CMGC_Hrs_Estimate_FOPU10(3).xlsx

XLSX spreadsheet 87 KB Posted

Attached to
Fort Pulaski National Monument: FOPU 10(3) CMGC
Solicitation number
DTFH71-13-R-00010
Issued by

About this file

CMGC Hour Estimate - FOPU 10(3)

View the file

Other files

File Type Posted
Amendment_001_-_PRA-FOPU_10(3)_CMGC.pdf PDF
ADV_Offeror's_Qualifications_Form.doc DOC document
FP03_Eng_.pdf PDF
FP03_Errata.pdf PDF
Subcontract_plan.doc DOC document
RFP_Solicitation_-_PRA-FOPU_10(3).pdf PDF
VETS-100A-Form-rev-2012.pdf PDF
FOPU_10(3)_CMGC_Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-1

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 1: Review Project InformationCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
TASKHydraulicBridgeEngrInternTechClericalTASK
EngrEngineerTOTALS
Review FHWA Bridge Inspection Report, FHWA Scoping
report, Preliminary plans and project photos, Draft
Enviromental Assessment, Tidal Water Level Elevation
Variations at the Bridge and Field Trip Report from the 30%
Design Field Review

SUBTOTAL (hrs)

A-17

Page &P of &N

1-2

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 1: Review Project InformationCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
HydraulicBridgeEngrInternTechClerical
EngrEngineerTOTAL
TOTAL HOURS:
APPROVED LABOR RATE:
LABOR COST:
DIRECT COSTS
ITEMQUANTITYUNIT COSTCOST
CADD use (Hour)
PC use(Hour)
TravelPer person travel expenses (two people on trip)
Printing half-size setsAirfare DEN to Norf
MailLPSMLodging
SUMMARY OF FEETask 1Meals
Personal car mileage (half)
A. TOTAL LABOR COST:Airport parking at DEN (half)
Rental Car and Fuel (half)
Total per person travel$ -
B. DIRECT COSTS
TOTAL FEE A+B
* Overhead FactorN/A
TOTAL DIRECT COSTS:

A-18

2-1

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 2: Participate in the In-Depth Bridge Underwater InspectionCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
TASKHydraulicBridgeEngrInternTechClericalTASK
EngrEngineerTOTALS
Travel from contractor's office to Project site
Participate in the underwater inspection
Travel from Project site to contractor's office

SUBTOTAL (hrs)

A-19

2-2

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 2: Participate in the In-Depth Bridge Underwater InspectionCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
HydraulicBridgeEngrInternTechClerical
EngrEngineerTOTAL
TOTAL HOURS:
APPROVED LABOR RATE:
LABOR COST:
DIRECT COSTS
ITEMQUANTITYUNIT COSTCOST
CADD use (Hour)
PC use(Hour)
TravelPer person travel expenses (two people on trip)
Printing half-size setsAirfare$ -
MailLPSMLodging$ -
SUMMARY OF FEETask 2Meals$ -
Personal car mileage (half)$ -
A. TOTAL LABOR COST:Airport parking (half)$ -
Rental Car and Fuel (half)$ -
Total per person travel$ -
B. DIRECT COSTS
TOTAL FEE A+B
* Overhead FactorN/A
TOTAL DIRECT COSTS:

A-20

3-1

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 3: Attend 70% Field ReviewCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
TASK0HydraulicBridgeEngrInternTechClericalTASK
0EngrEngineerTOTALS
Travel from contractor's office to Project site
Attend 70% Field Review
Travel from Project site to contractor's office

SUBTOTAL (hrs)

A-21
DO NOT PRINT BELOW THIS LINE
SUBTOTAL:0000000
Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here:
1. Revise plan sheets
2. Compute geometrics
3. Prepare overview sheets for NPS review
4. Prepare Special Contract Requirements
5. Prepare revised EE
6. Prepare UPA
7. Prepare Design Quantity Calculations

3-2

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 3: Attend 70% Field ReviewCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
0HydraulicBridgeEngrInternTechClerical
0EngrEngineerTOTAL
TOTAL HOURS:
AVERAGE SALARY:
DIRECT LABOR COST:
DIRECT COSTS
ITEMQUANTITYUNIT COSTCOST
CADD use (Hour)Per person travel expenses (two people on trip)
PC use(Hour)Airfare$ -
TravelLodging$ -
Meals$ -
Personal car mileage (half)$ -
SUMMARY OF FEETask 3Airport parking (half)$ -
Rental Car and Fuel (half)$ -
A. TOTAL LABOR COST:
Total per person travel$ -
B. DIRECT COSTS
TOTAL FEE A+B
* Overhead FactorN/A
TOTAL DIRECT COSTS:

A-22

4-1

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 4: Plans, Specifications, and Estimate (PS&E) ReviewsCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
TASK0HydraulicBridgeEngrInternTechClericalTASK
0EngrEngineerTOTALS
Review 70% PS&E Package
Review 95% PS&E Package

SUBTOTAL (hrs)

A-23
DO NOT PRINT BELOW THIS LINE
SUBTOTAL:0000000
Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here:
1. Revise plan sheets
2. Compute geometrics
3. Prepare overview sheets for NPS review
4. Prepare Special Contract Requirements
5. Prepare revised EE
6. Prepare UPA
7. Prepare Design Quantity Calculations

4-2

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 4: Plans, Specifications, and Estimate (PS&E) ReviewsCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
0HydraulicBridgeEngrInternTechClerical
0EngrEngineerTOTAL
TOTAL HOURS:
AVERAGE SALARY:
DIRECT LABOR COST:
DIRECT COSTS
ITEMQUANTITYUNIT COSTCOST
CADD use (Hour)
PC use(Hour)
Printing half-size sets
MailLPSM
Copies
Color CopiesSUMMARY OF FEETask 4

A. TOTAL LABOR COST:

B. DIRECT COSTS
TOTAL FEE A+B
* Overhead FactorN/A
TOTAL DIRECT COSTS:

A-24

5-1

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 5: Pricing and EstimatesCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
TASK0HydraulicBridgeEngrInternTechClericalTASK
0EngrEngineerTOTALS

Provide pricing information to design consultant

SUBTOTAL (hrs)

A-25
DO NOT PRINT BELOW THIS LINE
SUBTOTAL:0000000
Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here:
1. Revise plan sheets
2. Compute geometrics
3. Prepare overview sheets for NPS review
4. Prepare Special Contract Requirements
5. Prepare revised EE
6. Prepare UPA
7. Prepare Design Quantity Calculations

5-2

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 5: Pricing and EstimatesCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
0HydraulicBridgeEngrInternTechClerical
0EngrEngineerTOTAL
TOTAL HOURS:
AVERAGE SALARY:
DIRECT LABOR COST:
DIRECT COSTS
ITEMQUANTITYUNIT COSTCOST
CADD use (Hour)Per person travel expenses (two people on trip)
PC use(Hour)Airfare$ -
Printing half-size setsLodging$ -
MailLPSMMeals$ -
CopiesPersonal car mileage (half)$ -
Color CopiesSUMMARY OF FEETask 5Airport parking (half)$ -
TravelRental Car and Fuel (half)$ -
A. TOTAL LABOR COST:
Total per person travel$ -
B. DIRECT COSTS
TOTAL FEE A+B
* Overhead FactorN/A
TOTAL DIRECT COSTS:

A-26

6-1

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 6: Constructability ReportCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
TASK0HydraulicBridgeEngrInternTechClericalTASK
0EngrEngineerTOTALS

Prepare consructibility report

SUBTOTAL (hrs)

A-27
DO NOT PRINT BELOW THIS LINE
SUBTOTAL:0000000
Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here:
1. Revise plan sheets
2. Compute geometrics
3. Prepare overview sheets for NPS review
4. Prepare Special Contract Requirements
5. Prepare revised EE
6. Prepare UPA
7. Prepare Design Quantity Calculations

6-2

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 6: Constructability ReportCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
0HydraulicBridgeEngrInternTechClerical
0EngrEngineerTOTAL
TOTAL HOURS:
AVERAGE SALARY:
DIRECT LABOR COST:
DIRECT COSTS
ITEMQUANTITYUNIT COSTCOST
CADD use (Hour)
PC use(Hour)
Printing half-size sets
MailLPSM
Copies
Color CopiesSUMMARY OF FEETask 5

A. TOTAL LABOR COST:

B. DIRECT COSTS
TOTAL FEE A+B
* Overhead FactorN/A
TOTAL DIRECT COSTS:

A-28

7-1

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 7: Attend 95% PS&E Resolution MeetingCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
TASK0HydraulicBridgeEngrInternTechClericalTASK
0EngrEngineerTOTALS
0
Travel from contractor's office to Sterling, VA
Attend 95% PS&E Resolution meeting
Travel from Sterling, VA to contractor's office

SUBTOTAL (hrs)

A-29
DO NOT PRINT BELOW THIS LINE
SUBTOTAL:0000000
Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here:
1. Revise plan sheets
2. Compute geometrics
3. Prepare overview sheets for NPS review
4. Prepare Special Contract Requirements
5. Prepare revised EE
6. Prepare UPA
7. Prepare Design Quantity Calculations

7-2

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 7: Attend 95% PS&E Resolution MeetingCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
0HydraulicBridgeEngrInternTechClerical
0EngrEngineerTOTAL
TOTAL HOURS:
AVERAGE SALARY:
DIRECT LABOR COST:
DIRECT COSTS
ITEMQUANTITYUNIT COSTCOST
CADD use (Hour)Per person travel expenses (two people on trip)
PC use(Hour)Airfare$ -
TravelLodging$ -
Meals$ -
Personal car mileage (half)$ -
SUMMARY OF FEETask 7Airport parking (half)$ -
Rental Car and Fuel (half)$ -
A. TOTAL LABOR COST:
Total per person travel$ -
B. DIRECT COSTS
TOTAL FEE A+B
* Overhead FactorN/A
TOTAL DIRECT COSTS:

A-30

8-1

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 8: Construction ScheduleCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
TASK0HydraulicBridgeEngrInternTechClericalTASK
0EngrEngineerTOTALS

Prepare consruction schedule

SUBTOTAL (hrs)

A-31
DO NOT PRINT BELOW THIS LINE
SUBTOTAL:0000000
Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here:
1. Revise plan sheets
2. Compute geometrics
3. Prepare overview sheets for NPS review
4. Prepare Special Contract Requirements
5. Prepare revised EE
6. Prepare UPA
7. Prepare Design Quantity Calculations

8-2

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 8: Construction ScheduleCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
0HydraulicBridgeEngrInternTechClerical
0EngrEngineerTOTAL
TOTAL HOURS:
AVERAGE SALARY:
DIRECT LABOR COST:
DIRECT COSTS
ITEMQUANTITYUNIT COSTCOST
CADD use (Hour)
PC use(Hour)
Printing half-size sets
MailLPSM
Copies
Color CopiesSUMMARY OF FEETask 8

A. TOTAL LABOR COST:

B. DIRECT COSTS
TOTAL FEE A+B
* Overhead FactorN/A
TOTAL DIRECT COSTS:

A-32

9-1

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 9: Ongoing Design Support and CollaborationCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
TASK0HydraulicBridgeEngrInternTechClericalTASK
0EngrEngineerTOTALS
Respond to document review, project input, conference calls,
ongoing collaboration with the design team, etc.

SUBTOTAL (hrs)

A-33
DO NOT PRINT BELOW THIS LINE
SUBTOTAL:0000000
Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here:
1. Revise plan sheets
2. Compute geometrics
3. Prepare overview sheets for NPS review
4. Prepare Special Contract Requirements
5. Prepare revised EE
6. Prepare UPA
7. Prepare Design Quantity Calculations

9-2

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Task 9: Ongoing Design Support and CollaborationCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
0HydraulicBridgeEngrInternTechClerical
0EngrEngineerTOTAL
TOTAL HOURS:
AVERAGE SALARY:
DIRECT LABOR COST:
DIRECT COSTS
ITEMQUANTITYUNIT COSTCOST
CADD use (Hour)
PC use(Hour)
Printing half-size sets
MailLPSM
Copies
Color CopiesSUMMARY OF FEETask 9

A. TOTAL LABOR COST:

B. DIRECT COSTS
TOTAL FEE A+B
* Overhead FactorN/A
TOTAL DIRECT COSTS:

A-34

Summary

PROJECT:FOPU 10(3)CM/GC FEE ESTIMATE
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
SUMMARYCONTRACTOR ESTIMATE
PERSONNEL CATEGORIES / MANHOURS
Project ManagerSuprentendentSr.ProjectEngineerCADD
TASK0HydraulicBridgeEngrInternTechClerical
0EngrEngineerTOTALS
TOTAL HOURS TASK 1
TOTAL HOURS TASK 2
TOTAL HOURS TASK 3
TOTAL HOURS TASK 4
TOTAL HOURS TASK 5
TOTAL HOURS TASK 6
TOTAL HOURS TASK 7
TOTAL HOURS TASK 8
TOTAL HOURS TASK 9

TOTAL HOURS

Total LaborDirectTotalTask %Cumul %
ITEMCostsOverheadCostsProfitCosts
TASK 1
TASK 2
TASK 3
TASK 4
TASK 5
TASK 6
TASK 7
TASK 8
TASK 9

TOTALS:

GRAND TOTAL (rounded):

A-35

DO NOT PRINT BELOW THIS LINE
Development of PS&E must < 6% of Construction Cost therefore hours for the PS&E development are TOTALED here:
PERSONNEL CATEGORIES / MANHOURS
GM-14GM-13GS-12GS-11GS-11GS-09GS-05
PrincipalProjectTeamLeadHighwayTechnicianClerical
ManagerLeaderDesignerEngineerTOTAL
TOTAL HOURS:ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
AVERAGE SALARY:$70.47$55.92$41.60$27.78$24.74$24.74$19.21
DIRECT LABOR COST:$0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

ESTIMATED CONSTRUCTION COST: $6,000,000.00