

Vendor quote sheet for FY 17 Empire State Post-Cruise repairs package
DTMA9217Q00005
SECTION IDESCRIPTION OF SERVICESMAN HOURRATETOTAL LABORMATERIALTOTAL LABOR + MAT'L
ITEM 001Applicability of Rules and RegulationsNSP
ITEM 002Accuracy of InformationNSP
ITEM 003Surveys and Inspections$0.00$0.00
ITEM 004On-site contractor's representativeNSP
ITEM 005Documentation of Openings, Blanks and Plugs$0.00$0.00
ITEM 006Allowance for scap materialNSP
ITEM 007Hazardous Material Identification and Disposal$0.00$0.00
ITEM 008Use of ship's parts and equipmentNSP
ITEM 009Maintaing Ship's Cleanliness$0.00$0.00
ITEM 010Surface preparation and painting/coating guidelinesNSP
ITEM 011Safe for entry and safe for hot work certificates$0.00$0.00
ITEM 012Staging$0.00$0.00
ITEM 013Welding/brazing proceduresNSP
ITEM 014Contractor's industrial support$0.00$0.00
ITEM 015Security RequirementsNSP
ITEM 016Production Reporting$0.00$0.00
ITEM 017SchedulingNSP
TOTAL PRICE FOR SECTION I$0.00
SECTION IIREPAIR ITEMSMAN HOURRATETOTAL LABORMATERIALTOTAL LABOR + MAT'L
ITEM 101Annual Ship Safety Radio Survey
ITEM 102Calibrate oil content meters and overhaul OWS
ITEM 103Annual inspection of all fire extinguishing equipment, rescue boat righting back, and CO2 monitor
ITEM 104Annual liferaft inspection
Item 105Provide COI support labor
Iterm 106Removal and disposal of SLOPS
Item 107Re-surface decks
Item 108Surveys and repair or replace galley equipment
Item 109Annual vibration and thermography survey
Item 110Lifesaving equipmentPRICING FOR MATERIAL ONLY
Item 111MattressesPRICING FOR MATERIAL ONLY
Item 112Misc. Motor Overhauls
Item 113Misc. Pump Overhauls
Item 114Berthing Repairs
Item 115Machinery Teslting Assistance
Item 116Misc pipe and refrigeration repair
Item 117Fire Damper overhauls
TOTAL PRICE FOR SECTION II$0.00
SECTION IIIOPTIONAL ITEMSMAN HOUR OR QTYRATETOTAL LABORMATERIALTOTAL LABOR + MAT'L
ITEM 201Supplemental Labor (Optional) (Gov't estimates 800 hrs)800 HRs$0.00
ITEM 202Supplemental Material (Optional) (Gov't estimtes $250,000)$250,000.00
ITEM 203SUPLEMENTAL STEEL (OPTIONAL)
ITEM 204Flat Steel - 2000 lbsPRICING FOR MATERIAL ONLY
ITEM 205Audio Gaugings - 1000 each
TOTAL PRICE FOR SECTION III$

VENDOR QUOTE TOTAL: $

Complete the following information:
Firm:
Mailing Address:
Point of Contact (Name, Phone, Email Address):
Dun and Bradstreet Number
Cage Code
Remittance address if different from mailing:

File details come from the government source that posted it. Updated .