CMGC_Hrs_Estimate_FOPU10(3).xlsx
XLSX spreadsheet 87 KB Posted
- Attached to
- Fort Pulaski National Monument: FOPU 10(3) CMGC
- Solicitation number
- DTFH71-13-R-00010
About this file
CMGC Hour Estimate - FOPU 10(3)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_001_-_PRA-FOPU_10(3)_CMGC.pdf | ||
| ADV_Offeror's_Qualifications_Form.doc | DOC document | |
| FP03_Eng_.pdf | ||
| FP03_Errata.pdf | ||
| Subcontract_plan.doc | DOC document | |
| RFP_Solicitation_-_PRA-FOPU_10(3).pdf | ||
| VETS-100A-Form-rev-2012.pdf | ||
| FOPU_10(3)_CMGC_Synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-1
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||
| Task 1: Review Project Information | CONTRACTOR ESTIMATE | ||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||
| TASK | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | TASK | ||
| Engr | Engineer | TOTALS |
| Review FHWA Bridge Inspection Report, FHWA Scoping |
| report, Preliminary plans and project photos, Draft |
| Enviromental Assessment, Tidal Water Level Elevation |
| Variations at the Bridge and Field Trip Report from the 30% |
| Design Field Review |
SUBTOTAL (hrs)
A-17
Page &P of &N
1-2
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | ||||||||||
| FEDERAL HIGHWAY ADMINISTRATION | ||||||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | ||||||||||||
| Task 1: Review Project Information | CONTRACTOR ESTIMATE | |||||||||||
| PERSONNEL CATEGORIES / MANHOURS | ||||||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | |||||||
| Hydraulic | Bridge | Engr | Intern | Tech | Clerical | |||||||
| Engr | Engineer | TOTAL | ||||||||||
| TOTAL HOURS: | ||||||||||||
| APPROVED LABOR RATE: | ||||||||||||
| LABOR COST: | ||||||||||||
| DIRECT COSTS | ||||||||||||
| ITEM | QUANTITY | UNIT COST | COST | |||||||||
| CADD use (Hour) | ||||||||||||
| PC use(Hour) | ||||||||||||
| Travel | Per person travel expenses (two people on trip) | |||||||||||
| Printing half-size sets | Airfare DEN to Norf | |||||||||||
| LPSM | Lodging | |||||||||||
| SUMMARY OF FEE | Task 1 | Meals | ||||||||||
| Personal car mileage (half) | ||||||||||||
| A. TOTAL LABOR COST: | Airport parking at DEN (half) | |||||||||||
| Rental Car and Fuel (half) |
| Total per person travel | $ - | |
| B. DIRECT COSTS | ||
| TOTAL FEE A+B |
| * Overhead Factor | N/A | |
| TOTAL DIRECT COSTS: |
A-18
2-1
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||
| Task 2: Participate in the In-Depth Bridge Underwater Inspection | CONTRACTOR ESTIMATE | ||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||
| TASK | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | TASK | ||
| Engr | Engineer | TOTALS |
| Travel from contractor's office to Project site |
| Participate in the underwater inspection |
| Travel from Project site to contractor's office |
SUBTOTAL (hrs)
A-19
2-2
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||||||
| Task 2: Participate in the In-Depth Bridge Underwater Inspection | CONTRACTOR ESTIMATE | ||||||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||||||
| Hydraulic | Bridge | Engr | Intern | Tech | Clerical | ||||||||
| Engr | Engineer | TOTAL | |||||||||||
| TOTAL HOURS: | |||||||||||||
| APPROVED LABOR RATE: | |||||||||||||
| LABOR COST: | |||||||||||||
| DIRECT COSTS | |||||||||||||
| ITEM | QUANTITY | UNIT COST | COST | ||||||||||
| CADD use (Hour) | |||||||||||||
| PC use(Hour) | |||||||||||||
| Travel | Per person travel expenses (two people on trip) | ||||||||||||
| Printing half-size sets | Airfare | $ - | |||||||||||
| LPSM | Lodging | $ - | |||||||||||
| SUMMARY OF FEE | Task 2 | Meals | $ - | ||||||||||
| Personal car mileage (half) | $ - | ||||||||||||
| A. TOTAL LABOR COST: | Airport parking (half) | $ - | |||||||||||
| Rental Car and Fuel (half) | $ - |
| Total per person travel | $ - | |
| B. DIRECT COSTS | ||
| TOTAL FEE A+B |
| * Overhead Factor | N/A | |
| TOTAL DIRECT COSTS: |
A-20
3-1
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||
| Task 3: Attend 70% Field Review | CONTRACTOR ESTIMATE | ||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||
| TASK | 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | TASK | |
| 0 | Engr | Engineer | TOTALS |
| Travel from contractor's office to Project site |
| Attend 70% Field Review |
| Travel from Project site to contractor's office |
SUBTOTAL (hrs)
| A-21 | ||||||||
| DO NOT PRINT BELOW THIS LINE | ||||||||
| SUBTOTAL: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here: | ||||||||
| 1. Revise plan sheets | ||||||||
| 2. Compute geometrics | ||||||||
| 3. Prepare overview sheets for NPS review | ||||||||
| 4. Prepare Special Contract Requirements | ||||||||
| 5. Prepare revised EE | ||||||||
| 6. Prepare UPA | ||||||||
| 7. Prepare Design Quantity Calculations |
3-2
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||||||
| Task 3: Attend 70% Field Review | CONTRACTOR ESTIMATE | ||||||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||||||
| 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | |||||||
| 0 | Engr | Engineer | TOTAL | ||||||||||
| TOTAL HOURS: | |||||||||||||
| AVERAGE SALARY: | |||||||||||||
| DIRECT LABOR COST: | |||||||||||||
| DIRECT COSTS | |||||||||||||
| ITEM | QUANTITY | UNIT COST | COST | ||||||||||
| CADD use (Hour) | Per person travel expenses (two people on trip) | ||||||||||||
| PC use(Hour) | Airfare | $ - | |||||||||||
| Travel | Lodging | $ - | |||||||||||
| Meals | $ - | ||||||||||||
| Personal car mileage (half) | $ - | ||||||||||||
| SUMMARY OF FEE | Task 3 | Airport parking (half) | $ - | ||||||||||
| Rental Car and Fuel (half) | $ - | ||||||||||||
| A. TOTAL LABOR COST: | |||||||||||||
| Total per person travel | $ - |
| B. DIRECT COSTS |
| TOTAL FEE A+B |
| * Overhead Factor | N/A | |
| TOTAL DIRECT COSTS: |
A-22
4-1
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||
| Task 4: Plans, Specifications, and Estimate (PS&E) Reviews | CONTRACTOR ESTIMATE | ||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||
| TASK | 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | TASK | |
| 0 | Engr | Engineer | TOTALS |
| Review 70% PS&E Package |
| Review 95% PS&E Package |
SUBTOTAL (hrs)
| A-23 | ||||||||
| DO NOT PRINT BELOW THIS LINE | ||||||||
| SUBTOTAL: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here: | ||||||||
| 1. Revise plan sheets | ||||||||
| 2. Compute geometrics | ||||||||
| 3. Prepare overview sheets for NPS review | ||||||||
| 4. Prepare Special Contract Requirements | ||||||||
| 5. Prepare revised EE | ||||||||
| 6. Prepare UPA | ||||||||
| 7. Prepare Design Quantity Calculations |
4-2
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||||
| Task 4: Plans, Specifications, and Estimate (PS&E) Reviews | CONTRACTOR ESTIMATE | ||||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||||
| 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | |||||
| 0 | Engr | Engineer | TOTAL | ||||||||
| TOTAL HOURS: | |||||||||||
| AVERAGE SALARY: | |||||||||||
| DIRECT LABOR COST: | |||||||||||
| DIRECT COSTS | |||||||||||
| ITEM | QUANTITY | UNIT COST | COST | ||||||||
| CADD use (Hour) | |||||||||||
| PC use(Hour) | |||||||||||
| Printing half-size sets | |||||||||||
| LPSM | |||||||||||
| Copies | |||||||||||
| Color Copies | SUMMARY OF FEE | Task 4 |
A. TOTAL LABOR COST:
| B. DIRECT COSTS |
| TOTAL FEE A+B |
| * Overhead Factor | N/A | |
| TOTAL DIRECT COSTS: |
A-24
5-1
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||
| Task 5: Pricing and Estimates | CONTRACTOR ESTIMATE | ||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||
| TASK | 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | TASK | |
| 0 | Engr | Engineer | TOTALS |
Provide pricing information to design consultant
SUBTOTAL (hrs)
| A-25 | ||||||||
| DO NOT PRINT BELOW THIS LINE | ||||||||
| SUBTOTAL: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here: | ||||||||
| 1. Revise plan sheets | ||||||||
| 2. Compute geometrics | ||||||||
| 3. Prepare overview sheets for NPS review | ||||||||
| 4. Prepare Special Contract Requirements | ||||||||
| 5. Prepare revised EE | ||||||||
| 6. Prepare UPA | ||||||||
| 7. Prepare Design Quantity Calculations |
5-2
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||||||
| Task 5: Pricing and Estimates | CONTRACTOR ESTIMATE | ||||||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||||||
| 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | |||||||
| 0 | Engr | Engineer | TOTAL | ||||||||||
| TOTAL HOURS: | |||||||||||||
| AVERAGE SALARY: | |||||||||||||
| DIRECT LABOR COST: | |||||||||||||
| DIRECT COSTS | |||||||||||||
| ITEM | QUANTITY | UNIT COST | COST | ||||||||||
| CADD use (Hour) | Per person travel expenses (two people on trip) | ||||||||||||
| PC use(Hour) | Airfare | $ - | |||||||||||
| Printing half-size sets | Lodging | $ - | |||||||||||
| LPSM | Meals | $ - | |||||||||||
| Copies | Personal car mileage (half) | $ - | |||||||||||
| Color Copies | SUMMARY OF FEE | Task 5 | Airport parking (half) | $ - | |||||||||
| Travel | Rental Car and Fuel (half) | $ - | |||||||||||
| A. TOTAL LABOR COST: | |||||||||||||
| Total per person travel | $ - |
| B. DIRECT COSTS |
| TOTAL FEE A+B |
| * Overhead Factor | N/A | |
| TOTAL DIRECT COSTS: |
A-26
6-1
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||
| Task 6: Constructability Report | CONTRACTOR ESTIMATE | ||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||
| TASK | 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | TASK | |
| 0 | Engr | Engineer | TOTALS |
Prepare consructibility report
SUBTOTAL (hrs)
| A-27 | ||||||||
| DO NOT PRINT BELOW THIS LINE | ||||||||
| SUBTOTAL: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here: | ||||||||
| 1. Revise plan sheets | ||||||||
| 2. Compute geometrics | ||||||||
| 3. Prepare overview sheets for NPS review | ||||||||
| 4. Prepare Special Contract Requirements | ||||||||
| 5. Prepare revised EE | ||||||||
| 6. Prepare UPA | ||||||||
| 7. Prepare Design Quantity Calculations |
6-2
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||||
| Task 6: Constructability Report | CONTRACTOR ESTIMATE | ||||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||||
| 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | |||||
| 0 | Engr | Engineer | TOTAL | ||||||||
| TOTAL HOURS: | |||||||||||
| AVERAGE SALARY: | |||||||||||
| DIRECT LABOR COST: | |||||||||||
| DIRECT COSTS | |||||||||||
| ITEM | QUANTITY | UNIT COST | COST | ||||||||
| CADD use (Hour) | |||||||||||
| PC use(Hour) | |||||||||||
| Printing half-size sets | |||||||||||
| LPSM | |||||||||||
| Copies | |||||||||||
| Color Copies | SUMMARY OF FEE | Task 5 |
A. TOTAL LABOR COST:
| B. DIRECT COSTS |
| TOTAL FEE A+B |
| * Overhead Factor | N/A | |
| TOTAL DIRECT COSTS: |
A-28
7-1
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||
| Task 7: Attend 95% PS&E Resolution Meeting | CONTRACTOR ESTIMATE | ||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||
| TASK | 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | TASK | |
| 0 | Engr | Engineer | TOTALS | ||||||
| 0 | |||||||||
| Travel from contractor's office to Sterling, VA | |||||||||
| Attend 95% PS&E Resolution meeting | |||||||||
| Travel from Sterling, VA to contractor's office |
SUBTOTAL (hrs)
| A-29 | ||||||||
| DO NOT PRINT BELOW THIS LINE | ||||||||
| SUBTOTAL: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here: | ||||||||
| 1. Revise plan sheets | ||||||||
| 2. Compute geometrics | ||||||||
| 3. Prepare overview sheets for NPS review | ||||||||
| 4. Prepare Special Contract Requirements | ||||||||
| 5. Prepare revised EE | ||||||||
| 6. Prepare UPA | ||||||||
| 7. Prepare Design Quantity Calculations |
7-2
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||||||
| Task 7: Attend 95% PS&E Resolution Meeting | CONTRACTOR ESTIMATE | ||||||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||||||
| 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | |||||||
| 0 | Engr | Engineer | TOTAL | ||||||||||
| TOTAL HOURS: | |||||||||||||
| AVERAGE SALARY: | |||||||||||||
| DIRECT LABOR COST: | |||||||||||||
| DIRECT COSTS | |||||||||||||
| ITEM | QUANTITY | UNIT COST | COST | ||||||||||
| CADD use (Hour) | Per person travel expenses (two people on trip) | ||||||||||||
| PC use(Hour) | Airfare | $ - | |||||||||||
| Travel | Lodging | $ - | |||||||||||
| Meals | $ - | ||||||||||||
| Personal car mileage (half) | $ - | ||||||||||||
| SUMMARY OF FEE | Task 7 | Airport parking (half) | $ - | ||||||||||
| Rental Car and Fuel (half) | $ - | ||||||||||||
| A. TOTAL LABOR COST: | |||||||||||||
| Total per person travel | $ - |
| B. DIRECT COSTS |
| TOTAL FEE A+B |
| * Overhead Factor | N/A | |
| TOTAL DIRECT COSTS: |
A-30
8-1
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||
| Task 8: Construction Schedule | CONTRACTOR ESTIMATE | ||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||
| TASK | 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | TASK | |
| 0 | Engr | Engineer | TOTALS |
Prepare consruction schedule
SUBTOTAL (hrs)
| A-31 | ||||||||
| DO NOT PRINT BELOW THIS LINE | ||||||||
| SUBTOTAL: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here: | ||||||||
| 1. Revise plan sheets | ||||||||
| 2. Compute geometrics | ||||||||
| 3. Prepare overview sheets for NPS review | ||||||||
| 4. Prepare Special Contract Requirements | ||||||||
| 5. Prepare revised EE | ||||||||
| 6. Prepare UPA | ||||||||
| 7. Prepare Design Quantity Calculations |
8-2
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||||
| Task 8: Construction Schedule | CONTRACTOR ESTIMATE | ||||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||||
| 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | |||||
| 0 | Engr | Engineer | TOTAL | ||||||||
| TOTAL HOURS: | |||||||||||
| AVERAGE SALARY: | |||||||||||
| DIRECT LABOR COST: | |||||||||||
| DIRECT COSTS | |||||||||||
| ITEM | QUANTITY | UNIT COST | COST | ||||||||
| CADD use (Hour) | |||||||||||
| PC use(Hour) | |||||||||||
| Printing half-size sets | |||||||||||
| LPSM | |||||||||||
| Copies | |||||||||||
| Color Copies | SUMMARY OF FEE | Task 8 |
A. TOTAL LABOR COST:
| B. DIRECT COSTS |
| TOTAL FEE A+B |
| * Overhead Factor | N/A | |
| TOTAL DIRECT COSTS: |
A-32
9-1
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||
| Task 9: Ongoing Design Support and Collaboration | CONTRACTOR ESTIMATE | ||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||
| TASK | 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | TASK | |
| 0 | Engr | Engineer | TOTALS |
| Respond to document review, project input, conference calls, |
| ongoing collaboration with the design team, etc. |
SUBTOTAL (hrs)
| A-33 | ||||||||
| DO NOT PRINT BELOW THIS LINE | ||||||||
| SUBTOTAL: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Development of PS&E must < 6% of Construction Cost therefore hours for the following tasks are subtotaled here: | ||||||||
| 1. Revise plan sheets | ||||||||
| 2. Compute geometrics | ||||||||
| 3. Prepare overview sheets for NPS review | ||||||||
| 4. Prepare Special Contract Requirements | ||||||||
| 5. Prepare revised EE | ||||||||
| 6. Prepare UPA | ||||||||
| 7. Prepare Design Quantity Calculations |
9-2
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||||
| Task 9: Ongoing Design Support and Collaboration | CONTRACTOR ESTIMATE | ||||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||||
| 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | |||||
| 0 | Engr | Engineer | TOTAL | ||||||||
| TOTAL HOURS: | |||||||||||
| AVERAGE SALARY: | |||||||||||
| DIRECT LABOR COST: | |||||||||||
| DIRECT COSTS | |||||||||||
| ITEM | QUANTITY | UNIT COST | COST | ||||||||
| CADD use (Hour) | |||||||||||
| PC use(Hour) | |||||||||||
| Printing half-size sets | |||||||||||
| LPSM | |||||||||||
| Copies | |||||||||||
| Color Copies | SUMMARY OF FEE | Task 9 |
A. TOTAL LABOR COST:
| B. DIRECT COSTS |
| TOTAL FEE A+B |
| * Overhead Factor | N/A | |
| TOTAL DIRECT COSTS: |
A-34
Summary
| PROJECT: | FOPU 10(3) | CM/GC FEE ESTIMATE | |||||||
| FEDERAL HIGHWAY ADMINISTRATION | |||||||||
| EASTERN FEDERAL LANDS HIGHWAY DIVISION | |||||||||
| SUMMARY | CONTRACTOR ESTIMATE | ||||||||
| PERSONNEL CATEGORIES / MANHOURS | |||||||||
| Project Manager | Suprentendent | Sr. | Project | Engineer | CADD | ||||
| TASK | 0 | Hydraulic | Bridge | Engr | Intern | Tech | Clerical | ||
| 0 | Engr | Engineer | TOTALS | ||||||
| TOTAL HOURS TASK 1 | |||||||||
| TOTAL HOURS TASK 2 | |||||||||
| TOTAL HOURS TASK 3 | |||||||||
| TOTAL HOURS TASK 4 | |||||||||
| TOTAL HOURS TASK 5 | |||||||||
| TOTAL HOURS TASK 6 | |||||||||
| TOTAL HOURS TASK 7 | |||||||||
| TOTAL HOURS TASK 8 | |||||||||
| TOTAL HOURS TASK 9 |
TOTAL HOURS
| Total Labor | Direct | Total | Task % | Cumul % | |||
| ITEM | Costs | Overhead | Costs | Profit | Costs |
| TASK 1 |
| TASK 2 |
| TASK 3 |
| TASK 4 |
| TASK 5 |
| TASK 6 |
| TASK 7 |
| TASK 8 |
| TASK 9 |
TOTALS:
GRAND TOTAL (rounded):
A-35
| DO NOT PRINT BELOW THIS LINE |
| Development of PS&E must < 6% of Construction Cost therefore hours for the PS&E development are TOTALED here: |
| PERSONNEL CATEGORIES / MANHOURS | ||||||||
| GM-14 | GM-13 | GS-12 | GS-11 | GS-11 | GS-09 | GS-05 | ||
| Principal | Project | Team | Lead | Highway | Technician | Clerical | ||
| Manager | Leader | Designer | Engineer | TOTAL | ||||
| TOTAL HOURS: | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ||
| AVERAGE SALARY: | $70.47 | $55.92 | $41.60 | $27.78 | $24.74 | $24.74 | $19.21 | |
| DIRECT LABOR COST: | $0.00 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
ESTIMATED CONSTRUCTION COST: $6,000,000.00
| Development of PS&E as a percentage of Construction Cost: | ERROR:#REF! |
| ERROR:#REF! |