Amendment_0003_-_NP-UPDE_10(1).pdf

PDF 897 KB Posted

Attached to
Upper Delaware Scenic and Recreational River
Solicitation number
DTFH71-16-B-00022
Issued by

About this file

Rescheduled the Bid Opening date to April 5 2016 at 2 00 P.M. EST.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7116B00022

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

SEE BLOCK 1403/29/20160003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/26/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: NP UPDE 10(1)

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) to revise dewatering requirements in

Sections 157, 208, and 713.

2) Revise the Plans to revise dewatering requirements.

3) Provide a summary of responses to questions/clarifications asked by potential bidders.

4) Reschedule the Bid Opening date to April 5, 2016 at 2:00 P.M. EST.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0003

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project NP-UPDE 10(1)

Upper Delaware Scenic and Recreational River Solicitation: DTFH71-16-B-00022

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) to revise dewatering requirements in Sections 157, 208, and 713.

2) Revise the Plans to revise dewatering requirements.

3) Provide a summary of responses to questions/clarifications asked by potential bidders.

4) Reschedule the Bid Opening date to April 5, 2016 at 2:00 P.M.

SCR changes 1 of 1

Special Contract Requirement (J Pages) changes

1. Add the following after Subsection 155.07 of the Special Contract Requirements (SCR), page J-7:

Section 157. — SOIL EROSION AND SEDIMENT CONTROL

157.17. Add the following:

Measure filtering devices under Section 208.

2. Add the following to Subsection 208.07 of the SCR, page J-8:

Alternate filtering systems that are in compliance with Federal, state, and local regulations may be submitted for approval in accordance with Subsection 104.03.

3. Add the following after Subsection 712.02 of the SCR, page J-21:

Section 713. — ROADSIDE IMPROVEMENT MATERIAL

713.19. Add the following after the first paragraph:

(c) Capable of trapping particles larger than 150 microns and have a maximum apparent opening size (AOS) of a number 80 Sieve in accordance to ASTM D4751.

Plan Sheet changes 1 of 1

Plan Sheet changes

1. Delete the Plan Sheets R02 and R03, and substitute the Amendment No. 0003 Plan Sheets R02 and R03.

a) Sheet R02 updated to revise Note 9 to allow the use of alternate filtering systems as approved by the CO to filter dewatered water.

b) Sheet R03 updated to revise Note 3 to allow the use of alternate filtering systems as approved by the CO to filter dewatered water.

R02

-M a r -2

:5

A M

M

P R

O J E

C T

S u p d e (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

PROJECT TEAM LEADER

of

DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY

BRP NO.

5Dan Weston

STATE PROJECT

NUMBER

SHEET

CV CV

NPS

NO.NO.

PMIS

BRIDGE PLAN SHEET

BRP-1230

PA-NY128923

147471

ROEBLING BRIDGE

Structure Number 4870-001P

HC

NP-UPDE 10(1)

UPPER DELAWARE SCENIC AND RECREATIONAL RIVER

November 2015

-M a r -2

M

P R

O J E

C T

S u p d e (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

NO. DATE BY REVISIONS NO. DATE BY REVISIONS

CLAbutment 1

LACKAWAXEN, PA

Notes:

See Note 8 joint (Typ.)

Repair expansion

Bridge length = 534’-10’’ (–)

CLPier 1 PLAN

South sidewalk

North sidewalk

CLPier 2 CLPier 3

Gutter line

T y p

ELEVATION

CLAbutment 2

MINISINK, N.Y.

PLAN AND ELEVATION

A C

T U

A L F I L E R

U P

D E P

E .D

G N

" = 1’-0’’32

9’-0"

(Typ.)

D e la w a r e R iv e r

534’-10" (–) Length of the bridge may be used as working platform and equipment access.

Existing riprap within and around the perimeter of the piers

2.

1.

(Do not disturb)

Existing historic canal

Do not permit debris to enter waterways.

See " ICEBREAKER REPAIR DETAILS" sheet for more details.

upstream from bridge.

Do not disturb the existing historic water dam located approx. 300’-0" (–)

10’-0"

(Typ.)

See Note 5 overlay

Seal deck

See Note 10 as required (Typ.)

Repoint stone masonry

T y p .)N

Seal concrete deck overlay according to Section 552.

Mean flow (September) = 2060 c.f.s.

Mean flow (low month, August) = 1,297 c.f.s.

Mean flow (high month, April) = 6,206 c.f.s.

Mean annual flow = 3,274 c.f.s.

for the construction season, are provided for information.

the Lackawaxen near Barryville, NY) and may or may not be typical

1940 to 2015 data from station 1428500 (Delaware River above operation discharges. The following statistics which are based on including but not limited to rainfall, snow melt and upstream

Water levels may vary dramatically depending on many factors, daily upstreams.

In addition coordinate with the local power company which also discharges that uncompleted work or materials are not washed away by high flows.

that work can be accomplished during periods of low water and to ensure for information on release time and rates from Lake Wallenpaupack so

Contact PADEP (Pennsylvania Department of Environmental Protection) seal. See " MISCELLANEOUS DETAILS" sheet for more details.

Remove and replace the existing expansion joint seal with compression

See Note 9

Limit of cofferdam

See Note 6

Repair Timber Icebreaker (Typ.)

curb (Typ.)

sidewalk and bridge approach reconstruct

Remove and

OHW 597.00

sidewalk details. Match with existing sidewalk.

See "APPROACH SIDEWALK DETAIL" sheet for more repointing general notes.

See " GENERAL NOTES AND INDEX " sheet for masonry

ELEV. 597.00

OHW

3AMENDMENT NO.3

3 3/24/16 CV REVISED NOTE 9

7.

6.

5.

4.

3.

10.

11.

9.

8.

the piers.

to the Pennsylvania side and continue advancing in the same order of previous pier is completed. Start the in water work with the pier closer

In water work may not begin on a pier until the in water work of the before being released. Perform in water work for piers in succession.

being released or alternate filtering system as approved by the CO to Section 208. Pass the water through a sediment filter bag before

Construct cofferdam and dewater the working area according of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

BRIDGE PLAN SHEET

BRP-1230

ROEBLING BRIDGE

Structure Number 4870-001P

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonCV CV HC

STATE PROJECT

NO.NO.

PMIS

PA-NY128923

147471 NP-UPDE 10(1)

R03

-M a r -2

M

P R

O J E

C T

S u p d e (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

PROJECT TEAM LEADER

STATE PROJECT

NO.NO.

PMIS

BRIDGE PLAN SHEET

BRP-1230

PA-NY128923

147471

ROEBLING BRIDGE

Structure Number 4870-001P

Notes:

planking

Existing red oak

5’-0" 5’-0"5’-0"

PLAN

all the damaged timber wales as approved by the CO.

Survey all the icebreakers and remove and replace over weed barrier. (To remain)

Existing red oak timber planking Limit of 4" planking nailer board pine timber

8"x8" Southern nailer board pine timber

8"x8" Southern planking red oak timber

4"x1’-0" Existing

A

A

B

B

SECTION B-B

4" 4" 4"

Southern Pine

4" x 1’-0" Treated

(Typ.)

with washer and nut

"Ø through bolt8

Exposed face

C

C

SECTION C-C

Timber cribbing

1’-0" x 1’-0"

S e e N o te

T im b e r w a le s

(Typ.)

Replaced wale wale (Typ.)

Remaining

Nosing level. (Varies)

Existing water

Steel plate not shown

(Interlocking joint connection at nose)

Riprap infill

Existing class 4 timber cribbing

Existing 1’-0"x1’-0" tie rod

"Ø Steel8 7Existing

5 Spa. @ 6’-0" = 30’-0"

ELEVATION

to the existing condition after the work is completed.

Repair one icebreaker at the time. Restore the profile

6.

5.

4.

3.

2.

1.

WALE DETAIL

" = 1’-0’’4 1Scale:

" = 1’-0’’4 1Scale:

" = 1’-0’’4 1Scale: " = 1’-0’’3

1Scale:

" = 1’-0’’2 1Scale:

" = 1’-0’’2 1Scale:

Limit of 4" planking

ISOMETRIC VIEW A-A

See Note 6

" Ø Lag bolt (Typ)8

N o s in g w a le s x

ICEBREAKER REPAIR DETAILS

CC

C C existing (Typ.)

outer face to match timber wales. Batter

Proposed 1’-0" x 1’-0" may be used as working platform and equipment access.

Existing riprap within and around the perimeter of the piers

See Note 2.

Riprap

Existing

A C

T U

A L F I L E I

C E

B R

E A

K E

R R

E P

A I R D

E T .D

G N

Galvanized steel plate to be reused (Typ.)

"8 3Existing 11’-0" x 3’-0"x steel plate to be reused

Existing galvanized

As shown

Ipe Tropical hardwood

4" x 1’-0" nut. See Note 4 with washer and

"Ø through bolt8

Note 4 with cap. See

"Ø lag bolt8

(Typ.)

Timber cribbing

1’-0" x 1’-0"

" Ø through bolts at each end.8 7with (2) timber cribbing and connect each wale timber component lag bolts with cap. Attach each wale timber with a minimum of two

" Ø x 1’-8" 8 7Attach wales to the timber cribbing with (2)

Furnish countersunk lag bolts and bolt cap.

3 3/24/16 CV

3AMENDMENT NO.3 3AMENDMENT NO.3

before being released.

filter bag or alternate filtering system as approved by the CO water through a filtration bag before being released sediment

Dewater the working area according to Section 208. Pass

REVISED NOTE 3

-M a r -2

M

P R

O J E

C T

S u p d e (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

PROJECT TEAM LEADER

STATE PROJECT

NO.NO.

PMIS

BRIDGE PLAN SHEET

BRP-1230

PA-NY128923

147471

ROEBLING BRIDGE

Structure Number 4870-001P

Questions-Clarifications Page 1 of 2

Questions / Clarifications

Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.

Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.

The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.

The Government’s direct response to the sender may also have been updated below for better clarity.

1. Were soil boring tests performed at the locations where the cofferdam(s) are to be installed?

Response: Soil borings were not performed.

2. Based on past experience and given the information on the volume and flow of water of the Delaware River (see plan sheet R02, Note 2), it is reasonable to predict and highly probable that dewatering the cofferdam area according to the restrictions outlined on Note 9 of plan sheet R02 and Section 208 of the FP, specifically dewatering through a filter bag, will prove insufficient to accommodate the necessary pumping volume requirements to perform the work, given the physical limitations of how much flow filter bags can handle without bursting. Will dewatering be permitted without the use of filter bags? Section 208.07 of the FP indicates to remove water as necessary to perform the work. Will the contractor be in violation of any Federal, state, and local regulations by not dewatering using filter bags, but rather pumping water directly back into the river?

Response: Alternate filtering systems that comply with project permits may be proposed after project award for evaluation by the CO. See the SCR and Plan Sheet changes documents included in this Amendment for additional information. Sediment-laden or contaminated water cannot be discharged directly back into the river. The amount of dewatering will be determined to be as needed to safely perform the work, in coordination with the CO; the work area may not need to be completely dry to perform the work.

Questions-Clarifications Page 2 of 2

3. If the use of filter bags is required, will the contractor be permitted to construct floating docks staged on the river to support the filter bags or will it be necessary to run discharge hoses across the river to the river bank to locate the filter bags as indicated on plan sheet S04?

If required to place the filter bag(s) on a grassy area at the river bank, will discharge hoses be permitted to lie across the river to reach the shore from the point of the dewatering operation? If acceptable, how will this impact the Boater Safety Plan and public notification requirements?

Would it be necessary to close the river if discharge hose runs across the river to prevent damage to motorized boats or are motorized boats not permitted in this area of the Delaware River?

Response: Alternate filtering systems that comply with project permits may be proposed after project award for evaluation by the CO. See the SCR and Plan Sheet changes documents included in this Amendment for additional information. The Contractor is not permitted to completely close the river. At a minimum, one bay is required to remain open at all times. The Contractor is required to coordinate the Boating Safety Plan with the CO after project award.

4. If discharge hoses are not permitted to be laid across the river bed, will discharge hoses be required to be suspended a minimum of 10 feet as indicated for overhanging cables per Appendix 1 – Guide To Preparing, page 5, paragraph 3?

Response: Yes, all requirements of the Boating Safety Plan will be enforced.

5. Will an excavator or similar heavy equipment be permitted to work directly in the river? Or to enter the river for any length of time?

Response: No, an excavator or similar heavy equipment will not be permitted to work directly in the river or enter it.