Report_2_SWPPP.pdf
PDF 13 MB Posted
- Attached to
- Shiloh National Military Park
- Solicitation number
- DTFH71-16-B-00027
About this file
Report 2_SWPPP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ROBO_-_NP-SHIL_11(1) _18(1).pdf | ||
| FP14_Eng.pdf | ||
| Report_3_Pavement_Condition_Survey.pdf | ||
| VETS-4212_-_Form.pdf | ||
| Report_1_NEPA.pdf | ||
| Plans_-_NP-SHIL_11(1) _18(1).pdf | ||
| IFB_Solicitation_-_NP-SHIL_11(1) _18(1).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Synopsis_-_NP-SHIL_11(1) _18(1).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stormwater Pollution Prevention Plan (SWPPP)
SHIL 11(1), 18(1)
EPA SWPPP Template, Version 1.1 i
Construction SWPPP Template
Instructions
To help you develop your construction project Stormwater Pollution Prevention Plan (SWPPP), the
U.S Environmental Protection Agency (EPA) has created this SWPPP Template. The template is designed to help you develop a SWPPP that is compliant with the minimum requirements of
EPA’s 2012 Construction General Permit (“2012 CGP”), and is customizable to your specific project and site.
Using the SWPPP Template
Each section of the SWPPP Template includes “instructions” and space for your project and site information. You should read the instructions for each section before you complete that section.
The SWPPP Template was developed as an editable document file so that you can easily add tables and additional text, and delete unneeded or non-applicable fields. Note that some sections may require only a brief description while others may require several pages of explanation.
The following tips for using this template will help you ensure that the minimum permit requirements are met:
Read the 2012 CGP thoroughly before you begin preparation of your SWPPP to ensure that you have a working understanding of the permit’s underlying requirements. You will also need to consult Part 9 of the permit to determine if your state or tribe has included additional requirements that affect you.
Complete the SWPPP prior to submitting your Notice of Intent (NOI) for permit coverage.
This is required in Parts 1.4 and 7.1.1.
If you prepared a SWPPP for coverage under a previous version of EPA’s CGP, you must review and update your SWPPP to ensure that the 2012 CGP requirements are addressed prior to submitting your NOI.
Note: If your project is an “existing project” (see Part 1.4.2.b) or if you are a “new operator of an existing project” (see Part 1.4.2.c), and it is infeasible for you to comply with a specific requirement in Part 2.1 and 2.3.3 through 2.3.5 of the permit (except for Parts 2.3.3.1, 2.3.3.2b, 2.3.3.3c.i, and 2.3.3.4) because (1) the provision was not part of the permit you were previously covered under (i.e., the 2003 or 2008 CGP), and (2) because you are prevented from compliance due to the nature or location of earth disturbances that commenced prior to
February 16, 2012, or because you are unable to comply with the requirement due to the manner in which stormwater controls have already been installed or were already designed prior to February 16, 2012, you are required to include documentation in your SWPPP of the reasons why it is infeasible for you to meet the specific requirement, and then you may be waived from complying with the requirement. You must include a separate justification why it is infeasible for you to meet each of the applicable requirements.
If there is more than one construction operator for your project, consider coordinating development of your SWPPP with the other operators. However, while multiple operators may share the same SWPPP, make sure that responsibilities and scope of work are clearly described for each operator.
Once you have been provided coverage under the CGP, include your NOI and authorization email, as well as a copy of the CGP, as attachments to the SWPPP. See
Appendices B and C of the SWPPP Template.
EPA SWPPP Template, Version 1.1 ii
EPA notes that while EPA has made every effort to ensure the accuracy of all instructions and guidance contained in the SWPPP Template, the actual obligations of regulated construction activities are determined by the relevant provisions of the permit, not by the Template. In the event of a conflict between the SWPPP Template and any corresponding provision of the 2012
CGP, you must abide by the requirements in the permit. EPA welcomes comments on the SWPPP
Template at any time and will consider those comments in any future revision of this document.
You may contact EPA for CGP-related inquiries at cgp@epa.gov.
mailto:cgp@epa.gov
EPA SWPPP Template, Version 1.1 iii
For Construction Activities At:
NP- SHIL 11(1), 18(1): Rehabilitation of Corinth-Pittsburg Landing Road (Route 11) and Hamburg-
Purdy Road (Route 18)
Corinth-Pittsburg Landing Road and Hamburg-Purdy Road in Shiloh National Military Park
Hardin County, TN 38376
(731) 689-5696
SWPPP Prepared For:
Eastern Federal Lands Highway Division, FHWA
Kevin Rose
21400 Ridgetop Circle
Sterling, VA 20166
(571) 434-1541
Kevin.Rose@dot.gov
SWPPP Prepared By:
Eastern Federal Lands Highway Division, FHWA
Eric Rothermel
21400 Ridgetop Circle
Sterling, VA 20166
(703) 404-6365
Eric.Rothermel@dot.gov
SWPPP Preparation Date:
10 / 26 / 2015
Estimated Project Dates:
Project Start Date: __ __ / __ __ / __ __ __ __
Project Completion Date: __ __ / __ __ / __ __ __ __
EPA SWPPP Template, Version 1.1 iv
Contents
SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES
1.1 Operator(s) / Subcontractor(s)
1.2 Stormwater Team
SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING
2.1 Project/Site Information
2.2 Discharge Information
2.3 Nature of the Construction Activity
2.4 Sequence and Estimated Dates of Construction Activities
2.5 Allowable Non-Stormwater Discharges
2.6 Site Maps
SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS
3.1 Endangered Species Protection
3.2 Historic Preservation
3.3 Safe Drinking Water Act Underground Injection Control Requirements
SECTION 4: EROSION AND SEDIMENT CONTROLS
4.1 Natural Buffers or Equivalent Sediment Controls
4.2 Perimeter Controls
4.3 Sediment Track-Out
4.4 Stockpiled Sediment or Soil
4.5 Minimize Dust
4.6 Minimize the Disturbance of Steep Slopes
4.7 Topsoil
4.8 Soil Compaction
4.9 Storm Drain Inlets
4.10 Constructed Stormwater Conveyance Channels
4.11 Sediment Basins
4.12 Chemical Treatment
4.13 Dewatering Practices
4.14 Other Stormwater Controls
4.15 Site Stabilization
SECTION 5: POLLUTION PREVENTION STANDARDS
5.1 Potential Sources of Pollution
5.2 Spill Prevention and Response
5.3 Fueling and Maintenance of Equipment or Vehicles
5.4 Washing of Equipment and Vehicles
5.5 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes
5.6 Washing of Applicators and Containers used for Paint, Concrete or Other Materials
5.7 Fertilizers
5.8 Other Pollution Prevention Practices
SECTION 6: INSPECTION AND CORRECTIVE ACTION
6.1 Inspection Personnel and Procedures
6.2 Corrective Action
6.3 Delegation of Authority
SECTION 7: TRAINING
SECTION 8: CERTIFICATION AND NOTIFICATION
SWPPP APPENDICES
EPA SWPPP Template, Version 1.1 1
SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES
1.1 Operator(s) / Subcontractor(s)
Operator(s):
Company or Organization Name: Federal Highway Administration
Name: Kevin Rose
Address: 21400 Ridgetop Circle
City, State, Zip Code: Sterling, VA 20166
Telephone Number: (571) 434-1541
Email: Kevin.Rose@dot.gov
[Repeat as necessary.]
Subcontractor(s):
Insert Company or Organization Name:
Insert Name:
Insert Address:
Insert City, State, Zip Code:
Insert Telephone Number:
Insert Fax/Email:
Insert area of control (if more than one operator at site):
Emergency 24-Hour Contact:
Company or Organization Name: Federal Highway Administration
Name: Kevin Rose
Telephone Number: (571) 434-1541
Instructions (see definition of “operator” at CGP Part 1.1.a):
― Identify the operator(s) who will be engaged in construction activities at the site.
Indicate respective responsibilities, where appropriate. Also include the 24-hour emergency contact.
― List subcontractors expected to work on-site. Notify subcontractors of stormwater requirements applicable to their work.
― Consider using Subcontractor Agreements such as the type included as a sample in
Appendix G of the Template.
EPA SWPPP Template, Version 1.1 2
1.2 Stormwater Team
Insert Role or Responsibility: SWPPP Preparer
Insert Position:Environmental Protection Specialist
Insert Name: Eric Rothermel
Insert Telephone Number: (703) 404-6365
Insert Email: Eric.Rothermel@dot.gov
Insert Role or Responsibility: SWPPP Certifier
Insert Position: Sr. Environmental Protection Specialist
Insert Name: Lisa Landers
Insert Telephone Number: (571) 434-1592
Insert Email: Lisa.Landers@dot.gov
Insert Role or Responsibility:
Insert Position:
Insert Name:
Insert Telephone Number:
Insert Email:
Instructions (see CGP Part 7.2.1):
― Identify the staff members (by name or position) that comprise the project’s stormwater team as well as their individual responsibilities. At a minimum the stormwater team is comprised of individuals who are responsible for overseeing the development of the
SWPPP, any later modifications to it, and for compliance with the requirements in this permit (i.e., installing and maintaining stormwater controls, conducting site inspections, and taking corrective actions where required).
― Each member of the stormwater team must have ready access to either an electronic or paper copy of applicable portions of the 2012 CGP and your SWPPP.
EPA SWPPP Template, Version 1.1 3
SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING
2.1 Project/Site Information
Project Name and Address
Project/Site Name: NP- SHIL 11(1), 18(1): Rehabilitation of Corinth-Pittsburg Landing Road
(Route 11) and Hamburg-Purdy Road (Route 18)
Project Street/Location: Rehabilitation of Corinth-Pittsburg Landing Road and Hamburg-
Purdy Road
City: Hardin County
State: TN
ZIP Code: 38376
County or Similar Subdivision: Hardin County
Project Latitude/Longitude
(Use one of three possible formats, and specify method)
Latitude: Longitude:
1. 35 º 08 ' 57'' N (degrees, minutes, seconds) 1. 88 º 19 ' 44'' W (degrees, minutes, seconds)
2. _ _ º _ _ . _ _' N (degrees, minutes, decimal) 2. _ _ º _ _ . _ _' W (degrees, minutes, decimal)
3. _ _ . _ _ _ _ º N (decimal) 3. _ _ . _ _ _ _ º W (decimal)
Method for determining latitude/longitude:
USGS topographic map (specify scale: ) EPA Web site GPS
Other (please specify):
Horizontal Reference Datum:
NAD 27 NAD 83 or WGS 84 Unknown
If you used a U.S.G.S topographic map, what was the scale? ____________________________
Additional Project Information
Is the project/site located on Indian country lands, or located on a property of religious or cultural significance to an Indian tribe? Yes No
If yes, provide the name of the Indian tribe associated with the area of Indian country
(including the name of Indian reservation if applicable), or if not in Indian country, provide the name of the Indian tribe associated with the property: INSERT TEXT HERE
Instructions (see “Project/Site Information” section of Appendix J – NOI form):
― In this section, you are asked to compile basic site information that will be helpful to you when you file your NOI.
― Detailed information on determining your site’s latitude and longitude can be found at www.epa.gov/npdes/stormwater/latlong http://www.epa.gov/npdes/stormwater/latlong
EPA SWPPP Template, Version 1.1 4
If you are conducting earth-disturbing activities in response to a public emergency, document the cause of the public emergency (e.g., natural disaster, extreme flooding conditions), information substantiating its occurrence (e.g., state disaster declaration), and a description of the construction necessary to reestablish effective public services: INSERT
TEXT HERE
Are you applying for permit coverage as a “federal operator” as defined in Appendix A of the 2012 CGP? Yes No
2.2 Discharge Information
Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System
(MS4)? Yes No
Are there any surface waters that are located within 50 feet of your construction disturbances?
Yes No
Instructions (see “Discharge Information” section of Appendix J – NOI form):
― In this section, include information relating to your site’s discharge. This information corresponds to the “Discharge Information” section of the NOI form. Because you may be using EPA’s mapping tool to answer some of these questions, and the tool is accessed in the eNOI system, you may find it necessary to leave some questions unanswered until you have completed that portion of the NOI.
― For Table 1, list the name of the first surface water that receives discharges from your site. If your site has discharges to multiple surface waters, indicate the names of all such waters.
― For Table 2, if any of the surface waters you listed out in Table 1 are listed as impaired by the applicable State or Tribe, provide specified information about pollutants causing the impairment and whether or not a Total Maximum Daily Load (TMDL) has been completed for the surface water. For more information on TMDLs and impaired waters, including a list of TMDL contacts and links by state, visit www.epa.gov/npdes/stormwater/tmdl.
― For Table 3, indicate whether any of the surface waters you listed out in Table 1 are designated as Tier 2, 2.5, or 3 waters by your State or Tribe. See Appendix F for more information.
http://www.epa.gov/npdes/stormwater/tmdl
EPA SWPPP Template, Version 1.1 5
Table 1 – Names of Receiving Waters
Name(s) of the first surface water that receives stormwater directly from your site and/or from the MS4
(note: multiple rows provided where your site has more than one point of discharge that flows to different surface waters)
1. Tennessee River
2.
3.
4.
5.
6.
[Include additional rows as necessary.]
Table 2 – Impaired Waters / TMDLs (Answer the following for each surface water listed in Table 1 above)
Is this surface water listed as
“impaired”?
If you answered yes, then answer the following:
What pollutant(s) are causing the impairment?
Has a TMDL been completed?
Title of the TMDL document Pollutant(s) for which there is a TMDL
1. YES NO YES NO
2. YES NO YES NO
3. YES NO YES NO
4. YES NO YES NO
5. YES NO YES NO
6. YES NO YES NO
Describe the method(s) you used to determine whether or not your project/site discharges to an impaired water: INSERT TEXT HERE
Table 3 – Tier 2, 2.5, or 3 Waters (Answer the following for each surface water listed in Table 1 above)
Is this surface water designated as a Tier 2, Tier 2.5, or Tier 3 water?
(see Appendix F)
If you answered yes, specify which
Tier (2, 2.5, or 3) the surface water is designated as?
1. YES NO INSERT "Tier 2", "Tier 2.5", or "Tier 3"
2. YES NO INSERT "Tier 2", "Tier 2.5", or "Tier 3"
3. YES NO INSERT "Tier 2", "Tier 2.5", or "Tier 3"
4. YES NO INSERT "Tier 2", "Tier 2.5", or "Tier 3"
5. YES NO INSERT "Tier 2", "Tier 2.5", or "Tier 3"
6. YES NO INSERT "Tier 2", "Tier 2.5", or "Tier 3"
EPA SWPPP Template, Version 1.1 5
2.3 Nature of the Construction Activity
General Description of Project
Provide a general description of the construction project:
The project consists of the rehabilitation of 1.74 miles of Corinth-Pittsburg Landing Road and 1.95 miles of Hamburg-Purdy Road in Shiloh National Military Park in Hardin County, TN. The work includes concrete pavement removal, grading, aggregate base, concrete pavement construction, cleaning and sealing concrete pavement joints and cracks, underdrain, shoulder and ditch reconditioning, signing, and other miscellaneous work.
Soil disturbing activities include concrete pavement removal, grading, underdrain, and shoulder and ditch reconditioning. The total disturbed area for the project is approximately 6.0 acres.
Size of Construction Project
What is the size of the property (in acres), the total area expected to be disturbed by the construction activities (in acres), and the maximum area expected to be disturbed at any one time?
SIZE OF PROPERTY (in acres): 3712
TOTAL AREA OF CONSTRUCTION DISTURBANCES (in acres): 6 acres
MAXIMUM AREA TO BE DISTURBED AT ANY ONE TIME (in acres): 8 acres
[Repeat as necessary for individual project phases.]
Construction Support Activities (only provide if applicable)
Describe any construction support activities for the project (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas)
INSERT DESCRIPTION OF CONSTRUCTION SUPPORT ACTIVITY
INSERT CONTACT INFORMATION FOR CONSTRUCTION SUPPORT ACTIVITY (Name, Telephone No., Email Address)
INSERT LOCATION INFORMATION FOR CONSTRUCTION SUPPORT ACTIVITY (Address and/or
Latitude/Longitude)
Instructions (see CGP Parts 1.3.c and 7.2.2):
― Provide a general description of the nature of the construction activities at your project.
― Describe the size of the property (in acres) and the total area expected to be disturbed by the construction activities (in acres), construction support activities covered by this permit (see Part 1.3.c of the permit), and the maximum area expected to be disturbed at any one time.
EPA SWPPP Template, Version 1.1 6
2.4 Sequence and Estimated Dates of Construction Activities
Phase I
Establish Perimeter Controls
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment does not leave the project site. Perimeter controls include silt fence and other specified measures outside the construction limits
Phase II
Intermediate Controls
Apply intermediate controls during rough grading operations. Install silt fence in pavement removal areas or in areas that directed by the CO.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 7 days, or as directed by the CO. apply permanent turf establishment to the finished slopes according to Section 625.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm runoff
Provide silt fence around all stockpiled excavated roadway material. Apply temporary turf establishment to stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.
Phase III
Final Construction/ Stabilization
Instructions (see CGP Part 7.2.5):
― Describe the intended construction sequence and timing of major activities.
― For each phase of construction, include the following information:
Installation of stormwater controls, and when they will be made operational;
Commencement and duration of earth-disturbing activities, including clearing and grubbing, mass grading, site preparation (i.e., excavating, cutting and filling), final grading, and creation of soil and vegetation stockpiles requiring stabilization;
Cessation, temporarily or permanently, of construction activities on the site, or in designated portions of the site;
Final or temporary stabilization of areas of exposed soil. The dates for stabilization must reflect the applicable deadlines to which you are subject to in Part 2.2.1; and
Removal of temporary stormwater conveyances/channels and other stormwater control measures, removal of construction equipment and vehicles, and cessation of any pollutant-generating activities.
― The construction sequence must reflect the following requirements:
Part 2.1.1.1 (area of disturbance);
Part 2.1.1.3.a (installation of stormwater controls); and
Parts 2.2.1.1, 2.2.1.2, 2.2.1.3 (stabilization deadlines).
― Also, see EPA’s Construction Sequencing BMP Fact Sheet at http://www.epa.gov/npdes/stormwater/menuofbmps/construction/cons_seq) http://www.epa.gov/npdes/stormwater/menuofbmps/construction/cons_seq
EPA SWPPP Template, Version 1.1 7
After completion of roadway construction, do the following as directed by the CO: Finish grading and apply permanent turf establishment to any remaining disturbed areas. Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas where vegetation has not established. Remove silt fence only after all upslope areas are stabilized and vegetation is well established.
Remove all other perimeter controls when directed by the CO.
[Repeat as needed.]
2.5 Allowable Non-Stormwater Discharges
List of Allowable Non-Stormwater Discharges Present at the Site
Type of Allowable Non-Stormwater Discharge Likely to be Present at
Your Site?
Discharges from emergency fire-fighting activities YES NO
Fire hydrant flushings YES NO
Landscape irrigation YES NO
Instructions (see CGP Parts 1.3.d and 7.2.8):
― Identify all allowable sources of non-stormwater discharges. The allowable non-stormwater discharges identified in Part 1.3.d of the 2012 CGP include:
Discharges from emergency fire-fighting activities;
Fire hydrant flushings;
Landscape irrigation;
Waters used to wash vehicles and equipment, provided that there is no discharge of soaps, solvents, or detergents used for such purposes;
Water used to control dust;
Potable water including uncontaminated water line flushings;
Routine external building wash down that does not use detergents;
Pavement wash waters provided spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and detergents are not used. You are prohibited from directing pavement was waters directly into any surface water, storm drain inlet, or stormwater conveyance, unless the conveyance is connected to a sediment basin, sediment trap, or similarly effective control;
Uncontaminated air conditioning or compressor condensate;
Uncontaminated, non-turbid discharges of ground water or spring water;
Foundation or footing drains where flows are not contaminated with process materials such as solvents or contaminated ground water; and
Construction dewatering water that has been treated by an appropriate control.
EPA SWPPP Template, Version 1.1 8
Waters used to wash vehicles and equipment YES NO
Water used to control dust YES NO
Potable water including uncontaminated water line flushings YES NO
Routine external building wash down YES NO
Pavement wash waters YES NO
Uncontaminated air conditioning or compressor condensate YES NO
Uncontaminated, non-turbid discharges of ground water or spring water YES NO
Foundation or footing drains YES NO
Construction dewatering water YES NO
(Note: You are reminded of the requirement to identify the likely locations of these allowable non-stormwater discharges on your site map. See Section 2.6, below, of the SWPPP Template.)
EPA SWPPP Template, Version 1.1 9
2.6 Site Maps
Instructions (see CGP Part 7.2.6):
― Attach site maps in Appendix A of the Template. For most projects, a series of site maps is necessary and recommended. The first should show the undeveloped site and its current features. An additional map or maps should be created to show the developed site or, for more complicated sites, show the major phases of development.
These maps must include the following features:
― Boundaries of the property and of the locations where construction will occur, including:
Locations where earth-disturbing activities will occur, noting any phasing of construction activities;
Approximate slopes before and after major grading activities. Note areas of steep slopes, as defined in Appendix A;
Locations where sediment, soil, or other construction materials will be stockpiled;
Locations of any crossings of surface waters;
Designated points on the site where vehicles will exit onto paved roads;
Locations of structures and other impervious surfaces upon completion of construction; and
Locations of construction support activity areas covered by this permit.
― Locations of all surface waters, including wetlands, that exists on or near your site.
Indicate which waterbodies are listed as impaired, and which are identified by your state, tribe, or EPA as Tier 2, Tier 2.5, or Tier 3 waters.
― The boundary lines of any natural buffer areas. See CGP Part 2.1.2.1.a.
― Areas of federally-listed critical habitat for endangered or threatened species.
― Topography of the site, existing vegetative cover (e.g., forest, pasture, pavement, structures), and drainage pattern(s) of stormwater and allowable non-stormwater flow onto, over, and from the site property before and after major grading activities.
― Stormwater and allowable non-stormwater discharge locations, including:
Locations of any storm drain inlets on the site and in the immediate vicinity of the site; and
Locations where stormwater or allowable non-stormwater will be discharged to surface waters (including wetlands).
― Locations of all potential pollutant-generating activities.
― Locations of stormwater control measures.
― Locations where polymers, flocculants, or other treatment chemicals will be used and stored.
EPA SWPPP Template, Version 1.1 10
SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS
3.1 Endangered Species Protection
Eligibility Criterion
Under which criterion listed in Appendix D are you eligible for coverage under this permit?
A B C D E
For reference purposes, the eligibility criteria listed in Appendix D are as follows:
Criterion A. No federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site’s “action area” as defined in Appendix A of this permit.
Criterion B. The construction site’s discharges and discharge-related activities were already addressed in another operator’s valid certification of eligibility for your action area under eligibility Criterion A, C, D, E, or F and there is no reason to believe that federally-listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the “action area”. To certify your eligibility under this Criterion, there must be no lapse of NPDES permit coverage in the other operator’s certification. By certifying eligibility under this Criterion, you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based. You must include in your NOI the tracking number from the other operator’s notification of authorization under this permit. If your certification is based on another operator’s certification under Criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in your NOI form.
Criterion C. Federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your site’s “action area,” and your site’s discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat. This determination may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat. To make this certification, you must include the following in your NOI: 1) any federally listed species and/or designated habitat located in your
“action area”; and 2) the distance between your site and the listed species or designated critical habitat (in miles). You must also include a copy of your site map with your NOI.
Instructions (see CGP Parts 1.1.e, 7.2.14.1, Appendix D, and the “Endangered Species
Protection” section of the Appendix J – NOI form):
Follow the process in Appendix D of the permit for determining which eligibility criterion (A-E) you have met with respect to the protection of endangered species. You will
― Include documentation supporting your determination of eligibility.
― Additional information on Endangered Species Act (ESA) provisions for EPA’s
Construction General Permit is at www.epa.gov/npdes/stormwater/esa http://www.epa.gov/npdes/stormwater/esa
EPA SWPPP Template, Version 1.1 11
Criterion D. Coordination between you and the Services has been concluded. The coordination must have addressed the effects of your site’s discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat, and must have resulted in a written concurrence from the relevant Service(s) that your site’s discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI.
Criterion E. Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded.
The consultation must have addressed the effects of the construction site’s discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat. The result of this consultation must be either:
i. a biological opinion that concludes that the action in question (taking into account the effects of your site’s discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or
ii. written concurrence from the applicable Service(s) with a finding that the site’s discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally-designated habitat.
You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI.
Criterion F. Your construction activities are authorized through the issuance of a permit under section 10 of the ESA, and this authorization addresses the effects of the site’s discharges and discharge-related activities on federally-listed species and federally-designated critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI.
Supporting Documentation
Provide documentation for the applicable eligibility criterion you select in Appendix D, as follows:
For criterion A, indicate the basis for your determination that no federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site’s action area (as defined in Appendix A of the permit). Check the applicable source of information you relied upon:
Specific communication with staff of the U.S. Fish & Wildlife Service or National Marine
Fisheries Service. INSERT DATE OF COMMUNICATION AND WHO YOU SPOKE WITH
Publicly available species list. INSERT SPECIFIC DOCUMENT AND/OR WEBSITE RELIED UPON
Other source: INSERT SPECIFIC SOURCE
For criterion B, provide the Tracking Number from the other operator’s notification of permit authorization: INSERT AUTHORIZATION TRACKING NUMBER FROM OTHER OPERATOR'S
NOTIFICATION LETTER/EMAIL
Provide a brief summary of the basis used by the other operator for selecting criterion A, B, C, D, E, or F: INSERT TEXT HERE
EPA SWPPP Template, Version 1.1 12
For criterion C, provide the following information:
INSERT LIST OF FEDERALLY-LISTED SPECIES OR FEDERALLY-DESIGNATED CRITICAL HABITAT
LOCATED IN YOUR ACTION AREA
INSERT DISTANCE BETWEEN YOUR SITE AND THE LISTED SPECIES OR CRITICAL HABITAT (in miles)
Also, provide a brief summary of the basis used for determining that your site’s discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat:
INSERT TEXT HERE
For criterion D, E, or F, attach copies of any letters or other communication between you and the U.S. Fish & Wildlife Service or National Marine Fisheries Service concluding consultation or coordination activities. INSERT COPIES OF LETTERS OR OTHER COMMUNICATIONS HERE
3.2 Historic Preservation
Appendix E, Step 1
Do you plan on installing any of the following stormwater controls at your site? Check all that apply below, and proceed to Appendix E, Step 2.
Dike
Berm
Catch Basin
Pond
Stormwater Conveyance Channel (e.g., ditch, trench, perimeter drain, swale, etc.)
Culvert
Other type of ground-disturbing stormwater control: Silt Fence will be installed to prevent stormwater runoff.
(Note: If you will not be installing any ground-disturbing stormwater controls, no further documentation is required for Section 3.2 of the Template.)
Appendix E, Step 2
If you answered yes in Step 1, have prior surveys or evaluations conducted on the site already determined that historic properties do not exist, or that prior disturbances at the site have precluded the existence of historic properties? YES NO
Instructions (see CGP Part 1.1.f, 7.2.14.2, Appendix E, and the “Historic Preservation” section of the Appendix J – NOI form):
Follow the screening process in Appendix E of the permit for determining whether your installation of subsurface earth-disturbing stormwater controls will have an effect on historic properties.
― Include documentation supporting your determination of eligibility.
― To contact your applicable state or tribal historic preservation office, information is available at www.achp.gov/programs/html.
http://www.achp.gov/programs/html
EPA SWPPP Template, Version 1.1 13
If yes, no further documentation is required for Section 3.2 of the Template.
If no, proceed to Appendix E, Step 3.
Appendix E, Step 3
If you answered no in Step 2, have you determined that your installation of subsurface earth-disturbing stormwater controls will have no effect on historic properties? YES NO
If yes, provide documentation of the basis for your determination. INSERT REFERENCES TO
DOCUMENTS, STUDIES, OR OTHER SOURCES RELIED UPON
If no, proceed to Appendix E, Step 4.
Appendix E, Step 4
If you answered no in Step 3, did the State Historic Preservation Officer (SHPO), Tribal Historic
Preservation Office (THPO), or other tribal representative (whichever applies) respond to you within 15 calendar days to indicate whether the subsurface earth disturbances caused by the installation of stormwater controls affect historic properties? YES NO
If no, no further documentation is required for Section 3.2 of the Template.
If yes, describe the nature of their response:
Written indication that adverse effects to historic properties from the installation of stormwater controls can be mitigated by agreed upon actions. INSERT COPIES OF
LETTERS, EMAILS, OR OTHER COMMUNICATION BETWEEN YOU AND THE APPLICABLE SHPO,
THPO, OR OTHER TRIBAL REPRESENTATIVE
No agreement has been reached regarding measures to mitigate effects to historic properties from the installation of stormwater controls. INSERT COPIES OF LETTERS, EMAILS, OR OTHER COMMUNICATION BETWEEN YOU AND THE APPLICABLE SHPO, THPO, OR OTHER
TRIBAL REPRESENTATIVE
Other: INSERT COPIES OF LETTERS, EMAILS, OR OTHER COMMUNICATION BETWEEN YOU
AND THE APPLICABLE SHPO, THPO, OR OTHER TRIBAL REPRESENTATIVE
EPA SWPPP Template, Version 1.1 14
3.3 Safe Drinking Water Act Underground Injection Control Requirements
Do you plan to install any of the following controls? Check all that apply below.
Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system)
Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow
Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system)
If yes, INSERT COPIES OF LETTERS, EMAILS, OR OTHER COMMUNICATION BETWEEN YOU AND THE
STATE AGENCY OR EPA REGIONAL OFFICE
Instructions (see CGP Part 7.2.14.3):
― If you will use any of the identified controls in this section, include documentation of contact between you and the applicable state agency or EPA Regional Office responsible for implementing the requirements for underground injection wells in the
Safe Drinking Water Act and EPA’s implementing regulations at 40 CFR Parts 144-147.
― For state UIC program contacts, refer to the following EPA website:
http://water.epa.gov/type/groundwater/uic/whereyoulive.cfm.
http://water.epa.gov/type/groundwater/uic/whereyoulive.cfm
EPA SWPPP Template, Version 1.1 15
SECTION 4: EROSION AND SEDIMENT CONTROLS
4.1 Natural Buffers or Equivalent Sediment Controls
Buffer Compliance Alternatives
Are there any surface waters within 50 feet of your project’s earth disturbances? YES NO
(Note: If no, no further documentation is required for Part 4.1 in the SWPPP Template. Continue on to
Part 4.2.)
Check the compliance alternative that you have chosen:
I will provide and maintain a 50-foot undisturbed natural buffer.
(Note (1): You must show the 50-foot boundary line of the natural buffer on your site map.)
(Note (2): You must show on your site map how all discharges from your construction disturbances through the natural buffer area will first be treated by the site’s erosion and sediment controls. Also, show on the site map any velocity dissipation devices used to prevent erosion within the natural buffer area.)
I will provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by additional erosion and sediment controls, which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buffer.
(Note (1): You must show the boundary line of the natural buffer on your site map.)
(Note (2): You must show on your site map how all discharges from your construction disturbances through the natural buffer area will first be treated by the site’s erosion and
General Instructions (See CGP Parts 2.1 and 7.2.10):
― Describe the erosion and sediment controls that will be installed and maintained at your site.
― For more information or ideas on BMPs, see EPA’s National Menu of BMPs http://www.epa.gov/npdes/stormwater/menuofbmps
Instructions (see CGP Parts 2.1.2.1 and 7.2.9, and Appendix G):
This section only applies to you if a surface water is located within 50 feet your construction activities. If this is the case, consult CGP Part 2.1.2.1 and Appendix G for information on how to comply with the buffer requirements.
― Describe the compliance alternative (CGP Part 2.1.2.1.a.i, ii, or iii) that was chosen to meet the buffer requirements, and include any required documentation supporting the alternative selected. The compliance alternative selected must be maintained throughout the duration of permit coverage. However, if you select a different compliance alternative during your period of permit coverage, you must modify your
SWPPP to reflect this change.
― If you qualify for one of the exceptions in CGP Part 2.1.2.1.e, include documentation related to your qualification for such exceptions.
http://www.epa.gov/npdes/stormwater/menuofbmps
EPA SWPPP Template, Version 1.1 16 sediment controls. Also, show on the site map any velocity dissipation devices used to prevent erosion within the natural buffer area.)
INSERT WIDTH OF NATURAL BUFFER TO BE RETAINED
INSERT EITHER ONE OF THE FOLLOWING:
(1) THE ESTIMATED SEDIMENT REMOVAL FROM A 50-FOOT BUFFER USING APPLICABLE TABLES
IN APP. G, ATTACHMENT 1. INCLUDE INFORMATION ABOUT THE BUFFER VEGETATION AND
SOIL TYPE THAT PREDOMINATE AT YOUR SITE
OR
(2) IF YOU CONDUCTED A SITE-SPECIFIC CALCULATION FOR THE ESTIMATED SEDIMENT
REMOVAL OF A 50-FOOT BUFFER, PROVIDE THE SPECIFIC REMOVAL EFFICIENCY, AND
INFORMATION YOU RELIED UPON TO MAKE YOUR SITE-SPECIFIC CALCULATION.
INSERT DESCRIPTION OF ADDITIONAL EROSION AND SEDIMENT CONTROLS TO BE USED IN
COMBINATION WITH NATURAL BUFFER AREA
INSERT THE FOLLOWING INFORMATION:
- (1) SPECIFY THE MODEL OR OTHER TOOL USED TO ESTIMATE SEDIMENT LOAD
REDUCTIONS FROM THE COMBINATION OF THE BUFFER AREA AND ADDITIONAL EROSION
AND SEDIMENT CONTROLS INSTALLED AT YOUR SITE, AND
- (2) INCLUDE THE RESULTS OF CALCULATIONS SHOWING THAT THE COMBINATION OF
YOUR BUFFER AREA AND THE ADDITIONAL EROSION AND SEDIMENT CONTROLS
INSTALLED AT YOUR SITE WILL MEET OR EXCEED THE SEDIMENT REMOVAL EFFICIENCY OF
A 50-FOOT BUFFER
It is infeasible to provide and maintain an undisturbed natural buffer of any size, therefore I will implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer.
INSERT RATIONALE FOR CONCLUDING THAT IT IS INFEASIBLE TO PROVIDE AND MAINTAIN A
NATURAL BUFFER OF ANY SIZE
INSERT EITHER ONE OF THE FOLLOWING:
(1) THE ESTIMATED SEDIMENT REMOVAL FROM A 50-FOOT BUFFER USING APPLICABLE TABLES
IN APP. G, ATTACHMENT 1. INCLUDE INFORMATION ABOUT THE BUFFER VEGETATION AND
SOIL TYPE THAT PREDOMINATE AT YOUR SITE
OR
(2) IF YOU CONDUCTED A SITE-SPECIFIC CALCULATION FOR THE ESTIMATED SEDIMENT
REMOVAL OF A 50-FOOT BUFFER, PROVIDE THE SPECIFIC REMOVAL EFFICIENCY, AND
INFORMATION YOU RELIED UPON TO MAKE YOUR SITE-SPECIFIC CALCULATION.
INSERT DESCRIPTION OF ADDITIONAL EROSION AND SEDIMENT CONTROLS TO BE USED IN
COMBINATION WITH NATURAL BUFFER AREA
INSERT THE FOLLOWING INFORMATION:
- (1) SPECIFY THE MODEL OR OTHER TOOL USED TO ESTIMATE SEDIMENT LOAD
REDUCTIONS FROM THE EROSION AND SEDIMENT CONTROLS INSTALLED AT YOUR SITE,
AND
- (2) INCLUDE THE RESULTS OF CALCULATIONS SHOWING THAT THE ADDITIONAL EROSION
AND SEDIMENT CONTROLS INSTALLED AT YOUR SITE WILL MEET OR EXCEED THE SEDIMENT
REMOVAL EFFICIENCY OF A 50-FOOT BUFFER
EPA SWPPP Template, Version 1.1 17
I qualify for one of the exceptions in Part 2.1.2.1.e. (If you have checked this box, provide information on the applicable buffer exception that applies, below.)
Buffer Exceptions
Which of the following exceptions to the buffer requirements applies to your site?
There is no discharge of stormwater to the surface water that is located 50 feet from my construction disturbances.
(Note: If this exception applies, no further documentation is required for Section 4.1 of the
Template.)
No natural buffer exists due to preexisting development disturbances that occurred prior to the initiation of planning for this project.
(Note (1): If this exception applies, no further documentation is required for Section 4.1 of the
Template.)
(Note (2): Where some natural buffer exists but portions of the area within 50 feet of the surface water are occupied by preexisting development disturbances, you must still comply with the one of the CGP Part 2.1.2.1.a compliance alternatives.)
For a “linear project” (defined in Appendix A), site constraints (e.g., limited right-of-way) make it infeasible for me to meet any of the CGP Part 2.1.2.1.a compliance alternatives. INCLUDE
DOCUMENTATION HERE OF THE FOLLOWING: (1) WHY IT IS INFEASIBLE FOR YOU TO MEET ONE OF
THE BUFFER COMPLIANCE ALTERNATIVES, AND (2) BUFFER WIDTH RETAINED AND/OR SUPPLEMENTAL
EROSION AND SEDIMENT CONTROLS TO TREAT DISCHARGES TO THE SURFACE WATER
The project qualifies as “small residential lot” construction (defined in Part 2.1.2.1.e.iv and in
Appendix A).
For Alternative 1 (see Appendix G, Part G.2.3.2.a):
INSERT WIDTH OF NATURAL BUFFER TO BE RETAINED
INSERT APPLICABLE REQUIREMENTS BASED ON TABLE G-1
INSERT DESCRIPTION OF HOW YOU WILL COMPLY WITH THESE REQUIREMENTS
For Alternative 2 (see Appendix G, Part G.2.3.2.b):
INSERT (1) THE ASSIGNED RISK LEVEL BASED ON APPLICABLE TABLE IN APP. G, PART
G.2.3.2.b, AND (2) THE PREDOMINANT SOIL TYPE AND AVERAGE SLOPE AT YOUR SITE
INSERT APPLICABLE REQUIREMENTS BASED ON APP. G, TABLE G-7
INSERT DESCRIPTION OF HOW YOU WILL COMPLY WITH THESE REQUIREMENTS
Buffer disturbances are authorized under a CWA Section 404 permit. INSERT DESCRIPTION OF ANY
EARTH DISTURBANCES THAT WILL OCCUR WITHIN THE BUFFER AREA
(Note (1): If this exception applies, no further documentation is required for Section 4.1 of the
Template.)
(Note (2): This exception only applies to the limits of disturbance authorized under the Section
404 permit, and does not apply to any upland portion of the construction project.)
Buffer disturbances will occur for the construction of a water-dependent structure or water access area (e.g., pier, boat ramp, and trail). INSERT DESCRIPTION OF ANY EARTH DISTURBANCES THAT
WILL OCCUR WITHIN THE BUFFER AREA
(Note (1): If this exception applies, no further documentation is required for Section 4.1 of the
Template.)
EPA SWPPP Template, Version 1.1 18
4.2 Perimeter Controls
General
Silt Fence will be used around all disturbed areas on the project site.
Specific Perimeter Controls
Perimeter Control # 1: Silt Fence
Perimeter Control Description
Silt fence will be installed around all disturbed areas.
Installation
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment does not leave the project site. Perimeter controls include silt fence and other specified measures outside the construction limits.
Maintenance Requirements
Inspect for buildup of excess sediment, undercutting, sags, and toher failures. If the fabric becomes damaged, repair or replace as necessary. Remove sediment from behind the silt fence when it becomes 0.5 feet deep at the fence.
[Repeat as needed for individual perimeter controls.]
Instructions (see CGP Parts 2.1.2.2 and 7.2.10):
― Describe sediment controls that will be used (e.g., silt fences, filter berms, temporary diversion dikes, or fiber rolls) to meet the Part 2.1.2.2 requirement to “install sediment controls along those perimeter areas of your site that will receive stormwater from earth-disturbing activities.”
― For linear projects, where you have determined that the use of perimeter controls in portions of the site is impracticable, document why you believe this is to be the case.
― Also see, EPA’s Silt Fence BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/silt_fences or Fiber Rolls
BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/fiber_rolls http://www.epa.gov/npdes/pubs/www.epa.gov/npdes/stormwater/menuofbmps/construction/silt_fences http://www.epa.gov/npdes/stormwater/menuofbmps/construction/fiber_rolls
EPA SWPPP Template, Version 1.1 19
4.3 Sediment Track-Out
Do not allow construction vehicles to track sediment outside the project limits.
Specific Track-Out Controls
Track-Out Control # 1
Track-Out Control Description
Contractor will be responsible for ensure that construction vehicles do not track sediment outside the project limits.
Before construction begins.
Contractor will be responsible for maintenance of the track-out controls.
(Note: At a minimum, you must provide for maintenance that meets the following requirement in CGP Part 2.1.2.3.d: “Where sediment has been tracked-out from your site onto the surface of off-site streets, other paved areas, and sidewalks, you must remove the deposited sediment by the end of the same work day in which the track-out occurs or by the end of the next work day if track-out occurs on a non-work day. You must remove the track-out by sweeping, shoveling, or vacuuming these surfaces, or by using other similarly effective means of sediment removal. You are prohibited from hosing or sweeping tracked-out sediment into any stormwater conveyance (unless it is connected to a sediment basin, sediment trap, or similarly effective control), storm drain inlet, or surface water.”)
[Repeat as needed for individual track-out controls.]
Instructions (see CGP Parts 2.1.2.3 and 7.2.10):
― Describe stormwater controls that will be used to “minimize the track-out of sediment onto off-site streets, other paved areas, and sidewalks from vehicles exiting your construction site.”
― Describe location(s) of vehicle exit(s), procedures to remove accumulated sediment off-site (e.g., vehicle tracking), and stabilization practices (e.g., stone pads or wash racks or both) to minimize off-site vehicle tracking of sediment. Also include the design, installation, and maintenance specifications for each control.
― Also, see EPA’s Construction Entrances BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/cons_entrance http://www.epa.gov/npdes/stormwater/menuofbmps/construction/cons_entrance
EPA SWPPP Template, Version 1.1 20
4.4 Stockpiled Sediment or Soil
Silt fence will be used around all stockpiled materials.
Specific Stockpile Controls
Stockpile Control # 1
Stockpiled Sediment/Soil Control Description
Provide silt fence around all stockpiled excavated roadway material. Apply temporary turf establishment to stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Phase II of the Intermediate Controls
Inspect silt fence for buildup of excess sediment, undercutting, sags, and other failures. If the fabric becomes damaged, repair as necessary. Remove sediment from behind the silt fence when it becomes 0.5 feet deep at the fence.
(Note: At a minimum, you must comply with following requirement in CGP Part 2.1.2.4.d: Do not hose down or sweep soil or sediment accumulated on pavement or other impervious surfaces into any stormwater conveyance (unless connected to a sediment basin, sediment trap, or similarly effective control), storm drain inlet, or surface water.)
[Repeat as needed for individual stockpile controls.]
4.5 Minimize Dust
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.
Specific Dust Controls
Instructions (see CGP Parts 2.1.2.4 and 7.2.10):
― Describe stormwater controls and other measures you will take to minimize the discharge of sediment or soil particles from stockpiled sediment or soil. Include a description of structural practices (e.g., diversions, berms, ditches, storage basins), including design, installation, and maintenance specifications, used to divert flows from stockpiled sediment or soil, retain or detain flows, or otherwise limit exposure and the discharge of pollutants from stockpiled sediment or soil.
― Also, describe any controls or procedures used to minimize exposure resulting from adding to or removing materials from the pile.
Instructions (see CGP Parts 2.1.2.5 and 7.2.10):
Describe controls and procedures you will use at your project/site to minimize the generation of dust.
EPA SWPPP Template, Version 1.1 21
Dust Control # 1
Dust Control Description
Watering will be used to keep dust down.
Intermediate phasing of erosion and sediment controls.
NA
[Repeat as needed for individual dust controls.]
4.6 Minimize the Disturbance of Steep Slopes
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control measures.
No construction access will be permitted through a wetland or waterway.
Specific Steep Slope Controls
Steep Slope Control # 1
Steep Slope Control Description
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control measures.
[Repeat as needed for individual steep slope controls.]
Instructions (see CGP Parts 2.1.2.6 and 7.2.10):
― Describe how you will minimize the disturbance to steep slopes (as defined by CGP
Appendix A).
― Describe controls (e.g., erosion control…