RFP Solicitation - PRA-GRSM 1B21
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_001_-_PRA-GRSM_1B21.pdf | ||
| FP03_Eng_.pdf | ||
| FP03_Errata.pdf | ||
| Offeror's_Qualifications_Form.doc | DOC document | |
| Plans_PRA-GRSM_1B21.pdf | ||
| NEPA_Report_-_Categorical_Exclusion_Form.pdf | ||
| Subcontracting_plan.doc | DOC document | |
| VETS-100A-Form.pdf | ||
| Synopsis_Notice_-_PRA-GRSM_1B21.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U. S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Contract No. :
CONTRACTOR:
ADDRESS:
PRA-GRSM 1B21
GREAT SMOKY MOUNTAINS NATIONAL PARK
DEEP CREEK SLIDE REPAIR
PMIS # 202965
This Contract Cites Standard Specifications FP-
REQUEST FOR PROPOSAL
U.S. Customary Units
No. DTFH71-14-R-00002RFP
STATE North Carolina
COUNTY Swain County
PARK Great Smoky Mountains National Park
# Schedule Parking Area Roadway / Parking Area / Other Stations / SQFT Linear
Feet Route Miles
Lane Miles
1 A Newfound Gap Road (U.S. Route 441) 86+68.96 To 99+50.69 1,282 0.24 0.48
2 A ■ Parking Area 5,281 0.00 0.09
3 To 0.00 0.00
Project Length Totals : 1,282 0.24 0.57
TYPE OF IMPROVEMENT:
Restoration and stabilization of the slide area on Newfound Gap Road, MP 16.5. The work includes retaining wall construction, roadway reconstruction, stone masonry guardwall, steel backed timber guardrail, shoulder reconditioning, installation of culverts and inlets, site restoration, and other miscellaneous work.
TABLE OF CONTENTS
Page
Notice to Offeror 1 through 2
Checklist for Offerors Submission 1 through 2
Request for Proposal Statement 1 through 3
*SF-1442 Solicitation, Offer, and Award 1 through 5
Bid Schedule Instructions 1 through 3
*Bid Schedule B-1 through B-5
*SF-24 Bid Bond C-1 through C-2
FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION
REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES
Index to Federal and Transportation Acquisition Regulations 1 through 6
Representations and Certifications (OCRA online) D-1 through D-2
Instructions to Bidders E-1
*Socioeconomic Program Requirements F-1 through F-5
Minimum Wage Schedule F-6 through F-9
*General Contract Requirements G-1 through G-4
Construction Contract Requirements H-1 through H-5
Special Contract Requirements J-1 through J-45
Section K K-1 through K-3
SPECIFICATIONS On CD
Plans 1 through 79
NEPA Report – Categorical Exclusion Form 1 through 9
*Small Business Subcontracting Plan 1 through 5
*Offeror’s Qualifications Form 1 through 7
* Federal Contractor Veterans’ Employment Report VETS-100A 1 through 2
*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE BID SUBMITTAL PACKAGE
NOTICE TO OFFERORS
CONTRACT FORMAT: Offerors should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-page in this booklet. FAR provisions and clauses incorporated by reference can be accessed on the Internet on the GSA website at www.arnet.gov/far/. Offerors are encouraged to review the documents thoroughly before submitting proposal.
PROPOSAL BOOKLET AND OFFER SUBMITTAL:
It is the responsibility of the Offeror to verify that this proposal is complete as listed in the Table of Contents. The Offeror is responsible for submitting all required forms and documents with the offer.
Offerors should use the Checklist for Bid Submission included in this booklet to check that their bids are complete.
CONSTRUCTION CONTRACTS:
As stated in FAR Clause 52.236-1, the Contractor shall perform on the site, and with its own organization, work equivalent to at least 50%. Additional guidance is given in FAR Subpart
35.005 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e. proprietary Cintec arch strengthening.)
There are exceptions and they will be reviewed on a case-by-case basis.
HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Offeror must submit prior to award a Material Safety Data Sheet (MSDS's) for all hazardous materials that the Offeror identifies in paragraph (b) of this clause in the D-pages of this booklet. Failure to submit MSDS's may render the Offeror ineligible for award of contract.
ATTENTION LARGE BUSINESSES - UTILIZATION OF SMALL BUSINESS CONCERNS:
Large business Offerors should note their responsibilities in the awarding of subcontracts in accordance with FAR Clause 52.219-8, Utilization of Small Business Concerns. The offeror, if a large business concern, should note its responsibility to establish and conduct a Subcontracting Plan in accordance with FAR Clause 52.219-9, Alternate II, Small Business Subcontracting Plan. If the apparent Low Offeror is a LARGE BUSINESS it will be required to submit a Subcontracting Plan with proposal. If the apparent low offeror fails to submit a subcontracting plan acceptable to the Contracting Officer at proposal time, the offeror may be ineligible for award of the contract. PLEASE NOTE: A sample plan is included in this solicitation package as a separate document for your use.
FINANCING ASSISTANCE: Minority, Women-owned, and Disadvantaged Business Enterprises (DBE's). The Department of Transportation (DOT) offers working capital financing assistance for transportation related contracts. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $750,000 with interest at the prime rate. For further information, call (800) 532-1169 or 202-366-1930. Internet address: http://osdbuweb.dot.gov
INTERNET BASED DATA BASES - REQUIRED INPUT: According to the FAR Subpart
4.1102 contractors MUST be registered in System for Award Management (SAM) prior to contract award. Access the following web site to register: www.sam.gov
According to the FAR Subpart 4.1201 contractors MUST complete their Online Annual Representations and Certifications Application prior to contract award online at http://sam.gov/.
According to the FAR Subpart 22.1302 (b) contractors and sub-contractors MUST complete the required Annual Vets-100A Form in order to be eligible for a contract award. It can be completed on-line at http://vets100.dol.gov.
NOTICE TO OFFERORS - (CONT'D.)
2012 VETS 100 Filing Cycle Effective January 15, 2012, Customers will no longer be able to electronically file a VETS 100/100A Report. Customers may still file, but must first download the form from the VETS website www.dol.gov/vets/programs/fcp/main.htm, fill out the form and mail or email it to: Veterans' Employment and Training Service (VETS) In Care of: Department of Labor National Contact Center (DOL-NCC) 14120 Newbrook Drive, Suite 200 Chantilly, VA 20151 (866) 237-0275 Or email to: VETS100-Customersupport@dol.gov
PAYMENT:
Offerors are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.
PROGRESS PAYMENTS:
ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in the CCR must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the CCR database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.
WELFARE-TO-WORK INITIATIVE:
The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.
INCREASING SEAT BELT USE IN THE UNITED STATES:
The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.
OBTAINING PROPOSAL DOCUMENTS:
RFP documents will not be mailed. All documents are available for direct download from the Federal Business Opportunities (FBO) website:
https://www.fbo.gov/index?s=opportunity&mode=list&tab=list&cck=1&au=&ck= Type DTFH71 in Keywords/Sol. # Block then click on GO, or the Eastern Federal Lands Highway Division website: http://www.efl.fhwa.dot.gov/contracting/Documents.aspx Contractors are encouraged to register on the FBO website (for this specific project) in order to receive Email Notifications automatically when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:
eflhd.contracts@dot.gov.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES
NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON SAID
CHANGES.
CHECKLIST FOR OFFEROR SUBMISSION
The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 7 of the Standard Form 1442, Solicitation, Offer, and Award (page 1). This checklist is for informational purposes only and is not required to be filled out by the bidder. Failure to submit a complete bid may be cause to reject your bid.
1. Bid Envelope:
a. Addressed as shown in Block 7 of SF-1442
b. In lower left corner, indicate the following: Solicitation No., Project Name & Number, mail to room 105, if proposals are hand delivered bring them to Reception Area Room 100 and a Contract Specialist will be notified.
2. Standard Form 1442: Solicitation, Offer and Award
a. Block 14: Name and Address of Offeror.
b. Block 15: Telephone Number of Offeror.
c. Block 16: Remittance Address if different from Block 14.
d. Block 19: All Amendments Acknowledged, with dates of Amendments.
e. Block 20: Bid is signed and dated.
3. Bid Schedule - (Pages B-1 through B-5)
a. Unit proposal price and proposal amount provided for each pay item in numbers.
b. Corrections initialed.
c. Price Evaluation eligibility is indicated on the Proposal Summary page.
4. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)
a. Date executed
b. Legal name and address of Offeror.
c. Type of organization.
d. State of incorporation (if applicable).
e. Name and business address of Treasury approved surety.
f. Penal sum of bond (not less than 20% of proposal total).
g. Proposal identification.
h. Signature of Offeror
i. Seal, if corporation
j. Signature of Surety
k. Seal, if corporation
PROPOSALS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.
5. Power of Attorney.
a. Dated on or before execution date of bond
b. Power has original signature of surety, or is embossed with surety's seal in the certification section
CHECKLIST FOR OFFEROR SUBMISSION
PROPOSALS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED.
6. Fill In's. The following full text Clauses and/or Provision numbers shall be checked or filled in and return with the proposal package:
a. 52.219-4 – HubZone ONLY - See Section F, Clause 52-219-4, paragraph "C", check block if wavier is applicable.
7. Offeror's Qualifications form (provided separately as part of the proposal Documents Package). Form completed, signed and submitted with proposal
8. Sub-Contracting Plan - Large Businesses Only: Submittal is mandatory, Per FAR 52.219.9 Alt II.
Legislated subcontracting goals: (15 USC 644 (g)(1)
• 23% - Small Businesses (SB)
• 5% - Small Disadvantaged Businesses (SDB)
• 3% - HUBzones
• 5% - Small Woman Owned Business Entities (SWBE)
• 3% - Service-Disabled Veteran-Owned Small Businesses (SDVOSB)
THE FOLLOWING THREE ITEMS IF NOT SUBMITTED WITH THE BID; MUST
BE COMPLETED ELECTRONICALLY PRIOR TO CONTRACT AWARD.
9. System for Award Management (SAM): The Contractor is currently registered in the Internet- Based SAM database at http://www.sam.gov.
10. Online Representations and Certifications Application: The Contractor's Representations and Certifications have been input online via the Internet-Based electronic database at http://www.sam.gov.
11. Vets100 Reporting: The Contractor has completed the annual Internet-Based reporting requirement online at http://vets100.dol.gov.
2011 VETS 100 Filing Cycle Effective January 15, 2012, Customers will no longer be able to electronically file a VETS 100/100A Report. Customers may still file, but must first download the form from the VETS website www.dol.gov/vets/programs/fcp/main.htm, fill out the form and mail or email it to:
Veterans' Employment and Training Service (VETS) In Care of: Department of Labor National Contact Center (DOL-NCC) 14120 Newbrook Drive, Suite 200 Chantilly, VA 20151 (866) 237-0275 Or email to: VETS100-Customersupport@dol.gov
NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL
DATA IN THE THREE DATABASES IS CORRECT EACH TIME A PROPOSAL
PACKAGE IS SUBMITTED. FAILURE TO PROPERLY INPUT AND/OR UPDATE
YOUR DATA PRIOR TO CONTRACT AWARD MAY CAUSE THE PROPOSAL TO
BE REJECTED.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
GREAT SMOKY MOUNTAINS NATIONAL PARK
PROJECT PRA-GRSM 1B21
REQUEST FOR PROPOSALS
DTFH71-14-R-00002
Project Description: The project will restore and stabilize the slide area adjacent to Newfound Gap Road near Milepost 16.5. Construction consists of a soldier pile with lagging retaining wall, and other miscellaneous work. The soldier piles will be further connected via a whaler and rock bolts. The steel H-piles will be placed inside drilled shafts that are socketed in the competent rock. The project is located in the Great Smoky Mountains National Park, Swain County, North Carolina. The NEPA compliance has been completed. All work will occur on National Park Service property.
The construction cost for this project is estimated to be between $2,000,000 and $7,500,000.
Scope of Work: The detailed scope of work to be undertaken by the successful Offeror under the contract for this project is outlined in the Request for Proposal (RFP) solicitation documents.
These include the Plans, Special Contract Requirements (J Pages), and supplemental reports.
Procurement Overview of the Project: In accordance with Federal Acquisition Regulation (FAR) Subpart 14.5, the Eastern Federal Lands Highway Division (EFLHD) is conducting a Lowest Price Technically Acceptable Source Selection Process for this project. Under this Notice, the EFLHD (also referred to as “the Government”) is soliciting all eligible Contractor firms/teams (Offerors) to participate in a two-step RFP process. The two steps will include the submittal of two proposal packages; a technical proposal and a cost proposal.
During step one, a selection evaluation board will review and evaluate the technical proposals submitted by all interested, responsive Offerors. The selection committee will select qualified Offerors based on the pass/fail evaluation criteria as stated in the RFP’s Proposal Instructions - Evaluation of Proposal Documents (B Pages). Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal’s acceptability solely on the basis of the technical proposal as submitted. The Government may proceed with the second step (lowest price evaluation) without requesting further information from any Offeror; however, the Government may request additional information from any Offeror with a technical proposal considered reasonable and close to acceptable, and may discuss any technical proposal with its Offeror.
Only one technical proposal may be submitted by each Offeror. The step one technical proposal shall not include any prices or pricing information.
During step two, only technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered for award. The cost proposals corresponding to the acceptable technical proposals will be opened and ranked according to price and the contract will be awarded to the lowest responsive, responsible Offeror as stated in the RFP’s Proposal Instructions - Basis of Award (B Pages). Only one cost proposal may be submitted by each Offeror and the cost proposal must be based upon the Offeror’s own technical proposal.
As stated in FAR Clause 52.236-1, the Contractor shall perform on the site, and with its own organization, work equivalent to at least 50%.
Contract award is anticipated by approximately the first week of December 2013, with the Notice to Proceed anticipated to be effective upon receipt of valid Performance and Payment Bonds. Construction is to be completed by May 14, 2014.
It is not the intent of EFLHD to receive project specific design or engineering recommendations as part of the step one technical proposal. Offerors should limit their technical proposal to the information required by this Notice, and other information that may be relevant to the qualifications and experience of the Offeror. No reimbursement will be made for any expenses associated with the preparation of a step one technical proposal or a step two cost proposal.
Obligation to Keep Team Intact: In connection with the services covered by this procurement process, any in-house personnel, subcontractors, and outside associates will be limited to the individuals or firms that are specifically identified during the step one technical proposal. The Contractor shall obtain the Contracting Officer’s written consent before making any substitution for these designated in-house personnel, subcontractors, or outside associates.
Supplemental Work: Offerors are expected to provide qualified and experienced staff to develop appropriate pre-construction or construction protocols as designated by Federal, state, and local regulations/guidelines, including but not limited to the following:
• Work Plan.
• Accident Prevention Plan.
• Health and Safety Plan.
• Environmental Management Plan.
• Waste Management Plan.
• Recycling Plan.
Submittals: Each Offeror must provide one (1) original clearly marked and eight (8) duplicate original hard copies of the completed technical proposal. In addition, provide one (1) CD-ROM containing the completed technical proposal in PDF format. The technical proposal shall contain no more than ten (10) pages typed on one side only. The technical proposal shall be bound. If tabs are used and contain project-specific information, they will be counted as pages. The technical proposal shall be written on 8.5" x 11" paper using Times New Roman font with a size of 12-point. All technical proposal documents must be submitted in a sealed envelope separate from the cost proposal documents.
Each Offeror must provide one (1) original Bid Schedule and Cost Proposal Summary (Pages B- 1 through B-5) completed as instructed in the RFP’s Proposal Instructions - Step 2 Lowest Price (B Pages) instructions. All cost proposal documents containing prices or pricing related information, including but not limited to the SF1442 and Small Business Subcontracting Plan, must be submitted in a sealed envelope separate from the technical proposal documents.
Send all information to the following address:
Federal Highway Administration Eastern Federal Lands Highway Division 21400 Ridgetop Circle Sterling, VA 20166 Attn: Jason Albright (Fax and email submissions will not be accepted.)
Other Information: Questions concerning this solicitation may be directed to Mr. Jason Albright at 703-404-6212, e-mail to: EFLHD.contracts@dot.gov, or in his absence, to Ms.
Shirley Anderson at 703-948-1407.
mailto:eflhd.contracts@dot.gov
Shirley.Anderson Typewritten Text
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Federal Highway Administration Eastern Federal Lands Highway Div.
Construction Office 21400 Ridgetop Circle
EFLHD-CO
Sterling VA 20166-6511
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Shirley.Anderson Typewritten Text
Shirley.Anderson Typewritten Text Federal Highway Administration Federal Lands Highway A/P Branch, AMZ-150 PO Box 25710 or E-Mail
9-AMC-AMZ-EFLINVOICES@FAA.GOV
Oklahoma City, OK 73125
Shirley.Anderson Typewritten Text
CONTINUATION OF SF 1442
Block 2:
This project is UN-RESTRICTED - Proposals will be accepted from ALL eligible business concerns.
This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10)
The award of this project is subject to a 10% price evaluation preference for eligible HubZone Small Business Concerns (must be on the SBA listing) (see FAR Clause 52.219-4).
Facsimile and electronic bids will not be accepted.
PHYSICAL DATA AVAILABLE FOR REVIEW
1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2003 Edition, published by the Federal Highway Administration. http://mutcd.fhwa.dot.gov.
2. National Park Service Sign Manual, revised - January 1988, United States Department of the Interior. http://www.nps.gov/npsigns.
3. NEPA Report – Categorical Exclusion Form
4. RFP Statement
Block 9:
In accordance with FAR Provision 52.236-27, Site Visit, a Government representative can be available to show the project to prospective bidders. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.
∗Block 11:
The date of substantial completion for Schedule A, as defined in Subsection
101.04 of the FP, must be no later than May 14, 2014.
Work restrictions can be found in SCR Sections 108 and 156.
Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.) Contract Award/Notice to Proceed is subject to availability of funds.
Block 12A:
Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.
Block 13:
A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, http://www.nps.gov/npsigns mailto:eflhd.contracts@dot.gov whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee.
Block 17:
Amounts should be completed as follows:
Schedule A - $
Other:
The estimated price is expected to fall within the price range of $2,000,000 to $7,500,000.
Responsibility of offerors shall be evaluated in accordance with the information provided on the Bidder's Qualification Form, which can be downloaded from FHWA web site. FP-03 versions can be downloaded at the FHWA web site. FHWA web site is http://www.efl.fhwa.dot.gov/contracting-manuals-guides.aspx then click on Construction Specifications.
Evaluation and Basis of Award:
The Government will award the project to the lowest priced/technically acceptable responsible Offeror. The Contracting Officer intends to evaluate all proposals from all eligible Contractor firms/teams (Offerors) for technical acceptability. After all of the technical proposals have been evaluated, the Offerors that are found technically acceptable will be ranked according to price and the lowest Offeror will be awarded the contract.
Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability for technical qualifications rests with the offeror.
Responsibility of offerors shall be evaluated in accordance with the information provided on the Offeror's Qualification Form, which can be downloaded from FHWA web site. FP-96 or FP-03 versions can be downloaded at the FHWA web site. FHWA web site is http://www.efl.fhwa.dot.gov/contracting-manuals-guides.aspx then click on Construction Specifications.
Please Note:
This solicitation is a Request for Proposal (RFP). Therefore, there will not be a public bid opening and proposals are not available for review.
Subcontracting Goals
Required from all other than Small business when the requirement is expected to exceed $650,000 ($1,500,000 for Construction) [FAR 19.702]. The Contracting Officer, along review and advisory comments from the Office of Small Disadvantaged Business Utilization (OSDBU), is responsible for approving a reasonable and realistic plan [FAR 19.705-4] [TAM http://www.efl.fhwa.dot.gov/contracting/Documents.aspx
1219.201(e)(6)]. The legislated subcontracting goals are as shown below. A copy of each subcontracting plan (or contractor statement that no subcontracts are to be awarded) must be provided to OSDBU prior to close of negotiations [TAM 1219.705-5 and - 6].
Legislated subcontracting goals: (15 USC 644 (g)(1)
• 23% - Small Businesses (SB)
• 5% - Small Disadvantaged Businesses (SDB)
• 3% - HUBzones
• 5% - Small Woman Owned Business Entities (SWBE)
• 3% - Service-Disabled Veteran-Owned Small Businesses (SDVOSB)
PROPOSAL INSTRUCTIONS
PROJECT: PRA-GRSM 1B21
OFFERORS PLEASE NOTE: Before preparing the proposal, carefully read the Instructions to Bidders. While preparing the proposal, comply with the following:
The Government will award the project to the lowest priced/technically acceptable responsible Offeror. The Contracting Officer intends to evaluate all proposals from all eligible Contractor firms/teams (Offerors) for technical acceptability. After all of the technical proposals have been evaluated, the Offerors that are found technically acceptable will be ranked according to price and the lowest Offeror will be awarded the contract.
EVALUATION OF PROPOSAL DOCUMENTS
STEP 1 – TECHNICAL ACCEPTABILITY
Competing technical proposals will be evaluated against the solicitation requirements; they are not compared with each other. Each of the technical evaluation factors described below will be rated on a pass/fail basis, and must receive a passing score for an Offeror's proposal to receive further consideration. Failure to receive a passing score for any technical evaluation factor will result in rejection of an Offeror's proposal notwithstanding passing scores for other technical evaluation factors. Technical acceptability will be determined by evaluating each responsive proposal and comparing the results of that evaluation against the technical requirements specified in the solicitation. Proposals which satisfy the technical requirements of the solicitation, in light of the evaluation criteria, will be determined technically acceptable.
Evaluation Factor - Experience in the construction of roadway and retaining wall projects in the Great Smoky Mountains Region
Offerors will be evaluated on past performance and experience in the construction of roadway and retaining wall projects in the Great Smoky Mountains Region. This evaluation will be based on the Offerors record and reputation for satisfactorily completing projects similar in size and complexity. The Government will review and evaluate documented past performance and will rate each Offeror as acceptable or unacceptable. By acceptable past performance, the Government means that the Offeror has a good reputation for satisfying its customers and delivering quality work in a timely and safe manner at a reasonable cost. Acceptable past performance also means the Offeror has a reputation of integrity, reasonable and cooperative conduct, and commitment to safety and customer satisfaction. In reviewing and evaluating past performance, the Government will consider information obtained from the Offeror, and may consider information obtained from other sources. This includes past and present customers and their current and former employees; past and present subcontractors and their current and former employees; current and former employees of the Offeror; Federal, state, and local government agencies (including court records); and private consumer protection organizations. The Government will evaluate past performance information and will rate each Offeror as pass or fail.
The following specific sub factors will be evaluated:
(a) Experience in roadway construction projects in the Great Smoky Mountains Region similar in size, complexity, and location. Provide a list of three to five roadway and retaining wall construction projects that the prime contractor has completed in the last five years. The information provided for the construction projects shall be written on 8.5" x 11" paper using Times New Roman font with a size of 12-point, and shall contain the information listed below. Limit each construction project discussion to no longer than one 8.5" x 11" sheet.
• Project Name
• Project Location
• Project Owner and Contact Information including phone number and email address
• Year (Award of Contract, Original and Final Completion Date, reasons for extension if any)
• Name of Contractor Project Manager or Resident Engineer
• Name of Contractor Superintendent
• Name(s) of significant subcontractors (if any)
• Cost Performance – Initial Bid, Final Cost, Reasons for Change
• Discussion of project scope.
Include names, titles, and phone numbers for all references submitted.
(b) Ability to work with Federal or state agencies and successfully complete a project in difficult site conditions, including but not limited to a remote location, mountainous terrain, adverse weather conditions and/or work under traffic. Submit documentation that shows evidence of successful completion for the prime contractor and any identified subcontractors performing more than 25% of the work.
(c) Contractor’s approach to managing the construction schedule, including the ability to adjust activities to achieve required completion dates. Include experience in the following:
• Initial schedule development.
• Review of scheduled activities to ensure conformance with design and construction requirements.
• Schedule updates and adjustments as needed due to adverse or unforeseen conditions.
STEP 2 – LOWEST PRICE
COMPLETING THE BID SCHEDULE
Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total by adding the amounts of the several items, and show in the block provided on Page B-5. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, Offerors must submit prices for each pay item.
Review Subsection 109.05 of the FP regarding scope of payment for direct and indirect payment work.
The date of substantial completion for Schedule A, as defined in Subsection 101.04 of the FP, must be no later than May 14, 2014.
SCHEDULE OF WORK
The Bid Schedule is comprised of the following:
Schedule A - Great Smoky Mountains National Park (B-1 to B-4)
BASIS FOR AWARD
The Government will award the project to the lowest priced/technically acceptable responsible Offeror. The Contracting Officer intends to evaluate all proposals for technical acceptability.
After all of the technical proposals have been evaluated, the Offerors that were found technically acceptable will be ranked according to price and the contract will be awarded to the responsive, responsible Offeror with the lowest Evaluation Total Price of Project, which is defined as:
Schedule A (Base Contract) Total.
B - 1
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A1010 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A1020 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A1030 15705-0100 SOIL EROSION CONTROL, SILT FENCE
1,700 LNFT $____________ $____________
A1040 15705-1700 SOIL EROSION CONTROL, FILTER BERM (FIBER LOG)
520 LNFT $____________ $____________
A1050 15706-0200 SOIL EROSION CONTROL, CHECK DAM
36 EACH $____________ $____________
A1060 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
2 EACH $____________ $____________
A1070 20103-0000 CLEARING AND GRUBBING
4,900 SQYD $____________ $____________
A1080 20301-1400 REMOVAL OF INLET
2 EACH $____________ $____________
A1090 20302-1400 REMOVAL OF GUARDRAIL, TIMBER
500 LNFT $____________ $____________
A1100 20302-2100 REMOVAL OF PIPE CULVERT
300 LNFT $____________ $____________
A1110 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
775 SQYD $____________ $____________
A1120 20315-0000 SAWCUTTING PAVEMENT
1,200 LNFT $____________ $____________
A1130 20401-0000 ROADWAY EXCAVATION
10,000 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:PRA-GRSM 1B21
Project Name:Great Smoky Mountains National Park
B - 2
A1140 25101-4000 PLACED RIPRAP, CLASS 4
24 CUYD $____________ $____________
A1150 25602-0000 GROUND ANCHOR
5,200 LNFT $____________ $____________
A1160 25605-0000 PERFORMANCE TEST
7 EACH $____________ $____________
A1170 30101-4000 AGGREGATE BASE GRADING C OR D
450 TON $____________ $____________
A1180 30503-0000 AGGREGATE-TOPSOIL COURSE
90 CUYD $____________ $____________
A1190 40101-0600 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE,
0.3 TO <3 MILLION ESAL
470 TON $____________ $____________
A1200 40101-1000 SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE,
0.3 TO <3 MILLION ESAL
200 TON $____________ $____________
A1210 41301-0000 ASPHALT PAVEMENT MILLING
3,600 SQYD $____________ $____________
A1220 55101-1500 STEEL H-PILES 12 X 63, IN PLACE
1,540 LNFT $____________ $____________
A1230 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (FOR CAP AND COREWALL
PRECAST LAGGING INCLUDING REINFORCEMENT AND FORM LINERS)
400 CUYD $____________ $____________
A1240 55401-1000 REINFORCING STEEL (FOR CONCRETE CAP AND COREWALL ONLY)
14,500 LB $____________ $____________
A1250 55501-0000 STRUCTURAL STEEL (GALVANIZED WALER AND MISC. GALVANIZED
STEEL)
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 3
A1260 56501-0000 DRILLED SHAFTS (INCLUDING SOCKET CONCRETE)
220 LNFT $____________ $____________
A1270 60201-0800 24-INCH PIPE CULVERT
100 LNFT $____________ $____________
A1280 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
1 EACH $____________ $____________
A1290 60403-0800 INLET, TYPE 4A
2 EACH $____________ $____________
A1300 60504-0000 GEOCOMPOSITE SHEET DRAIN SYSTEM
1,200 SQYD $____________ $____________
A1310 61701-3900 GUARDRAIL SYSTEM SBTA
175 LNFT $____________ $____________
A1320 62002-0000 STONE MASONRY (FOR INSIDE AND TOP FACE OF COREWALL)
90 SQYD $____________ $____________
A1330 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
2,700 SQYD $____________ $____________
A1340 62502-0000 TURF ESTABLISHMENT
2,700 SQYD $____________ $____________
A1350 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
430 LNFT $____________ $____________
A1360 63401-2300 PAVEMENT MARKINGS, TYPE L, SOLID
5,200 LNFT $____________ $____________
A1370 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
3 EACH $____________ $____________
A1380 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
30 EACH $____________ $____________
A1390 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
60 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 4
A1400 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
A1410 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
725 LNFT $____________ $____________
A1420 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
4,600 LNFT $____________ $____________
A1430 63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL
4,600 LNFT $____________ $____________
A1440 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
75 SQFT $____________ $____________
A1450 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
380 HOUR $ 21.50 $ 8,170.00
A1460 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
B - 5
COST PROPOSAL SUMMARY
Project PRA-GRSM 1B21
(1) Schedule A Total (from Page B-4) = (1) $____________________
The date of substantial completion for Schedule A, as defined in Subsection 101.04 of the FP, must be no later than May 14, 2014.
Does the Offeror claim the Price Evaluation Preference for HUBZone Small Business Concerns as defined in FAR Clause 52.219-4?
Yes No
20%�12�� ���������
2%/,*$7,21�
:H�� WKH�3ULQFLSDO� DQG�6XUHW\�LHV�� DUH� ILUPO\�ERXQG�WR�WKH�8QLWHG�6WDWHV�RI�$PHULFD��KHUHLQDIWHU�FDOOHG�WKH�*RYHUQPHQW��LQ�WKH�DERYH�SHQDO�VXP���)RU SD\PHQW� RI� WKH� SHQDO� VXP�� ZH� ELQG� RXUVHOYHV�� RXU� KHLUV�� H[HFXWRUV�� DGPLQLVWUDWRUV�� DQG� VXFFHVVRUV�� MRLQWO\� DQG� VHYHUDOO\�� � +RZHYHU�� ZKHUH� WKH 6XUHWLHV�DUH�FRUSRUDWLRQV�DFWLQJ�DV�FR�VXUHWLHV��ZH��WKH�6XUHWLHV��ELQG�RXUVHOYHV�LQ�VXFK�VXP��MRLQWO\�DQG�VHYHUDOO\��DV�ZHOO�DV��VHYHUDOO\��RQO\�IRU�WKH SXUSRVH�RI�DOORZLQJ�D� MRLQW�DFWLRQ�RU�DFWLRQV�DJDLQVW�DQ\�RU�DOO� RI�XV�� �)RU�DOO�RWKHU�SXUSRVHV��HDFK�6XUHW\�ELQGV�LWVHOI��MRLQWO\�DQG�VHYHUDOO\�ZLWK�WKH 3ULQFLSDO��IRU�WKH�SD\PHQW�RI�WKH�VXP�VKRZQ�RSSRVLWH�WKH�QDPH�RI�WKH�6XUHW\�� �,I�QR�OLPLW�RI�OLDELOLW\�LV�LQGLFDWHG��WKH�OLPLW�RI�OLDELOLW\�LV�WKH�IXOO�DPRXQW
RI�WKH�SHQDO�VXP�
&21',7,216�
7KH�3ULQFLSDO�KDV�VXEPLWWHG�WKH�ELG�LGHQWLILHG�DERYH�
7+(5()25(�
7KH�DERYH�REOLJDWLRQ�LV�YRLG�LI�WKH�3ULQFLSDO����D��XSRQ�DFFHSWDQFH�E\�WKH�*RYHUQPHQW�RI�WKH�ELG�LGHQWLILHG�DERYH��ZLWKLQ�WKH�SHULRG�VSHFLILHG�WKHUHLQ�IRU DFFHSWDQFH� �VL[W\������GD\V�LI�QR�SHULRG�LV�VSHFLILHG���H[HFXWHV�WKH�IXUWKHU�FRQWUDFWXDO�GRFXPHQWV�DQG�JLYHV�WKH�ERQG�V��UHTXLUHG�E\�WKH�WHUPV�RI�WKH ELG�DV�DFFHSWHG�ZLWKLQ�WKH�WLPH�VSHFLILHG��WHQ������GD\V�LI�QR�SHULRG�LV�VSHFLILHG��DIWHU�UHFHLSW�RI�WKH�IRUPV�E\�WKH�SULQFLSDO��RU��E��LQ�WKH�HYHQW�RI�IDLOXUH WR� H[HFXWH� VXFK� IXUWKHU� FRQWUDFWXDO� GRFXPHQWV�DQG�JLYH�VXFK�ERQGV��SD\V� WKH�*RYHUQPHQW� IRU�DQ\�FRVW�RI�SURFXULQJ� WKH�ZRUN�ZKLFK�H[FHHGV� WKH
DPRXQW�RI�WKH�ELG�
(DFK� 6XUHW\�H[HFXWLQJ� WKLV� LQVWUXPHQW�DJUHHV� WKDW� LWV�REOLJDWLRQ� LV�QRW� LPSDLUHG�E\�DQ\�H[WHQVLRQ�V��RI� WKH� WLPH� IRU� DFFHSWDQFH�RI� WKH�ELG� WKDW� WKH 3ULQFLSDO�PD\�JUDQW�WR�WKH�*RYHUQPHQW���1RWLFH�WR�WKH�VXUHW\�LHV��RI�H[WHQVLRQ�V��DUH�ZDLYHG���+RZHYHU��ZDLYHU�RI�WKH�QRWLFH�DSSOLHV�RQO\�WR�H[WHQVLRQV DJJUHJDWLQJ�QRW�PRUH�WKDQ�VL[W\������FDOHQGDU�GD\V�LQ�DGGLWLRQ�WR�WKH�SHULRG�RULJLQDOO\�DOORZHG�IRU�DFFHSWDQFH�RI�WKH�ELG�
:,71(66�
7KH�3ULQFLSDO�DQG�6XUHW\�LHV��H[HFXWHG�WKLV�ELG�ERQG�DQG�DIIL[HG�WKHLU�VHDOV�RQ�WKH�DERYH�GDWH�
67$1'$5'�)250�����5(9��������
3UHVFULEHG�E\�*6$���)$5�����&)5���������D�
$87+25,=('�)25�/2&$/�5(352'8&7,21
3UHYLRXV�HGLWLRQ�LV�XVDEOH
35,1&,3$/
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
6,*1$785(�6�
1$0(�6��
�7\SHG�
&RUSRUDWH
6HDO
�6HDO� �6HDO� �6HDO�
,1',9,'8$/�685(7<�,(6�
�6HDO� �6HDO�
3.�� ��
%,'�%21'
�6HH�LQVWUXFWLRQ�RQ�UHYHUVH�
'$7(�%21'� (;(&87('��0XVW�QRW�EH�ODWHU� WKDQ�ELG
RSHQLQJ�GDWH�
7<3(�2)�25*$1,=$7,21� ��;��RQH�
,1',9,'8$/
-2,17� 9(1785(
3$571(56+,3
&25325$7,21
67$7(�2)� ,1&25325$7,21
35,1&,3$/��/HJDO�QDPH�DQG�EXVLQHVV�DGGUHVV�
685(7<�,(6���1DPH�DQG�EXVLQHVV�DGGUHVV�
PENAL SUM OF BOND
3(5&(17 2)�%,' 35,&(
$02817� 127� 72�(;&(('
0,//,21�6� 7+286$1'�6� +81'5('�6� &(176
%,'�,'(17,),&$7,21
%,'�'$7(
)25��&RQVWUXFWLRQ�
6XSSOLHV��RU�6HUYLFHV�
,19,7$7,21� 12�
&25325$7(�685(7<�,(6�
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
&RUSRUDWH
6HDO
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
3XEOLF�UHSRUWLQJ�EXUGHQ�IRU�WKLV�FROOHFWLRQ�RI�LQIRUPDWLRQ�LV�HVWLPDWHG�WR�DYHUDJH����PLQXWHV�SHU�UHVSRQVH��LQFOXGLQJ�WKH�WLPH�IRU�UHYLHZLQJ�LQVWUXFWLRQV��VHDUFKLQJ�H[LVWLQJ�GDWD VRXUFHV��JDWKHULQJ�DQG�PDLQWDLQLQJ�WKH�GDWD�QHHGHG��DQG�FRPSOHWLQJ�DQG�UHYLHZLQJ�WKH�FROOHFWLRQ�RI�LQIRUPDWLRQ�� �6HQG�FRPPHQWV�UHJDUGLQJ�WKLV�EXUGHQ�HVWLPDWH�RU�DQ\�RWKHU DVSHFW�RI�WKLV�FROOHFWLRQ�RI�LQIRUPDWLRQ��LQFOXGLQJ�VXJJHVWLRQV�IRU�UHGXFLQJ�WKLV�EXUGHQ��WR�WKH�)$5�6HFUHWDULDW��095���)HGHUDO�$FTXLVLWLRQ�3ROLF\�'LYLVLRQ��*6$��:DVKLQJWRQ��'& debbie C-1
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 67$1'$5'�)250�����5(9���������%$&.
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
(e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitation listed therein. where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designed "SURETY(IES)" on the face of the form, insert only the letter identification of the sureties.
(b) Where individual sureties are involved, a completed Affidavit of Individual surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal";
and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."
debbie C-2
CONTRACT CLAUSES INDEX
FEDERAL ACQUISITION REGULATION (FAR) TRANSPORTATION ACQUISITION REGULATION (TAR)
(Updated thru FAC 2005-70 on 9/30/2013)
FAR & TAR CLAUSES INCORPORATED BY REFERENCE
CLAUSE TITLE DATE REMARKS
52.202-1 DEFINITIONS Jan-12 52.203-3 GRATUITIES Apr-84 52.203-5 COVENANT AGAINST CONTINGENT FEES Apr-84 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT Sep-06 52.203-7 ANTI-KICKBACK PROCEDURES Oct-10 52.203-8 CANCEL & RECOVER OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY Jan-97 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY Jan-97 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACT Sep-07 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS Oct-10 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT Apr-10 52.203-14 DISPLAY OF HOTLINE POSTER(S) Dec-07 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER May-11 52.204-7 SYSTEM FOR AWARD MANAGEMENT Jul-13 Contractor Mandatory Internet Data Input 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS Jul-13 Contractor Mandatory Internet Data Input
52.209-6
PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED OR PROPOSED FOR DEBARMENT Aug-13
52.214-5 SUBMISSION OF BIDS Mar-97 If applicable 52.214-19 CONTRACT AWARD -- SEALED BIDDING-CONSTRUCTION Aug-96 If applicable 52.214-26 ALT 1 AUDIT AND RECORDS -- SEALED BIDDING (ALT 1 - (MAR 09)) Oct-10 If applicable 52.214-27 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA - MODIFICATIONS - SEALED BIDDING Aug-11 52.214-28 SUBCONTRACTOR COST OR PRICE DATA -- MODIFICATIONS--SEALED BIDDING Oct-10 52.214-29 ORDER OF PRECEDENCE - SEALED BIDDING Jan-86 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE Apr-91 52.214-35 SUBMISSION OF OFFERS IN THE U.S. CURRENCY Apr-91 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS Jul-13 52.219-9 ALT 1 SMALL BUSINESS SUBCONTRACTING PLAN (ALT 1 - (Oct 01)) Jul-13 Large Business Mandatory Submittal Requirement 52.219-14 LIMITATIONS ON SUBCONTRACTING Nov-11 52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN Jan-99 52.222-3 CONVICT LABOR Jun-03 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT -- OVERTIME COMPENSATION Jul-05 52.222-5 DAVIS-BACON ACT- SECONDARY SITE OF THE WORK Jul-05 52.222-6 DAVIS-BACON ACT Jul-05 Contractor Mandatory Wage Rates Posting 52.222-7 WITHHOLDING OF FUNDS Feb-88 52.222-8 PAYROLLS AND BASIC RECORDS Jun-10 Contractor Weekly Payroll Submittals 52.222-9 APPRENTICES AND TRAINEES Jul-05 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS Feb-88
52.252-2 Clauses Incorporated By Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. The full text of a clause may be accessed electronically at this address: www.arnet.gov/far/
(End of Clause)
(Updated thru FAC 2005-70 on 9/30/2013)
52.222-11 SUBCONTRACTS (LABOR STANDARDS) Jul-05 52.222-12 CONTRACT TERMINATION -- DEBARMENT Feb-88 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS Feb-88 52.222-14 DISPUTES CONCERNING LABOR STANDARDS Feb-88 52.222-15 CERTIFICATION OF ELIGIBILITY Feb-88 52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES Mar-12 52.222-21 PROHIBITION OF SEGREGATED FACILITIES Feb-99 52.222-26 EQUAL OPPORTUNITY Mar-07 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION Feb-99 52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, & OTHER EL Sep-10 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES Oct-10 52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETS, VETS OF THE VIETNAM ERA, ET AL Sep-10 52.222-38 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS Sep-10 Contractor Annual Mandatory Reporting Requirement 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT Dec-10 52.222-50 COMBATING TRAFFICKING IN PERSONS Feb-09 If applicable 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACT Sep-13 http://www.biopreferred.gov 52.223-5 POLLUTION PREVENTION AND RIGHT TO KNOW INFORMATION May-11 52.223-6 DRUG-FREE WORKPLACE May-01 Contractor Annual Contractor Reporting Reqt 52.223-10 WASTE REDUCTION PROGRAM May-11 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION CONTRACTS May-08 Mandatory 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING Aug-11 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES Jun-08 52.227-1 AUTHORIZATION AND CONSENT Dec-07 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .