Plans_PRA-CHOH_212(1).pdf
PDF 5 MB Posted
- Solicitation number
- DTFH71-14-B-00002
About this file
Plans_PRA-CHOH 212(1)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PRA-CHOH_212(1)_-_Amendment_0002.pdf | ||
| PRA-CHOH_212(1)_-_Amendment_0001.pdf | ||
| FP03_Errata.pdf | ||
| VETS-100A_Form.pdf | ||
| Bridge_Inspection_Report.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| IFB_Solicitation_PRA-CHOH_212(1).pdf | ||
| FP03_Eng_.pdf | ||
| NEPA_Report_-_Categorical_Exclusion_Form.pdf | ||
| Synopsis_Notice_-_PRA-CHOH_212(1).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Sheet
Symbols And Abbreviations
Location Map
Tabulation of Quantities
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
SHEET
NO.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH:
ROAD:
WIDTH TYPE
SURFACE:
BASE
ROADBED
ADT (2013)
ADT (2033)
DHV
%Truck
D
V (MPH)
SPECIFICATIONS:
FP-03 U.S.Customary Units.
Roads and Bridges on Federal Highway Projects", "Standard Specifications for Construction of
BRIDGE:
DESIGN DESIGNATION:
20’ +/-e(max)
C/A
Project Manager Lead Designer
J. Talley
TOTAL
SHEETS
(miles)
Know what’sbelow.
before you dig.Call
R
Administration
Federal Highway
U.S. Department of Transportation
SHEET
NO
LANE MILES:
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICEN
KEY MAP
STATE OF MARYLAND
SALISBURY
BALTIMORE
CUMBERLAND
FREDERICK
0 4040
SCALE IN MILES
NATIONAL HISTORICAL PARK
CHESAPEAKE AND OHIO CANAL
PROJECT PRA-CHOH 212(1)
WASHINGTON COUNTY, MARYLAND
K. McCool
A N/A
Number
3100-008P substructure of Big Slackwater Bridge.
Rehabilitation of timber deck and steel
Timber bridge deck
< 100 feet
NEAR MILEPOST 84.3
REHABILITATION OF BIG SLACKWATER BRIDGE
Timber Bridge Deck
N/A
N/A
N/A
N/A
Unknown
Unknown
Unknown
Unknown
Unknown
15mph
ALT
HAGERSTOWN
MARTINSBURG
THURMONT
FREDERICK
PURCELLVILLE
LEESBURG
RESTON
ROCKVILLE
GERMANTOWN
WASHINGTON
BALTIMORE
CHANTILLY
STERLING
MIDDLEBURG
HALFWAY
WAYNESBORO
RANDALLSTOWN
340230
SHARPSBURG
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
81 INTERSTATE
INTERSTATE
BOONSBORO
M A R Y L A
N D
INTERSTATE
INTERSTATE
MARYLAND
PENNSYLVANIA
BETHESDA
C H
E S
A P
E A
K E
B A
Y
V
IR
G
IN
IA
W E S T
SCALE IN MILES
0 10 20
N
PRA-CHOH 212(1)
MP 84.3
A1
A2
C1
A1
R1-R9
A3-A5
PMIS # 169496
M1 Erosion and Sediment Control Narrative
Bridge Plans
S1 Standards and Details
#3100-008P
Big Slackwater Bridge, Structure
Bridge
Big Slackwater
0.95 - 0.96
Schedule Description Milepost Length BIP Report
SEPTEMBER, 2013
M
P R
O J E
C T
S c h o h (1
P r o j
D e v C
A D
D A 1_
C H
O H
(1 tt l.
d g n
T
IM
E
-S e p -2
:0
P
M
REG STATE PROJECTNPS
NO.NO.
PMIS
169496 MDNC PRA-CHOH 212(1)
80899
James.Talley Text Box
R/W R/W
R/W R/W
P/E C/E
No Symbol
TB or TP
P P or
UD UD
W W
P/E C/E
No Symbol
TB or TP
P P or or
UD UD
W W
FOUND
36 31
6 1
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
26 25 69426 25 694 c
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
Bench mark BM
Begining beg.
Bearing brg.
Balance point BP
Back BK
Footing ftg.
Flange flg.
Finish fin.
Inside diameter ID
West W
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve centeral angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
Expansion joint exp. jt.
Excavation exc.
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
Gage(gauge) ga.
Galvanized galv.
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transision)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original groung OG
North N
Normal crown NC or NCR
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Range R.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
Section Sec.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transision)
Tangent distance Ts
(tangent length)
Tangent distance T
Vertical point of intersection VPI
Vehicle per hour vph
PAVEMENT REMOVAL/ROADWAY OBLITERATION
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
PROPOSEDEXISTING
PROJECTED
INTERSTATE U.S. STATE
AREA PATTERN
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
MATERIAL SOURCE
NORTH ARROW
EXISTING PROPOSED
wall facewall face
TB or TP or
P/LP/L
MEDIAN & SIDE (CONCRETE) BARRIER
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
MILL AND OVERLAY
SIDEWALK ASPHALT/CONCRETE
FULL DEPTH PAVEMENT
OVERLAY
SECTION CORNER
SECTION CORNER4
SECTION16
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
ROUTE NUMBERS
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
N
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
E=electrical, FO=fibre optics SS=storm sewer, T=telephone, W=water G=gas, O=oil, P=power, SA=sanitary sewer, UNDERGROUND UTILITIES
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:-
DIVERSION CHANNEL
TEST PIT
B-1
TP-1
ABBREVIATIONS
SYMBOLS AND
EOP
EOG
embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
PHTPhoto monument
Pavement pvmt.
A2
MUTCD - Manual on Uniform Traffic Control Devices, 2009 edition
P R
O J E
C T
S c h o h (1
P r o j
D e v C
A D
D A -C
H O
H
(1 s y m .d g n
T
IM
E
-A u g -2
:2
P
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
169496 MDNC PRA-CHOH 212(1)
NATIONAL HISTORICAL PARK
CHESAPEAKE AND OHIO
80899
(OVERVIEW)
LOCATION MAP
A3
Project PRA-CHOH 212(1)
P R
O J E
C T
S c h o h (1
P r o j
D e v C
A D
D A -C
H O
H
(1 lo c .d g n
T
IM
E
-A u g -2
:2
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
169496 MDNC PRA-CHOH 212(1)
NATIONAL HISTORICAL PARK
CHESAPEAKE AND OHIO
A4
(DETAIL)
LOCATION MAP
Project PRA-CHOH 212(1)
P R
O J E
C T
S c h o h (1
P r o j
D e v C
A D
D A -C
H O
H
(1 lo c .d g n
T
IM
E
-A u g -2
:2
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
169496 MDNC PRA-CHOH 212(1)
NATIONAL HISTORICAL PARK
CHESAPEAKE AND OHIO
A5
(SITE PLAN)
LOCATION MAP
Route 212 Route 212
C&O Canal
C
O C a n a l
P o to m a c R iv e r
B ig S la ck w a te r P k g
R o u te
Dam No. 4 Road
Dam No. 4 Road
T o M d
R o u te
D a m N o
Potomac River
Structure 3100-008P Project PRA-CHOH 212(1)
(see Note 1) Route 937
Not to Scale
N
See Note 2 Limits of Clearing (typ)
Legend:
Waterline/Shoreline
Existing pavement
Limits of clearing
See Note 3 Remove five trees
4.
3.
2.
1.
Notes:
by the CO.
delineators along the bridge rail as directed the bridge rail and 3" white retroreflective Place Type 3 Object Markers at the ends of maple).
same species (1 sycamore, 2 hickory, 2 trees in-kind with 1-1.5" caliper trees of the by the CO. Do not remove stumps. Replace Remove five trees for site access as directed area as needed and as directed by the CO.
of the CO. Use filter berm to protect the work Limits are subject to change at the direction Clearing limits are 5’ from the abutment.
at the direction of the CO.
accordance with the MUTCD, 2009 edition, or existing NPS gate. Furnish and place sign in No. R11-2) sign on Type 3 Barricade near the with Route 937. Place "Road Closed" (MUTCD Route 212 may be closed at the intersection
P R
O J E
C T
S c h o h (1
P r o j
D e v C
A D
D A -C
H O
H
(1 lo c .d g n
T
IM
E
-S e p -2
:2
P
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
169496 MDNC PRA-CHOH 212(1)
NATIONAL HISTORICAL PARK
CHESAPEAKE AND OHIO
TABULATION OF QUANTITIES
C1
M
P R
O J E
C T
S c h o h (1
P r o j
D e v C
A D
D C 1-
C H
O H
(1 q n t.
d g n
T
IM
E
-S e p -2
:1
A
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
169496 MDNC PRA-CHOH 212(1)
NATIONAL HISTORICAL PARK
CHESAPEAKE AND OHIO
CONTROL NARRATIVE
EROSION & SEDIMENT
M1
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
inspection of the area as directed by the CO.
After completion of construction, remove trash and leftover construction materials and perform a final
Phase III Final Construction / Stabilization and building materials are not allowed to fall into the canal. Remove any materials from the canal.
Apply intermediate controls as necessary during construction of the new structure. Ensure that trash
Phase II Intermediate Controls not allowed to enter the canal. Do not allow equipment to enter the water.
During removal of the existing structure, ensure that waste or pieces of the existing structure are contained and
Phase I Removal of Existing Bridge Structure
Sequence of Construction
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting
Contract Requirements.
for Construction of Roads and Bridges on Federal Highway Projects, FP-03 (U.S. Customary Units), and the Special measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous water materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
Approximately 0.0 acres of new impervious surface will be created by the reconstructed bridge.
The total disturbed area for the project is approximately 0.0 acres. The receiving water is the Potomac River.
No soil disturbing activities are anticipated for this project.
This work includes replacement of the steel substructure and timber deck.
This project consists of the reconstruction of Big Slackwater Bridge over the Chesapeake and Ohio Canal.
Project Description
P R
O J E
C T
S c h o h (1
P r o j
D e v C
A D
D M 1-
C H
O H
(1 e s c .d g n
T
IM
E
-A u g -2
:2
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
169496 MDNC PRA-CHOH 212(1)
NATIONAL HISTORICAL PARK
CHESAPEAKE AND OHIO
R01
STATE PROJECT
REGION
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONS
-S e p -2
:4
A
NO. DATE BY REVISIONS NO. DATE BY
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
GENERAL NOTES:
SPECIFICATIONS:
Construction:
DESIGN LOADS:
Dead Load:
Live Loads:
MATERIALS:
Bearings:
Design:
Miscellaneous Structural Steel:
- MT. - 10% min.
Fillet welds - Visual - 100%
Non-destructive testing of welds shall be performed as follows:
classified E7028.
Perform welding process manual shielded arc welding (SMAW) using low hydrogen electrodes
Perform all welding in accordance with the current AASHTO/AWS D1.5 Bridge Welding Code.
Welding:
2002 and Errata 2003 and 2005.
AASHTO Standard Specifications for Highway Bridges, 17th Edition, Federal Highway Projects, FP-03 (U.S. Customary Units).
Standard Specifications for Construction of Roads and Bridges on
HS 20 Truck
BRIDGE DRAWING NO. DRAWING TITLE
INDEX OF DRAWINGS
GENERAL NOTES AND INDEX
A C
T U
A L F I L E R
N P S
C
O
B S
W
G E
N
N O
T E S .D
G N
Future Wearing Surface: 25 psf.
Timber: 50 pcf.
Timber:
R01
SCOPE OF WORK
5.
4.
3.
2.
1.
Structural Steel:
No scale
Bridge Construction Specifications, using Design Method A, and 50 durometer hardness.
Furnish elastomeric bearing pads conforming to the requirements of Section 18 of the AASHTO retention of 0.60 pcf according to the latest AWPA Standard.
Provide Southern Pine No. 1 timber treated with Chromated Copper Arsenate (CCA) with a minimum
Rail components: Sawn lumber
Deck panels: Nail laminated timber
American Wood Protection Association (AWPA)
Furnish metal for all sole plates conforming to ASTM A36.
Install nail laminated timber deck and wheel guard.
bolts and diaphragms.
Install new steel plate girders, bearing pads, anchor
Clean abutment seat.
and bearings.
Remove existing rolled steel beams, diaphragms, deck.
Remove existing timber curb and timber plank
Wheel Guard Connection
Typical Section and Deck Plan
Bearing Details
Girder Splice Details
Girder Details -2
Girder Details -1
Framing Plan
Plan and Elevation
General Notes and Index and galvanize conforming to ASTM A153.
and washers conforming to ASTM A563 and ASTM F436. Furnish hardware conforming to ASTM A307 to AASHTO M 164, Type 3 (ASTM A325, Type 3) unless otherwise noted on the plans. Furnish nuts
" diameter fasteners conforming8 7connections are slip critical, friction type, Class A, with plate girder web plates, all web and flange splice plates, and all bottom flange plates. All field member components subjected to tensile stress. These member components consist of all
Meet the ASTM A709 Supplemental Requirements, S83 (for Zone 2), and S93 for main load carrying
The contractor is responsible for the stability of the structure during all phases of construction.
up paint on site as specified by manufacturer.
finish to match Federal Standard 595C, Color No. 20059 (brown). Field paint girder splice and touch structural steel. Paint all structural steel at the manufactoring plant. Furnish the top coat with gloss
Grade 50) unless otherwise noted on the plans. Provide a 3 coat, Type 2 paint system on Grade 50
Furnish high-strength low alloy structural steel conforming to AASHTO M 270, Grade 50 (ASTM A709, STATE PROJECT
SHEET
NO.
REGION
NC MD CHOH 212(1)
Structure Number
BRIDGE DRAWING
of
DATE DRAWING NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
3100-008P
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
BRP-1206September 2013
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
ROGER LUPB EMA LW
R02
Structure Number
-S e p -2
:4
A
M M
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
NO.
U.S. DEPARTMENT OF TRANSPORTATION
NC MD
ROGER LUPB EMA 9
3100-008P
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
LW
CHOH 212(1)
BRP-1206September 2013
-S e p -2
:4
A
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
A C
T U
A L F I L E R
N P S
C
O
B S
W F
R A
M E .D
G N
As shown
N
Begin Bridge
R o a d w a y
End Bridge
" = 51’-7"8 38 spa. @ 6’-5
L StructureC
PLAN
ELEVATION
53’-9" ground line
Approximate existing
PLAN AND ELEVATION
R02
Bridge Length: 53’-9" of backwall at front face
W h e e l g u a r d
W h e e l g u a r d of backwall at front face
Steel impact angle (Typ.)
Existing Abutment 2Existing Abutment 1
(Ty p.)
CLBearings Abutment 1 CLBearings Abutment 2 sheet for detail
See "WHEEL GUARD CONNECTION" block spacing
Scupper
Exp. Fix.
Existing Abutment 2Existing Abutment 1
CLScupper block (Typ.)
’’ = 1’-0’’4 1Scale:
’’ = 1’-0’’4 1Scale:
1" Deck joint (Typ.)
Note:
2.
1.
Match existing deck elevations.
in field prior to ordering material.
Verifiy all dimensions and locations
(see note 2) laminated deck
Skewed nail
STATE PROJECT
SHEET
NO.
REGION
NC MD CHOH 212(1)
Structure Number
BRIDGE DRAWING
of
DATE DRAWING NO.
U.S. DEPARTMENT OF TRANSPORTATION
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
BRP-1206September 2013
R03
-S e p -2
:4
A
M M
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
ROGER LUPB EMA 9
3100-008P
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
LW
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BY
-S e p -2
:4
A
NO. DATE BY REVISIONS NO. DATE
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
FRAMING PLAN
" "4
A C
T U
A L F I L E R
N P S
C
O
B S
W F
R A
M E .D
G N
"4 353’-6
CLBearings Abutment 1 CLBearings Abutment 2
21’-4" 21’-4"
StructureCL
90°Typ.)
Bearing Stiffener (Typ.)
(Typ.)
25°
S p a
S p a
G1
G2
G3
G4
G5
G6
As shown
"8 79’-2
"8 77’-5
5’-9"
4’-0"
"8 79’-2
’’GIRDER DETAILS-2’’ sheet.
Connection plate (Typ.) See
See ’’GIRDER DETAILS-2’’ sheet.
Intermediate diaphragm (Typ.)
CLBolted field splice (Typ.)
’’GIRDER SPLICE DETAILS’’ sheet.
Bolted field splice (Typ.) See
N
"4 313’-4
(Typ.)
"8
R03
’’ = 1’-0’’8 3Scale:
FRAMING PLAN
2’-3"
6"
(Typ.)
End diaphragm
STATE PROJECT
SHEET
NO.
REGION
NC MD CHOH 212(1)
Structure Number
BRIDGE DRAWING
of
DATE DRAWING NO.
U.S. DEPARTMENT OF TRANSPORTATION
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
BRP-1206September 2013
R04
-S e p -2
:4
A
M M
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
ROGER LUPB EMA 9
3100-008P
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
LW
-S e p -2
:4
A
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
NOTES:
0.1 L 0.2 L 0.3 L 0.4 L 0.5 L 0.7 L 0.8 L 0.9 L0.6 L of Bearings
G I R
D E
R S
CAMBER TABLE
I STEEL D.L. (in.)
III SUPERIMPOSED D.L. (in.)
IV ADDITIONAL CAMBER (in.)
CL
TOTAL = I+II+III+IV (in.) 0
Not to scale
CLAbutment 1
Point no.
Reference line
Span L cambered girder
Top of Web fully
Total Camber
(see note 1.)
deflected girder
Top of web fully
DL Deflection
0.8L 0.9L0.7L0.1L 0.2L 0.3L 0.4L 0.5L 0.6L
CAMBER DIAGRAM - DOUBLE SPAN
CLAbutment 2
CLBearings Abutment 1 CLBearings Abutment 2
GIRDER ELEVATION
’’ = 1’-0’’2 1Scale:
"4 353’-6
’’ web plate16 716’’ x
’’ Bottom flange8 518’’ x 1
’’ Top flange8 518’’ x 1
(Typ.)
(Typ.)
CL Bolted field splice
GIRDER DETAILS - 1
"4 313’-4
II TIMBER DECK D.L. (in.)
0’’ 0’’ 0’’ 0’’ 0’’ 0’’ 0’’ 0’’ 0’’
’’16 1 ’’16
3 ’’4 1 ’’4
1 ’’ 16 5 ’’4
1 ’’4 1 ’’ 16
3 ’’ 16
’’16 1 ’’8
1 ’’8 1 ’’ 16
1’’16 3 ’’ 16
3 ’’ 8 1’’8
1’’16
0’’ 0’’ 0’’ 0’’ 0’’ 0’’ 0’’ 0’’ 0’’
’’ 8 1 ’’16
5 ’’8 3 ’’2
1 ’’16 7 ’’8
3 ’’16 5 ’’ 8
1’’16
A C
T U
A L F I L E R
N P S
C
O
B S
W
G I R
D D
T S .D
G N
1.
As shown
"8
(Typ.)
’’ Bearing stiffener2
1’’ x 2
See "FRAMING PLAN’’ for layout.
’’ Connection plates (Typ.)2 1"x 2
R04 do not have a vertical slope.
Match top of web to fully deflected girder line on bridges that
STATE PROJECT
SHEET
NO.
REGION
NC MD CHOH 212(1)
Structure Number
BRIDGE DRAWING
of
DATE DRAWING NO.
U.S. DEPARTMENT OF TRANSPORTATION
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
BRP-1206September 2013
R05
-S e p -2
:4
A
M M
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
ROGER LUPB EMA 9
3100-008P
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
LW
-S e p -2
:4
A
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
GIRDER SECTIONS
Scale: 2’’ = 1’-0’’
INTERIOR GIRDER CONNECTION PEXTERIOR GIRDER CONNECTION PBEARING STIFFENERS AT ABUTMENTS L L
CLGirder
(See note 1) or M.B.
C.P.G.W.
Detail A
Detail A
Detail A
T y p
1 1’’
(Typ.)
Detail A
5Detail A
Detail A
Detail A
Detail A
5Detail A
5Detail A
CLGirder CLGirder
B o th s id e s-
’’ Plate8
SECTION B-BDETAIL A
Scale: 3’’ = 1’-0’’
Top of bot. flange
B
B
GIRDER DETAILS - 2
’’8 1’’ 4
+ ’’8
1’’ 4
+ ’’8
1’’ 4
CLGirder
CLGirder
Scale: 2’’ = 1’-0’’
5’-0"
CLBearings Abutment 2
1’-4" at abutment (Typ.)
Bearing stiffner
Near face abutment
GirderCL
"8
CLBearings Abutment 1
CLBearings Abutment 2
"8
Girder
End of
(T yp
GIRDER PLAN DETAIL
Scale: 1’’ = 1’-0’’
(T yp
25°
(Ty p.)
DRIP PLATE DETAIL
Scale: 1’’ = 1’-0’’
(T y p
G1
CLCL Interior GirderExterior Girder
INTERMEDIATE DIAPHRAGM DETAIL
Scale: 2’’ = 1’-0’’
Level
(Typ.)
’’2
C12 x 20.7
(Typ.) AA
3’-9"
(Typ.)
Notes:
M.B. = Mill to bear then fillet weld.
C.P.G.W. = Complete penetration groove weld.
2.
1.
T y p
T y p
(Typ.)
Bottom flange
SECTION A-A
Scale: 3’’ = 1’-0’’
1’-6"
CLGirder
(Typ.)
C12 x 20.7
A C
T U
A L F I L E R
N P S
C
O
B S
W
G I R
D D
T S .D
G N
1" m in.
As shown backwall
Near face stiffener
Bearing
’’2 1" x 2
16 plate
Connection
’’2 1’’ x 2 plate
Connection
’’2 1’’ x 2
R05
’’2
T y p
T y p
(Typ.)
’’ Bearing stiffener2 1’’ x 2
3"
(Typ.) (Typ.)
(End diaphragn similar and coped)
End diaphram shown and coped) (For connection use shim plate if necessary.
(G1 shown, G6 mirror image) of exterior girders
Drip plate at exterior face
3"
2’’ x 8’’ Nail laminated timber deck
T y p aids to the bottom flange of the girders unless noted.
Do not weld forming devices or other construction
STATE PROJECT
SHEET
NO.
REGION
NC MD CHOH 212(1)
Structure Number
BRIDGE DRAWING
of
DATE DRAWING NO.
U.S. DEPARTMENT OF TRANSPORTATION
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
BRP-1206September 2013
R06
-S e p -2
:4
A
M M
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
ROGER LUPB EMA 9
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
LW
-S e p -2
:4
A
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
SECTION A-A
GIRDER SPLICE DETAILS
A C
T U
A L F I L E R
N P S
C
O
B S
W
G I R
D S
P L I C
E D
T S .D
G N
"4 14’-6
"8 51"2
11 8 Spa. @ 3’’ = 2’-0" "2 11"8
51 8 Spa. @ 3’’ = 2’-0"
CLBolted field splice
Scale: 3’’ = 1’-0’’
A
CLBolted field splice
WEB SPLICE DETAIL
Scale: 3’’ = 1’-0’’
S p a
3 Spa. @ 3’’ = 9"
A
3 Spa. @ 3’’ = 9"
’’4 12’ -
"4 14’-6
CLBolted field splice
"8 51 "8
51 "2 118 Spa. @ 3’’ = 2’-0""2
11 8 Spa. @ 3’’ = 2’-0"
Scale: 3’’ = 1’-0’’
Scale: 3’’ = 1’-0’’
"2 14 "2
143" 3"
Web splice plates
’’)4 3’’ x 1’-3’’ x 4
12 - (2’-
CLGirder
3""2 14"2
143" Exterior top splice plate
’’)4 3’’ x 1’-9’’ x 4
11 - (4’-6
Interior top splice plates
’’)4 3’’ x 4
3’’ x 64 12 - (4’-6
Interior bottom splice plates
’’)4 3’’ x 4
3’’ x 64 12 - (4’-6
Exterior bottom splice plate
’’)4 3’’ x 1’-6’’ x 4
11 - (4’-6
INTERIOR TOP & BOTTOM FLANGE SPLICE PLAN
EXTERIOR TOP & BOTTOM FLANGE SPLICE PLAN
CLGirder
As shown
"2 11 "2
R06
’’Ø A325 bolt (Typ.)8
’’Ø A325 bolt (Typ.)8
CL
bolt (Typ.)
Flange splice
’’ Max. gap4
Notes:
5. Field paint splice splice plate.
4. Field cut timber deck to fit over outside of
3. Expose the heads of the bolts where possible.
plates to privide entering and tightening clearance.
2. Assemble web splice plates prior to flange splice
’’ Dia. bolt entering and tightening clearances.8 71.
NO.
REGION
NC MD CHOH 212(1)
Structure Number
BRIDGE DRAWING
of
DATE DRAWING NO.
U.S. DEPARTMENT OF TRANSPORTATION
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
BRP-1206September 2013
R07
-S e p -2
:4
A
M M
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
ROGER LUPB EMA 9
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
LW
-S e p -2
:4
A
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
GIRDER BEARING PLAN
A
A
GirderCL
CL
CL
CL
8’’ Hole
(each side for fixed bearings) bearings)
(each side for expansion
2’’ x 3’’ Slotted hole
Bearing pad
Anchor bolt
ANCHOR BOLT DETAIL
GirderCL
CL
Scale: 3’’ = 1’-0’’
SECTION A-A
1’’ 1’’ bearing
Laminated elastomeric
Anchor bolt
2 Hex nuts bearing only
’’ Clear at expansion4
BEARING ELEVATION
Plate washer
’’2 1’’ x 5’’ x 62
Scale: 3’’=1’-0’’
Sole plate
Sole plate
CLAnchor bolt
Notes:
Furnish sole plate and washers conforming to AASTO M 270 Grade 36.
Galvanize anchor bolts, hex nuts, and washers in accordance with ASTM A153.
pads conforming to AASHTO M 251.
Furnish Grade 2, 50 durometer hardness, steel laminated elastomeric bearing
CLBearings
SECTION C-C
LAMINIATED ELASTOMERIC BEARING PAD DETAILS
PLAN
" Clr.8
(Typ.)
all sides
C
’’ Interior layer8
’’ Exterior layer8
C
8"
4"
8"
4"
Scale: 3’’ = 1’-0’’
GirderCLCL moulded securely to pad
’’ Steel shims 8 14 -
Not to scale
Not to Scale
BEARING DETAILS
A C
T U
A L F I L E R
X
N P S
C
O
B S
W
B E
A R I N
G D
E T S .D
G N
10"
5"5"
8"
"2 14 "4
38 3"3" "4 38 "2
M in
M in
CL
As shown bearing seat
Existing top of bearing seat
Existing top of
T y p
T y p .)1 bearing seat
Existing top of
T y p
T y p
5.
4.
3.
2.
1.
grout (Typ,) epoxy
Drill and grout (Typ,) epoxy
Drill and anchor bolt
1Fully swedged 1 bearing elastomeric
Laminated
R07
(Typ.)
Anchor bolt
T y p girder
Edge of
"4
Near face of backwall nuts conforming to AASHTO M 291 (ASTM A563 heat treated Grade DH or DH3).
Furnish swedged anchor bolts confroming to ASTM F1554 Grade 36. Furnish hex
Provide non-shrink epoxy grout for anchors.
STATE PROJECT
SHEET
NO.
REGION
NC MD CHOH 212(1)
BRIDGE DRAWING
of
DATE DRAWING NO.
U.S. DEPARTMENT OF TRANSPORTATION
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
BRP-1206September 2013
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
Structure Number 3100-008P
R08
-S e p -2
:4
A
M M
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
ROGER LUPB EMA 9
3100-008P
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
LW
CHOH 212(1)
BRP-1206September 2013
-S e p -2
:4
A
M M
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE REVISIONS NO. DATE BY
Notes:
Note:
5"
’’4
IMPACT ANGLE
CL
A C
T U
A L F I L E R
C H
O H
T Y P
X S
D
T S .D
G N approved equal
Sikaflex IA or an
JOINT DETAIL
holes @ 24’’
’’ Dia. 16
22’-9"
10’-5" 10’-5""2 111 "2
Profile grade
4" x 24" x 12" Scupper blocks, end block to be flush with ends of deck.
(Typ.)
NEAR ABUTMENT NEAR MIDSPAN
Plate girder
(Typ.)
TYPICAL SECTION
Not to scale
Not to scale
CLStructure
M in
M in
Existing abutment
R08
As shown
" = 1’-0"4 3Scale
1"
1" Dia. backer rod
" thick, uncompressed)8 3(1
AASHTO M153, Type 1
Preformed joint filler centers of scupper blocks. (Typ.)
block and deck. Splice curb only at washers at each scupper block through maximum. Use two 1" dia. bolts with
Curb length 12’-0’’ minimum and 16’-0"
12’’ x 12’’ Curb, continuous each side.
" Thick4 end of the deck.
’’ x 8’’ lag bolts. Recess impact angle flush at the4
’’ dia. holes drilled @ 24’’ spacing to accept16 between curbs. Long leg of each impact angle to have
Use one continuous angle to fit full clear deck width
" = 1’-0"4 1Scale
DECK PLAN
CLStructure
"4 35’-6
" (Measured along the C of gidrer)4 353’-6 L
12 Panels @ 4’-0" = 48’-0"
End panel
(Ty p.)
Impact angle (Typ.)
Deck attachment
(Typ.)
@ 18’’, staggered as shown.
30 penny nails (threaded, hardened-steel)
2’’ x 8’’ Laminated deck nailed with
(Typ.)
head bolt
’’ Ø Dome8
’’STEEL ANGLE BRACKET DETAILS’’
Steel angle bracket, see
STEEL ANGLE BRACKET DETAILS
See ’’DETAIL - 1’’
" = 1’-0"2 1Scale
DETAIL - 1
Girder nail laminated panel
8’’ Thick southern pine
Deck attachment
CL
(Typ.)
Edge of flange
4’-0"
6’’ 6’’1’-0’’1’-0’’1’-0’’
T y p
3"
’’ 4
’’8
Not to scale
CLAngle
’’ 4
4 2’’ x 11 ’’
Slotted hole
Plate grider (Typ.)
Impact angle
"4
T y p a t s p li c e
Beam flange thickness or splice plate thickness
TYPICAL SECTION AND DECK PLAN
1.
2.
3.
4.
5.
specifications.
and splice bolts. Coat exposed timber according to
Cut recesses in deck panels to clear splice plates accordance to AASHTO M 111 or M 232.
Galvanize steel angle brackets, bolts and nuts in
Furnish angle brackets conforming to ASTM A36.
Furnish nuts and bolts conforming to ASTM A307.
Match existing deck elevations.
STATE PROJECT
SHEET
NO.
REGION
NC MD CHOH 212(1)
Structure Number
BRIDGE DRAWING
of
DATE DRAWING NO.
U.S. DEPARTMENT OF TRANSPORTATION
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
BRP-1206September 2013
R09
-S e p -2
:4
A
M M
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
ROGER LUPB EMA 9
3100-008P
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
LW
CHOH 212(1)
BRP-1206September 2013
A C
T U
A L F I L E X
X X
X
D G
N
-S e p -2
:4
A
M M
P R
O J E
C T
S c h o h s la c k w a te r b r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N P
S
C
O
B S
W P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
NC MD
As shownPB EMA 99
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
6" 6" 1’-0" 6"6" 6" 1’-0" 6"
CL Span
(Symmetry) of wheel guards
3" Chamfer at ends
ELEVATION
" = 1’-0"4 3Scale:
WHEEL GUARD CONNECTION
R09 surface
Existing road
"8 34’-5 6" 1’-0" 6""8
34’-5 6" 1’-0" 6""8 34’-5 "8
34’-5 10" of deck. (Typ.)
end block to be flush with ends
4" x 24" x 12" Scupper blocks,Plate girder laminated deck
2" x 8" Nail 1"Ø Bolt (Typ.)
Curb splice (Typ.)
T y p the CO.
guard length 16’-0" minimum except as approved by wheel guards only at centers of scupper blocks. Wheel wheel guard, scupper block and deck as shown. Splice
Use two 1" bolts with washers at each block through
8" x 8" Wheel guards on 4" x 8" x 2’-0" scupper blocks.
STATE PROJECT
SHEET
NO.
REGION
NC MD CHOH 212(1)
Structure Number
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATE DRAWING NO.
U.S. DEPARTMENT OF TRANSPORTATION
CHESAPEAKE AND OHIO NATIONAL HISTORICAL PARK
BIG SLACKWATER BRIDGE
BRP-1206September 2013
E157-04
U.S. CUSTOMARY DETAIL
NO SCALE
DETAILDETAIL APPROVED FOR USE
FILTER BERM
Notes:
GRADE (G) *
DITCH
SPACING(S)
CHECK DAM
2%
3%
4%
5%
6%
50 ft 75 ft
33 ft
25 ft
20 ft
16 ft 25 ft
30 ft
40 ft
50 ft
18" HIGH12" HIGH
2% or above 6% ditch grades
* Do not use Check Dams below
USED FOR SLOPE PROTECTION
USED AS A CHECK DAM
TYPICAL SECTION
directed by the CO.
site when no longer required, as
Disperse the compost filter berm on or as directed by the CO.
of the exposed height of the berm, the berm when it has reached 1/3
Remove sediment at the base of directed by the CO.
functional condition at all times, as
Maintain compost filter berm in a in accordance with Section 157.
Provide sock and compost materials
APPROVED : MAY 2011
Stake as required at edge of ditch drawn in and tied off to stake
Excess sock material to be
4.
3.
2.
1.
Filter sock (See Note 1)
Filter Berm (See Note 1)
FLOW
(See Note 1) Filter Berm / Sock trenching.
anchoring with stakes or stones and/or filter sock through either light compaction, To prevent undermining, securely seat the
30’ (typ.)
USED AS INLET PROTECTION
FLOW
7’
Stake as required (typ.)
or greater Finished grade, 2:1 slope
See Note 1.
filled with mulch filter material.
Filter berm comprised of sock
S1
M
P R
O J E
C T
S c h o h (1
P r o j
D e v C
A D
D S td -D e t\ s t1 d e ta il .d g n
T
IM
E
-A u g -2
:2
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
169496 MDNC PRA-CHOH 212(1)
NATIONAL HISTORICAL PARK
CHESAPEAKE AND OHIO
File details come from the government source that posted it. Updated .