Amendment_0002_-_FW-TERI_11(1).pdf

PDF 137 KB Posted

Attached to
Tensas River National Wildlife Refuge
Solicitation number
DTFH71-16-B-00026
Issued by

About this file

Amendment 0002- FW-TERI 11(1) Tensas River National Wildlife Refuge

View the file

Other files

File Type Posted
ROBO_-_FW-TERI_11(1).pdf PDF
Amendment_0004_-_FW-TERI_11(1).pdf PDF
Amendment_0003_-_FW-TERI_11(1).pdf PDF
Amendment_0001_-_FW-TERI_11(1).pdf PDF
ADV_Bidder's_Qualifications_Form_-_FWS-TERI_11(1).doc DOC document
FP14_Eng.pdf PDF
Plans_Adv.pdf PDF
IFB_Solicitation_-_FWS-TERI_11(1).pdf PDF
Report_1_NEPA.pdf PDF
VETS-4212_-_Form.pdf PDF
Synopsis_-_FWS-TERI_11(1).doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 0002

Amendment Info

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project FW-TERI 11(1)

Tensas River National Wildlife Refuge Solicitation: DTFH71-16-B-00026

The purpose of this Amendment is to:

1) Replace the B pages’ Bid Schedule and Summary to include a missing pay item description.

2) Revise the Special Contract Requirements (J Pages) as follows:

a) Revise Section 602 to update the pipe culvert material and measurement requirements.

b) Revise Section 647 to update the water control structure material requirements.

3) Provide a summary of responses to questions/clarifications asked by potential bidders.

The Bid Opening date remains May 5, 2016, at 2:00 p.m.

B pages Changes_Amendment No. 0002

Solicitation B Pages changes

1. Delete the Solicitation Bid Schedule pages B-1 thru B-3, and substitute the amended Bid Schedule pages B-1 thru B-3.

a) Added description for pay item 15705-0100 (line item A0040) Soil Erosion Control, Silt Fence.

B I D S C H E D U L E Schedule A B-1

Project No: FW-TERI 11(1)

Name: REHABILITATION OF WILDLIFE DRIVE (ROUTE 11) AND DRAINAGE IMPROVEMENTS

Item No. Quantity Unit Unit Price Amount

15101-0000

Line A0010 100% LPSM $ $

15201-0000

Line A0020 100% LPSM $ $

15401-0000

Line A0030 100% LPSM $ $

15705-0100

Line A0040 4,500 LNFT $ $

15705-1300

Line A0050 280 LNFT $ $

15705-1800

Line A0060 630 LNFT $ $

15706-2200

Line A0070 4 EACH $ $

15720-0000

Line A0080 100% LPSM $ $

20101-0000

Line A0090 3.6 ACRE $ $

20202-0000

Line A0100 430 SQYD $ $

20220-1000

Line A0110 2 EACH $ $

20301-2400

Line A0120 1 EACH $ $

20301-2800

Line A0130 4 EACH $ $

20302-2100

Line A0140 270 LNFT $ $

20402-0000

Line A0150 350 CUYD $ $

20420-0000

Line A0160 4,800 CUYD $ $

20701-0700

Line A0170 3,400 SQYD $ $

30110-0000

Line A0180 13,100 TON $ $

60103-0220

Line A0190 4 EACH $ $

60201-0800

Line A0200 35 LNFT $ $

EMBANKMENT CONSTRUCTION

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE B

AGGREGATE SURFACE COURSE

MOBILIZATION

CONSTRUCTION SURVEY AND STAKING

CONTRACTOR TESTING

SOIL EROSION CONTROL, SILT FENCE

SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL

SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM

CONCRETE, HEADWALL FOR 48-INCH PIPE CULVERT (WINGWALLS AND FOUNDATIONS)

24-INCH PIPE CULVERT

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

REMOVAL OF PIPE CULVERT

SUBEXCAVATION

SOIL EROSION CONTROL, FILTER BAG

STORM WATER POLLUTION PREVENTION PLAN

CLEARING AND GRUBBING

SELECTIVE CLEARING

REMOVAL, INDIVIDUAL TREE

REMOVAL OF SIGN

Amendment

Amendment 0002

Amendment 0002

B I D S C H E D U L E Schedule A B-2

Project No: FW-TERI 11(1)

Name: REHABILITATION OF WILDLIFE DRIVE (ROUTE 11) AND DRAINAGE IMPROVEMENTS

Item No. Quantity Unit Unit Price Amount

60201-0900

Line A0210 100 LNFT $ $

60201-1200

Line A0220 65 LNFT $ $

60202-0200

Line A0230 165 LNFT $ $

60703-0000

Line A0240 25 LNFT $ $

61401-0000

Line A0250 6 CUYD $ $

62403-0000

Line A0260 60 CUYD $ $

62502-0000

Line A0270 535 SQYD $ $

62901-0600

Line A0280 170 SQYD $ $

63304-0900

Line A0290 15 SQFT $ $

63308-3000

Line A0300 8 EACH $ $

63316-1000

Line A0310 2 EACH $ $

63503-0300

Line A0320 30 LNFT $ $

63504-1000

Line A0330 20 SQFT $ $

63701-0000

Line A0340 1 EACH $ $

64703-1650

Line A0350 2 EACH $ $

FIELD OFFICE

MITIGATION, FLASH BOARD RISER (WATER CONTROL STRUCTURE)

Schedule Total:

Submitted by:

ROLLED EROSION CONTROL PRODUCT, TYPE 2.B

SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING

OBJECT MARKER, TYPE 3

48-INCH PIPE CULVERT

18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

CLEANING CULVERTS IN PLACE

REMOVE AND RESET SIGN

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

30-INCH PIPE CULVERT

LEAN CONCRETE BACKFILL

FURNISHING AND PLACING TOPSOIL

TURF ESTABLISHMENT

Page B - 3

BID SUMMARY

Project FW-TERI 11(1)

(1) Schedule A Bid Total (from Page B-2) = (1) $____________________

Schedule A Contract Administrative Cost Input the number of calendar days necessary to complete all Schedule A work from Notice to Proceed (or date specified in the Notice to Proceed) to the completion of Schedule A.

The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 50 and less than or equal to ( < ) 75.

(2) calendar days x $1,000 per calendar day = (2) $____________________

Total Price of Project (for evaluation purposes only)

EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) $____________________

DO NOT INCLUDE ANY CONTRACT ADMINISTRATION COSTS IN BLOCK 17 OF THE SF-1442

Questions/Clarifications

Questions/Clarifications

Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.

Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.

The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.

The Government’s direct response to the sender may also have been updated below for better clarity.

1. Is it your intention to use aggregate surface course material for embankment construction?

Response: As shown on plan sheet B01, and as required in Subsection 204.10 of the Special Contract Requirements (SCR) (page J-9 of the Solicitation Booklet), aggregate surface course material is required for the embankment construction.

2. Is the contractor required to have a full time Quality Control Manager (QCM) with no other responsibilities, or can the Superintendent or Surveyor assume the QCM’s responsibilities, if they are qualified?

Response: As specified in Subsection 153.02 of the FP (standard specifications book), the Quality Control Manager (QCM) must be a full-time QCM and have no other responsibilities other than managing quality control. Therefore, the superintendent or the surveyor cannot perform the QCM duties.

3. The specifications require high-density polyethylene (HDPE) pipe culverts, but there are several 18” equivalent pipe-arches that can’t be furnished in HDPE. Also, there are a couple of flashboard risers that are detailed as corrugated metal pipe, but have no gauge or material requirements.

Response: Subsection 602.03 and Section 647 of the SCR have been revised to address both situations. Subsection 602.03 now requires the use HDPE pipe (smooth inside walls) for all new pipe culverts, except for the arch or elliptical pipe culverts and the water control structure pipe culverts. The subsection also specifies the type of pipe and the required gauge for pipe culverts. Section 647 was updated to revise the material requirements for the risers and pipe culvert stubs for the water control structures.

SCR changes

Special Contract Requirements (J Pages) changes

1. Delete Subsection 602.03 of the Special Contract Requirements (SCR), page J-9, and substitute the following:

602.03. Add the following:

Use high-density polyethylene (HDPE) pipe (smooth inside walls) for all new pipe culverts, except for arch or elliptical pipe culverts and the water control structure pipe culverts.

Use 16 gauge minimum polymer-coated galvanized corrugated steel pipe culverts for arch and elliptical pipe culverts.

Use 16 gauge minimum polymer-coated galvanized corrugated steel pipe for the water control structure stubs and culverts attached to the water control structure.

2. Add the following to Section 602 of the SCR, page J-9:

602.09. Add the following:

Measure pipe culvert stubs for water control structures under Section 647.

3. Delete Subsection 647.02 of the SCR, page J-17, and substitute the following:

647.02 Conform to the following Subsections:

Gaskets for metal pipe 707.17 Metallic-coated corrugated steel pipe 707.02 Polymer-coated steel pipe 707.08

4. Delete the fourth paragraph of Subsection 647.03 of the SCR, page J-17, and substitute the following:

Use 16 gauge minimum polymer-coated galvanized corrugated steel pipe culverts for the water control structure pipe culvert stubs. Install pipe culvert stubs according to Section 602.

Use 10 gauge minimum polymer-coated galvanized corrugated steel risers for the water control structures.

B Pages_Amendment 2.pdf
BID SCHEDULE INSTRUCTIONS
COMPLETING THE BID SCHEDULE
To be eligible for award, bidders must submit prices for each pay item.
SCHEDULE OF WORK
BIDDING OF CALENDAR DAYS / COMPLETION OF WORK
BASIS FOR AWARD

File details come from the government source that posted it. Updated .