Report_DSR_STIS_004_Multi_Use_Trail.pdf

PDF 402 KB Posted

Attached to
Gateway National Recreation Area - Staten Island Unit; NY ERFO GATE STIS 2013-1(2)
Solicitation number
DTFH71-13-B-00026
Issued by

About this file

Report_DSR_STIS 004_Multi Use Trail

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bonnie.Dubose Text Box

PMIS# 197287

Sheet No: 1 of 5

DSR No:

Disaster No:

Latitude:

Longitude:

Mile Post:

Maint. Level:

Type: Traveled Way Width: 8 Surface Type: Concrete Thickness: ADT:

ID#: Shoulder Width: Surface Type: Thickness:

Inspection Date:

Unit Unit Price

Unit Unit Price

Scope/Description of Repair: Reconstruct 850 lf of 8' wide concrete multi use trail.

$0

$0

$0

$0

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT STIS-004

(Title 23, Federal-Aid System/Federal Domain)

Road Number: Adjacent to Route 30 (Buffalo Road)

NY 2013-1-NPS

COST ESTIMATE for EMERGENCY REPAIRS* Quantity Item Description Cost

12/5/2012

Classification:Road Data:Bridge Data:

Applicant: Gateway National Recreation Area County: Richmond

-74° 07' 35"

40° 32' 30"

Agency: National Park Service State: New York

Description and Cause of Damage: Approximately 850 lf of multi use trail has been damaged by heavy equipment removing sand and debris deposited in area due to high water inundation during Hurricane Sandy.

$0

$0

$0

Proposed: Force Account Contract Total Emergency Repairs $0

COST ESTIMATE for PERMANENT REPAIRS* Quantity Item Description Cost

Road Name: Great Kills Multi Use Trail Approximately 1.2

LPSM $

LPSM $

LPSM $

SQYD $

SQYD $

SQYD $

LF $

Eligible Ineligible

Eligible Ineligible

1 Mobilization

1 Temporary Traffic Control 0

756 Roadway Reconditioning

756 Place Concrete

1 Survey & Staking

756 Removal of Concrete

$0

$0

1000 Erosion & Sedimentation Control

$0

*Attach Supplemental Sheets if necessary

Signature: Date:

Reviewed By: (Name and Title) Signature: Date:

Identify Betterment, if any, and provide justification*

Submitted By: (Name and Title)

Preliminary Engineering

Construction Engineering

Right-of-Way $0

Other

TOTAL ESTIMATED COST

(Emergency and Permanent Repairs)

Subtotal Permanent Repairs (continuation sheet) $0

Recommended By: J Eric Wright, EFL ERFO Coordinator Signature: Date:

Proposed: Force Account Contract Total Permanent Repairs

$0

$0

$0

$0

$0

$0

Sheet No: 2 of 5

Disaster No:

County: Richmond

Mile Post:Road Number: Adjacent to Route 30 (Buffalo Road)

Applicant: Gateway National Recreation Area

Approximately 1.2

State: New York

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) STIS-004

(Title 23, Federal-Aid System/Federal Domain) NY 2013-1-NPS

Storm cleanup operation and missing section of trail

Typical broken section of concrete path

Sheet No: 3 of 5

Disaster No:

County: Richmond

Mile Post:Road Number: Adjacent to Route 30 (Buffalo Road) Approximately 1.2

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) STIS-004

(Title 23, Federal-Aid System/Federal Domain) NY 2013-1-NPS

Applicant: Gateway National Recreation Area State: New York

Area of Multi Use Trail to be Reconstructed

Sheet No: 5 of 5

Disaster No:

County: Richmond

Mile Post:Road Number: Adjacent to Route 30 (Buffalo Road) Approximately 1.2

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) STIS-004

(Title 23, Federal-Aid System/Federal Domain) NY 2013-1-NPS

Applicant: Gateway National Recreation Area State: New York

Multi Use Trail shown in Blue

File details come from the government source that posted it. Updated .