Bid_Opening_Results_Schedule_A B_-_FW-JOHE_10(1) _100(1).pdf

PDF 33 KB Posted

Attached to
John Heinz National Wildlife Refuge
Solicitation number
DTFH71-17-B-00004
Issued by

About this file

Bid Results

View the file

Other files

File Type Posted
Amendment_0001_-_FW-JOHE_10(1) _100(1).pdf PDF
Report_2_Pavement.pdf PDF
Report_1_NEPA.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
FP14_Eng.pdf PDF
VETS-4212_-_Form.pdf PDF
Report_3_Geotech.pdf PDF
Plans_-_FW-JOHE_10(1) _100(1).pdf PDF
IFB_Solicitation_-_FW-JOHE_10(1) _100(1).pdf PDF
Synopsis__-_FW-JOHE_10(1) _100(1).doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration

Eastern Federal Lands Highway Division

Bid Opening for

John Heinz National Wildlife Refuge

PROJECT: FW-JOHE 10(1), 100(1)

SOLICITATION NO. DTFH71-17-B-00004

November 03, 2016 at 2:00 p.m.

Sterling, VA

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. DTFH71-17-B-00004 Project: FW-JOHE 10(1), 100(1) November 03, 2016, 2:00 p.m. local time

BIDDER’S BID TOTALS DAYS TOTAL PRICE

Bryant’s Land & Development, Inc.

SCHEDULE A

$636,180.00

OPTION 1

$106,800.00

SCHEDULE A

SCHEDULE A + OPTION 1

$742,980.00

Marino Corporation SCHEDULE A

$582,260.00

OPTION 1

$101,740.00

$684,000.00

General Civil Company SCHEDULE A

$572,250.00

OPTION 1

$116,240.00

$688,490.00

JMC Contractors, Inc. SCHEDULE A

$385,820.00

OPTION 1

$180,190.00

$566,010.00

The total calendar days bid to complete all contract work must be completed within 75 calendar days.

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. DTFH71-17-B-00004 Project: FW-JOHE 10(1), 100(1) November 03, 2016, 2:00 p.m. local time

The total calendar days bid to complete all contract work must be completed within 75 calendar days.

BIDDER’S BID TOTALS DAYS TOTAL PRICE

Pavkov Contracting SCHEDULE A

$815,053.00

OPTION 1

$94,030.00

$909,083.00

Puente Construction SCHEDULE A

$899,000.00

OPTION 1

$293,750.00

$1,192,750.00

SCHEDULE A

OPTION 1

ENGINEER’S ESTIMATE SCHEDULE A

$400,000.00

OPTION 1

$100,000.00

SCHEDULE A

OPTION 1

$500,000.00

Slide Number 1
FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. DTFH71-17-B-00004 Project: FW-JOHE 10(1), 100(1)�November 03, 2016, 2:00 p.m. local time �
��FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION� BID OPENING for SOLICITATION NO. DTFH71-17-B-00004 Project: FW-JOHE 10(1), 100(1)�November 03, 2016, 2:00 p.m. local time �The total calendar days bid to complete all contract work must be completed within 75 calendar days.�

File details come from the government source that posted it. Updated .