Plans_PRA-NAMA_502(5).pdf

PDF 23 MB Posted

Attached to
National Mall and Memorial Parks - Kutz Bridge, PRA-NAMA 502(5)
Solicitation number
DTFH71-14-B-00008
Issued by

About this file

Plans_PRA-NAMA 502(5)

View the file

Other files

File Type Posted
FP03_Eng_.pdf PDF
IFB_Solicitation_PRA-NAMA_502(5).pdf PDF
Report_2_Bridge_Inspection_Report_2013.pdf PDF
VETS-100A_Form.pdf PDF
Report_4_NEPA.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Subcontracting_plan.doc DOC document
Report_3_Cert_Program_for_Bridge_Temp_Works_(FHWA-RD-93-033).pdf PDF
Report_1_Bridge_Inspection_Report_2011.pdf PDF
FP03_Errata.pdf PDF
Synopsis_Notice_PRA-NAMA_502(5).doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF THE INTERIOR

M

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D a 1-n a m a (5 tt l.

d g n

:5

:5

A

-D e c -2

SHEET

NO

DESCRIPTION

INDEX TO SHEETS

PLANS FOR PROPOSED

REG STATE PROJECT

SHEET

NO.

NC DC A1

NATIONAL PARK SERVICE

NPS

NO.

106126

DESCRIPTION OF PROJECT

IMPROVEMENT:

PROJECT LENGTH:

ROAD:

WIDTH TYPE

SURFACE:

DECK

ADT (2013)

ADT (2033)

DHV

%Truck

D

V (MPH)

6%

SPECIFICATIONS:

FP-03 U.S.Customary Units.

Roads and Bridges on Federal Highway Projects", "Standard Specifications for Construction of

BRIDGE:

DESIGN DESIGNATION:

Concrete

C/A Full

N

Project Manager Lead Designer

PMIS NO.

100016

TOTAL

SHEETS

Cycle #3(miles)

N

KEY MAP

WASHINGTON DC AND METROPOLITAN AREA

15 12 6 0 15

SCALE IN MILES

VIRGINIA

SPRINGFIELD

ALEXANDRIA

ANDREWS

AIR FORCE

BASE

BETHESDA

MCLEAN

ARLINGTONFALLS

CHURCH

VIENNA

SILVER

SPRING

HYATTSVILLE

ROCK

CREEK

PARK

FT

MYER

B A

L T

W A S

H

P A

R K

W A

Y

GEORGE

P A

R K

W A

Y

MARYLAND

WASH. DC

W A S

H

D

IS

T R

IC

T O

F C O

LU

M B

IA

A R

LIN

G T O

N C

O

F A

IR

F A X C

O

M O

N T G

O M

E R Y C

O

P R

IN

C E G

E O

R G E S C

O

NATIONAL MALL AND MEMORIAL PARKS

DISTRICT OF COLUMBIA

PRA-NAMA 502(5)

RAMANIKLAL SATASIYA BOB BEUCLER

INDEPENDENCE AVE.

B

S

IN

D R

W E S T

O H

IO

O

PRA-NAMA 502(5)

21,700 vpd

24,000 vpd

3,255 vpd

N/A

34’ Asphalt

34’

2.5" asphalt over concrete bridge deck

0.1471 Miles

A Kutz Bridge 10+00 to 17+76.67 0.1471 NACC3400, Rte.0502

MP 0.504 to MP 0.652, Schedule Description Station to Station Length RIP Milepost/

PROJECT PRA-NAMA 502(5)

PROJECT PRA-NAMA 502(5)

(INDEPENDENCE AVENUE EASTBOUND)

KUTZ BRIDGE

0 0.25

SCALE IN MILES

0.125

CONSTITUTION AVE.

THE MALL

MADISON DR.

T

H

S T

T

H

S T

T

H

S T

HOUSE

WHITE

ST.

E

T

H

S

T

T

H

S

T

T

H

S T

S

T

S

T

E ST.

C R

E E

K P

K W

Y R

O C

K

VIRG

IN

IA AVE.

PENNSYLVANIA

AVE.

JEFFERSON DR.

INDEPENDENCE AVE.

AVE.

MARYLAND

L ’E

N F

A N

T

P

R O

M

T

H

S

T

C h a n n e l

W a sh in g to n

D ST.

C ST.

T

MONUMENT

WASHINGTON

M A

IN

E A

V E

R W

A L L E N

B E R

G

P L

O H

IO

D

R

MEMORIAL

JEFFERSON

Basin

Tidal

MEMORIAL

MLK

M E

M B

R

ID

G E

G E O R G E M

A S O

N

P o to m a c R iv e r

MEMORI

AL B

RI

DGE

ARLI

NGTON

MEMORIAL

LINCOLN

CONSTITUTION AVE.

W A

TE

R S

T.

M A

IN

E A

V E

(Independence Avenue Eastbound)

Rehabilitate Kutz Bridge

PMIS # 100016

STEEL PAINTING, STONE MASONRY, AND OTHER WORK

ASPHALT MILL AND OVERLAY, DECK CONCRETE REPAIR,

BRIDGE STRUCTURE # 3400-032P

Standards and Details

Bridge As-Built Plans

Bridge Plans

Permanent Striping

Temporary Traffic Control Plans

Erosion Control Narrative

Wingwall Erosion Repair Plan

Plan

Summaries and Schedules

Tabulation of Quantities

Typical Sections

Staging Area Plan

Location Map

Symbols and Abbreviations

Title Sheet

PLANS PREPARED BY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

Administration

Federal Highway

U.S. Department of Transportation

Know what’sbelow.

before you dig.Call

R

Website: www.missutility.net prior to digging at 811 or 1-800-257-7777

Call DC Miss Utility One Call Center

DECEMBER, 2013

OVER TIDAL BASIN (April 22, 2013)

BIP report: KUTZ BRIDGE INDEPENDENCE AVENUE

Bridge structure: # 3400-032P

S1-S7

R18-R33

R1-R17

P1

N1-N9

M1

E1

D1

C2-C3

C1

B1-B5

A4

A3

A2

A1

R/W

P/E C/E

P

UD

W

P/E C/E

P or

UD

W

FOUND

36 31

6 1

36 31

6 1

No Symbol

No Symbol

FOUND

36 31

6 1

36 31

6 1

400 No Symbol x 99.9

T-45

2,645.9

T-3 x 99.9

T-45

2,645.9

T-3

26 25 69426 25 694 c

Average daily traffic ADT

Alternate alt.

Ahead AH

Aggregate aggr.

Abutment Abut.

Footing ftg.

Flange flg.

Finish fin.

Inside diameter ID

West W

(curve delta or deflection)

Curve total angle

(spiral curve transitions)

Curve centeral angle

Culvert culv.

Corrugated metal pipe CMP

Continuous cont.

Construction joint Constr. jt.

Connection conn.

Column col.

Clear clr.

Centers ctrs.

Center to center cc, c-c or c. to c.

Centerline

Drop Inlet DI

Drawing(s) dwg(s), or drwg(s)

Distance dist.

Diaphragm diaph.

Diameter D, dia., or

Diagonal diag.

Design speed V

Design hourly volume DHV

Expansion joint exp. jt.

Excavation exc.

Equation EQ or eq.

End section ES

Embankment emb.

[El. 94.16]

Elevation with number El. 94.161

Elevation elev.

Edge of pavement EP or EOP

East E

Gage(gauge) ga.

Galvanized galv.

High water HW

Hexagon hex.

Headwall hdwl.

Joint jt.

Low water LW

Longitudinal(longitude) long.

Length of spiral Ls

(spiral curve transision)

Length of curve Lc

Length of curve(simple curve) L

Left lt., Lt. or LT

Latitude lat.

Lamination lam.

On centers o. c.

Outside diameter OD

Out to out o. to o.

Original groung OG

North N

Normal crown NC or NCR

Route Rte.

Roadway Rdwy.

Right-of-way R/W

Right Rt., rt.or RT

Required reqd.

Reinforcement (reinforced) reinf.

Range R.

Radius R

Symmetrical sym.

Superelevation rate e

Structure struc.

Stringer stgr.

Stiffener stiff.

Station Sta.

Standard std.

Spiral central angle s

Spacing, spaces or spaced spa.

South S

Section Sec.

Typical typ.

Township T.

Thread thd.

easement

Temporary construction TCE

Temporary benchmark TBM

(spiral curve transision)

Tangent distance Ts

(tangent length)

Tangent distance T

Vertical point of intersection VPI

Vehicle per hour vph

PAVEMENT REMOVAL/ROADWAY OBLITERATION

LAKE, POND or RESERVOIR; MARSHLAND

SLOPE STAKE

PROPOSEDEXISTING

PROJECTED

INTERSTATE U.S. STATE

AREA PATTERN

TREELINE; TREE

BUILDING

UNDERDRAIN

BOX CULVERT

CULVERT with DROP INLET

PIPE CULVERT with HEADWALL

PIPE CULVERT with END SECTION

PIPE CULVERT (arrow shows flow)

BRIDGE

STREET LIGHT

TELEPHONE BOOTH or PEDESTAL

SUPPORT POLE with ANCHOR

RETAINING WALL

SIGNS

PORTABLE

POST MOUNTED

GUARDRAIL

CATTLEGUARD

GATE with FENCE

FENCE

MATERIAL SOURCE

NORTH ARROW

EXISTING PROPOSED

wall facewall face

TB or TP or

P/LP/L

MEDIAN & SIDE (CONCRETE) BARRIER

FOREST BOUNDARY

NATIONAL PARK or

SECTION LINE16

SECTION LINE4

SECTION LINE

COUNTY BOUNDARY

CITY BOUNDARYCITY BOUNDARY

NATIONAL BOUNDARY

STATE BOUNDARY

TOWNSHIP or RANGE LINE

PROPERTY LINE

BRASS CAP

STEEL PIN

Top of Triangle Points North

TRAVERSE POINT (Horizontal & Vertical)

TRAVERSE POINT (Horizontal)

COORDINATE GRID TICK

SPOT ELEVATION

HUB & TACK

BORING LOCATION

RIPRAP/CULVERT RIPRAP

CHECK DAM

DIVERSION BERM

SILT FENCE

MILL AND OVERLAY

SIDEWALK ASPHALT/CONCRETE

FULL DEPTH PAVEMENT

OVERLAY

SECTION CORNER

SECTION CORNER4

SECTION16

PROPERTY CORNER

PARCEL NUMBER

EASEMENT (Permanent - Construction)

ROUTE NUMBERS

RIGHT-OF-WAY LINE

with MONUMENT

RIGHT-OF-WAY LINE

TOP OF CUT

TOE OF FILL

TRANSITION

SINGLE TRACK

ROADWAY, EXISTING

INTERMITTENT DRAINAGE/ SMALL CREEK

SPRING

LARGE CREEK/RIVER

RAILROAD

TRAIL

MULTIPLE TRACK

FO=Fibre optics

T=Telephone, E&T=Joint Electrical and Telephone

E=Electrical for distribution line

P=Electrical for transmission line

OVERHEAD(POWER POLE) UTILITIES

E=electrical, FO=fibre optics SS=storm sewer, T=telephone, W=water G=gas, O=oil, P=power, SA=sanitary sewer, UNDERGROUND UTILITIES

PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:-

DIVERSION CHANNEL

TEST PIT

B-1

TP-1

ABBREVIATIONS

SYMBOLS AND

EOP

EOG

embankment

Mechanically stabilized MSE

Monument mon. or MON

Minimum min.

Mile[Kilometer] post M.P[K.P.]

Maximum max.

Material matl.

Mainline M.L.

Point on tangent POT

Point on spiral POS

Point on curve POC

Point of tangent to spiral PS or TS

Point of tangent PT

Point of spiral to tangent PST or ST spiral

Point of spiral to reverse SRS

Point of spiral to curve PSC or SC

Point of intersection PI

Point of curve to spiral PCS or CS

Point of curve PC

Point of compound curve PCC

Plate pl.

PHTPhoto monument

Pavement pvmt.

Bench mark BM

Beginning beg.

Bearing brg.

Balance point BP

Back BK

A2

Drum

Traffic direction arrow

Advance warning arrow panel

Westbound

Eastbound

Portable changeable message sign

Equivalent single axle loads

Nominal maximum size aggregate

Superpave hot asphalt concrete pavement

WB

EB

PCMS

ESAL

NMSA

SACP

LCenterline C

No Symbol

TB or TP

P or

UD

W

No Symbol

TB or TP

P or

UD

W

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D a -n a m a (5 s y m .d g n

:1 :1

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

A3

MAP

LOCATION

O

C ST.

D ST.

Basin Tidal

W a sh in g to n

C h a n n e l

B U C

K E Y E

O H

IO

D

R

O H

IO

D

R

B R

ID

G E

R O

C H

A M

B E A

U M

E M

G E O

R G

E M

A S

O N M

E M B

R

ID

G E

IN

L E T B

R

ID

G E

MEMORIAL

JEFFERSON

O

UTLET BRID

G E

M A

IN

E A

V E

S W

A N B

O A T

PARKING AREA

INDEPENDENCE

KUTZ BRIDGE

AVE.

L ’E

N F

A

P

O M

E N

A D

E

INDEPENDENCE AVE.

AVE

MARYLAND

C ST.

M A

IN

E A

V E .W

A T E R S

T

WHITE HOUSE

T

H

S

T

T

H

S

T

T

H

S

T

PENNSYLVANIA

AVE.

CONSTITUTION AVE.

MONUMENT

WASHINGTON

MADISON DR.

THE MALL

JEFFERSON DR.

CONSTITUTION AVE.

REFLECTING POOL

ST.

E

R O

C K

C R

E E

K P

K W

Y

VIR

G

IN

IA

E ST.

AVE.

H E

N R

Y B

A C

O N D

R

LINCOLN

MEMORIAL

F R E

N C

H D

R

D A

N

IE

L

MEMORI

AL B

RI

DGE

ARLI

NGTON

MEMORIAL BRID

GE

THEODORE ROOSEVELT

O H

IO

D

R

B A S

IN

D

R

W E S

TP

o to m a c

R iv e r

INDEPENDENCE AVE.

1 A

Construction Signs:

A

AREA

STAGING

W

L L E

N B

E R

G P

L

MEMORIAL

MLK

AHEAD

UNDER CONSTRUCTION

KUTZ BRIDGE

Notes:

EB INDEPENDENCE AVENUE, 10+00.00

BEGIN PROJECT PRA-NAMA 502(5)

EB INDEPENDENCE AVENUE, 17+76.67

END PROJECT PRA-NAMA 502(5)

ROAD

WORK2

MILE2

ROAD

WORK

1000 FT

Anote 4

See note 3

See

Ohio Dr.

HDQTRS

PARK

REGION (NCR)

NATIONAL CAPITAL

A

SCALE IN FEET

0 500 1000

Message Sign

Portable Changeable

MESSAGE

VARIABLE

5.

4.

3.

2.

1.

and Sequence of Construction sheet.

For work hours, refer to the Traffic Control Plan General Notes at this bridge location for vehicles higher than this clearance.

Do not use Maine Avenue under Independence Avenue has a minimum underneath clearance of 12’-2".

The Independence Avenue Bridge over Maine Avenue of HS20 (MS18). Do not use construction vehicles over this bridge.

The Inlet Bridge on Ohio Drive has a bridge loading

Cover or remove all conflicting signs.

portable changeable message signs.

traffic control devices and approve messages on the

The CO will approve the final location and spacing of

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D a -n a m a (5 lo c .d g n

:2

1-

O c t-

:2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

801HV86021

E

8-inch in c h in c h

E

TS

TS

TS

TS

TS

E

E

E

E

E

E

E E

E

E

8-inch in c h in c h

E

E in c h in c h

12-inch in c h

12-inch

12-inch in c h in c h

12-inch in c h

12-inch

12-inch

30-in ch

30-inch

30-inch30-inch

30-inch

30-in ch in c h in c h in c h in c h

18-inch

18-inch in c h in c h

27.5"x27.5" Box culvert

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D a -n a m a (5 s ta g in g .d g n

:5

-D e c -2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

100’

100’

21’

EB INDEPENDENCE AVE.

STAGING AREA

STAGING AREA PLAN

Notes:

1.

2.

Subsection 107.02.

Protect trees in the vicinity of the staging area in accordance with

3.

areas as directed by the CO.

accumulated mud, gravel, and other debris, and repair damaged the construction entrance for the duration of the project. Remove

Maintain and protect the existing exposed aggregate sidewalk across

4.

min.

10’

WB MAINE AVE.

contours and conditions.

with the area of construction entrance to the approximate existing

At the completion of the project, restore the staging area along

A4

Silt fence (typical)

5.

No left turns are permitted when leaving the staging area.

6.

7.

8.

SCALE IN FEET

0 15 30 approval from the CO for the final staging area location.

construction entrance shown are approximate only. Obtain

The locations of the wood stockade fence, gate, and stabilized

Allow the Park event staff use of the staging area on the fourth of July.

Detail E619-A.

fence, 96-in height. See

Install 380’ of wood stockade

Maintain and protect the existing exposed aggregate sidewalk. See Note 3.

See Detail E157-01.

construction entrance.

Construct stabilized

See Section 625 for topsoil and turf establishment requirements.

See Section 159 for additional staging area information.

See Subsection 159.04.

wood stockade gate.

Install an 8-foot high 21-foot wide

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D b 1-n a m a (5 ty p .d g n

:2

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

B1

Notes:

17’-0"

2%

CLCL

CL

(See note 2)

Proposed travel way

2.00%

Existing structure

A B C

MILL AND OVERLAY TABLE

A

B

C

Section

2.5"

2.5"

2.5" north curb reveal

Maintain existing

ExistingExisting 2%

Proposed Proposed

Varies

(north to south)

Type IV pavement smoothness

3 to <30 million ESALs

" NMSA,2

1Overlay Depth, SACP, (Washington Monument)

SIDEWALK

NORTH

(Jefferson Memorial)

SIDEWALK

SOUTH

34’-0" Existing travelway

2.5" to 2.5"

(see table)

Mill depth

(see table)

Overlay depth south curb reveal

Maintain 5.75" minimum

Match existing sidewalk slope

1.92" to 1.92" at 10+00

Varies 17’-0" to 16’-2"

Varies 17’-0" to 15’-4"

Travel lane

Varies 11’-4" to 10’- 6 2/3"

Varies 0’-0" to 1’-2"

(West of Abutment 1)

TYPICAL SECTION

Mill Depth

2.

1.

(8+78 to 10+00)

(Independence Avenue Eastbound)

2’-4" to

0’-0"

Varies

2.5" to 1.92" at 10+00

2.5" to 2.5" at 8+78

2.5" to 2.5" at 8+78

Varies 17’-0" to 16’-2"

Travel lane

Varies 11’-4" to 10’- 6 2/3"

Travel lane

Varies 11’-4" to 10’- 6 2/3"

SCALE IN FEET

20 4 travel way centerline.

Place asphalt to ensure that the crown is centered about the proposed

STAGE DETAILS sheets in the bridge plans.

For bridge dimensions, see the EXISTING TYPICAL SECTIONS AND

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D b 1-n a m a (5 ty p .d g n

:2

:4

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

B2

Notes:

17’-0"

2%

CLCL

CL

(See note 2)

Proposed travel way

2.00%

Existing structure

A B C

MILL AND OVERLAY TABLE

A

B

C

Section

2.5"

2.5"

2.5" north curb reveal

Maintain existing

ExistingExisting 2%

Proposed Proposed

Varies

(north to south)

Type IV pavement smoothness

3 to <30 million ESALs

" NMSA,2

1Overlay Depth, SACP, (Washington Monument)

SIDEWALK

NORTH

(Jefferson Memorial)

SIDEWALK

SOUTH

T r a ff ic r a il ty p

P e d e s tr ia n r a il ty p

34’-0" Existing travelway

See note 3

2.5" to 2.5"

(see table)

Mill depth

(see table)

Overlay depth south curb reveal

Maintain 5.75" minimum

4.

3.

2.

1.

Match existing sidewalk slope

(see note 4)

Mill Depth (min.)

(Abutment 1, 10+00 to 10+74.33)

Kutz Bridge (Independence Avenue Eastbound)

(Abutment 1)

TYPICAL SECTION

2.5" to 1.53" at 10+74.33

2.5" to 1.92" at 10+00

1.53" to 1.5" at 10+74.33

1.92" to 1.92" at 10+00

Varies 16’-2" to 15’-0" Varies 16’-2" to 15’-0"

Varies 15’-4" to 13’-0"

Travel lane

Varies 10’- 6 2/3" to 10’-0"

Travel lane

Varies 10’- 6 2/3" to 10’-0"

Travel lane

Varies 10’- 6 2/3" to 10’-0"

2’-4" to 4’-0"

Varies Varies 1’-2" to 2’-0" membrane

Install waterproofing

SCALE IN FEET

20 4

Mill to a depth to ensure removal of all asphalt surface.

at locations as shown on the PLAN sheet.

Remove existing concrete curb and replace with granite curb travel way centerline.

Place asphalt to ensure that the crown is centered about the proposed

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D b 1-n a m a (5 ty p .d g n

:2

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

B3

Notes:

Travel lane

10’-0"

Travel lane

10’-0"

Travel lane

10’-0"

13’-0"17’-0"

2%

15’-0" 15’-0"

2’-0"

CLCL

CL

(See note 2)

Proposed travel way

2.00%

Existing structure

A B C

MILL AND OVERLAY TABLE

A

B

C

Section

2.5"

2.5"

2.5" north curb reveal

Maintain existing

ExistingExisting 2%

Proposed Proposed

2.02%

(north to south)

Type IV pavement smoothness

3 to <30 million ESALs

" NMSA,2

1Overlay Depth, SACP, (Washington Monument)

SIDEWALK

NORTH

(Jefferson Memorial)

SIDEWALK

SOUTH

T r a ff ic r a il ty p

P e d e s tr ia n r a il ty p

4’-0"

34’-0" Existing travelway

2.5" to 2.5"

2.5" to 1.53"

1.53" to 1.5"

(see table)

Mill depth

(see table)

Overlay depth south curb reveal

Maintain 5.75" minimum

Match existing sidewalk slope

(see note 3)

Mill Depth (min.)

(10+74.33 to 17+02.33)

Kutz Bridge (Independence Avenue Eastbound)

(Bridge Section)

TYPICAL SECTION

3.

2.

1.

membrane

Install waterproofing

SCALE IN FEET

20 4

Mill to a depth to ensure removal of all asphalt surface.

travel way centerline.

Place asphalt to ensure that the crown is centered about the proposed

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D b 1-n a m a (5 ty p .d g n

:2

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

B4

17’-0"

2%

CLCL

CL

(See note 2)

Proposed travel way

2.00%

Existing structure

A B C

MILL AND OVERLAY TABLE

A

B

C

Section

2.5"

2.5"

2.5" north curb reveal

Maintain existing

ExistingExisting 2%

Proposed Proposed

Varies

(north to south)

Type IV pavement smoothness

3 to <30 million ESALs

" NMSA,2

1Overlay Depth, SACP, (Washington Monument)

SIDEWALK

NORTH

(Jefferson Memorial)

SIDEWALK

SOUTH

T r a ff ic r a il ty p

34’-0" Existing travelway

See note 3

2.5" to 2.5"

(see table)

Mill depth

(see table)

Overlay depth south curb reveal

Maintain 5.75" minimum

Match existing sidewalk slope

(see note 4)

Mill Depth (min.)

(Abutment 2)

TYPICAL SECTION

(Abutment 2, 17+02.33 to 17+76.67)

Kutz Bridge (Independence Avenue Eastbound)

W in g w a ll ty p

2.5" to 1.53" at 17+02.33

1.53" to 1.5" at 17+02.33

2.5" to 2.14" at 17+76.67

2.14" to 2.14" at 17+76.67

Varies 15’-0" to 16’-3" Varies 15’-0" to 16’-3"

Varies 2’-0" to 0’-9"

Varies 13’-0" to 15’-6"

Travel lane

Varies 10’-0" to 10’-10"

Travel lane

Varies 10’-0" to 10’-10"

Travel lane

Varies 10’-0" to 10’-10"

4’-0" to 1’-6"

Varies membrane

Install waterproofing

SCALE IN FEET

20 4

Notes:

4.

3.

2.

1.

Mill to a depth to ensure removal of all asphalt surface.

at locations as shown on the PLAN sheet.

Remove existing concrete curb and replace with granite curb travel way centerline.

Place asphalt to ensure that the crown is centered about the proposed

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D b 1-n a m a (5 ty p .d g n

:2

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

B5

MILL AND OVERLAY TABLE

A

B

C

Section

2.5"

2.5"

2.5"

(north to south)

Type IV pavement smoothness

3 to <30 million ESALs

" NMSA,2

1Overlay Depth, SACP, 2.5" to 2.5"

2.5" to 2.14" at 17+76.67

2.5" to 2.5" at 18+25

2.14" to 2.14" at 17+76.67

(East of Abutment 2)

TYPICAL SECTION

Mill Depth

(17+76.67 to 18+25)

(Independence Avenue Eastbound)

17’-0"

2%

CLCL

CL

(See note 2)

Proposed travel way

2.00%

Existing structure

A B C north curb reveal

Maintain existing

ExistingExisting 2%

Proposed Proposed

Varies

(Washington Monument)

SIDEWALK

NORTH

(Jefferson Memorial)

SIDEWALK

SOUTH

34’-0" Existing travelway

(see table)

Mill depth

(see table)

Overlay depth south curb reveal

Maintain 5.75" minimum

Match existing sidewalk slope

Varies 16’-3" to 17’-0"

Varies 15’-6" to 17’-0"

Varies 0’-0" to 1’-2"

Varies 16"-3" to 17’-0"

2.5" to 2.5" at 18+25

Travel lane

Varies 10’-10" to 11’-4" Travel lane

Varies 10’-10" to 11’-4"

Travel lane

Varies 10’-10" to 11’-4"

Varies 1’-6" to 0’-0"

SCALE IN FEET

20 4

Notes:

2.

1.

travel way centerline.

Place asphalt to ensure that the crown is centered about the proposed

NC DC

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D c 1-n a m a (5 q n t.

d g n

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

C1

NPS NO.

NO.

PMIS

QUANTITIES

OF

TABULATION

100016 106126

PRA-NAMA 502(5)

-D e c -2

M1 1:

M

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D c -n a m a (5 s ig n c .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NC DC

REG STATE PROJECT SHEET NO.

C2

NPS NO.

NO.

PMIS

100016

SCHEDULE

CONSTRUCTION SIGNS

ROAD WORK

END

PRA-NAMA 502(5)

106126

G20-2

Text

No.No.

Sign Sign Text

9 W20-5R

LOCATION Width in

Height in

Area

PANEL SIZE

Corner

Radii

Border

Width Width

Margin Numbers Upper

Case Case

Lower

Series

Color

Combination RemarksQuantity

Total Area in

TEXT SIZE

See note 2 See note 3

Orange on

Black sqft ininin inin sqft

48 48 16

48 24

48 48 16 See note 2

See note 2

See note 3

See note 3

48 48 See note 2 See note 3

Orange on

Black

NOTES:

Traffic Control Devices" (MUTCD) and the MUTCD’s latest edition of "Standard Highway Signs".

3. Construct and erect all signs in accordance with the latest edition of the "Manual on Uniform

2. Actual locations of the signs are as shown in the Construction Traffic Control Plans and Location Map or as directed by the CO.

CLOSED

AHEAD

RIGHT LANE

R9-10 See note 2 See note 3

48 24 8

White on

Black

SIDEWALK CLOSED

USE OTHER SIDE

W4-2R

W4-2L

Mount on type III barricade

SUBTOTAL 19 254

Use at time and location as per the CO

48 48 16 See note 2 See note 3

LANES

UNEVEN

W8-11

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

R11-2

ROAD

CLOSED

CENTER

LANE

CLOSED

AHEAD

W9-3

W12-1

See note 2 See note 3

See note 2 See note 3 48 30 10

White on

Black

4. Backfill post holes with topsoil upon removal of signs.

1. Install sign post supports according to Detail E635-01.

WORK

AHEAD

ROAD

W20-5L

W20-1

48 48

See note 2

See note 2

See note 2 See note 3

See note 3

See note 3

WORK

1000 FT

ROAD

W20-1 16

-D e c -2

M1 1:

M

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D c -n a m a (5 s ig n c .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NC DC

REG STATE PROJECT SHEET NO.

C3

NPS NO.

NO.

PMIS

100016

SCHEDULE

CONSTRUCTION SIGNS

PRA-NAMA 502(5)

106126

Text

No.No.

Sign Sign Text

LOCATION Width in

Height in

Area

PANEL SIZE

Corner

Radii

Border

Width Width

Margin Numbers Upper

Case Case

Lower

Series

Color

Combination RemarksQuantity

Total Area in

TEXT SIZE

sqft ininin inin sqft

48 48

TOTAL

NOTES:

CLOSED

AHEAD

LEFT LANE

(mod)

W20-5R

STEEL

PLATES

AHEAD

90 44 See note 2

Special 27.50 1 6 6 - C6.5 1.25

AHEAD

UNDER CONSTRUCTION

KUTZ BRIDGE

SUBTOTAL 19

ROUNDED TOTAL 38 615

WORK

1/2 MILE

ROAD

W20-1

See note 2 See note 3

3 48

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

4 64

15 5

137.50

361.50

615.50

Traffic Control Devices" (MUTCD) and the MUTCD’s latest edition of "Standard Highway Signs".

3. Construct and erect all signs in accordance with the latest edition of the "Manual on Uniform

2. Actual locations of the signs are as shown in the Construction Traffic Control Plans and Location Map or as directed by the CO.

4. Backfill post holes with topsoil upon removal of signs.

1. Install sign post supports according to Detail E635-01.

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D d 1-n a m a (5 p la n .d g n

:2

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

D1

PLAN

AVENUE

XX

STA. 18+25

END MILL & OVERLAY

END PROJECT

TIDAL BASIN

TIDAL BASIN

i n in

KUTZ BRIDGE

SCALE IN FEET

INDEPENDENCE

STA. 8+78

BEGIN MILL & OVERLAY

BEGIN PROJECT

MH

MHD

I

I

18 in in in in in a b a n d o n P d in a b a n d o n P d i n

3.

2.

1.Notes:

Replace expansion joint (typical)

(northside only) granite curb replace with concrete curb, Remove existing pedestrian rail

Paint to match traffic rail (typical)

Remove and replace curb face of

Proposed

(typical) rail to remain

Existing pedestrian

(northside only) granite curb replace with concrete curb, Remove existing curb

Concrete

Existing curb

Granite

Existing

(See notes 4 and 5)

(Southside only) installation at inlet curb removal, and curb

Limit of sidewalk widening, curb

Concrete

Existing curb

Concrete

Existing

("x" represents cracked panels) portland cement concrete sidewalk panels

Replace five 4’ x 4’ reinforced curb

Granite

Existing

(See notes 4 and 5)

(Southside only) installation at inlet curb removal, and curb

Limit of sidewalk widening, curb

Granite

Existing

(See note 3) erosion area

NE wingwall

Repair

74’-4"123’-6"127’-0"127’-0"127’-0"123’-6"74’-4"

2 1/2 " depth, minimum crosshatched area

Mill & overlay

(See Subsection 615.04) southside sidewalk

Power wash the existing curb

Concrete

Existing curb

Granite

Existing

SCALE IN FEET

0 25 50

.6

.3

.3

.6

DETAIL A

DETAIL A

DETAIL B

DETAIL B

disturbed areas as shown in the plans.

Topsoil and provide turf establishment for all

6.

5.

4.

7.

See WINGWALL EROSION REPAIR PLAN.

centerline. See TYPICAL SECTION sheets.

is centered about the proposed

Place asphalt to ensure that the crown south sidewalk open at all times.

Keep either the north sidewalk or

See Subsection 636.06 for lighting work.

inlet to 10+00 and from 17+76.67 to inlet.

and for sidewalk / curb details from

See Detail E615-A for sidewalk panels structure for granite curb detail from 10+00 to 17+76.67.

See CURB DETAILS sheet in the bridge plans

Install LED luminaires to replace old luminaires.

Replace wiring inside each of the 16 light posts (typical).

existing green color (typical).

Paint light posts to match

(remove and reset existing sign, no pay) portland cement concrete sidewalk panels

Replace two approximately 5’ x 9’ reinforced

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D e 1-n a m a (5 p la n .d g n

:1

-D e c -2

NOTES:

SECTION A-A SECTION B-B

N o r th e a s t w in g w a ll

K u tz B r id g e

Seawall

Footing

Top of seawall

Install turf establishment

Topsoil, 6" depth

Geotextile type III-B, top layer

Existing ground

2’ bottom layer

Geotextile type III-B, Endwall

Footing

Footing

S e a w a ll

Northeast wingwall (Kutz Bridge)

1’

Top of seawall

Install turf establishment

Topsoil, 6" depth

Geotextile type III-B, top layer

2’ bottom layer

Geotextile type III-B, Existing ground between geotextile layers

AASHTO M 43 no.57 gradation stone bottom layer geotextile type III-B, Vertical limit of bottom layer geotextile type III-B, Vertical limit of bottom layer geotextile type III-B, Vertical limit of

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

REPAIR PLAN

WINGWALL EROSION

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126 E1

A

A

B

B Eroded area

Water (Tidal Basin)

S e a w a ll

Northea st wing wall (Ku tz Brid ge)

Indepe ndence

Avenu e East bound

See note 1

PLAN

’61

Limit of eroded area

Silt fence

N

E n d w a ll

15’

Grassed area and no. 57 stone.

Limit of geotextile type III-B for equipment access.

Limit of hatched clearing area

Edge of sidewalk stone between geotextile layers

AASHTO M 43 no.57 gradation6 m in im u m

3.

2.

1.

SCALE IN FEET

2.50 5 disturbed areas outside the labeled eroded area.

of topsoil and turf establishment on all the limits of the labeled eroded area. Install 4"

Install 6" of topsoil and turf establishment within topsoil, and turf establishment.

install geotextile type III-B, 57 stone, filtration bags (see Subsection 157.06) and is complete, pump out standing water using

After repointing work described in note 1 seawall and wingwall on the Tidal Basin side.

Repoint the stone masonry gap between the

(See Subsection 202.09) and row of shrubs

Remove trees

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

CONTROL NARRATIVE

EROSION & SEDIMENT

M1DC PRA-NAMA 502(5)NC100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

construction limits.

does not leave the project site. Perimeter controls include silt fence and other specified measures outside the

Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment

Phase I Establish Perimeter Controls

Sequence of Construction

Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.

measures.

Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control

Do not allow construction vehicles to track sediment outside the project limits.

No construction access will be permitted through a wetland or waterway.

Officer (CO).

Do not modify the type, size, or location of any control or practice without prior approval from the Contracting

Contract Requirements.

for Construction of Roads and Bridges on Federal Highway Projects, FP-03 (U.S. Customary Units), and the Special measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The

The work consists of applying measures throughout the life of the project to control erosion and to minimize the

The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.

General Guidelines

Response Center at 1-800-424-8802.

requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National

Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.

waste materials. Do not dispose of hazardous water materials into the on-site dumpsters. Dispose of

Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.

maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and

Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.

Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.

Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to

Waste, garbage, sanitary waste

Soaps, solvents used for vehicle washing

Fuels, oils, equipment-related compounds

Wash-water from concrete, paint, curing compounds, and other construction materials

The following discharges are prohibited:

Prohibited Discharges

The Runoff Coefficient prior to construction is 0.15. The Runoff Coefficient after construction will be 0.15.

No new impervious surface will be created by the reconstructed roadway.

The total disturbed area for the project is approximately 0.015 acres. The receiving water is Potomac River (Tidal Basin).

and backfilling an eroded area at the intersection of the bridge’s northeast wingwall and the Tidal Basin seawall.

Soil disturbing activities include tree removal, grading, and embankment installation relating to getting access to

This project consists of the rehabilitation of Kutz Bridge.

Project Description

Record the inspection date and summary of findings within 24 hours of completing a site inspection.

their rated capacity.

and for capacity. Immediately cease pumping and replace damaged filter bags, or bags that have reached

Filter bags - check the filter bags daily during dewatering operations for punctures, tears, or other damage, it becomes 0.5 feet deep at the fence.

becomes damaged, repair or replace as necessary. Remove sediment from behind the silt fence when

Silt fence - inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric end of the day.

0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the

Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.

Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices

Maintenance and Inspection Procedures

Remove all other perimeter controls when directed by the CO.

Remove silt fence only after all upslope areas are stabilized and vegetation is well established.

Remove all devices used for dewatering.

Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.

where vegetation has not established.

Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas

Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.

After completion of roadway construction, do the following as directed by the CO:

Phase III Final Construction / Stabilization areas.

Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days of stockpiling.

Provide silt fence around all stockpiled excavated roadway material. Apply temporary turf establishment to culverts.

and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed

Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade

Install inlet protection prior to diverting water through inlets.

runoff.

At the end of each day�s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent turf establishment to the finished slopes according to Section 624 and 625.

Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days roadway.

culverts as called out in the Erosion and Sediment Control plans. Install filter berms in ditches along the

Apply intermediate controls during rough grading operations. Install silt fence in areas surrounding the

Phase II Intermediate Controls

NPS NO.

NO.

PMIS

SEQUENCE OF CONSTRUCTION

GENERAL NOTES AND

TRAFFIC CONTROL PLAN

N1

1.

2.

TRAFFIC CONTROL GENERAL NOTES SEQUENCE OF ROADWAY CONSTRUCTION

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D n 1-n a m a (5 tc p .d g n

:4

-D e c -2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

3.

11)Set up containment system under bridge

10)Masonry repointing and repair

9) Asphalt overlay of work area

8) Lighting (remove lampposts, paint lampposts, reset lampposts, south side only)

7) Sand blasting and painting of underneath bridge structure

6) Extend south side sidewalk

5) Traffic rail (remove, replace, and paint south rail only)

4) Deck work (spot repair, waterproofing membrane, joint repair)

3) Remove existing curb and replace with granite curb (south side only)

2) Mill work area to expose deck

1) Power wash existing south sidewalk

Perform the following tasks, or portions of the following tasks, requiring a south lane closure:

North and center lanes open.

STAGE 4:

3) Asphalt overlay of work area

2) Deck work (spot repair, waterproofing membrane, joint repair)

1) Mill work area to expose deck

Perform the following tasks, or portions of the following tasks, requiring a center lane closure:

North and south lanes open.

STAGE 3:

10)Set up containment system under bridge

9) Masonry repointing and repair

8) Asphalt overlay of work area

7) Lighting (remove lampposts, paint lampposts, reset lampposts, north side only)

6) Sand blasting and painting of underneath bridge structure

5) Remove concrete curb and replace with granite curb (north side only)

4) Traffic rail (remove, replace, and paint north rail only)

3) Deck work (spot repair, waterproofing membrane, joint repair)

2) Mill work area to expose deck

1) Temporary striping

Perform the following tasks, or portions of the following tasks, requiring a north lane closure:

Center and south lanes open.

STAGE 2:

5) Set up containment system under bridge

4) Power wash existing south sidewalk

3) Lighting work (rewiring)

2) Northeast wingwall erosion repair

1) Masonry repointing and repair

Perform the following tasks, or portions of the following tasks, with lane closures during non-rush hours:

North, center, and south lanes open.

STAGE 1:

Construct the following using the Construction Traffic Control and Signing sheets within the plans:

and on weekends from 8:00pm Friday to 6:00am Monday.

on weeknights from 8:00pm to 6:00am Monday through Friday

At any stage of construction, two lane closures are permitted

Friday. Do not set up or remove traffic control devices during the rush hours.

during the rush hours of 6:00am to 9:30am and 3:30pm to 7:00pm Monday through

After this nine week period, one lane closures of any lane are permitted except maximum of three weeks per lane between June 1, 2014 and September 1, 2014.

is permitted for 7 days a week, 24 hours per day, per each lane, for a

For each of the three lane closures (stages 2, 3, and 4), the one lane closure

For days that work is not permitted, see Subsection 108.01.

4.

7.

8.

The CO will approve the final location and spacing of traffic control devices.

6.

each stage, as directed by the CO.

Cover or remove all conflicting signs and remove all conflicting striping for be left overnight with "UNEVEN LANES" warning signs.

day. Elevation differences up to 1‰", or up to 3" with a 1:3 fillet, may

Wherever practical, construct adjacent traffic lanes to the same elevation each contractors working in the vicinity, and make adjustments as necessary.

Coordinate traffic control signing and devices as needed with all other

5.

message signs.

The CO will determine the final locations and messages of the portable changeable to traffic before the concrete has developed the minimum required strength.

Use steel plates to cover full-depth bridge deck patches which must be opened

9.

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D n 1-n a m a (5 tc p .d g n

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

N2 i n in

PLAN

SECTION

Work area

N Notes:

Work area

5’ 6 3/4"

Monument

Washington

SIDEWALK

NORTH

Memorial

Jefferson

SIDEWALK

SOUTH

See note 2

Travel lane

11’ 4"

North

Travel lane

11’ 4"

Center

Travel lane

11’ 4"

South

3.

2.

1.

SCALE IN FEET

0 50 100

2.5 50

SCALE IN FEET

NON-ROADWAY WORK

TRAFFIC CONTROL

CONSTRUCTION

Keep either the north sidewalk or south sidewalk open at all times.

and close south sidewalk.

sidewalk work area, open the north sidewalk to pedestrian traffic

The work area is shown as the width of the north sidewalk. For a south

CONSTRUCTION sheet for work performed during this stage.

See the TRAFFIC CONTROL PLAN GENERAL NOTES AND SEQUENCE OF

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D n 1-n a m a (5 tc p .d g n

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

N3 i n in

PLAN

SECTION

Work area

N Notes:

2.

1.

2’

Work area

5’ 6 3/4"

Monument

Washington

SIDEWALK

NORTH

Memorial

Jefferson

SIDEWALK

SOUTH

1’

10’ 0"

Travel lane

9’ 6"

Center

Travel lane

9’ 6"

South

Mill and overlay

Work area

12’

North a b a n d o n P d in a b a n d o n P d i n

SCALE IN FEET

0 50 100

2.5 50

SCALE IN FEET

NORTH LANE WORK

STAGES 1 and 2

TRAFFIC CONTROL

CONSTRUCTION

WORK sheet for signage and drum locations.

See CONSTRUCTION TRAFFIC SIGNING STAGES 1 AND 2 NORTH LANE

CONSTRUCTION sheet for work performed during this stage.

See the TRAFFIC CONTROL PLAN GENERAL NOTES AND SEQUENCE OF

Install temporary tape

Remove existing white dashed line

Install temporary tape

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D n 1-n a m a (5 tc p .d g n

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

N4 i n in

PLAN

SECTION

Work area

N Notes:

2’

Monument

Washington

SIDEWALK

NORTH

Memorial

Jefferson

SIDEWALK

SOUTH

2’

0’ 6" 0’ 6"

Travel lane

9’ 6"

North

Mill and overlay

Work area

10’

Center

Travel lane

9’ 6"

South

CENTER LANE WORK

STAGE 3

TRAFFIC CONTROL

CONSTRUCTION

b a n d o n P d in a b a n d o n P d i n

SCALE IN FEET

0 50 100

2.5 50

SCALE IN FEET

2.

1.

WORK sheet for signage and drum locations.

See CONSTRUCTION TRAFFIC SIGNING STAGE 3 CENTER LANE

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D n 1-n a m a (5 tc p .d g n

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

N5 i n in

PLAN

SECTION

Work areas

N

Work Area

9’ 8"

Notes:

2’

Monument

Washington

SIDEWALK

NORTH

Memorial

Jefferson

SIDEWALK

SOUTH

1’

Travel lane

10’ 0"

North

Travel lane

9’ 0"

Center

Mill and overlay

Work Area

8’

South b a n d o n P d in a b a n d o n P d i n

SCALE IN FEET

0 50 100

2.5 5

SCALE IN FEET

SOUTH LANE WORK

STAGES 1 and 4

TRAFFIC CONTROL

CONSTRUCTION

2.

1.

WORK sheet for signage and drum locations.

See CONSTRUCTION TRAFFIC SIGNING STAGES 1 AND 4 SOUTH LANE

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D n 1-n a m a (5 tc p .d g n

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

N

M A

T C

H L

IN

E

M A

T C

H L

IN

E

INDEPENDENCE AVENUE EASTBOUND

Notes:

INDEPENDENCE AVENUE EASTBOUND

barricade type III

Mounted on

R9-10 barricade type III

Mounted on

R9-10

ROAD WORK

END

G20-2

ROAD WORK

END

G20-2

SIDEWALK CLOSED

USE OTHER SIDE USE OTHER SIDE

SIDEWALK CLOSED

SCALE IN FEET

0 50 100 barricade type III

Mounted on

R9-10

USE OTHER SIDE

SIDEWALK CLOSED

barricade type III

Mounted on

R9-10

SIDEWALK CLOSED

USE OTHER SIDE

NON-ROADWAY WORK

STAGE 1

TRAFFIC SIGNING

CONSTRUCTION

N6

(see note 3)

Work area

(see note 3)

Work area

4.

3.

2.

1.

AREA

STAGING

pedestrian guidance if necessary.

Use snow fence as directed by the CO for additional sidewalk or the south sidewalk open at all times.

Work on one side at a time. Keep either the north

Changeable Message Signs.

See the LOCATION MAP sheet for locations of Portable

Cover all signs when not in use.

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D n 1-n a m a (5 tc p .d g n

:3

:5

A

M 1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

N7

N

WORK

AHEAD

ROAD

LANE

CLOSED

AHEAD

LEFT

LANE

CLOSED

AHEAD

LEFT

W4-2

200’

200’

W20-5L

200’

W20-1

W20-5L

INDEPENDENCE AVENUE EASTBOUND

Notes:

Taper

50’ placed between oncoming traffic and workers

Truck-mounted attenuator with flashing arrow

Taper 200’

INDEPENDENCE AVENUE EASTBOUND

Work area

M A

T C

H L

IN

E

M A

T C

H L

IN

E

ROAD WORK

END

G20-2

ROAD WORK

END

G20-2

(typical)

25’ spacing

Drums

(See note 1)

(typical)

25’ spacing

Drums

(typical) striping

Existing

(typical) striping

Existing panel

Arrow panel

Arrow

SIDEWALK CLOSED

USE OTHER SIDE USE OTHER SIDE

SIDEWALK CLOSED

ROAD

CLOSED

(see note 4) barricade type III

Mounted on

R11-2

.2 white dashed

Install final tape temporary

Install dashed white existing

Remove

5.

4.

3.

1.

0’

LANE

CLOSED

AHEAD

LEFT

(see note 4)

Portable

W20-5L

(see note 5) barricade type III

Mounted on

R9-10

(see note 5) barricade type III

Mounted on

R9-10

SCALE IN FEET

0 50 100

NORTH LANE WORK

STAGES 1 and 2

TRAFFIC SIGNING

CONSTRUCTION

AREA

STAGING

pedestrian guidance if necessary.

Use snow fence as directed by the CO for additional from 8+78 to 9+50.

For temporary use while milling and overlaying

Changeable Message Signs.

See the LOCATION MAP sheet for locations of Portable

Cover all signs when not in use.

for nighttime operations.

drums parallel to the work area (25’ spacing)

Place Type C Steady-Burn warning lights on

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D n 1-n a m a (5 tc p .d g n

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

N8 N

WORK

AHEAD

ROAD

LANE

CLOSED

AHEAD

LEFT

W4-2

100’

300’

W20-5L

200’

W20-1

W12-1

INDEPENDENCE AVENUE EASTBOUND

placed between oncoming traffic and workers

Truck-mounted attenuator with flashing arrow

Taper 100’

INDEPENDENCE AVENUE EASTBOUND

Work area

M A

T C

H L

IN

E

M A

T C

H L

IN

E

ROAD WORK

END

G20-2

ROAD WORK

END

G20-2

(See note 1)

(typical)

25’ spacing

Drums

(typical) striping

Existing

(typical) striping

Existing panel

Arrow

ROAD

CLOSED

(see note 4) barricade type III

Mounted on

R11-2

.2 white dashed

Install final

CENTER LANE WORK

STAGE 3

TRAFFIC SIGNING

CONSTRUCTION

0’

LANE

CLOSED

AHEAD

LEFT

(see note 4)

Portable

W20-5L

SCALE IN FEET

0 50 100

W12-1

CENTER

LANE

CLOSED

AHEAD

W9-3

100’

5.

4.

3.

2.

1.

Notes:

panel

Arrow

CENTER

LANE

CLOSED

AHEAD

W9-3

200’ 200’

200’ Taper

(See note 1)

(typical)

25’ spacing

Drums from 8+78 to 9+50.

For temporary use while milling and overlaying

Changeable Message Signs.

See the LOCATION MAP sheet for locations of Portable

Cover all signs when not in use.

for nighttime operations.

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D n 1-n a m a (5 tc p .d g n

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

N9

N

WORK

AHEAD

ROAD

RIGHT

LANE

CLOSED

AHEAD

RIGHT

LANE

CLOSED

AHEAD

ROAD WORK

END

M A

T C

H L

IN

E

W4-2 W20-5R

W20-1

W20-5R

M A

T C

H L

IN

E

G20-2

0 2

INDEPENDENCE AVENUE EASTBOUND

228’

200’200’

106126

Notes:

4.

3.

2.

1.

Work area placed between oncoming traffic and workers

Truck-mounted attenuator with flashing arrow

ROAD WORK

END

G20-2

(typical)

25’ spacing

Drums

(See note 1)

(typical)

25’ spacing

Drums

(typical) striping

Existing

(typical) striping

Existing curb face of

Proposed panel

Arrow panel

Arrow

INDEPENDENCE AVENUE EASTBOUND

USE OTHER SIDE

SIDEWALK CLOSED

SIDEWALK CLOSED

USE OTHER SIDE

200’ Taper

(see note 4) barricade type III

Mounted on

R9-10

(see note 4) barricade type III

Mounted on

R9-10

SCALE IN FEET

0 50 100

SOUTH LANE WORK

STAGES 1 and 4

TRAFFIC SIGNING

CONSTRUCTION

Changeable Message Signs.

See the LOCATION MAP sheet for locations of Portable

Cover all signs when not in use.

for nighttime operations.

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D p 1-n a m a (5 s s p .d g n

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

(KUTZ BRIDGE)

NATIONAL MALL AND MEMORIAL PARKS

P1

N

PLAN

PERMANENT STRIPING

i n in

Notes:

(at existing stop bar)

STA. 18+13.25

STRIPING

END PERMANENT

curb face of

Proposed

See note 3

TIDAL BASIN

TIDAL BASIN

white

4" Solid c-c 10’-6" c-c 10’-2" c-c 11’-0" c-c 10’-8"

SCALE IN FEET

0 25 50

STA. 9+60

STRIPING

BEGIN PERMANENT

See note 2 white (typical)

4" Broken

(10+74.33) joint expansion

Existing

10’-0" center of stripe to face of curb

10’-0" center of stripe to center of stripe

10’-0" center of stripe to face of curb c-c

10’-9" c-c

10’-6" c-c

10’-3"

10’

30’

Use temporary tape for all temporary striping.

Restripe the existing stop bar.

expansion joint to the proposed 11’-0" wide lanes at the 18+13.25 stop bar.

Transition striping from the proposed 10’-0" wide lanes at the 17+02.33 to the proposed 10’-0" wide lanes at the 10+74.33 expansion joint.

Transition striping from the proposed 10’-9" wide lanes at 9+60 to installing final permanent striping.

Obtain the CO’s approval for the location of all striping prior

Match existing striping locations.

4.

3.

2.

1.

limit (8+78)

Mill / Overlay (17+02.33) joint expansion

Existing limit (18+25)

Mill / Overlay

E157-01

U.S. CUSTOMARY DETAIL

DETAIL

50 ft (m in.)

NOTES:

ENTRANCE

STABILIZED CONSTRUCTION

Exis ting Ro adway shoulder

Existing

Work area boundary

2.

1.

NO SCALE

(if required) pipe culvert

Temporary 18" the aggregate base.

the entire area prior to placing

Place Geotextile, Type IIB, over drainage ditches.

where entrance crosses existing

Install temporary 18" pipe culverts entrance when required.

Construct drainage ditches along

APPROVED : MAY 2011

DETAIL APPROVED FOR USE

(6" minimum depth)

AASHTO M-43, size #3 ft ( min

S1

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D S td -D e t\ s t1 1_ d e ta il .d g n

:3

:0

A

M 1-

O c t-

REG STATE PROJECT SHEET NO.

DC PRA-NAMA 502(5)NC

NPS NO.

NO.

PMIS

100016

106126

U.S. DEPARTMENT OF TRANSPORTATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Gravel base material o e o f s lo p e

SILT FENCE INSTALLATION AT TOE OF FILL

SILT FENCE INSTALLATION IN A DRAINAGE DITCH

Flow

Section A Section B

ELEVATION

JOINING TWO ADJACENT SILT FENCE SECTIONS

PLAN

ELEVATION

Section A

Section B

Flow

Varies

Varies

PLAN

(undisturbed)

Existing ground

Geotextile fabric

14"

Fi ll sl op e

Limits of clearing

Flow

Flow

Staple Posts

Staple

Flow around the end of the silt fence to prevent water from flowing

Provide sufficient length

(See note 2)

26" long post (max.)

(m in

NOTES:

Spacing 4’ (max.)

6" (max.)

Staple spacing m a x Im u m

S p a c in g into ground (min.)

Post driven 6" ground (min.)

Post 20" above

NON INTRUSIVE

SILT FENCE

4.

3.

2.

1.

drip line.

defined as 10’ beyond an indfividual tree’s

Avoid digging in the tree root zone which is information for installation procedures.

are satisfied. Follow manufacture’s will be allowed as long as specified minimums

Alternate pre-assembled silt fence options

Control Plan.

conditions only when specified on Erosion

Use drainage ditch installation for low flow feet and inches.

Unless otherwise shown, dimensions are in

Gravel base material

T o e o f s lo p e

SILT FENCE INSTALLATION AT TOE OF FILL

SILT FENCE INSTALLATION IN A DRAINAGE DITCH

Flow

Section A Section B

ELEVATION

JOINING TWO ADJACENT SILT FENCE SECTIONS

PLAN

ELEVATION

Section A

Section B

Flow

Varies

Varies

PLAN

(undisturbed)

Existing ground

Geotextile fabric

14"

Fi ll sl op e

Limits of clearing

Flow

Flow

Staple Posts

Staple

Flow around the end of the silt fence to prevent water from flowing

Provide sufficient length

(See note 2)

26" long post (max.)

(m in

NOTES:

Spacing 4’ (max.)

6" (max.)

Staple spacing m a x Im u m

S p a c in g into ground (min.)

Post driven 6" ground (min.)

Post 20" above

NON INTRUSIVE

SILT FENCE

4.

3.

2.

1.

drip line.

defined as 10’ beyond an indfividual tree’s

Avoid digging in the tree root zone which is information for installation procedures.

are satisfied. Follow manufacture’s will be allowed as long as specified minimums

Alternate pre-assembled silt fence options

Control Plan.

conditions only when specified on Erosion

Use drainage ditch installation for low flow feet and inches.

Unless otherwise shown, dimensions are in

S2

M

P R

O J E

C T

S n a m a (5 p r o j d e v C

A D

D S td -D e t\ s t1 tr e n c h le s s .d g n

:3

1-

O c t-

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

REG STATE PROJECT SHEET NO.

NPS

NO.NO.

PMIS

DC

DETAIL

U.S. CUSTOMARY DETAIL

E157-02

DETAIL APPROVED FOR USE

NO SCALE

REVISED:

100016 802

106126

NC PRA-NAMA 502(5)

Clamp

Clamp

Pump

Intake hose straps

Heavy duty lifting metal clamps and securely fastened with specified by manufacturer

Hose to be inserted as

Clamp

Clamp

Pump Intake hose

AREA

VEGETATED

WELL

AREA

VEGETATED

WELL

AREA

VEGETATED

WELL

AREA

VEGETATED

WELL

FLOW

TOP VIEW

SIDE VIEW

area

Well vegetated

Sewn in spout…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .