Amendment_0003_-_NY_ERFO_FIIS_2013-1(7).pdf

PDF 9 MB Posted

Attached to
Fire Island National Seashore Federal contract opportunity
Solicitation number
DTFH71-16-B-00031
Issued by
Department of Transportation Federal Highway Administration

About this file

Bid Opening date is scheduled for June 30 2016 at 2 00 p.m. EST.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Island National Seashore, newest first.
File Type Posted
Results_of_Bid_-_Schedule_A_-_NY_ERFO_FIIS_2013-1(7).pdf PDF
Amendment_0002_-_NY_ERFO_FIIS_2013-1(7).pdf PDF
Amendment_0001_-_NY_ERFO_FIIS_2013-1(7).pdf PDF
VETS-4212_-_Form.pdf PDF
Subcontract_plan.doc DOC document
IFB_Solicitation_-_NY_ERFO_FIIS_2013-1(7).pdf PDF
Supplemental_Specifications.pdf PDF
Report_3_As-built.pdf PDF
FP14_Eng.pdf PDF
Report_1_NEPA.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Report_2_Load_Letter.pdf PDF
Plans_-_NY_ERFO_FIIS_2013-1(7).pdf PDF
Synopsis_-_NY_ERFO_FIIS_2013-1(7).doc DOC document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7116B00031

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

SEE BLOCK 1406/23/20160003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/23/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

NY ERFO FIIS 2013-1(7)

The purpose of this Amendment is to:

1) Replace the Bid Schedule Page B-1 to add a pay item for Treated Timber Piles, In Place

(Lay Piles).

2) Revise the Special Contract Requirements (J Pages) as follows:

a) Section 108 to revise the restrictions for no work days.

b) Section 551 to add requirements for lay piles and clarify measurement and payment for lay piles.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 35

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFH7116B00031/0003

c) Section 637 to clarify requirements for providing boat access for the CO.

3) Revise the Plans to replace 18 plan sheets to update and clarify work requirements.

4) Provide Pre-Bid Meeting Minutes.

5) Provide a summary of responses to questions/clarifications submitted by potential bidders via email.

6) Reschedule the Bid Opening date to June 30, 2016 at 2:00 p.m. EST.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Amendment No. 0003

Amendment Info

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0003 Project NY ERFO FIIS 2013-1(7)

Fire Island National Seashore Watch Hill Marina

Solicitation: DTFH71-16-B-00031

The purpose of this Amendment is to:

1) Replace the Bid Schedule Page B-1 to add a pay item for Treated Timber Piles, In Place (Lay Piles).

2) Revise the Special Contract Requirements (J Pages) as follows:

a) Section 108 to revise the restrictions for no work days.

b) Section 551 to add requirements for lay piles and clarify measurement and payment for lay piles.

c) Section 637 to clarify requirements for providing boat access for the CO.

3) Revise the Plans to replace 18 plan sheets to update and clarify work requirements.

4) Provide Pre-Bid Meeting Minutes.

5) Provide a summary of responses to questions/clarifications submitted by potential bidders via email.

6) Reschedule the Bid Opening date to June 30, 2016 at 2:00 p.m. EST.

B Pages Info

Solicitation B Pages changes

Delete the Bid Schedule page B-1 and substitute the amended Bid Schedule page B-1.

1) Added pay item 55101-2300 Treated Timber Pile, In Place (Lay Piles).

B I D S C H E D U L E Schedule A

Project No: NY ERFO FIIS 2013-1(7)

Name: FIRE ISLAND NATIONAL SEASHORE

Item No. Quantity Unit Unit Price Amount

15101-0000

Line A0020 ALL LPSM $

15201-0000

Line A0040 ALL LPSM $

15701-0000

Line A0060 ALL LPSM $

20304-1000

Line A0080 ALL LPSM $

55101-2300

Line A0100 3,850 LNFT $ $

55101-2300

Line A0120 625 LNFT $ $

55701-2000

Line A0140 61 MFBM $ $

55701-3000

Line A0160 58 MFBM $ $

55706-2000

Line A0180 ALL LPSM $

63601-3000

Line A0200 ALL LPSM $

63701-0000

Line A0220 1 EACH $ $

64501-0000

Line A0240 ALL LPSM $

64605-0000

Line A0260 ALL LPSM $

Schedule A Bid Total:

Submitted by:

MOBILIZATION

CONSTRUCTION SURVEY AND STAKING

SOIL EROSION CONTROL (SILT CURTAIN)

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

TREATED TIMBER PILE, IN PLACE

TREATED TIMBER PILE, IN PLACE (LAY PILES)

FIXTURE (EXTINGUISHERS)

STRUCTURAL TIMBER AND LUMBER, TREATED

STRUCTURAL TIMBER AND LUMBER, COMPOSITE

STRUCTURAL TIMBER AND LUMBER, TREATED (ELECTRICAL SHED)

SYSTEM INSTALLATION, ELECTRICAL

FIELD OFFICE

LOCATE UTILITIES

Amendment No. 0003

Amend 0003

B-1

Construction activities at the project site cannot begin any earlier than September 6, 2016. All work must be completed no later than September 1, 2017.

Does the Bidder claim the Price Evaluation Preference for HUBZone Small Business Concerns as defined in FAR Clause 52.219-4?

Yes No

Bonnie.Dubose Text Box

Bonnie.Dubose Text Box

Bonnie.Dubose Line

Bonnie.Dubose Line

SCR Info Changes

Special Contract Requirements (J Pages) changes

1. Delete the third paragraph of Subsection 108.01 of the SCR, page J-3, and substitute the following:

No work will be permitted on Saturdays, Sundays, or National legal holidays.

2. Add the following Subsection 551.06 to the SCR, page J-10:

Provide 12-inch diameter, 25-foot long treated timber replacement piles for lay piles where directed by the CO.

4. Add the following to Subsection 551.10 of the SCR, page J-10:

Prior to removal of lay piles, identify to the CO the piles that require removal, but that cannot be removed and reset in good condition.

5. Add the following to Subsection 551.18 of the SCR, page J-11:

Measure only identified piles by CO for removal. Do not measure removal and resetting timber lay piles. Piles removed prior to CO approval and that cannot be reset will be considered to have been damaged by Contractor operations and will not be measured for payment. Timber mooring piles required to be removed for Contractor operations will not be measured for payment.

6. Add the following after the first sentence to Subsection 637.03(d) of the SCR, page J-17:

Provide transportation to and from the Watch Hill Ferry Terminal, Patchogue, NY at the beginning and end of each work day.

Plans Changes Info

Plans changes

Delete Plan Sheets A03, A05, A06, C01, D01, D04, D05, D06, D07, D09, D16, D22, D23, D24, D25, D26, R04, and R07, and substitute the amended Plan Sheets A03, A05, A06, C01, D01, D04, D05, D06, D07, D09, D16, D22, D23, D24, D25, D26, R04, and R07.

1) Sheet A03 updated to provide additional text description for electrical symbol list.

2) Sheet A05 updated to provide general construction note 7 for lay piles.

3) Sheet A06 updated to provide note 2 and revise notes 1 and 8 for electrical abbreviations.

4) Sheet C01 updated to add pay item and quantity for lay piles.

5) Sheet D01 updated to provide notes 5 & 6 and sheeting limits call outs to place signs and fencing to prevent pedestrian access.

6) Sheet D04 updated to revise note 1 for coordination with National Park Services.

7) Sheet D05 updated to provide notes 10, 11, & 12 for electrical one-line diagram. Revise circuit breaker and feeder 1.

8) Sheet D06 updated to revise note 1 for lighting fixtures and lighting poles.

9) Sheet D07 updated to revise note 1 for lighting fixtures and lighting poles and additional text description to pole call outs.

10) Sheet D09 updated to delete metal ladder.

11) Sheet D16 updated to revise conduit type on notes 3 and 4 for electrical details and conduit call outs.

12) Sheet D22 updated to provide note 3 for electrical panel schedules, add power to shunt trips circuit breakers, and add spare breakers.

13) Sheet D23 updated to provide note 3 for electrical panel schedules, add power to shunt trips circuit breakers, and add spare breakers.

14) Sheet D24 updated to provide note 3 for electrical panel schedules, add power to shunt trips circuit breakers, and add spare breakers.

15) Sheet D25 updated to provide note 3 for electrical panel schedules and add power to shunt trips circuit breakers.

16) Sheet D26 updated to provide note 4 for electrical panel schedules, add power to shunt trips circuit breakers, add surge protection device (SPD), and add spare breaker.

17) Sheet R04 updated to provide note 11 for finger piers proposed work and revise section

B-B for finger pier typical section.

18) Sheet R07 updated to provide post size and spacing on detail.

Note number within diamond to be specific to area/item indicated on sheet. Note number without diamond is a general note and pertains to all conditions where it may apply.

ELECTRICAL SYMBOL LIST

SYMBOL DESCRIPTION

Branch circuit and conduit(s) routed in deck

Power feeder and conduit(s) trenched minimum 24" below grade.

Conduit turned down

Conduit turned up

Light lines indicate existing to remain

Heavy lines indicate new

New panelboard

Existing panelboard to be demolished

Fused 3 or 4 pole disconnect switch with solid neutral. as indicated on the sheets. Numerals denotes switch/fuse size

60AS

40AF

Unfused 3 or 4 pole disconnect switch with solid neutral. as indicated on the sheets. Numeral denotes switch size.

60AS

Junction box (wall or ceiling mounted).

Ground.

Pull box/Splice box. Provide NEMA 6 pull boxes.

WP

Manhole.

Marine grade duplex receptacle. NEMA 5-20R, mounting height is indicated on sheets. (WP-weatherproof), (GFI-ground fault interrupter).

Branch circuit and conduit(s) trenched minimum 24" below grade.

Lighthouse style pedestal with base extension and with

Side A = 50A, 120V, 1P &

Side B = 50A, 120V, 1P Receptacles.

Transformer.

Empty conduit for future fiber optical cable trenched minimum

24" below grade. Provide pull string and electrical true tape.

Electrical meter.

Lighthouse style pedestal with base extension and with

Side A = 50A, 208V, 1P & 50A, 120V, 1P &

Side B = 50A, 208V, 1P & 50A, 120V, 1P Receptacles.

Only one (1) receptacle per side is to be used per boat slip.

Existing equipment to be removed.

Photo sensor similar to Tork photo electric controls 5400 series, model 5403, Nema 3R enclosure, two (2) 3/4" knockouts at bottom.

Receptacle 3-prong turn-lock meets the requirements of EEI-Nema.

Adjustable over full 360° for proper photoelectric control orientation.

Voltage range 105-130V, 60 Hz, contact rating per pole, 3000 watts.

16' pole, lighting fixture mounted on square metal pole on deck.

Lighting fixture shall be similar to CIMARRON LED CL1S manufactured by Spaulding or approved equal lighting model

CL1S-A-16L-1-3K-5M-XX-PRU-BS (bird shield) with metal square pole model SSA-16-40-A-CX-XX. Refer to sheet for pole height locations.

12' pole, lighting fixture mounted on square metal pole on deck.

Lighting fixture shall be similar to CIMARRON LED CL1S manufactured by Spaulding or approved equal lighting model

CL1S-A-16L-1-3K-5M-XX-PRU-SCO-BS (bird shield) with metal square pole model SSA-12-40-A-CX-XX.

Refer to sheet for pole height locations.

Lighting fixture mounted on round metal pole on deck. Lighting fixture shall be similar to VAPORTITE LED manufactured by HUBBELL or approved equal Outdoor lighting model

VWGL-1-VGL-YW-WALL-11-250-120-4100-757-70-3.6 with metal round post similar to manufactured by Spaulding lighting model

RSA-10-45-C-P2-XX.

Lighting fixture mounted on round metal pole and concrete base.

Lighting fixture shall be similar to VAPORTITE LED manufactured by

HUBBELL or approved equal Outdoor lighting model

VWGL-1-VGL-YW-WALL-11-250-120-4100-757-70-3.6 with metal round post similar to manufactured by Spaulding lighting model

RSA-10-45-C-P2-XX. Concrete base provided by others.

Lighting fixture mounted on wood post supported by deck railing.

Lighting fixture shall be similar to VAPORTITE LED manufactured by

HUBBELL or approved equal Outdoor lighting model

VWGL-1-VGL-YW-WALL-11-250-120-4100-757-70-3.6.

SYMBOL DESCRIPTION

Metal Ladder from deck to basin

GFI

Wall mounted Single Pole Lighting Control Switch.S

Line voltage Thermostat with automatic switch over between

Heating and Cooling (Set 65°F in Winter and 85°F in Summer).

ELECTRICAL SYMBOL LIST

A03

NY

NY ERFO FIIS2013-1(7)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

STATE PROJECT SHEET NO.

NPS

NO.

NO.

PMIS

FIRE ISLAND NATIONAL SEASHORE

120485

201456

195093

213699

AMENDMENT NO. 3

DESCRIPTION BY DATE

REVISIONS

NO.

WATCH HILL MARINA

Added text description

LEA 06/16/16

AutoCAD SHX Text ,1

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text T

AutoCAD SHX Text | PROJECT: 5836 | PLOTBY: BBONILLA | PLOTDATE: 6/17/2016 1:36 PM | FILENAME: 5836-A03.dwg |

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

A05

GENERAL NOTES

GENERAL NOTES:

SPECIFICATIONS:

Construction:

Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects, FP-14, US Customary units

Special Contract Requirements

AASHTO LRFD Guide Specifications for the Design of Pedestrian

Bridges, 2009 with 2015 Interims

AASHTO LRFD Bridge Design Specifications, 7th Edition with 2015

Interims

NFPA 70 2014 National Electric Code

MATERIALS:

Timber:

Use composite plastic lumber conforming to the requirements of

Subsection 716.03 for all decking.

Use treated Southern Pine No. 1 conforming to the requirements of

Section 557 - Timber Structures for all other timber. The American

Wood Protection Association (AWPA) use category designation for rails, posts, and cross ties that are in ground contact is UC5A. Use

ACQ preservative for sand retention barrier timber, railings, and all electrical shed timber except shed piles. Treat all other timber with

CCA preservative. Acceptable preservative types and minimum preservative retention rates (lbs of preservative per cubic foot of timber) are:

Preservative Type UC5A Min. Retention

Alkaline Copper Quat (ACQ) 0.60

Chromated Copper Arsenate (CCA) 2.50

Use waterborne preservatives.

All timber dimensions shown on the plans are nominal unless noted otherwise. Use standard dressed dimensions for sawn lumber as specified by the Southern Pine Inspection Bureau (SPIB) grading rules, latest edition.

Treat all cuts, abrasions or other disturbances to the surfaces of treated wood in accordance with Section 557 - Timber Structures.

Connectors:

Use galvanized steel for tie-back connections, tie rod connections, and hardware in contact with tie-backs and tie rod connections.

Use stainless connectors and hardware at all other locations.

Use threaded rod, thru bolts, or carriage bolts conforming to ASTM

A320, Grade B8, Class 2 for all bolt connections.

Use Ogee or dock washers, lock washers, and nuts on each end.

Use nuts conforming to the requirements of ASTM A194 Grade 8, Stainless AISI 304.

Use washers conforming to the requirements of SS304.

Do not use nails as a connector unless otherwise noted in these plans or Special Contract Requirements. Countersink all screws.

Tie Rods

Use deformed or plain round tie rods conforming to ASTM A615, Grade 60. Hot-dip galvanize tie rods in conformance with ASTM

A153 with a minimum thickness of 3.9 mils (0.1 millimeters).

Electrical:

See electrical sheets for electrical notes.

SCALE:

The scales shown on these plans are valid for printing on 11x17 paper.

ELEVATIONS:

Elevations indicated on these plans are based on NAVD 88.

GENERAL SCOPE OF WORK:

1. Remove the existing marina decking, install new bulkhead, install new timber posts, reinforce and supplement existing stringers, and replace existing decking. Replace sand retention barrier. Provide all new materials for the proposed marina rehabilitations unless otherwise noted.

2. Remove and reset all anchor cleats. Fasten cleats to underlying timber framing via lag screws through composite decking.

3. Replace electrical and lighting components as described on the electrical drawings in accordance with the National Electrical

Code at the locations shown.

4. Coordinate with all utilities that have facilities within the project area prior to the start of construction. Contact "Dig Safely" at

811 at least two full working days prior to any excavation or pile installation to determine the presence and/or location of any underground utilities.

5. Prepare, submit for approval, and properly implement a soil erosion plan in accordance with the requirements of Section 157

- Soil Erosion and Sediment Control.

6. Install fire extinguishers in accordance with NFPA 303, 6.2.1.1 at a maximum spacing of 150 feet O.C. along the marina, and no more than 75 feet from any boardwalk terminus. Mount 20 pound ABC fire extinguisher in a weatherproof housing to timber posts.

7. Salvage ladders to concessionaire.

GENERAL CONSTRUCTION NOTES:

1. The dimensions and elevations shown on these plans have been obtained from limited field investigations. Field measure all existing components impacted by the new work to ensure consistency with the proposed modifications. Bring any discrepancies in dimensions, character or extent of the existing components to the attention of the CO before advancing the work.

2. Develop the full capacity of the structural members in all connections in accordance with the latest edition of the National

Design Specification for Wood Construction and Supplement

(NDS). Design and detail all connections and framing not otherwise detailed on the plans. Submit details of any required connections and framing not otherwise detailed on the plans to the CO for review and approval prior to beginning any work.

3. Tighten thru-bolt connections so that washers just start to press into the wood substrate.

4. Repair damage to existing components or structures caused by contractor operations as directed by the CO.

5. Access the site by boat or barge. Obtain special use driving permits to access site when bay ice conditions prevent boat or barge access.

6. Set benchmark for electrical datum plane at El. 4.00 at location directed by CO.

7. Remove and reset existing timber lay piles as necessary to provide access for the construction of the Timber Bulkhead at no cost to the government. Prior to removal, identify to the CO the lay piles that require removal but that cannot be removed and reset in good condition. Provide 12-inch diameter, 25-foot long treated timber replacement piles for select lay piles where directed by the CO. Piles removed prior to CO approval and that cannot be reset will be considered to have been damaged by contractor operations and will not be paid for. Reset lay piles after completion of the bulkhead. Timber mooring piles required to be removed for contractor operations will not be paid for.

AMENDMENT NO. 3

General Construction Note 7 added

VHB 06/16/16

DESCRIPTION BY

REVISIONS

NO.

ELECTRICAL ABBREVIATIONS

A

Ampere

KW Kilowatt

AF

Ampere Frame

LTG

Lighting

AFF Above Finished Floor MCB Main Circuit Breaker

AT

Ampere Trip

KCMIL Thousand Circular Mils

BKR Breaker MTD Mounted

C Conduit MTG

Mounting

CB Circuit Breaker N Normal

CKT Circuit NIC Not in Contract

CO

Contracting Officer

NTS Not to Scale

DIA Diameter

PH, P, Ø

Phase

DISC Disconnect PSEG LI

Public Service Electric & Gas Long Island

E,EX Existing

PWR Power

ETR

Existing to Remain

RGC

Rigid Galvanized Conduit

FDR Feeder RMC

Rigid Metallic Conduit

FIIS Fire Island RTRC

Reinforced Thermosetting Resin Conduit

FINS Fire Island National Seashore SCC Short Circuit Current

FT Feet or Foot SS Stainless Steel

G,GND

Ground TYP

Typical

GFI

Ground Fault Interupter

UON Unless Otherwise Noted

GSC Galvanized Steel Conduit V

Voltage

HZ Hertz W Wire

KAIC

Kilo-Amps Interrupting Capacity

WOS Without Substitution

KVA

Kilovolt Ampere

WP

Weatherproof

GENERAL NOTES:

1. Perform all work in accordance with the adopted edition national electric code in particular to Article 555, accepted standards established by O.S.H.A, pertinent NFPA codes such as NFPA 303 and rules and regulations of all local, NY State and federal authorities having jurisdiction. Provide owner with certificate of inspection.

2. Per NFPA 303 the electrical service is to be turned off from the power source when the water reaches the mark for the electrical datum plane.

3. Return all demolished items as switchboard, panelboards, circuit breakers and conductors to the CO. Coordinate exact location with the CO.

4. Do all necessary cutting and rough patching. Including but not limited to: finish painting and patching, masonry and concrete foundations for equipment.

5. Electrical sheets indicate the size and general location of work.

Do not used scaled dimensions.

6. Prepare and furnish to the CO "as-built" plans.

7. Provide temporary light and power at construction areas.

8. Test and adjust all parts of the work and associated equipment to work properly and be in perfect operating condition. Conduct megger tests between phases and between each phase and ground of all feeders, and panelboards. Correct defects disclosed by these tests. Submit copies of the report to the CO for approval.

9. Eliminate splices in conductors wherever possible. Only where approved by the CO, provide watertight splices in readily accessible junction boxes. Splice boxes in non-accessible locations are not permitted. In unfinished areas (e.g.

equipment rooms, electrical equipment rooms, etc.) conduits run exposed.

10. Properly clean-up and store all materials, tools and equipment after each work period.

11. Provide approved fire stopping and/or watertight compound at all penetrations through fire rated floors, walls and partitions to maintain fire rating of floor, walls or partitions.

12. Provide waterproofing at all conduits penetration into pull boxes, panelboards, disconnect switches, transformers, wireways, etc., internal and external of conduit(s).

13. Maintain power and lighting throughout. All required interruptions shall be as directed by CO.

14. Coordinate the location of all electrical equipment, raceways, etc. so as to avoid interference with piping, building steel, etc.

a. Maintain adequate access to all junction, termination and pull boxes.

b. Maintain adequate access to all equipment for operation, maintenance and repairs.

15. Provide submittals showing proposed work for approval by the

CO prior to installation, according to Subsection 104.03(a).

16. Support wall mounted electrical equipment (i.e. panelboards, junction boxes, disconnect switches, etc.) by strut channel secured to floor and ceiling. Unless wall is of masonry type which is of suitable construction to support weight of equipment, or except as otherwise noted or specified.

17. Survey existing electrical equipment, devices and raceways whether or not shown on the sheets, which may interfere with the work. Determine the source of power and the load it serves. Disconnect and remove completely or relocate and reconnect existing equipment, devices and raceways as directed by the CO.

18. Turn over to the CO existing equipment indicated to be removed, unless otherwise directed.

19. Provide expansion fittings in all conduit and electrical raceway runs.

20. Prior commencing work coordinate with PSEG LI for all electrical requirements, including shut down replacement of transformer secondary feeders and the installation of the

Electric Meters.

21. Submit for approval short circuit calculations prior purchasing of equipment.

A06

ELECTRICAL ABBREVIATIONS

AND GENERAL NOTES

Added note #2 and revision 1 and 8

LEA 06/16/16

NY

NY ERFO FIIS2013-1(7)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

STATE PROJECT SHEET NO.

NPS

NO.

NO.

PMIS

FIRE ISLAND NATIONAL SEASHORE

120485

201456

195093

213699

AMENDMENT NO. 3

DESCRIPTION BY DATE

REVISIONS

NO.

WATCH HILL MARINA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text | PROJECT: 5836 | PLOTBY: BBONILLA | PLOTDATE: 6/17/2016 9:21 AM | FILENAME: 5836-A06.dwg |

AutoCAD SHX Text

AutoCAD SHX Text

C01

TABULATION OF QUANTITIES

Line Item

No.

Pay Item

Number

Pay Item Description

Unit

Sheet and Description

A05 D01 R04 R04 R05 R06 R12 R07 R15 R16/R17

Electrical

Key Plan

General

Notes

Marina Plan

Proposed

Section A

(Perimeter

Bulkhead)

Proposed

Section B

(Finger Pier

Bulkhead)

Proposed

Section C

(Perimeter

Bulkhead)

Proposed

Section D

(Bulkhead

Wall at Ferry

Dock)

Ferry Railing

Sand

Retention

Barrier Detail

Panelboard

Pile

Foundaiton

Electrical

Shed Details

1 & 2

Marina

Electrical

Key Plan

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0060 15701-0000 SOIL EROSION CONTROL LPSM ALL

A0080 20304-1000

REMOVAL OF STRUCTURES AND

OBSTRUCTIONS

LPSM ALL

A0100 55101-2300

TREATED TIMBER PILE, IN PLACE

LNFT

3,850

A0120 55101-2300

TREATED TIMBER PILE, IN PLACE (LAY

PILES)

LNFT 625

A0140 55701-2000

STRUCTURAL TIMBER AND LUMBER,

TREATED

MFBM 2 23 6 2 1 1 23 4

A0160 55701-3000

STRUCTURAL TIMBER AND LUMBER,

COMPOSITE

MFBM 4 38 9 7 1

A0180 55706-2000

STRUCTURAL TIMBER AND LUMBER,

TREATED (ELECTRICAL SHED)

LPSM ALL

A0200 63601-3000

SYSTEM INSTALLATION, ELECTRICAL

LPSM ALL

A0220 63701-0000 FIELD OFFICE EACH 1

A0240 64501-0000 LOCATE UTILITIES LPSM ALL

A0260 64605-0000

FIXTURE (EXTINGUISHERS)

LPSM ALL

SUMMARY OF QUANTITIES - SCHEDULE A

Estimated

Quantities

Bid Schedule

ALL

ALL

ALL

ALL

3,850

ALL

ALL

ALL

ALL

AMENDMENT NO. 3

Quantity for lay piles added

VHB 06/16/16

DESCRIPTION BY

REVISIONS

NO.

Repair electrical systems and rehabilitate marina boardwalks (Typ.)

B a s i n

D

B a s

C

VISITOR

CENTER

B a s

A a s

Coordinate with PSEG LI to verify condition of underground electrical line and if it is active. Not all conduits are shown.

B

B

C

Replace existing bulkhead

(approximately 3850 lnft)

C

B

B

A

A

A

A

A

Demolish bocce courts

Replace sand retention barrier

(approximately 1200 lnft)

Replace electrical shed

O p e r a i l i n g

O p e n i n g

O p e n i n g x u m p o u t

19'-9" x 2'-6" Bumpout

O p e n i n g

O p e n i n g

T y p

S t a i r s

13'-0" x 2'-6" Bumpout

O p e n i n g

R a m p

9'-9" x 11'-3" Bumpout

O p e n i n g

13'-2" x 2'-6" Bumpout

R a m p

7'-8" x 8'-3" Bumpout

13'-6" x 2'-6" Bumpout

A

O p e n i n g

8'-0" x

10'-0"

Bumpout

O p e n i n g

W a l k w a y

W a l k w a y

R a m p

8'-0"

Path

Tie-pile (Typ.)

E

E

F

H

E

F

H

F

H

E

FH

E

E

F

H

Ferry railing

Switchback ramp

R a m p

D

D

Replace decking (approximately 3000 sqft)

See Detail G

E

IM

HM

LZ

HM

SM

Notes:

1. MLW and MHW and Limit of LZ located on Vertical bulkhead wall within Marina.

2. See Typical Existing Sections sheets and Typical

Rehabilitation Sections sheets for sections.

3. Install RPZ valves at all fire hose locations.

4. Request antenna to be lowered if wires prevent work access. Antenna has 3 support wires approximately

10'± from base attached to concrete footings that are to not be disturbed.

5. Dimensions shown are existing.

6. Install boom and buoy visible at night across mouth of marina entrance during construction to mark closure.

Bulkhead wall (Typ.)

See Section E

See Section D (20'-0" T&G sheeting)

O p e n i n g

Shed boardwalk

C

C

Antenna (See Note 4)

2" Tide gauge conduit to remain

40'±

E

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

Limits of 20'-0" T&G sheeting

Limits of 20'-0"

T&G sheeting

MARINA PLAN

NY

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

STATE PROJECT SHEET NO.

FIRE ISLAND NATIONAL SEASHORE

120485

201456

A M v h b p r o j w a t t s n p s n e r t r a n s t e c h s u p p t e c h f i i s c a d d e w a d o c k s m i c r o s t a m a r i n a s w a t c h h i l l w a t c h h i l l m a p d w g

195093

213699

D01

0 100 200 Feet

AMENDMENT NO. 3

Notes 5, 6 & 20' sheeting limits added

VHB 06/16/16

DESCRIPTION BY DATE

REVISIONS

NO.

Existing PSEGLI Primary feed to remain.

Grade

Level

Existing 300KVA

PSEGLI Transformer

Existing CT cabinet and

Incoming service section

Existing Concession

Distribution Main Switch

Existing Switch Board

Distribution section

Spare

Existing time clock

Existing

Concession meter

Existing FINS meter

Existing Panelboard located in existing storage closet at bathroom area

Concession site lighting panel

Existing pull box

Existing Panelboard outdoor enclosure

NOTES:

1. Salvage switchboard, panelboards, circuit breakers, conductors in accordance with

Specification section 203. Coordinate delivery location with the CO, National Park

Services, 166 West Ave., Patchogue NY

11772.

D04

ELECTRICAL DEMOLITION

ONE-LINE DIAGRAM

NY

NY ERFO FIIS2013-1(7)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

STATE PROJECT SHEET NO.

NPS

NO.

NO.

PMIS

FIRE ISLAND NATIONAL SEASHORE

120485

201456

195093

213699

AMENDMENT NO. 3

DESCRIPTION BY DATE

REVISIONS

NO.

WATCH HILL MARINA

Revised note #1

LEA 06/16/16

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text

2000AS

AutoCAD SHX Text

2000AF

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

FINS

AutoCAD SHX Text Main

AutoCAD SHX Text Panel

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'E'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'F'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'D'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'A'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'H'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'G'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'B'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'C'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'I'

AutoCAD SHX Text

CON

AutoCAD SHX Text

CESSION

AutoCAD SHX Text

MAIN

AutoCAD SHX Text

FINS

AutoCAD SHX Text Site

AutoCAD SHX Text Lighting

AutoCAD SHX Text Panel

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text | PROJECT: 5836 | PLOTBY: BBONILLA | PLOTDATE: 6/17/2016 9:21 AM | FILENAME: 5836-D04.dwg |

AutoCAD SHX Text

AutoCAD SHX Text

Existing PSEGLI Primary feed to remain.

Grade

Level

Existing 300kVA PSEGLI

Transformer

13.2kV-120/208V

Incoming service and CT compartment

Switchboard main and digital metering section

1200A, 120/208V, 3 phase, 4 wire, 65,000 AIC, Nema 4X Stainless Steel

Spare

Marina meter

Panelboard weatherproof enclosure

(Typ.)

Spare

PSEGLI Primary feeder

225kVA PSEGLI

Transformer

13.2kV-120/208V

400AS/175AF

POWER FEEDER LEGEND

TAG

FEEDER

SIZE

GROUND

WIRE SIZE

CONDUIT

SIZE

4#350KCMIL

#3/0

4"

4#400KCMIL #2 3"

4#300KCMILL #3 3"

4#500KCMIL #1 4"

4#4/O

#4

2 1/2"

4#400KCMIL

#1/0 3 1/2"

NUMBER

OF SETS

3#500KCMIL #3 3"

4#4/0

#4

2 1/2"

4#500KCMIL #1 4" 2

Coordinate electrical meters with PSGELI and the CO in the field prior to commencing any work.

Electrical contractor is responsible to provide feeder oversize lugs at switchboard and at panelboards as required.

Provide surge protection device rated for 240kA peak surge current per phase, in a NEMA 4X enclosure.

Provide NEMA 4x splice box at underside of shed.

Provide NEMA 4x splice box adjacent to panelboard.

Refer to grounding details #3 on sheet D18.

Coordinate work with PSEGLI requirements.

Cable to be 15kV, (3)-1/0 awg with concentric neutral in 5" conduit.

Ground neutral conductor at disconnect switch.

The demand calculated load for this main distribution board is based on the connected loads for each panelboard connected with the demand factor per

NEC section 555.12 as follows:

Total connected load

=(1037.6)(30%)(90%)

=280.15kVA

The connected load for this distribution board is as follows:

Total connected load = 600 amps = 155.2kVA

Provide 100% rated main circuit breaker.

NOTES:

Shed

Level

NEMA 4X Stainless Steel

112.5kVA Transformer

208V-480V (Delta-Wye)

NEMA 4X Stainless Steel

112.5kVA Transformer

480V-120/208V

(Delta-Wye)

Existing Panelboard located in existing storage closet at bathroom area

Existing

800A, 120/208V, 3 phase, 4 wire, 65,000 AIC, Nema 4X Stainless

Steel

Concession meter

(Typ.)

Spare

Incoming service and

CT compartment

Switchboard main and digital metering section

Panelboard weatherproof enclosure

Spare

Splice box #2

Splice box #3

Splice box #1

Splice box #4

Splice box #5

3#250KCMIL

4#300KCMIL

4#2/0

3#350KCMIL

4#4/0

4#2

4#3/0

4#350KCMIL

4#250KCMIL

#4

#6

#1/0

#8

#2

#6

#4

#4

#4 3"

3"

2 1/2"

2 1/2"

2 1/2"

3 1/2"

4"

2"

2"

TAG

FEEDER

SIZE

GROUND

WIRE SIZE

CONDUIT

SIZE

NUMBER

OF SETS

D05

ELECTRICAL ONE-LINE

DIAGRAM

NY

NY ERFO FIIS2013-1(7)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

STATE PROJECT SHEET NO.

NPS

NO.

NO.

PMIS

FIRE ISLAND NATIONAL SEASHORE

120485

201456

195093

213699

AMENDMENT NO. 3

DESCRIPTION BY DATE

REVISIONS

NO.

WATCH HILL MARINA

Added notes, revised C.B. and feeder 1

LEA 06/16/16

AutoCAD SHX Text

600AF

AutoCAD SHX Text %%u400AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'A3'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'A2'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'A1'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'B2'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'B1'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'C2'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'C1/D3'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'D1'

AutoCAD SHX Text

PANEL

AutoCAD SHX Text 'D2'

AutoCAD SHX Text

400AF

AutoCAD SHX Text

%%U400AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

SPD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

250AF

AutoCAD SHX Text %%u175AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

600AF

AutoCAD SHX Text %%u225AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

600AF

AutoCAD SHX Text %%u225AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

400AF

AutoCAD SHX Text %%u175AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

400AF

AutoCAD SHX Text %%u400AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

250AF

AutoCAD SHX Text %%u175AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

600AF

AutoCAD SHX Text %%u300AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

600AF

AutoCAD SHX Text %%u250AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

250AF

AutoCAD SHX Text %%u250AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

AutoCAD SHX Text

1200AF

AutoCAD SHX Text %%u1200AT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FIIS

AutoCAD SHX Text Main

AutoCAD SHX Text Panel

AutoCAD SHX Text

CON

AutoCAD SHX Text

CESSION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

250AF

AutoCAD SHX Text %%u200AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

SPD

AutoCAD SHX Text

400AF

AutoCAD SHX Text %%u400AT

AutoCAD SHX Text 2P

AutoCAD SHX Text

250AF

AutoCAD SHX Text %%u200AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

800AF

AutoCAD SHX Text %%u800AT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

250AF

AutoCAD SHX Text %%u250AT

AutoCAD SHX Text 3P

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text | PROJECT: 5836 | PLOTBY: BBONILLA | PLOTDATE: 6/17/2016 1:36 PM | FILENAME: 5836-D05.dwg |

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Approximate location of existing PSEG LI transformer

A

B

I

Basin D

Basin C

Existing pull box

C

D06

1. Demolish all existing devices indicated to be demolished such as pedestals, panelboards, panelboard enclosures, feeders, branch circuits, lighting fixtures, lighting poles and conduits back to the origination point.

Demolition of existing shed housing existing electrical switchboard and equipment is by others.

Electrical contractor to demolished electrical equipment in shed. Coordinate all required shutdowns with PSEGLI and the CO in advance.

Demolish a total of thirty-three (33) existing pedestals and branch circuits and conduits back to the origination point.

Approximate location of existing transformer secondary. Electrical contractor to coordinate shutdown with the CO and PSEGLI, prior to demolition of existing feeder.

NOTES:

REFER TO SHEET D07 FOR CONTINUATION

ELECTRICAL DEMOLITION POWER &

LIGHTING PLAN SHEET 1 OF 3

WATCH HILL VISITOR'S CENTER MARINA ELECTRICAL DEMOLITION POWER & LIGHTING PLAN

SCALE: 1" = 50'-0"

NY

NY ERFO FIIS2013-1(7)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

STATE PROJECT SHEET NO.

NPS

NO.

NO.

PMIS

FIRE ISLAND NATIONAL SEASHORE

120485

201456

195093

213699

AMENDMENT NO. 3

DESCRIPTION BY DATE

REVISIONS

NO.

WATCH HILL MARINA

Revised note #1

LEA 06/16/16

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text | PROJECT: 5836 | PLOTBY: BBONILLA | PLOTDATE: 6/17/2016 9:21 AM | FILENAME: 5836-D06.dwg |

AutoCAD SHX Text

AutoCAD SHX Text

F

E

Basin B

Basin A

D

Existing 12' Pole

Existing 16' Pole

H

G

D07

1. Demolish all existing devices indicated to be demolished such as pedestals, panelboards, panelboard enclosures, feeders, branch circuits, lighting fixtures, lighting poles and conduits back to the origination point.

Demolish a total of Forty-one (41) existing pedestals and branch circuits and conduits back to the origination point.

NOTES:

ELECTRICAL DEMOLITION POWER &

LIGHTING PLAN SHEET 2 OF 3

WATCH HILL VISITOR'S CENTER MARINA ELECTRICAL DEMOLITION POWER & LIGHTING PLAN

SCALE: 1" =50'-0"

R E F E R

T O

S H

E E T

D

F O

R

C O

N T I N

U A T I O

N

REFER TO SHEET D06 FOR CONTINUATION

NY

NY ERFO FIIS2013-1(7)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

STATE PROJECT SHEET NO.

NPS

NO.

NO.

PMIS

FIRE ISLAND NATIONAL SEASHORE

120485

201456

195093

213699

AMENDMENT NO. 3

DESCRIPTION BY DATE

REVISIONS

NO.

WATCH HILL MARINA

Revised note #1

LEA 06/16/16

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text | PROJECT: 5836 | PLOTBY: BBONILLA | PLOTDATE: 6/17/2016 9:21 AM | FILENAME: 5836-D07.dwg |

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Approximate location of existing

300 KVA PSEG LI

transformer

C2

(Typ.)

D2

D1

Basin D

Basin C

C1/D3

C1/D3#30

D2#10

D2#10 D2#10

D2#10

D2#10

C1/D3#30

C1/D3#30

C1/D3#30

(Typ.)

(Typ.)

(Typ.)

MH-1

MH-2

(Typ.)

Bathroom area

Restaurant

Approximate location of new

225KVA PSEGLI

Transformer

BRANCH CIRCUIT LEGEND

TAG

CIRCUIT

SIZE

GROUND

WIRE SIZE

CONDUIT

SIZE

2#10

#10

3/4"

D09

Provide secondary conductors from existing

PSEG LI transformer to the new main distribution ct cabinet. Refer to sheet D16 for additional information. Coordinate this scope of work in advance with the CO and PSEG LI prior to commencing any work.

Shed housing, electrical main distribution comprised of the ct cabinet, two (2) main circuit breakers and distribution section(s) on the 2nd level of newly constructed shed. Refer to sheet

D16 for additional information, and to sheet

D18 for grounding information and details.

Provide new outdoor enclosure (wp) for new panelboard. Provided weep holes to discharge condensation. Refer to sheet D17 "typical electrical panelboard detail" for additional information.

Provide trenching for panelboard feeder conductors in conduit as indicated on sheet

D18 , from panelboard to distribution section(s) located on 2nd floor of newly constructed shed.

Refer to note 2 above. Trench conduits minimum of 24 inches below grade. No splices are allowed for any feeder conductor run.

Route panelboard feeder conductors and conduit(s) to the main distribution section(s) located on the 2nd floor of the newly constructed shed. Refer to sheet D05 and D16 for additional information.

Provide photo sensor mounted on the side of the panelboard outdoor enclosure.

Provide conduit(s) and feeder(s) from the FIIS panel to the bathroom area existing electrical panelboard. Existing panelboard located in existing storage closet. Storage closet door shall be reversed to swing out. Reverse door prior to electrical contractor commencing the of work.

Coordinate termination point via splice box #5 with the CO in the field. Refer to sheet D05 for additional information.

Provide conduit(s) and feeder(s) from the 800A main distribution board to the concession restaurant area existing power connection point.

Coordinate termination point via splice box #4 with the CO in the field. Refer to sheet D05 for additional information.

Provide one (1) #8 AWG insulated ground conductor in 3/4 inch conduit at metal ladder.

Ladder grounding conductor shall be independent of any other electrical system grounding. Refer to sheet D18 detail #5.

Provide transformer concrete pad as per

PSEG-LI latest requirements. Coordinate exact location with the CO, prior to commencing any work. Install pad at grade.

Coordinate work with PSEGLI requirements.

NOTES:

REFER TO SHEET D10 FOR CONTINUATION

ELECTRICAL POWER & LIGHTING

PLAN SHEET 1 OF 3

WATCH HILL VISITOR'S CENTER MARINA ELECTRICAL POWER & LIGHTING PLAN

SCALE: 1" = 50'-0"

TYPICAL CIRCUIT LEGEND:

Number denotes branch circuit #10 from panel D2.

Letter/Number denotes panel D2.

D2#10

NY

NY ERFO FIIS2013-1(7)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

STATE PROJECT SHEET NO.

NPS

NO.

NO.

PMIS

FIRE ISLAND NATIONAL SEASHORE

120485

201456

195093

213699

AMENDMENT NO. 3

DESCRIPTION BY DATE

REVISIONS

NO.

WATCH HILL MARINA

Removed metal ladder

LEA 06/16/16

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text D19

AutoCAD SHX Text B

AutoCAD SHX Text D19

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text | PROJECT: 5836 | PLOTBY: BBONILLA | PLOTDATE: 6/17/2016 9:21 AM | FILENAME: 5836-D09.dwg |

AutoCAD SHX Text

AutoCAD SHX Text

Service to existing panel in storage closet at bathroom area

FIIS PANEL

(TYP.)

SHED SECTION B-B

SCALE: 1/4"=1'-0"

Service to panel A3

Step-Up

Transformer

112.5kVA

400A/175AF

disc. switch

Splice box

#1

Panel FIIS

CKT#3

WP

GFI

Panel FIIS CKT#8, 10, 12

FIIS

Panel

PSEG LI

CT Compartment and 800AT/800AF

Main Distribution

Distribution

Section

PSEG LI

CT Compartment and 1200AT/1200AF

Main Distribution

Step-Up

Transformer 112.5kVA

400A/175AF

disc. switch

WP

GFI

Panel FIIS

CKT#3

SPD

A

A

B

B

SHED PLAN VIEW

SCALE: 1/8"=1'-0"

Distribution Section

Panel FIIS

CKT#7

Panel FIIS

CKT#7

Panel FIIS

CKT#5

SPD

Electrical secondary from existing 300kVA PSEG LI transformer

Service to panel A2

Service to panel A1

Service to panel B2

Service to panel B1

(TYP.)

PSEGLI

electrical meter

Section 2 Section 1

SHED SECTION A-A

SCALE: 1/4"=1'-0"

Main CB

SPD

Splice box #3

Splice box

#2

3'-6"

Transition between rigid galvanized steel

PVC coated conduit and

PVC or RTRC conduit.

(TYP.)

PVC or RTRC conduit (TYP.)

Service to panelboard D2

Rigid galvanized steel

PVC coated conduit (TYP.)

Splice box

#1

Service to restaurant concession existing power

Section 2 Section 1

Electrical secondary from 225kVA

PSEG LI transformer

PSEGLI

electrical meter

Main CB

SPD

Service to panel C1/D3

Service to panel C2

Service to panel D1

Refer to sheet D05 for electrical conduit and conductor information.

Coordinate electrical meters location with PSEGLI and CO in the field prior to commencing any work.

Provide rigid galvanized steel PVC coated conduits from the main distribution panelboard to below grade level. Transition to PVC or

RTRC conduit for the remainder of the conduit route.

Provide ridig galvanized steel PVC coated conduits for the entire conduit route.

5. Refer to sheet D18 for trenching details.

Provide two (2) chain hung lighting fixtures similar to Mercury

Lighting L501-4-4200-35K-HTA-UXX-

UNI-SSL-HB. Provide all accessories required for a complete installation. Provide one (1) lighting control switch. Circuit lighting fixtures to panel FIIS CKT#1.

Provide one (1) wall mounted fan forced unit heater similar to TPI

Corporation 5100 Series, 208V, 3-phase, 2.5kw. Provide wall mounted bracket installed per manufacturer requirements.

Provide 2 square foot fixed louver with 50% free area. Provide

120V, motorized damper and interlock with operation of exhaust fan. Provide bird screen.

Roof mounted mushroom type exhaust fan similar to Greenheck

Model G-085-D, 1/20HP, 120V, 500 CFM, 0.25" static pressure.

Provide bird screen and roof curb.

NOTES:

ELECTRICAL DETAILS

D16

NY

NY ERFO FIIS2013-1(7)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

STATE PROJECT SHEET NO.

NPS

NO.

NO.

PMIS

FIRE ISLAND NATIONAL SEASHORE

120485

201456

195093

213699

AMENDMENT NO. 3

DESCRIPTION BY DATE

REVISIONS

NO.

WATCH HILL MARINA

Revised conduit type

LEA 06/16/16

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text | PROJECT: 5836 | PLOTBY: BBONILLA | PLOTDATE: 6/17/2016 9:22 AM | FILENAME: 5836-D16.dwg |

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PANEL: D1

Nema 3R

Location:

Basin 'D' - West side

Mounting:

Floor on concrete pad, Inside weather proof enclosure

Service:120/208v 3ph 4w w/ground bus Mains: MCB 250 Amps

Bus rating: 400a Short circuit rating: 22 KA RMS SYM ckt. bkr. Branch circuit Branch circuit ckt. bkr.

Amps

Trip

Pole

Designation

Volt

Amps

No No

Volt

Amps

Designation

Pole

Amps

Trip

* 125 2 Pedestal PD-1

10400 1 2 0

Spare

2 125 *

10400 3 4 0

* 125 2 Pedestal PD-2

10400 5 6 0

Spare

2 125 *

10400 7 8 0

* 125 2 Pedestal PD-3

10400 9 10 0

Power to Shunt trip breakers

1 20

10400 11 12 0

Spare

1 20

* 125 2 Pedestal PD-4

10400 13 14 0

Spare

1 20

10400 15 16 0

Spare

1 20

* 125 2 Pedestal PD-5

10400 17 18 0

Space

10400 19 20 0

Space

* 125 2 Pedestal PD-6

10400 21 22 0

Space

10400 23 24 0

Space

30 3

Panel Surge Protection

0 25 26 0

Space

0 27 28 0

Space

0 29 30 0

Space

Subtotal:

Phase A Phase B Phase C

41,600 41,600 41,600

Total:

124,800

Provide Shut Trip Circuit Breaker

PANEL: D2

Nema 3R

Location:

Basin 'D' - North side

Mounting:

Floor on concrete pad, Inside weather proof enclosure

Service:120/208v 3ph 4w w/ground bus Mains: MCB 250 Amps

Bus rating: 400A Short circuit rating: 22 KA RMS SYM ckt. bkr. Branch circuit Branch circuit ckt. bkr.

Amps

Trip

Pole

Designation

Volt

Amps

No No

Volt

Amps

Designation

Pole

Amps

Trip

* 125 2 Pedestal PD-7

10400 1 2 0

Spare

2 125 *

10400 3 4 0

* 125 2 Pedestal PD-8

10400 5 6 0

Spare

2 125 *

10400 7 8 0

* 125 2 Pedestal PD-9

10400 9 10 55

Pole Lighting (Via Photo cell)

1 20

10400 11 12 0

Power to Shunt trip breakers

1 20

* 125 2 Pedestal PD-10

10400 13 14 0

Spare

1 20

10400 15 16 0

Spare

1 20

* 125 2 Pedestal PD-11

10400 17 18 0

Spare

1 20

10400 19 20 0

Space

* 125 2 Pedestal PD-12

10400 21 22 0

Space

10400 23 24 0

Space

30 3

Panel Surge Protection

0 25 26 0

Space

0 27 28 0

Space

0 29 30 0

Space

Subtotal:

Phase…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .