IFB_Solicitation_FW-NLS_10(1).pdf

PDF 2 MB Posted

Attached to
Neal Smith National Wildlife Refuge 10(1)
Solicitation number
DTFH71-14-B-00003
Issued by

About this file

The Bid Opening Date will be December 31 2013 at 2 00 PM EST.

View the file

Other files

File Type Posted
Amendment_001_FW-NLS_10(1).pdf PDF
FP03_Errata.pdf PDF
FP03_Eng_.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
VETS-100A_Form.pdf PDF
Plans_FW-_NLS_10(1).pdf PDF
NEPA_Report.pdf PDF
Soils_and_Foundation_Report.pdf PDF
Synopsis_FW-NLS_10(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Contract No. :

CONTRACTOR:

ADDRESS:

FW-NLS 10(1)

NEAL SMITH NATIONAL WILDLIFE REFUGE

PACIFIC STREET (ROUTE 10)

SAMMS# 2010148088

This Contract Cites Standard Specifications FP-

SOLICITATION

U.S. Customary Units

No. DTFH71-14-B-00003IFB

STATE Iowa

COUNTY Jasper

REFUGE Neal Smith National Wildlife Refuge

# Schedule Parking Area Roadway / Parking Area / Other Stations / SQFT Linear

Feet Route Miles

Lane Miles

1 A Route# 10 (Pacific Street) 10+25.00 To 138+20.89 12,796 2.42 4.84

2 A Route# 10 (Pacific Street), Pull-Off, Rt. 49+03.62 To 51+63.61 260 0.05 0.10

3 A Route# 10 (Pacific Street), Pull-Off, Rt. 116+76.11 To 119+07.29 231 0.04 0.08

4 A Route# 10 (Pacific Street) 138+72.91 To 224+16.28 8,543 1.62 3.24

5 A Route# 10 (Pacific Street) 224+88.28 To 245+00.00 2,012 0.38 0.76

6 A ■ Entrance Parking Area 8,326 0.00 0.14

7 B Route# 10 (Pacific Street), North Bridge 138+20.89 To 138+72.91 52 0.01 0.02

8 C Route# 10 (Pacific Street), South Bridge 224+16.28 To 224+88.28 72 0.01 0.02

9 D Route# 10 (Pacific Street) 245+00.00 To 261+53.99 1,654 0.31 0.62

10 E ■ Prairie Learning Center Parking Area 85,056 0.00 1.46

11 To 0.00 0.00

Project Length Totals : 25,620 4.85 11.28

TYPE OF IMPROVEMENT:

Superpave asphalt pavement overlay, shoulder widening, crack sealing, bridge replacement, bridge rehabilitation, and other miscellaneous work.

TABLE OF CONTENTS

Page

Notice to Bidders 1 through 2

Checklist for Bid Submission 1 through 2

*SF-1442 Solicitation, Offer, and Award 1 through 4

Bid Schedule Instructions 1 through 3

*Bid Schedule B-1 through B-13

*SF-24 Bid Bond C-1 through C-2

FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION

REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES

Index to Federal and Transportation Acquisition Regulations 1 through 6

Representations and Certifications (OCRA online) D-1 through D-2

Instructions to Bidders E-1

*Socioeconomic Program Requirements F-1 through F-4

Minimum Wage Schedule F-5 through F-10

*General Contract Requirements G-1 through G-4

Construction Contract Requirements H-1 through H-5

Special Contract Requirements J-1 through J-64

Section K K-1 through K-3

Permits Obtained for this Project 1 through 30

SPECIFICATIONS On CD

Plans 1 through 189

Soils and Foundation Report 1 through 51

NEPA Report 1 through 32

* Bidder’s Qualifications Form 1 through 7

* Federal Contractor Veterans’ Employment Report VETS-100A 1 through 2

*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE BID SUBMITTAL PACKAGE

NOTICE TO BIDDERS

CONTRACT FORMAT:

Bidders should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-page in this booklet.

FAR provisions and clauses incorporated by reference can be accessed on the Internet on the GSA website at www.arnet.gov/far/. Bidders are encouraged to review the documents thoroughly before bidding.

PROPOSAL BOOKLET AND OFFER SUBMITTAL:

It is the responsibility of the Bidder to verify that this proposal is complete as listed in the Table of Contents. The Bidder is responsible for submitting all required forms and documents with the offer.

Offerors should use the Checklist for Bid Submission included in this booklet to check that their bids are complete.

CONSTRUCTION CONTRACTS:

As stated in FAR Clause 52.236-1 and 52.219-3, the Contractor shall perform on the site, and with its own employees, work equivalent to at least 15% of the cost of contract performance. See FAR Clause 52.219-3 for other limitations on subcontracting applicable to this Contract.” Additional guidance is given in FAR Subpart 35.005 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e.

proprietary Cintec arch strengthening.) There are exceptions and they will be reviewed on a case-by-case basis.

HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Offeror must submit prior to award a Material Safety Data Sheet (MSDS's) for all hazardous materials that the Offeror identifies in paragraph (b) of this clause in the D-pages of this booklet. Failure to submit MSDS's may render the Offeror ineligible for award of contract. The apparent low Offeror should submit their MSDS's within two weeks after bid opening.

FINANCING ASSISTANCE: Minority, Women-owned, and Disadvantaged Business Enterprises (DBE's). The Department of Transportation (DOT) offers working capital financing assistance for transportation related contracts. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $750,000 with interest at the prime rate. For further information, call (800) 532-1169 or 202-366-1930. Internet address: http://osdbuweb.dot.gov

INTERNET BASED DATA BASES - REQUIRED INPUT:

According to the FAR Subpart 4.1102 contractors MUST be registered in System for Award Management (SAM) prior to contract award. Access the following web site to register:

www.sam.gov

According to the FAR Subpart 4.1201 contractors MUST complete their Online Annual Representations and Certifications Application prior to contract award online at http://sam.gov/.

According to the FAR Subpart 22.1302 (b) contractors and sub-contractors MUST complete the required Annual Vets-100A Form in order to be eligible for a contract award. It can be completed on-line at http://vets100.dol.gov. 2012 VETS 100 Filing Cycle Effective January 15, 2012, Customers will no longer be able to electronically file a VETS 100/100A Report. Customers may still file, but must first download the form from the VETS website www.dol.gov/vets/programs/fcp/main.htm, fill out the form and mail or email it to:

Veterans' Employment and Training Service (VETS)In Care of: Department of Labor National Contact Center (DOL- NCC)14120 Newbrook Drive, Suite 200 Chantilly, VA 20151(866) 237-0275 Or email to: VETS100-customersupport@dol.gov http://www.sam.gov/ http://orca.bpn.gov/ http://vets100.dol.gov/ http://www.dol.gov/vets/programs/fcp/main.htm mailto:VETS100-customersupport@dol.gov mailto:VETS100-customersupport@dol.gov

NOTICE TO BIDDERS

PAYMENT:

Offerors are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.

PROGRESS PAYMENTS:

ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in the CCR must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the CCR database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.

WELFARE-TO-WORK INITIATIVE:

The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.

INCREASING SEAT BELT USE IN THE UNITED STATES:

The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.

OBTAINING BID DOCUMENTS:

Bid documents will not be mailed. All bid documents are available for direct download from the Federal Business Opportunities (FBO) website: http://www.fbo.gov/ or the Eastern Federal Lands Highway Division website: http://www.efl.fhwa.dot.gov/contracting/Documents.aspx Contractors are encouraged to register on the FBO website (for this specific project) in order to receive Email Notifications automatically when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:

eflhd.contracts@dot.gov.

THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES

NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON SAID

CHANGES.

PLEASE NOTE: for security reasons, individuals requiring access to all government buildings must present a valid photo ID and be escorted to their destination by a Government employee. All visitors attending bid openings are urged to arrive at least 1 hour prior to schedule bid opening. All visitors must register with the receptionist in Room 100. A Government employee will collect all bids. Prior to bid opening, a Government employee will escort all bidders to the bid opening. Unescorted visitors will be denied entry and no exceptions will be made.

http://www.fbo.gov/ http://www.efl.fhwa.dot.gov/contracting/Documents.aspx mailto:eflhd.contracts@dot.gov

CHECKLIST FOR BID SUBMISSION

The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 7 of the Standard Form 1442, Solicitation, Offer, and Award (page 1). This checklist is for informational purposes only and is not required to be filled out by the bidder. Failure to submit a complete bid may be cause to reject your bid.

1. Bid Envelope:

a. Addressed as shown in Block 7 of SF-1442

b. In lower left corner, indicate the following: Solicitation No., Project Name & Number, mail to room

105, if proposals are hand delivered bring them to Reception Area Room 100 and a Contract Specialist will be notified.

2. Standard Form 1442: Solicitation, Offer and Award

a. Block 14: Name and Address of Bidder.

b. Block 15: Telephone Number of Bidder.

c. Block 16: Remittance Address if different from Block 14.

d. Block 19: All Amendments Acknowledged, with dates of Amendments.

e. Block 20: Bid is signed and dated.

3. Bid Schedule - (Pages B-1 through B-13)

a. Unit bid price and bid amount provided for each pay item in numbers.

b. Corrections initialed.

4. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)

a. Date executed

b. Legal name and address of bidder.

c. Type of organization.

d. State of incorporation (if applicable).

e. Name and business address of Treasury approved surety.

f. Penal sum of bond (not less than 20% of bid total).

g. Bid identification.

h. Signature of Bidder

i. Seal, if corporation

j. Signature of Surety

k. Seal, if corporation

BIDS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.

5. Power of Attorney.

a. Dated on or before execution date of bond

b. Power has original signature of surety, or is embossed with surety's seal in the certification section

BIDS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED.

CHECKLIST FOR BID SUBMISSION

6. Bidder's Qualifications form (provided separately as part of the Bid Documents Package).

Form completed, signed and submitted with bid

THE FOLLOWING THREE ITEMS IF NOT SUBMITTED WITH THE BID; MUST

BE COMPLETED ELECTRONICALLY PRIOR TO CONTRACT AWARD.

7. System for Award Management (SAM): The Contractor is currently registered in the Internet-Based SAM database at http://www.sam.gov. If contractor elects to not have SAM viewed by public they must submit a copy with Bidder’s Qualification Package.

8. Online Representations and Certifications Application: The Contractor's Representations and Certifications have been input online via the Internet-Based electronic database at http://sam.gov.

9. Vets100 Reporting: The Contractor has completed the annual Internet-Based reporting requirement online at http://vets100.dol.gov.

2012 VETS 100 Filing Cycle Effective January 15, 2012, Customers will no longer be able to electronically file a VETS 100/100A Report. Customers may still file, but must first download the form from the VETS website www.dol.gov/vets/programs/fcp/main.htm, fill out the form and mail or email it to: Veterans' Employment and Training Service (VETS) In Care of: Department of Labor National Contact Center (DOL-NCC), 14120 Newbrook Drive, Suite 200 Chantilly, VA 20151 (866) 237-0275 Or email to: VETS100-Customersupport@dol.gov

NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL

DATA IN THE ABOVE DATABASES IS CORRECT EACH TIME A BID PACKAGE IS

SUBMITTED. FAILURE TO PROPERLY INPUT AND/OR UPDATE YOUR DATA

PRIOR TO CONTRACT AWARD MAY CAUSE THE BID TO BE REJECTED.

http://www.sam.gov/ http://sam.gov/ http://vets100.dol.gov/ http://www.dol.gov/vets/programs/fcp/main.htm mailto:VETS100-Customersupport@dol.gov

�����./�0::/303�#73//5�20�9/3:03;�2./�=03D�3/AB83/>�#2�2./�9384/5�59/48:8/>�$/60=�81�523842�#4403>#14/�=82.�2./�2/3;5�0:�2.85�5068482#2801?�8:�2.85�0::/3�85�#44/92/>

$@�2./��0E/31;/12�81�=382817�=82.81�--------------------�4#6/1>#3�>#@5�#:2/3�2./�>#2/�0::/35�#3/�>B/����������

�%(��
�)��
�������
���
����� �������������������
���

�����./�0::/303�#73//5�20�:B3185.�#1@�3/AB83/>�9/3:03;#14/�#1>�9#@;/12�$01>5�

0��#������ ��2�

������������
H������

������� �)4��

3�2���%����

�����"��� � ��������
�������������
��" ��������������
�������������"���

����������3 4��� '5 '6 �--����7��

3�2���%���

�����������������������
H������

������� )4������ �$���� �� �4������

����2�� #��0 ��2�����

�)��������� )�&4'��������������� ������������ &4'���������������

�"������&��*���G��'����, Block 26

Federal Highway Administration Eastern Federal Lands Highway Division ATTN: Construction Office 21400 Ridgetop Circle Sterling, VA 20166-6511

Federal Highway Administration Eastern Federal Lands Highway Division A/P Branch, AMZ-150 P.O. Box 25710 or E-MAIL

9-AMC-AMZ-EFLINVOICES@FAA.GOV

Oklahoma City, OK 73125

EFLHD-CO

peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text

CONTINUATION OF SF 1442

Block 2:

This project is RESTRICTED- Sealed bids from only HUBZone Certified Business concerns will be accepted.

This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10)

Facsimile and electronic bids will not be accepted.

PHYSICAL DATA AVAILABLE FOR REVIEW

1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2003 Edition, published by the Federal Highway Administration. http://mutcd.fhwa.dot.gov.

2. Soils and Foundation Report

3. NEPA Report

4. Permits

Block 9:

In accordance with FAR Provision 52.236-27, Site Visit, a Government representative can be available to show the project to prospective bidders. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.

∗Block 11:

If Schedule A (Base Contract) and Schedules B, C, D, and E (Government Options 1, 2, 3, and

4) are awarded at the same time:

The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 155 and less than or equal to ( < ) 250.

If Schedule A (Base Contract) and Schedules B, C, D, and E (Government Options 1, 2, 3, and

4) are NOT awarded at the same time

The number of calendar days for Schedule A cannot be lower than 140 calendar days and cannot exceed 230 calendar days. The number of calendar days for Schedule B cannot be lower than 40 calendar days and cannot exceed 75 calendar days. The number of calendar days for Schedule C cannot be lower than 20 calendar days and cannot exceed 40 calendar days. The number of calendar days for Schedule D cannot be lower than 15 calendar days and cannot exceed 30 calendar days. The number of calendar days for Schedule E cannot be lower than 20 calendar days and cannot exceed 40 calendar days.

CONTINUATION OF SF 1442

The completion time for the contract will be the time offered by the successful bidder, not to exceed the maximum time above. Work restrictions can be found in SCR Sections 108 and 156.

Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.) Contract Award/Notice to Proceed is subject to availability of funds.

Block 12A:

Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.

Block 13:

A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee.

Block 17:

Amounts should be completed as follows:

Schedule A - $ Schedule B (Option 1) - $ Schedule C (Option 2) - $ Schedule D (Option 3) - $ Schedule E (Option 4) - $

DO NOT INCLUDE ANY CONTRACT ADMINISTRATION COSTS IN BLOCK 17.

Other:

The estimated price is expected to fall within the price range of $2,000,000 to $7,500,000.

Responsibility of bidders shall be evaluated in accordance with the information provided on the Bidder's Qualification Form, which can be downloaded from FHWA web site. FP-03 versions can be downloaded at the FHWA web site. FHWA web site is http://www.efl.fhwa.dot.gov/contracting-manuals-guides.aspx then click on Construction Specifications.

http://www.efl.fhwa.dot.gov/contracting/Documents.aspx

BID SCHEDULE INSTRUCTIONS

PROJECT: FW-NLS 10(1)

BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to

Bidders. While preparing the bid, comply with the following:

COMPLETING THE BID SCHEDULE

Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total by adding the amounts of the several items, and show in the block provided on Page B-3 for Schedule A, Page B-5 for Schedule B, Page B-7 for Schedule C, Page B-9 for Schedule D, and Page B-11 for Schedule E. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.

To be eligible for award, bidders must submit prices for each pay item.

Review Subsection 109.05 of the FP regarding scope of payment for direct and indirect payment work.

SCHEDULES OF WORK

The Bid Schedule is comprised of the following separate schedules and options of work:

Schedule A (Base Contract) - Pages B-1 thru B-3

Schedule B (Government Option 1) - Pages B-4 thru B-5

Schedule C (Government Option 2) - Pages B-6 thru B-7

Schedule D (Government Option 3) - Pages B-8 thru B-9

Schedule E (Government Option 4) - Pages B-10 thru B-11

The Government will award the project as a Base Contract (Schedule A) with the option to award Schedules B, C, D, and E (Government Options 1, 2, 3, and 4); see FAR Clauses 52.217-4 and 52.217-5.

The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price, by proper utilization of available funds and upon receipt of all required funding. If complete funding is in place at the time of award of Schedule A (Base Contract), the Government may award Schedules B, C, D, and E (Government Options 1, 2, 3, and 4) at that time. If funding for Schedules B, C, D, and E (Government Options 1, 2, 3, and 4) is received after award of Schedule A (Base Contract), the Government has the right to exercise Schedules B, C, D, and E (Government Options 1, 2, 3, and 4) at the unit prices bid according to the following schedule:

Schedule B (Government Option 1): No later than 120 calendar days after the Notice To Proceed of Schedule A (Base Contract).

Schedule C (Government Option 2): No later than 120 calendar days after the Notice To Proceed of Schedule A (Base Contract).

Schedule D (Government Option 3): No later than the contract completion date for Schedule A (Base Contract).

Schedule E (Government Option 4): No later than 120 calendar days after the Notice To Proceed of Schedule A (Base Contract).

BIDDING OF CALENDAR DAYS

For each schedule or option of work shown on the Bid Summary page(s), determine the number of calendar days necessary to complete that schedule or option of work from Notice To Proceed of that schedule or option of work to the completion of that schedule or option of work.

Determine the number of calendar days necessary to complete all contract work if all schedules and options are awarded at the same time. Specify the number of calendar days (NOT to exceed the maximum number of calendar days shown in Block 11 of the SF-1442) in the space provided on the Bid Summary page(s). If a minimum number of calendar days is provided in Block 11 of the SF-1442, do not specify a number of calendar days lower than the minimum. Failure to specify a number of calendar days for contract completion indicates the bidder accepts the maximum contract time provided in Block 11 of the SF-1442.

The number of calendar days specified by the successful bidder for the completion of the awarded combination of the Base Contract and Government Option(s) will become the performance period for the contract.

If the Government Option(s) are exercised after the award of the Base Contract, the number of calendar days specified by the successful bidder for that Government Option(s) will become the performance period for that Government Option(s) and will begin once the Notice to Proceed is issued for that Government Option(s).

In developing a construction schedule to determine the number of calendar days included in their bid, bidders should consider and include any work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. Bidders are advised to consider those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc). Bidders are also advised to consider time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s). The total calendar days bid should also include any work limitations and any delay days or Contractor/supplier winter shutdowns required due to weather sensitive work items.

When evaluating the bids, the Government will consider the Contract Administrative Cost for the project to be $2,200 per calendar day bid. The Contract Administrative Cost is only used to determine the Evaluation Total Price of Project.

Fill in the Bid Total(s) and the Contract Administrative Cost(s) as directed on the Bid Summary page(s). Fill in the Evaluation Total Price of Project in the space provided on the Bid Summary page(s). Fill in the Calendar Days Bid for each schedule or option of work in the space(s) provided on the Bid Summary page(s).

The contract administration cost is used for evaluation and ranking purposes only. Do not include any contract administration costs when filling out Block 17 of the SF-1442. The amount in Block 17 should be completed as follows:

Schedule A - $ .

Schedule B - $ .

Schedule C - $ .

Schedule D - $ .

Schedule E - $ .

BASIS FOR AWARD

The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:

Schedule A (Base Contract) Bid Total + Schedule B (Government Option 1) Bid Total + Schedule C (Government Option 2) Bid Total + Schedule D (Government Option 3) Bid Total + Schedule E (Government Option 4) Bid Total + Contract Administrative Cost for Total Calendar Days Bid.

B - 1

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A1000 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A1010 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A1020 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A1030 15705-0100 SOIL EROSION CONTROL, SILT FENCE

49,500 LNFT $____________ $____________

A1040 15706-2100 SOIL EROSION CONTROL, FILTER BERM

1 EACH $____________ $____________

A1050 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

ALL LPSM $___LPSM_____ $____________

A1060 20101-0000 CLEARING AND GRUBBING

16.0 ACRE $____________ $____________

A1070 20301-1100 REMOVAL OF GATE

1 EACH $____________ $____________

A1080 20301-2000 REMOVAL OF PIPE END SECTION

1 EACH $____________ $____________

A1090 20301-2400 REMOVAL OF SIGN

45 EACH $____________ $____________

A1100 20302-1200 REMOVAL OF GUARDRAIL

180 LNFT $____________ $____________

A1110 20302-2100 REMOVAL OF PIPE CULVERT

120 LNFT $____________ $____________

A1120 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

8,000 SQYD $____________ $____________

A1130 20420-0000 EMBANKMENT CONSTRUCTION

6,350 CUYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base Contract

Project No:FW-NLS 10(1)

Project Name:Neal Smith National Wildlife Refuge

B - 2

A1140 21101-1000 ROADWAY OBLITERATION, METHOD 1

210 SQYD $____________ $____________

A1150 21101-2000 ROADWAY OBLITERATION, METHOD 2

850 SQYD $____________ $____________

A1160 25101-4000 PLACED RIPRAP, CLASS 4

55 CUYD $____________ $____________

A1170 30101-4000 AGGREGATE BASE GRADING C OR D

18,100 TON $____________ $____________

A1220 40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE,

<0.3 MILLION ESAL (TYPE IV ROUGHNESS)

150 TON $____________ $____________

A1230 40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE,

<0.3 MILLION ESAL

2,100 TON $____________ $____________

A1240 40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE,

<0.3 MILLION ESAL (TYPE I PAVEMENT ROUGHNESS)

7,000 TON $____________ $____________

A1250 40101-0900 SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE,

<0.3 MILLION ESAL

16 TON $____________ $____________

A1270 41410-2000 CRACK, CLEANING ROUTING AND SEALING

2,460 LNFT $____________ $____________

A1280 60201-0600 18-INCH PIPE CULVERT

60 LNFT $____________ $____________

A1290 60201-0800 24-INCH PIPE CULVERT

10 LNFT $____________ $____________

A1300 60501-0000 STANDARD UNDERDRAIN SYSTEM (4-INCH DIAMETER)

1,250 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base Contract

B - 3

A1310 61702-0000 TERMINAL SECTION (TL-2 END TERMINAL)

8 EACH $____________ $____________

A1320 61707-2000 STRUCTURE TRANSITION RAILING, SBT SYSTEM

160 LNFT $____________ $____________

A1330 62501-0000 TURF ESTABLISHMENT

8.5 ACRE $____________ $____________

A1340 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING

260 SQFT $____________ $____________

A1350 63316-1000 REMOVE AND RESET SIGN

10 EACH $____________ $____________

A1360 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID

150,000 LNFT $____________ $____________

A1370 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

49,000 LNFT $____________ $____________

A1380 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE C)

40 EACH $____________ $____________

A1390 63405-0950 PAVEMENT MARKINGS, TYPE C, STRAIGHT ARROW

40 EACH $____________ $____________

A1400 63502-0900 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH

40 EACH $____________ $____________

A1410 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

80 LNFT $____________ $____________

A1420 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

49,300 LNFT $____________ $____________

A1430 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

310 SQFT $____________ $____________

A1440 63701-0000 FIELD OFFICE

1 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base Contract

Project No:FW-NLS 10(1)

Project Name:Neal Smith National Wildlife Refuge

Meseret.Yigezu Typewritten Text Submitted by:_________________________________

Meseret.Yigezu Typewritten Text

Meseret.Yigezu Typewritten Text

Meseret.Yigezu Typewritten Text Schedule Total:_______________

Meseret.Yigezu Typewritten Text

Meseret.Yigezu

B - 4

B0001 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

B0002 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

B0003 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

B0004 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM

130 LNFT $____________ $____________

B0005 15706-2200 SOIL EROSION CONTROL, FILTER BAG

1 EACH $____________ $____________

B0006 20304-2000 REMOVAL OF BRIDGE

ALL LPSM $___LPSM_____ $____________

B0007 20701-1300 EARTHWORK GEOTEXTILE, TYPE IV-B

550 SQYD $____________ $____________

B0008 20801-0000 STRUCTURE EXCAVATION

340 CUYD $____________ $____________

B0009 20803-0000 STRUCTURAL BACKFILL

100 CUYD $____________ $____________

B0010 25101-5000 PLACED RIPRAP, CLASS 5

740 CUYD $____________ $____________

B0011 55101-2000 STEEL H-PILES 14 X 102, IN PLACE

660 LNFT $____________ $____________

B0012 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

120 CUYD $____________ $____________

B0013 55201-0800 STRUCTURAL CONCRETE, CLASS D (AE)

50 CUYD $____________ $____________

B0014 55302-0400 PRECAST, PRESTRESSED CONCRETE SLABS, 36" VOIDED

62 LNFT $____________ $____________

Bid Schedule Schedule:B Schedule Type:Government Option 1

B - 5

B0015 55302-0500 PRECAST, PRESTRESSED CONCRETE SLABS, 48" VOIDED

217 LNFT $____________ $____________

B0016 55401-2000 REINFORCING STEEL, EPOXY COATED

4,600 LB $____________ $____________

B0017 55601-1400 BRIDGE RAILING, TIMBER, STEEL-BACKED

104 LNFT $____________ $____________

B0018 56401-1000 BEARING DEVICE, ELASTOMERIC

18 EACH $____________ $____________

B0019 57801-0000 HIGH PERFORMANCE CONCRETE

23 CUYD $____________ $____________

B0020 60520-0000 GRANULAR BACKFILL

145 CUYD $____________ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:B Schedule Type:Government Option 1

B - 6

C0001 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

C0002 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

C0003 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

C0004 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM

110 LNFT $____________ $____________

C0005 15706-2200 SOIL EROSION CONTROL, FILTER BAG

1 EACH $____________ $____________

C0006 20302-0150 REMOVAL OF BRIDGE RAILING

144 LNFT $____________ $____________

C0007 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

240 SQYD $____________ $____________

C0008 20304-3000 REMOVAL OF BRIDGE DECK

ALL LPSM $___LPSM_____ $____________

C0009 20701-1300 EARTHWORK GEOTEXTILE, TYPE IV-B

620 SQYD $____________ $____________

C0010 25101-6000 PLACED RIPRAP, CLASS 6

1,050 CUYD $____________ $____________

C0011 40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE,

<0.3 MILLION ESAL (TYPE 1 PAVEMENT ROUGHNESS)

50 TON $____________ $____________

C0012 55601-1400 BRIDGE RAILING, TIMBER, STEEL-BACKED

144 LNFT $____________ $____________

C0013 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED

16 MFBM $____________ $____________

Bid Schedule Schedule:C Schedule Type:Government Option 2

B - 7

C0014 55901-0000 MEMBRANE WATERPROOFING

240 SQYD $____________ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:C Schedule Type:Government Option 2

B - 8

D0001 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

D0002 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

D0003 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

D0004 15705-0100 SOIL EROSION CONTROL, SILT FENCE

3,400 LNFT $____________ $____________

D0005 20101-0000 CLEARING AND GRUBBING

1.00 ACRE $____________ $____________

D0006 20301-2400 REMOVAL OF SIGN

5 EACH $____________ $____________

D0007 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE

35 LNFT $____________ $____________

D0008 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

500 SQYD $____________ $____________

D0009 20420-0000 EMBANKMENT CONSTRUCTION

150 CUYD $____________ $____________

D0010 30101-4000 AGGREGATE BASE GRADING C OR D

1,150 TON $____________ $____________

D0011 40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE,

<0.3 MILLION ESAL

135 TON $____________ $____________

D0012 40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE,

<0.3 MILLION ESAL (TYPE I ROUGHNESS)

520 TON $____________ $____________

Bid Schedule Schedule:D Schedule Type:Government Option 3

B - 9

D0014 41410-2000 CRACK, CLEANING ROUTING AND SEALING

180 LNFT $____________ $____________

D0015 60501-0000 STANDARD UNDERDRAIN SYSTEM (4-INCH DIAMETER)

200 LNFT $____________ $____________

D0016 61501-1100 SIDEWALK, ASPHALT

25 SQYD $____________ $____________

D0017 62501-0000 TURF ESTABLISHMENT

0.4 ACRE $____________ $____________

D0018 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING

30 SQFT $____________ $____________

D0019 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID

10,650 LNFT $____________ $____________

D0020 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

3,500 LNFT $____________ $____________

D0021 63405-0050 PAVEMENT MARKINGS, SYMBOLS

3 EACH $____________ $____________

D0022 63405-0950 PAVEMENT MARKINGS, TYPE C, STRAIGHT ARROW

3 EACH $____________ $____________

D0023 63502-0900 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH

25 EACH $____________ $____________

D0024 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

30 LNFT $____________ $____________

D0025 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

3,500 LNFT $____________ $____________

D0026 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

90 SQFT $____________ $____________

Bid Schedule Schedule:D Schedule Type:Government Option 2

Project No:FW-NLS 10(1)

Project Name:Neal Smith National Wildlife Refuge

Meseret.Yigezu

Submitted by:_____________________________ Schedule Total:_____________

B - 10

E0001 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

E0002 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

E0003 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

E0004 20301-1500 REMOVAL OF LIGHT POLE

15 EACH $____________ $____________

E0005 20301-2400 REMOVAL OF SIGN

15 EACH $____________ $____________

E0006 20301-3400 REMOVAL OF WHEELSTOP

3 EACH $____________ $____________

E0007 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE

145 LNFT $____________ $____________

E0008 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

32 SQYD $____________ $____________

E0009 20420-0000 EMBANKMENT CONSTRUCTION

5 CUYD $____________ $____________

E0010 30101-4000 AGGREGATE BASE GRADING C OR D

60 TON $____________ $____________

E0011 40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE,

<0.3 MILLION ESAL

15 TON $____________ $____________

E0012 40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE,

<0.3 MILLION ESAL TYPE IV PAVEMENT ROUGHNESS

835 TON $____________ $____________

Bid Schedule Schedule:E Schedule Type:Government Option 4

B - 11

E0013 41301-0000 ASPHALT PAVEMENT MILLING

2,000 SQYD $____________ $____________

E0014 41410-2000 CRACK, CLEANING ROUTING AND SEALING

1,000 LNFT $____________ $____________

E0015 60902-1100 CURB AND GUTTER, CONCRETE, 13-INCH DEPTH

15 LNFT $____________ $____________

E0016 60915-1000 WHEELSTOP, CONCRETE

3 EACH $____________ $____________

E0017 61501-0100 SIDEWALK, CONCRETE

260 SQYD $____________ $____________

E0018 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING

25 SQFT $____________ $____________

E0019 63316-1000 REMOVE AND RESET SIGN

1 EACH $____________ $____________

E0020 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

4,800 LNFT $____________ $____________

E0021 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL

8 EACH $____________ $____________

E0022 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

50 LNFT $____________ $____________

E0023 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

20 SQFT $____________ $____________

E0024 63602-2000 SYSTEM INSTALLATION, LIGHTING (SOLAR)

14 EACH $____________ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:E Schedule Type:Government Option 4

B-12

BID SUMMARY

PROJECT FW-NLS 10(1)

(1) Schedule A (Base Contract) Bid Total (from Page B-3) = (1) $____________________

(2) Schedule B (Government Option 1) Bid Total (from Page B-5) = (2) $____________________

(3) Schedule C (Government Option 2) Bid Total (from Page B-7) = (3) $____________________

(4) Schedule D (Government Option 3) Bid Total (from Page B-9) = (4) $____________________

(5) Schedule E (Government Option 4) Bid Total (from Page B-11) = (5) $____________________

Contract Administrative Cost for Total Calendar Days Bid

If Schedule A (Base Contract) and Schedules B, C, D, and E (Government Options 1, 2, 3, and 4) are awarded at the same time, input the number of calendar days necessary to complete all contract work (Schedules A thru E) from Notice to Proceed (or date specified in the notice to proceed) to completion of all contract work.

The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 155 and less than or equal to ( < ) 250.

(6) calendar days x $2,200 per calendar day = (6) $____________________

Total Price of Project (for evaluation purposes only)

EVALUATION TOTAL PRICE OF PROJECT = (1)+(2)+(3)+(4)+(5)+(6) $____________________

DO NOT INCLUDE ANY CONTRACT ADMINISTRATION COSTS IN BLOCK 17 OF THE SF-1442

B-13

BID SUMMARY

PROJECT FW-NLS 10(1)

Calendar Days Bid for Each Schedule of Work

If Schedule A (Base Contract) and Schedules B, C, D, and E (Government Options 1, 2, 3, and 4) are NOT awarded at the same time, input the number of calendar days necessary to complete each schedule of work. Do not bid more/less than the allowable maximum/minimum calendar days shown:

Maximum time allowed for completion of Schedule A = 230 calendar days Minimum time allowed for completion of Schedule A = 140 calendar days

Maximum time allowed for completion of Schedule B = 75 calendar days Minimum time allowed for completion of Schedule B = 40 calendar days

Maximum time allowed for completion of Schedule C = 40 calendar days Minimum time allowed for completion of Schedule C = 20 calendar days

Maximum time allowed for completion of Schedule D = 30 calendar days Minimum time allowed for completion of Schedule D = 15 calendar days

Maximum time allowed for completion of Schedule = 40 calendar days Minimum time allowed for completion of Schedule E = 20 calendar days

Schedule A (Base Contract) = __________ calendar days

Schedule B (Government Option 1) = __________ calendar days

Schedule C (Government Option 2) = __________ calendar days

Schedule D (Government Option 3) = __________ calendar days

Schedule E (Government Option 4) = __________ calendar days

CONTRACT CLAUSES INDEX

FEDERAL ACQUISITION REGULATION (FAR) TRANSPORTATION ACQUISITION REGULATION (TAR)

(Updated thru FAC 2005-70 on 9/30/2013)

FAR & TAR CLAUSES INCORPORATED BY REFERENCE

CLAUSE TITLE DATE REMARKS

52.202-1 DEFINITIONS Jan-12 52.203-3 GRATUITIES Apr-84 52.203-5 COVENANT AGAINST CONTINGENT FEES Apr-84 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT Sep-06 52.203-7 ANTI-KICKBACK PROCEDURES Oct-10 52.203-8 CANCEL & RECOVER OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY Jan-97 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY Jan-97 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACT Sep-07 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS Oct-10 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT Apr-10 52.203-14 DISPLAY OF HOTLINE POSTER(S) Dec-07 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER May-11 52.204-7 SYSTEM FOR AWARD MANAGEMENT Jul-13 Contractor Mandatory Internet Data Input 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS Jul-13 Contractor Mandatory Internet Data Input

52.209-6

PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS

DEBARRED, SUSPENDED OR PROPOSED FOR DEBARMENT Aug-13

52.214-5 SUBMISSION OF BIDS Mar-97 If applicable 52.214-19 CONTRACT AWARD -- SEALED BIDDING-CONSTRUCTION Aug-96 If applicable 52.214-26 ALT 1 AUDIT AND RECORDS -- SEALED BIDDING (ALT 1 - (MAR 09)) Oct-10 If applicable 52.214-27 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA - MODIFICATIONS - SEALED BIDDING Aug-11 52.214-28 SUBCONTRACTOR COST OR PRICE DATA -- MODIFICATIONS--SEALED BIDDING Oct-10 52.214-29 ORDER OF PRECEDENCE - SEALED BIDDING Jan-86 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE Apr-91 52.214-35 SUBMISSION OF OFFERS IN THE U.S. CURRENCY Apr-91 52.219-3 NOTICE TO TOTAL HUB ZONE SET-ASIDE Nov-11 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS Jul-13 52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN Jan-99 52.222-3 CONVICT LABOR Jun-03 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT -- OVERTIME COMPENSATION Jul-05 52.222-5 DAVIS-BACON ACT- SECONDARY SITE OF THE WORK Jul-05 52.222-6 DAVIS-BACON ACT Jul-05 Contractor Mandatory Wage Rates Posting 52.222-7 WITHHOLDING OF FUNDS Feb-88 52.222-8 PAYROLLS AND BASIC RECORDS Jun-10 Contractor Weekly Payroll Submittals 52.222-9 APPRENTICES AND TRAINEES Jul-05 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS Feb-88 52.222-11 SUBCONTRACTS (LABOR STANDARDS) Jul-05

52.252-2 Clauses Incorporated By Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. The full text of a clause may be accessed electronically at this address: www.arnet.gov/far/

(End of Clause)

(Updated thru FAC 2005-70 on 9/30/2013)

52.222-12 CONTRACT TERMINATION -- DEBARMENT Feb-88 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS Feb-88 52.222-14 DISPUTES CONCERNING LABOR STANDARDS Feb-88 52.222-15 CERTIFICATION OF ELIGIBILITY Feb-88 52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES Mar-12 52.222-21 PROHIBITION OF SEGREGATED FACILITIES Feb-99 52.222-26 EQUAL OPPORTUNITY Mar-07 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION Feb-99 52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, & OTHER EL Sep-10 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES Oct-10 52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETS, VETS OF THE VIETNAM ERA, ET AL Sep-10 52.222-38 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS Sep-10 Contractor Annual Mandatory Reporting Requirement 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT Dec-10 52.222-50 COMBATING TRAFFICKING IN PERSONS Feb-09 If applicable 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACT Sep-13 http://www.biopreferred.gov 52.223-5 POLLUTION PREVENTION AND RIGHT TO KNOW INFORMATION May-11 52.223-6 DRUG-FREE WORKPLACE May-01 Contractor Annual Contractor Reporting Reqt 52.223-10 WASTE REDUCTION PROGRAM May-11 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION CONTRACTS May-08 Mandatory 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING Aug-11 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES Jun-08 52.227-1 AUTHORIZATION AND CONSENT Dec-07 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT Dec-07 52.227-4 PATENT INDEMNITY-CONSTRUCTION CONTRACTS Dec-07 52.227-14 RIGHTS IN DATA - GENERAL Dec-07 52.227-17 RIGHTS IN DATA - SPECIAL WORKS Dec-07 52.228-1 BID GUARANTEE Sep-96 52.228-2 ADDITION BOND SECURITY Oct-97 Contractor Submittal Requirement 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION Jan-97 52.228-11 PLEDGES OF ASSETS Jan-12 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS Oct-95 52.228-14 IRREVOCABLE LETTER OF CREDIT Dec-99 Contractor Submittal Requirement 52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION Oct-10 52.229-2 NORTH CAROLINA STATE AND LOCAL SALES AND USE TAX Apr-84 52.229-3 FEDERAL, STATE, AND LOCAL TAXES Feb-13 52.230-2 COST ACCOUNTING STANDARDS May-12 If applicable 52.230-3 DISCLOSURE AND CONSISTENCY OF COST ACCOUNTING PRACTICES May-12 If applicable 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS Jun-10 Contractor Submittal Requirement 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS Sep-02 52.232-13 NOTICE OF PROGRESS PAYMENTS Apr-84 52.232-16 PROGRESS PAYMENT Apr-12 52.232-17 INTEREST Oct-10 52.232-18 AVAILABILITY OF FUNDS Apr-84 52.232-23 ASSIGNMENT OF CLAIMS Jan-86 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS Jul-13 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD MANAGEMENT Jul-13 52.233-1 ALT 1 DISPUTES (ALT-1, DEC-91) Jul-02 52.233-3 PROTEST AFTER AWARD Aug-96 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM Oct-04 52.236-2 DIFFERING SITE CONDITIONS Apr-84 http://www.biopreferred.gov/

(Updated thru FAC 2005-70 on 9/30/2013)

52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK Apr-84 52.236-5 MATERIAL AND WORKMANSHIP Apr-84 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR Apr-84 52.236-7 PERMITS AND RESPONSIBILITIES Nov-91 52.236-8 OTHER CONTRACTS Apr-84 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES & IMPROVEMENTS Apr-84 52.236-10 OPERATIONS AND STORAGE AREAS Apr-84 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION Apr-84 52.236-12 CLEANING UP Apr-84 52.236-13 ACCIDENT PREVENTION Nov-91 Contractor Submittal Requirement 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS Apr-84 52.236-17 LAYOUT OF WORK Apr-84 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION Feb-97 52.236-26 PRECONSTRUCTION CONFERENCE Feb-95 52.242-13 BANKRUPTCY Jul-95 52.242-14 SUSPENSION OF WORK Apr-84 52.243-4 CHANGES Jun-07 If applicable 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS Jul-13 52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES Apr-12 52.246-12 INSPECTION OF CONSTRUCTION Aug-96 52.246-21 WARRANTY OF CONSTRUCTION Mar-94 52.248-3 ALT 1 VALUE ENGINEERING - CONSTRUCTION (ALT-1, APR-84) Oct-10 52.249-2 ALT 1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (ALT-I, Sep-96) Apr-12 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) Apr-84 52.253-1 COMPUTER GENERATED FORMS Jan-91

TAR CLAUSES INCORPORATED BY REFERENCE

1252.211-70 INDEX FOR SPECIFICATIONS Apr-05 1252.242-73 CONTRACTING OFFICERS TECHNICAL REPRESENTATIVE Oct-94

FAR & TAR PROVISIONS INCORPORATED BY REFERENCE

52.217-3 EVALUATION EXCLUSIVE OF OPTION Apr-84 52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD Jun-88 52.217-5 EVALUATION OF OPTIONS Jul-90 52-217-7 OPTION FOR INCREASED QUANTITY -- SEPARATELY PRICED LINE ITEM Mar-89

(Updated thru FAC 2005-70 on 9/30/2013)

FAR & TAR CLAUSES INCORPORATED BY FULL TEXT

CLAUSE TITLE DATE SECTION SECTION TYPE REMARKS

52.203-17

CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM

EMPLOYEES OF WHISTELBLOWER RIGHTS Sep-13 G GEN'L CONTRACT REQS.

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS Jul-13 G GEN'L CONTRACT REQS. If Applicable 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK Apr-84 H CONSTR. CONTRACTS REQS Government Fill In 52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION Sep-00 H CONSTR. CONTRACTS REQS Government Fill In 52.211-18 VARIATION IN ESTIMATED QUANTITY Apr-84 H CONSTR. CONTRACTS REQS

52.222-23

NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT

OPPORTUNITY FOR CONSTRUCTION Feb-99 F SOCIOECON PROG REQS Contractor Reporting Reqs

52.223-3 ALT I HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (ALT-I, JUL-95) Jan-97 G GEN'L CONTRACT REQS. Contractor Submittal Reqs 52.223-4 RECOVERED MATERIAL CERTIFICATION May-08 G GEN'L CONTRACT REQS. Contractor Submittal Reqs 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGN ITEMS May-08 G GEN'L CONTRACT REQS.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .