Plans_FW-_NLS_10(1).pdf
PDF 36 MB Posted
- Attached to
- Neal Smith National Wildlife Refuge 10(1)
- Solicitation number
- DTFH71-14-B-00003
About this file
Plans FW- NLS 10(1)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_001_FW-NLS_10(1).pdf | ||
| FP03_Errata.pdf | ||
| FP03_Eng_.pdf | ||
| IFB_Solicitation_FW-NLS_10(1).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-100A_Form.pdf | ||
| NEPA_Report.pdf | ||
| Soils_and_Foundation_Report.pdf | ||
| Synopsis_FW-NLS_10(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL WILDLIFE REFUGE
U.S. DEPARTMENT OF THE INTERIOR
M
P R
O J E
C T
S F
W S N
E S
M n ls
(1
P r o j
D e v C
A D
D A 1-
N E
S M (1 tt l.
d g n
T
IM
E
-N o v -2
:0
A
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 4.76 Miles
ROAD:
WIDTH TYPE
SURFACE:
BASE
ROADBED
24' +
27' +
ADT (2013)
ADT (2033)
DHV
%Truck
D
V (MPH)
50/50
5%
SPECIFICATIONS:
Title Sheet
Symbols and Abbreviations
Typical Sections
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
REG STATE PROJECT
SHEET
NO.
TOTAL
SHEETS
FP-03 U.S.Customary Units.
Roads and Bridges on Federal Highway Projects", "Standard Specifications for Construction of
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
BRIDGE:
DESIGN DESIGNATION:
SCALE IN MILES
0 40 80 e(max) 6%
C/A None
Project Manager Lead Designer
SENO SIOU
U.S. Department of Transportation
Administration
Federal Highway
A01
SHEET
NO
A01
A02
A03
D01-D21
D22
U.S. FISH AND WILDLIFE SERVICE
N
INTERSTATE
Moines
Des City
Iowa
STATE OF IOWA
KEY MAP
NEAL SMITH
JASPER COUNTY, IOWA
IA3
S. HAILEGIORGIS
Google Maps - @2012 Google
AND BRIDGE REHABILITATION
CONSTRUCTION OF PARKING AREA, BRIDGE REPLACEMENT,
REHABILITATION OF PACIFIC STREET AND ASSOCIATED PULL-OFFS,
RIP MILEPOSTS: MP 0.00 to MP 4.76 (RIP CYCLE IV)
Pacific Street (Route 10) bridge rehabilitation, and other miscellaneous work.
widening, crack sealing, bridge replacement, Superpave asphalt pavement overlay, shoulder
2 - 11' lanes
2 - 4' shoulders
Superpave asphalt pavement
Superpave asphalt pavement
Existing aggregate base
Existing soil
Entry Road North Bridge #33670-00085 (Sept. 2011)
Entry Road South Bridge #33670-00083 (Sept. 2011)
T01-T74
A04
A05-A07
Survey Control Data
B01-B04
Plans and Profiles
Cross Sections
A
B
C 0.01224+16.28 to 224+88.28
Schedule Station to Station (miles)
Length
Cycle #
RIP Milepost/
C01-C02 Tabulation of Quantities
N
S01-S24 Standards and Details
R01-R20
D23
Prairie Learning Center Parking Area Plan
Entrance Parking Area Layout, Signing & Striping Plan
D24 Entrance Parking Area Spot Elevation Plan
M01 Erosion & Sediment Control Narrative
M02-M12 Erosion & Sediment Control Plans
P01 Prairie Learning Center Pkg. Area Signing & Striping Plan
D
C03-C12 Schedules and Summaries
FW-NLS 10(1)
PROJECT FW-NLS 10(1)
FW-NLS 10(1)
Project
FW-NLS 10(1)
Project
E
0.01138+20.89 to 138+72.91
2.42 - 2.43/4
4.06 - 4.07/4
R21-R28 Entry Road South Bridge Plans
Entry Road North Bridge Plans
N01-N03
SAMMS# 2010148088
Entry Road North Bridge/Rte.# 10
/Rte.#Description
Entry Road South Bridge/Rte.# 10
Prairie Learning Center Pkg. Area/Rte.# 900
Location Map & Construction Signing
Centerline Chain Description
Traffic Control Plans
245+00.00 to 261+53.99 0.31 4.45 - 4.76/4Pacific Street/Rte.# 10
224+88.28 to 245+00.00
138+72.91 to 224+16.28
10+25.00 to 138+20.89
0.38
1.62
2.42
4.07 - 4.45/4
2.43 - 4.06/4
0.19 - 2.42/4
Pull-Off @ MP 2.8/Rte.# 10
Pacific Street, Entrance Parking Area, &
NOVEMBER 2013
R/W R/W
R/W R/W
P/E C/E
No Symbol
TB or TP
P P or
UD UD
W W
P/E C/E
No Symbol
TB or TP
P P or or
UD UD
W W
FOUND
36 31
6 1
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
26 25 69426 25 694 c
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
Footing ftg.
Flange flg.
Finish fin.
Inside diameter ID
West W
Expansion joint exp. jt.
Excavation exc.
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
Gage(gauge) ga.
Galvanized galv.
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
North N
Normal crown NC or NCR
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Range R.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
Section Sec.
Vertical point of intersection VPI
Vehicle per hour vph
PAVEMENT REMOVAL/ROADWAY OBLITERATION
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
PROPOSEDEXISTING
PROJECTED
INTERSTATE U.S. STATE
AREA PATTERN
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
MATERIAL SOURCE
NORTH ARROW
EXISTING PROPOSED
wall facewall face
TB or TP or
P/LP/L
MEDIAN & SIDE (CONCRETE) BARRIER
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
MILL AND OVERLAY
SIDEWALK ASPHALT/CONCRETE
FULL DEPTH PAVEMENT
OVERLAY
SECTION CORNER
SECTION CORNER4
SECTION16
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
ROUTE NUMBERS
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
E=electrical, FO=fiber optics SS=storm sewer, T=telephone, W=water G=gas, O=oil, P=power, SA=sanitary sewer, UNDERGROUND UTILITIES
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:-
DIVERSION CHANNEL
TEST PIT
B-1
TP-1
ABBREVIATIONS
SYMBOLS AND
EOP
EOG
embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
PHTPhoto monument
Pavement pvmt.
Bench mark BM
Beginning beg.
Bearing brg.
Balance point BP
Back BK
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve central angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transition)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transition)
Tangent distance Ts
(tangent length)
Tangent distance T
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original ground OG
R&N
Proposed elevation EL
Remove and install new sign
PEL
EELExisting profile elevation
Proposed profile elevation
A02
Temporary silt fence
Bike symbol pavement marking
Straight arrow pavement marking
BK
AR
P R
O J E
C T
S F
W S N
E S
M n ls
(1
P r o j
D e v C
A D
D A -N
E S
M (1 s y m .d g n
-A u g -2
:5
A
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NEAL SMITH NATIONAL WILDLIFE REFUGE
IA3 FW-NLS 10(1)
A03
S 112th Ave W
S 104th Ave W
S 102nd Ave W
S 112th Ave W
S 88th Ave W S 88th Ave W
S 96th Ave WS 96th Ave W
S 80th Ave W
S 76th Ave W
W th S t S
W th S t S
W th S t S
W r d S t S
C o H w y S
G
W th S t S
W th S t S
W th S t S
C o H w y S
G
S 76th Ave W
S S ta te S tW r d S t S
W th S t S
W th S t S
W th S t S
S 98th Ave W
W s t S t S
W th S t S
W th S t S
S E th S t W th S t S
Pinion Ave
S 104th Ave W
W n d S t S
W th S t S
W th S t S
W th S t S
P a c ific S t
W th S t S
W th S t S
Prairie City
Entry Road North Bridge
Entry Road South Bridge
Pull-Off @ MP 2.8
Parking Area
New Entrance
Notes:
1.
2.
and spacing of all traffic control devices.
The CO will approve the final locations directed by the CO.
Cover or remove all conflicting signs as
SP-1
UNDER CONSTRUCTION
PACIFIC STREET
SP-1
UNDER CONSTRUCTION
PACIFIC STREET
SP-1
UNDER CONSTRUCTION
PACIFIC STREET
SP-1
UNDER CONSTRUCTION
PACIFIC STREET
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
G20-2
G20-2
G20-2
G20-2
CONSTRUCTION SIGNING
LOCATION MAP AND
No Scale
10+25.00
FW-NLS 10(1)
Begin Project
261+53.99
FW-NLS 10(1)
End Project
(19 miles)
Des Moines
224+16.28 - 224+88.28
Schedule C
138+20.89 - 138+72.91
Schedule B
Area, Schedule E Center Parking Prairie Learning
SP-1
UNDER CONSTRUCTION
PACIFIC STREET
224+88.28 to 245+00.00
138+72.91 to 224+16.28
10+25.00 to 138+20.89
Schedule A:
245+00.00 to 261+53.99
Schedule D:
e f l-f il e s h a r e .f lh d .f h w a .d o t.
g o v D a ta P
R O J E
C T
S F
W S N
E S
M n ls
(1
P r o j
D e v C
A D
D A -N
E S
M (1 lo c .d g n
-A u g -2
:3
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
TBAR
TBAR
STOP
TBAR
N
N O
R T
H
N
N O
R T
H
NNORTH
TBAR
NNORTH
NNORTH
TBAR
PASSIN
GNO
ZONE
TBAR
N
N O
R T
H
TBAR
TBAR
FL
ASH
ERS
S T O P
TBAR
N
N O
R T
H
N
N O
R T
H
N
N O
R T
H
TBAR
N
N O
R T
H
TBAR
N
N O
R T H
TBAR
N
NORTH
TBAR
NNORTH
FLASHERS
FLASHERS
NAIL
NNORTH
DO
NOT
PASS
N
SPEED
LIMIT
NORTH
STOP
AHEAD
NNORTHNNORTH
N
N O
R T
H
N
N O
R T
H
NNORTH
N
N O
R T
H
N
N O
R T
H
SPEED
LIMIT
SPEED
LIMIT
N
N O
R T
H
ID
O T
PA
C
IFIC
S T
109TH
S
T
H W
Y117S /W
SIGN
BEYOND THIS
AREA CLOSED
N E
INFORMATION
NWR
STOP
.3
SIGN
BEYOND THIS
AREA CLOSED
E N
T R
Y P
R O
H I B I T
E D
P N
W R U
N A
U T
H O
R I Z
E D
R V
B U S E S A
N D
E M P
LO
Y E E S
P A R K
IN
G
FO
R
H O
T Z
O N
E N
W R N
O N
T O
X
IC
S
DO
NOT
PASS
147.32’ Az 171°
.3
.1
A z
A z
.9
.8
27.74’
A z
Az 232°
.8
21.05’ A z
Az 62°
.0
3.59’
Az 180°
A z
.0
.3
’ A z
A z
.5 5’
66.55’
Az 185°
Az
41 33 30.84044 N
93 16 18.47712 W
.5
A z
22.55
Az 9°
.2
A z
.2
A z
41 34 13.63991 N
93 15 58.69387 W
41 34 23.42514 N 93 16 16.60626 W
.3
.4
A z
A z
Az 119°
A z
.2 2’
Az
TBAR
.0
.2
TBAR
.1
A z
11.32’ f rom flashe r
TBAR
59.98’26.79’ Az 280°Az 89°
TBAR
.5
41 35 20.76020 N
93 16 31.50616 W
41 35 9.14701 N
93 16 39.60259 W
41 35 17.61904 N
93 16 13.28737 W
TBAR
.0
A z
N
N O
R T
H
N
N O
R T
H
N
N O
R T
H
TBAR
47.02’ .1
Az 357° A z 1
TBAR
LE
A V
IN
G N
LS
N
W R
/IN
FO
13.65’Az 164°
.8
TBAR
91.05’ 343°
99.0 3’
11°
TBAR
.0 8’
.9
A z
°A z
8°
TBAR
102.75’
Az 262°
.2
NWR SYSTEM
TBAR
87.88’
358°
.4
125.66’
A z
Az 181°
NO
PASSING
ZONE
PROJECT CONTROL POINT REFERENCE
A z
Geoid Model : GEIOD09 (Conus)
Ellipsoid Name : Geodetic Ref System 1980
Vert. Datum : NAVd 1988
Hor. Datum : NAD 1983 (Conus)
Zone : Iowa South 1402
Coordinate System : US State Plane 1983
PROJECT COORDINATE SYSTEM
SURVEY CONTROL DATA
A04
IOWADOT
ROW/
148123110
IDOT
NAME
575100.429
571875.718
580527.372
580817.241
580866.185
581394.407
581536.807
580607.540
579834.521
579479.478
578734.900
579049.196
577872.169
576245.498
575721.319
574397.505
573248.996
572262.283
570715.186
568008.623
567926.339
567504.905
567834.985
567548.465
567520.342
566701.077
566630.712
566627.576
NORTHING
1702281.703
1704503.466
1708147.853
1707878.212
1707986.518
1706682.826
1705426.697
1704697.906
1704396.811
1703789.691
1703236.866
1701851.643
1701239.422
1701988.791
1701899.432
1702328.396
1702999.126
1704363.187
1705208.273
1703969.155
1702870.793
1702112.953
1700477.839
1700415.198
1700929.076
1700146.209
1699866.603
1699170.359
EASTING
823.921
889.092
912.910
914.898
921.389
925.044
920.905
908.770
869.026
865.574
914.123
843.136
843.102
848.515
832.608
836.026
859.258
884.383
895.348
808.398
823.638
837.823
885.618
890.662
861.931
896.057
908.587
922.131
ELEV.
PROJECT CONTROL POINTS
NAIL
TBAR
PRC;IADOT
MON;IADOT
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TYPE
P R
O J E
C T
S F
W S N
E S
M n ls
(1
P r o j
D e v C
A D
D A -N
E S
M (1
S u r v e y D a ta .d g n
-M a y -2
:3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
P R
O J E
C T
S F
W S N
E S
M n ls
(1
P r o j
D e v C
A D
D A -N
E S
M (1
C h a in
D s c .d g n
-M a y -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NEAL SMITH NATIONAL WILDLIFE REFUGE
IA3
CHAIN DESCRIPTION
CENTERLINE
Sheet 1 of 3
Describe Chain PACI
Chain PACI contains:
3 CUR PACI-1 CUR PACI-2 CUR PACI-3 CUR PACI-4 CUR PACI-5 CUR PACI-6 CUR PACI-7-
CUR PACI-8 CUR PACI-9 CUR PACI-10 CUR PACI-11 CUR PACI-12 CUR PACI-13 CUR PACI-
-14 CUR PACI-15 CUR PACI-16 CUR PACI-17 CUR PACI-18 CUR PACI-19 CUR PACI-20 CUR-
PACI-21 CUR PACI-22 CUR PACI-23 CUR PACI-24 CUR PACI-25 CUR PACI-26 CUR PACI-2-
7 CUR PACI-28 4 5
Beginning chain PACI description
Point 3 N 580,539.010 E 1,708,346.055 Sta 10+00.00
Course from 3 to PC PACI-1 N 56° 02’ 16.12" W Dist 26.706
Curve Data
Curve PACI-1
P.I. Station 11+65.66 N 580,631.557 E 1,708,208.653
Delta = 7° 56’ 55.93" (RT)
Degree = 2° 51’ 53.24"
Tangent = 138.957
Length = 277.468
Radius = 2,000.000
External = 4.821
Long Chord = 277.245
Mid. Ord. = 4.810
P.C. Station 10+26.71 N 580,553.929 E 1,708,323.905
P.T. Station 13+04.17 N 580,724.376 E 1,708,105.244
C.C. N 582,212.742 E 1,709,441.196
Back = N 56° 02’ 16.12" W
Ahead = N 48° 05’ 20.19" W
Chord Bear = N 52° 03’ 48.16" W
Course from PT PACI-1 to PC PACI-2 N 48° 05’ 20.19" W Dist 357.303
Curve PACI-2
P.I. Station 19+07.01 N 581,127.060 E 1,707,656.620
Delta = 27° 35’ 26.52" (LT)
Degree = 5° 43’ 46.48"
Tangent = 245.538
Length = 481.549
Radius = 1,000.000
External = 29.703
Long Chord = 476.909
Mid. Ord. = 28.846
P.C. Station 16+61.48 N 580,963.046 E 1,707,839.345
P.T. Station 21+43.03 N 581,187.792 E 1,707,418.712
C.C. N 580,218.864 E 1,707,171.369
Back = N 48° 05’ 20.19" W
Ahead = N 75° 40’ 46.72" W
Chord Bear = N 61° 53’ 03.46" W
Course from PT PACI-2 to PC PACI-3 N 75° 40’ 46.72" W Dist 1,049.288
Curve PACI-3
P.I. Station 33+44.02 N 581,484.850 E 1,706,255.035
Delta = 11° 33’ 00.82" (LT)
Degree = 3° 49’ 10.99"
Tangent = 151.706
Length = 302.384
Radius = 1,500.000
External = 7.652
Long Chord = 301.873
Mid. Ord. = 7.613
P.C. Station 31+92.31 N 581,447.326 E 1,706,402.027
P.T. Station 34+94.70 N 581,492.182 E 1,706,103.506
C.C. N 579,993.934 E 1,706,031.012
Back = N 75° 40’ 46.72" W
Ahead = N 87° 13’ 47.54" W
Chord Bear = N 81° 27’ 17.13" W
Course from PT PACI-3 to PC PACI-4 N 87° 13’ 47.54" W Dist 601.061
Curve PACI-4
P.I. Station 44+97.91 N 581,540.666 E 1,705,101.469
Delta = 67° 39’ 49.55" (LT)
Degree = 9° 32’ 57.47"
Tangent = 402.149
Length = 708.573
Radius = 600.000
External = 122.304
Long Chord = 668.110
Mid. Ord. = 101.595
P.C. Station 40+95.76 N 581,521.230 E 1,705,503.147
P.T. Station 48+04.33 N 581,176.511 E 1,704,930.837
C.C. N 580,921.931 E 1,705,474.150
Back = N 87° 13’ 47.54" W
Ahead = S 25° 06’ 22.91" W
Chord Bear = S 58° 56’ 17.69" W
Course from PT PACI-4 to PC PACI-5 S 25° 06’ 22.91" W Dist 316.044
Curve PACI-5
P.I. Station 52+12.26 N 580,807.125 E 1,704,757.754
Delta = 13° 06’ 13.76" (LT)
Degree = 7° 09’ 43.10"
Tangent = 91.883
Length = 182.964
Radius = 800.000
External = 5.259
Long Chord = 182.565
Mid. Ord. = 5.225
P.C. Station 51+20.38 N 580,890.327 E 1,704,796.740
P.T. Station 53+03.34 N 580,717.251 E 1,704,738.646
C.C. N 580,550.887 E 1,705,521.157
Back = S 25° 06’ 22.91" W
Ahead = S 12° 00’ 09.15" W
Chord Bear = S 18° 33’ 16.03" W
Course from PT PACI-5 to PC PACI-6 S 12° 00’ 09.15" W Dist 444.091
Curve PACI-6
P.I. Station 61+28.34 N 579,910.287 E 1,704,567.083
Delta = 51° 46’ 06.56" (RT)
Degree = 7° 17’ 55.77"
Tangent = 380.909
Length = 709.272
Radius = 785.000
External = 87.535
Long Chord = 685.390
Mid. Ord. = 78.753
P.C. Station 57+47.43 N 580,282.868 E 1,704,646.295
P.T. Station 64+56.70 N 579,741.940 E 1,704,225.395
C.C. N 580,446.113 E 1,703,878.457
Back = S 12° 00’ 09.15" W
Ahead = S 63° 46’ 15.71" W
Chord Bear = S 37° 53’ 12.43" W
Course from PT PACI-6 to PC PACI-7 S 63° 46’ 15.71" W Dist 206.974
Curve PACI-7
P.I. Station 69+62.25 N 579,518.510 E 1,703,771.902
Delta = 42° 23’ 17.34" (LT)
Degree = 7° 26’ 27.64"
Tangent = 298.572
Length = 569.656
Radius = 770.000
External = 55.860
Long Chord = 556.753
Mid. Ord. = 52.082
P.C. Station 66+63.68 N 579,650.466 E 1,704,039.732
P.T. Station 72+33.33 N 579,240.490 E 1,703,663.044
C.C. N 578,959.749 E 1,704,380.041
Back = S 63° 46’ 15.71" W
Ahead = S 21° 22’ 58.37" W
Chord Bear = S 42° 34’ 37.04" W
Course from PT PACI-7 to PC PACI-8 S 21° 22’ 58.37" W Dist 182.898
Curve PACI-8
P.I. Station 80+17.58 N 578,510.231 E 1,703,377.110
Delta = 97° 45’ 18.86" (RT)
Degree = 10° 54’ 48.53"
Tangent = 601.344
Length = 895.729
Radius = 525.000
External = 273.273
Long Chord = 790.972
Mid. Ord. = 179.723
P.C. Station 74+16.23 N 579,070.182 E 1,703,596.359
P.T. Station 83+11.96 N 578,803.036 E 1,702,851.866
C.C. N 579,261.596 E 1,703,107.498
Back = S 21° 22’ 58.37" W
Ahead = N 60° 51’ 42.77" W
Chord Bear = S 70° 15’ 37.80" W
Course from PT PACI-8 to PC PACI-9 N 60° 51’ 42.77" W Dist 511.119
Curve PACI-9
P.I. Station 94+33.69 N 579,349.226 E 1,701,872.091
Delta = 98° 17’ 59.40" (LT)
Degree = 10° 51’ 05.30"
Tangent = 610.614
Length = 905.866
Radius = 528.000
External = 279.238
Long Chord = 798.783
Mid. Ord. = 182.645
P.C. Station 88+23.08 N 579,051.908 E 1,702,405.430
P.T. Station 97+28.95 N 578,778.553 E 1,701,654.876
C.C. N 578,590.727 E 1,702,148.338
Back = N 60° 51’ 42.77" W
Ahead = S 20° 50’ 17.83" W
Chord Bear = S 69° 59’ 17.53" W
Course from PT PACI-9 to PC PACI-10 S 20° 50’ 17.83" W Dist 170.739
Curve PACI-10
P.I. Station 100+22.93 N 578,503.794 E 1,701,550.295
Delta = 10° 03’ 43.91" (RT)
Degree = 4° 05’ 33.20"
Tangent = 123.250
Length = 245.866
Radius = 1,400.000
External = 5.415
Long Chord = 245.550
Mid. Ord. = 5.394
P.C. Station 98+99.68 N 578,618.982 E 1,701,594.139
P.T. Station 101+45.55 N 578,398.039 E 1,701,487.000
C.C. N 579,117.006 E 1,700,285.715
Back = S 20° 50’ 17.83" W
Ahead = S 30° 54’ 01.74" W
Chord Bear = S 25° 52’ 09.78" W
Course from PT PACI-10 to PC PACI-11 S 30° 54’ 01.74" W Dist 234.715
A05FW-NLS 10(1)
P R
O J E
C T
S F
W S N
E S
M n ls
(1
P r o j
D e v C
A D
D A -N
E S
M (1
C h s c .d g n
-M a y -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NEAL SMITH NATIONAL WILDLIFE REFUGE
IA3
CHAIN DESCRIPTION
CENTERLINE
Sheet 2 of 3
Course from PT PACI-7 to PC PACI-8 S 21° 22’ 58.37" W Dist 182.898
P.I. Station 80+17.58 N 578,510.231 E 1,703,377.110
P.C. Station 74+16.23 N 579,070.182 E 1,703,596.359
P.T. Station 83+11.96 N 578,803.036 E 1,702,851.866
Course from PT PACI-8 to PC PACI-9 N 60° 51’ 42.77" W Dist 511.119
P.I. Station 94+33.69 N 579,349.226 E 1,701,872.091
P.C. Station 88+23.08 N 579,051.908 E 1,702,405.430
P.T. Station 97+28.95 N 578,778.553 E 1,701,654.876
Course from PT PACI-9 to PC PACI-10 S 20° 50’ 17.83" W Dist 170.739
P.I. Station 100+22.93 N 578,503.794 E 1,701,550.295
P.C. Station 98+99.68 N 578,618.982 E 1,701,594.139
P.T. Station 101+45.55 N 578,398.039 E 1,701,487.000
Course from PT PACI-10 to PC PACI-11 S 30° 54’ 01.74" W Dist 234.715
Curve Data
Curve PACI-11
P.I. Station 109+31.90 N 577,723.306 E 1,701,083.173
Delta = 69° 02’ 31.07" (LT)
Degree = 7° 08’ 38.80"
Tangent = 551.632
Length = 966.418
Radius = 802.000
External = 171.397
Long Chord = 909.000
Mid. Ord. = 141.217
P.C. Station 103+80.27 N 578,196.639 E 1,701,366.463
P.T. Station 113+46.68 N 577,289.454 E 1,701,423.864
C.C. N 577,784.773 E 1,702,054.627
Back = S 30° 54’ 01.74" W
Ahead = S 38° 08’ 29.33" E
Chord Bear = S 3° 37’ 13.80" E
Course from PT PACI-11 to PC PACI-12 S 38° 08’ 29.33" E Dist 573.797
Curve PACI-12
P.I. Station 123+33.95 N 576,512.982 E 1,702,033.603
Delta = 49° 06’ 30.20" (RT)
Degree = 6° 19’ 51.69"
Tangent = 413.467
Length = 775.678
Radius = 905.000
External = 89.977
Long Chord = 752.152
Mid. Ord. = 81.840
P.C. Station 119+20.48 N 576,838.169 E 1,701,778.244
P.T. Station 126+96.16 N 576,107.067 E 1,701,954.945
C.C. N 576,279.236 E 1,701,066.472
Back = S 38° 08’ 29.33" E
Ahead = S 10° 58’ 00.87" W
Chord Bear = S 13° 35’ 14.23" E
Course from PT PACI-12 to PC PACI-13 S 10° 58’ 00.87" W Dist 191.738
Curve PACI-13
P.I. Station 131+46.92 N 575,664.535 E 1,701,869.190
Delta = 51° 40’ 08.32" (LT)
Degree = 10° 42’ 34.17"
Tangent = 259.027
Length = 482.460
Radius = 535.000
External = 59.407
Long Chord = 466.277
Mid. Ord. = 53.470
P.C. Station 128+87.90 N 575,918.831 E 1,701,918.468
P.T. Station 133+70.36 N 575,468.164 E 1,702,038.108
C.C. N 575,817.051 E 1,702,443.697
Back = S 10° 58’ 00.87" W
Ahead = S 40° 42’ 07.45" E
Chord Bear = S 14° 52’ 03.29" E
Course from PT PACI-13 to PC PACI-14 S 40° 42’ 07.45" E Dist 176.850
Curve PACI-14
P.I. Station 139+01.87 N 575,065.218 E 1,702,384.722
Delta = 45° 03’ 30.28" (RT)
Degree = 6° 42’ 04.54"
Tangent = 354.663
Length = 672.387
Radius = 855.000
External = 70.641
Long Chord = 655.194
Mid. Ord. = 65.250
P.C. Station 135+47.21 N 575,334.092 E 1,702,153.437
P.T. Station 142+19.59 N 574,711.579 E 1,702,357.782
C.C. N 574,776.524 E 1,701,505.252
Back = S 40° 42’ 07.45" E
Ahead = S 4° 21’ 22.84" W
Chord Bear = S 18° 10’ 22.31" E
Course from PT PACI-14 to PC PACI-15 S 4° 21’ 22.84" W Dist 196.731
Curve PACI-15
P.I. Station 146+20.96 N 574,311.376 E 1,702,327.295
Delta = 39° 49’ 07.87" (LT)
Degree = 10° 08’ 27.05"
Tangent = 204.632
Length = 392.658
Radius = 565.000
External = 35.915
Long Chord = 384.804
Mid. Ord. = 33.769
P.C. Station 144+16.32 N 574,515.417 E 1,702,342.838
P.T. Station 148+08.98 N 574,144.704 E 1,702,446.016
C.C. N 574,472.500 E 1,702,906.206
Back = S 4° 21’ 22.84" W
Ahead = S 35° 27’ 45.03" E
Chord Bear = S 15° 33’ 11.10" E
Course from PT PACI-15 to PC PACI-16 S 35° 27’ 45.03" E Dist 732.582
Curve PACI-16
P.I. Station 156+49.63 N 573,459.997 E 1,702,933.737
Delta = 14° 09’ 42.44" (RT)
Degree = 6° 35’ 08.60"
Tangent = 108.070
Length = 215.038
Radius = 870.000
External = 6.686
Long Chord = 214.491
Mid. Ord. = 6.635
P.C. Station 155+41.56 N 573,548.019 E 1,702,871.038
P.T. Station 157+56.60 N 573,359.310 E 1,702,972.995
C.C. N 573,043.271 E 1,702,162.427
Back = S 35° 27’ 45.03" E
Ahead = S 21° 18’ 02.59" E
Chord Bear = S 28° 22’ 53.81" E
Course from PT PACI-16 to PC PACI-17 S 21° 18’ 02.59" E Dist 275.130
Curve PACI-17
P.I. Station 161+81.85 N 572,963.108 E 1,703,127.473
Delta = 20° 44’ 57.05" (LT)
Degree = 6° 59’ 14.24"
Tangent = 150.122
Length = 296.956
Radius = 820.000
External = 13.629
Long Chord = 295.336
Mid. Ord. = 13.406
P.C. Station 160+31.73 N 573,102.975 E 1,703,072.939
P.T. Station 163+28.69 N 572,851.633 E 1,703,228.022
C.C. N 573,400.851 E 1,703,836.922
Back = S 21° 18’ 02.59" E
Ahead = S 42° 02’ 59.64" E
Chord Bear = S 31° 40’ 31.12" E
Course from PT PACI-17 to PC PACI-18 S 42° 02’ 59.64" E Dist 379.492
Curve PACI-18
P.I. Station 169+28.45 N 572,406.276 E 1,703,629.726
Delta = 44° 22’ 51.75" (LT)
Degree = 10° 36’ 37.19"
Tangent = 220.266
Length = 418.281
Radius = 540.000
External = 43.195
Long Chord = 407.903
Mid. Ord. = 39.996
P.C. Station 167+08.18 N 572,569.837 E 1,703,482.197
P.T. Station 171+26.46 N 572,392.564 E 1,703,849.564
C.C. N 572,931.517 E 1,703,883.180
Back = S 42° 02’ 59.64" E
Ahead = S 86° 25’ 51.39" E
Chord Bear = S 64° 14’ 25.52" E
Course from PT PACI-18 to PC PACI-19 S 86° 25’ 51.39" E Dist 182.168
Curve PACI-19
P.I. Station 177+45.57 N 572,354.023 E 1,704,467.475
Delta = 78° 47’ 38.45" (RT)
Degree = 10° 46’ 11.58"
Tangent = 436.943
Length = 731.614
Radius = 532.000
External = 156.435
Long Chord = 675.310
Mid. Ord. = 120.888
P.C. Station 173+08.63 N 572,381.224 E 1,704,031.379
P.T. Station 180+40.24 N 571,920.956 E 1,704,525.542
C.C. N 571,850.256 E 1,703,998.261
Back = S 86° 25’ 51.39" E
Ahead = S 7° 38’ 12.94" E
Chord Bear = S 47° 02’ 02.17" E
Course from PT PACI-19 to PC PACI-20 S 7° 38’ 12.94" E Dist 280.691
Curve PACI-20
P.I. Station 186+01.67 N 571,364.508 E 1,704,600.153
Delta = 41° 17’ 44.14" (LT)
Degree = 7° 41’ 26.55"
Tangent = 280.737
Length = 536.954
Radius = 745.000
External = 51.139
Long Chord = 525.407
Mid. Ord. = 47.855
P.C. Station 183+20.93 N 571,642.755 E 1,704,562.845
P.T. Station 188+57.89 N 571,180.079 E 1,704,811.811
C.C. N 571,741.762 E 1,705,301.237
Back = S 7° 38’ 12.94" E
Ahead = S 48° 55’ 57.08" E
Chord Bear = S 28° 17’ 05.01" E
Course from PT PACI-20 to PC PACI-21 S 48° 55’ 57.08" E Dist 210.741
Curve PACI-21
P.I. Station 196+68.45 N 570,647.580 E 1,705,422.926
Delta = 77° 09’ 16.14" (RT)
Degree = 7° 37’ 08.83"
Tangent = 599.825
Length = 1,012.643
Radius = 752.000
External = 209.922
Long Chord = 937.848
Mid. Ord. = 164.110
P.C. Station 190+68.63 N 571,041.634 E 1,704,970.696
P.T. Station 200+81.27 N 570,119.061 E 1,705,139.276
C.C. N 570,474.673 E 1,704,476.672
Back = S 48° 55’ 57.08" E
Ahead = S 28° 13’ 19.06" W
Chord Bear = S 10° 21’ 19.01" E
Course from PT PACI-21 to PC PACI-22 S 28° 13’ 19.06" W Dist 666.868
A06FW-NLS 10(1)
P R
O J E
C T
S F
W S N
E S
M n ls
(1
P r o j
D e v C
A D
D A -N
E S
M (1
C h s c .d g n
-M a y -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NEAL SMITH NATIONAL WILDLIFE REFUGE
IA3
CHAIN DESCRIPTION
CENTERLINE
Sheet 3 of 3
Course from PT PACI-18 to PC PACI-19 S 86° 25’ 51.39" E Dist 182.168
P.I. Station 177+45.57 N 572,354.023 E 1,704,467.475
P.C. Station 173+08.63 N 572,381.224 E 1,704,031.379
P.T. Station 180+40.24 N 571,920.956 E 1,704,525.542
C.C. N 571,850.256 E 1,703,998.261
Chord Bear = S 47° 02’ 02.17" E
Course from PT PACI-19 to PC PACI-20 S 7° 38’ 12.94" E Dist 280.691
P.I. Station 186+01.67 N 571,364.508 E 1,704,600.153
P.C. Station 183+20.93 N 571,642.755 E 1,704,562.845
P.T. Station 188+57.89 N 571,180.079 E 1,704,811.811
C.C. N 571,741.762 E 1,705,301.237
Chord Bear = S 28° 17’ 05.01" E
Course from PT PACI-20 to PC PACI-21 S 48° 55’ 57.08" E Dist 210.741
P.I. Station 196+68.45 N 570,647.580 E 1,705,422.926
P.C. Station 190+68.63 N 571,041.634 E 1,704,970.696
P.T. Station 200+81.27 N 570,119.061 E 1,705,139.276
C.C. N 570,474.673 E 1,704,476.672
Chord Bear = S 10° 21’ 19.01" E
Course from PT PACI-21 to PC PACI-22 S 28° 13’ 19.06" W Dist 666.868
Curve Data
Curve PACI-22
P.I. Station 209+91.20 N 569,317.301 E 1,704,708.980
Delta = 18° 24’ 30.93" (LT)
Degree = 3° 49’ 10.99"
Tangent = 243.062
Length = 481.936
Radius = 1,500.000
External = 19.566
Long Chord = 479.866
Mid. Ord. = 19.314
P.C. Station 207+48.14 N 569,531.469 E 1,704,823.921
P.T. Station 212+30.08 N 569,077.795 E 1,704,667.552
C.C. N 568,822.136 E 1,706,145.605
Back = S 28° 13’ 19.06" W
Ahead = S 9° 48’ 48.13" W
Chord Bear = S 19° 01’ 03.59" W
Course from PT PACI-22 to PC PACI-23 S 9° 48’ 48.13" W Dist 225.854
Curve PACI-23
P.I. Station 218+90.13 N 568,427.396 E 1,704,555.053
Delta = 43° 04’ 52.55" (RT)
Degree = 5° 12’ 31.35"
Tangent = 434.203
Length = 827.101
Radius = 1,100.000
External = 82.596
Long Chord = 807.754
Mid. Ord. = 76.827
P.C. Station 214+55.93 N 568,855.246 E 1,704,629.058
P.T. Station 222+83.03 N 568,165.449 E 1,704,208.764
C.C. N 569,042.729 E 1,703,545.153
Back = S 9° 48’ 48.13" W
Ahead = S 52° 53’ 40.68" W
Chord Bear = S 31° 21’ 14.40" W
Course from PT PACI-23 to PC PACI-24 S 52° 53’ 40.68" W Dist 487.009
Curve PACI-24
P.I. Station 230+49.72 N 567,702.921 E 1,703,597.311
Delta = 56° 05’ 23.78" (RT)
Degree = 10° 54’ 48.53"
Tangent = 279.676
Length = 513.951
Radius = 525.000
External = 69.848
Long Chord = 493.673
Mid. Ord. = 61.646
P.C. Station 227+70.04 N 567,871.645 E 1,703,820.361
P.T. Station 232+83.99 N 567,793.904 E 1,703,332.848
C.C. N 568,290.347 E 1,703,503.637
Back = S 52° 53’ 40.68" W
Ahead = N 71° 00’ 55.54" W
Chord Bear = S 80° 56’ 22.57" W
Course from PT PACI-24 to PC PACI-25 N 71° 00’ 55.54" W Dist 236.249
Curve PACI-25
P.I. Station 239+05.18 N 567,995.985 E 1,702,745.447
Delta = 61° 16’ 09.85" (LT)
Degree = 8° 48’ 53.05"
Tangent = 384.940
Length = 695.079
Radius = 650.000
External = 105.433
Long Chord = 662.431
Mid. Ord. = 90.718
P.C. Station 235+20.24 N 567,870.759 E 1,703,109.449
P.T. Station 242+15.32 N 567,736.991 E 1,702,460.665
C.C. N 567,256.115 E 1,702,897.995
Back = N 71° 00’ 55.54" W
Ahead = S 47° 42’ 54.61" W
Chord Bear = S 78° 20’ 59.53" W
Course from PT PACI-25 to PC PACI-26 S 47° 42’ 54.61" W Dist 212.699
Curve PACI-26
P.I. Station 247+28.04 N 567,392.026 E 1,702,081.352
Delta = 59° 29’ 33.90" (RT)
Degree = 10° 54’ 48.53"
Tangent = 300.018
Length = 545.131
Radius = 525.000
External = 79.678
Long Chord = 520.970
Mid. Ord. = 69.179
P.C. Station 244+28.02 N 567,593.883 E 1,702,303.308
P.T. Station 249+73.15 N 567,480.783 E 1,701,794.763
C.C. N 567,982.283 E 1,701,950.079
Back = S 47° 42’ 54.61" W
Ahead = N 72° 47’ 31.50" W
Chord Bear = S 77° 27’ 41.55" W
Course from PT PACI-26 to PC PACI-27 N 72° 47’ 31.50" W Dist 177.812
Curve PACI-27
P.I. Station 252+66.03 N 567,567.430 E 1,701,514.991
Delta = 23° 38’ 02.25" (LT)
Degree = 10° 25’ 02.69"
Tangent = 115.071
Length = 226.870
Radius = 550.000
External = 11.909
Long Chord = 225.265
Mid. Ord. = 11.656
P.C. Station 251+50.96 N 567,533.387 E 1,701,624.911
P.T. Station 253+77.83 N 567,554.551 E 1,701,400.642
C.C. N 567,008.006 E 1,701,462.199
Back = N 72° 47’ 31.50" W
Ahead = S 83° 34’ 26.25" W
Chord Bear = N 84° 36’ 32.62" W
Course from PT PACI-27 to PC PACI-28 S 83° 34’ 26.25" W Dist 155.441
Curve PACI-28
P.I. Station 258+29.62 N 567,503.987 E 1,700,951.695
Delta = 57° 04’ 13.41" (RT)
Degree = 10° 30’ 46.75"
Tangent = 296.344
Length = 542.856
Radius = 545.000
External = 75.359
Long Chord = 520.691
Mid. Ord. = 66.205
P.C. Station 255+33.27 N 567,537.154 E 1,701,246.178
P.T. Station 260+76.13 N 567,733.128 E 1,700,763.773
C.C. N 568,078.730 E 1,701,185.181
Back = S 83° 34’ 26.25" W
Ahead = N 39° 21’ 20.34" W
Chord Bear = N 67° 53’ 27.04" W
Course from PT PACI-28 to 4 N 39° 21’ 20.34" W Dist 53.070
Point 4 N 567,774.163 E 1,700,730.120 Sta 261+29.20
Course from 4 to 5 N 42° 25’ 12.39" W Dist 118.803
Point 5 N 567,861.865 E 1,700,649.980 Sta 262+48.00
Ending chain PACI description
A07FW-NLS 10(1)
Travel lane
11'
Travel lane
11'
B01
PACIFIC STREET
Asphalt prime coat
LC
Existing ground
Embankment Construction existing Match existing
Match
NO SCALE
1:8
1:4 & v arie s
4'
Pull-off
10' 2'
Shldr.
4'2'
Shldr.
1:4 & varies
1:8
STREET
PACIFIC
Asphalt pavement: 2" ±
Existing pavement structure
Existing edge of pavement of pavement
Existing edge
6" Aggregate base, grading C or D
See Detail A
DETAIL A
Aggregate base: 6" ±
Saw cutSaw cut
Proposed Pavement Structure
Paved shoulder
4'
Existing edge of pavement
S a w c u t
Asphalt prime coat
6" Aggregate base, grading C or D
Travel lane
11'2'
Shldr.
system to remain
Existing underdrain
Existing pavement
TYPICAL SECTION
Tack coat
Tack coat
Notes:
grading is completed.
except paved surfaces, as directed by the CO after
Apply turf establishment to all disturbed areas,1.
2.
4.
by the CO. Maintain a minimum ditch grade of 0.5%.
Adjust ditches to provide proper
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .