Plans - Pages 157 - 309.pdf

PDF 35 MB Posted

Attached to
I-95 Ramp at the Fort Belvoir North Area
Solicitation number
DTFH71-12-B-00015
Issued by

About this file

Plans - Pages 157 - 309

View the file

Other files

File Type Posted
Amendment 001 - AAD-VA 95(1).pdf PDF
FP03_Eng .pdf PDF
FP03 Errata.pdf PDF
Subcontracting plan form.doc DOC document
IFB Solicitation - AAD-VA 95(1).pdf PDF
Cert - Bridge Temp Works —
Report2_Drainage.pdf PDF
Plans - Pages 1 - 156.pdf PDF
Report3_Bridge Hydraulics.pdf PDF
ADV_Bidder's Qualifications Form.doc DOC document
VETS-100A Form rev 2011.pdf PDF
Report4_Traffic Management.pdf PDF
Report1_Subsurface Investigation Report.pdf PDF
Synopsis - AAD-VA 95(1).doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JIN O JIN

2012.03.07 11:37:46 -05'00'

2012.03.07 11:38:02 -05'00'

2012.03.07 11:38:19 -05'00'

2012.03.07 11:38:33 -05'00'

N

W

E

S

0 50 100

SCALE IN FEET

09BH-09

EL. 217.2

NOTES

1. BASE MAP BASED ON ELECTRONIC DRAWING ENTITLED "HOR_I95DAR_01.DGN" PREPARED BY PARSONS TRANSPORTATION GROUP

PROFESSIONAL OF WASHINGTON D.C., AS PROVIDED ON 10 FEBRUARY 2009.

2. LOCATIONS OF SUBSURFACE EXPLORATIONS WERE DETERMINED BY HALEY & ALDRICH USING A TRIMBLE GEOXT GPS. GROUND SURFACE ELEVATIONS WERE INTERPOLATED BY HALEY & ALDRICH FROM THE TOPOGRAPHIC BASE MAP.

3. ELEVATIONS SHOWN ARE BASED ON NAVD 1988 (CONUS) VERTICAL DATUM.

4. TEST BORINGS 09BH-01 THROUGH 09BH-14 WERE DRILLED BETWEEN 1 APRIL AND 28 APRIL 2009. TESTS BORINGS 09BH-6A, 09BH-11A, 09BH-13A AND 09BH-15 WERE DRILLED DURING THE PERIOD OF 21 DECEMBER THROUGH 29 DECEMBER 2009. CONE PENETRATION TESTS 09CP-01 AND 09CP-02 WERE ALSO PERFORMED ON 21 DECEMBER 2009. TEST BORING 09BH-12 WAS ELIMINATED FROM THE

PROPOSED EXPLORATION DUE TO ACCESSIBILITY ISSUES.

5. BORINGS HOV-1 THROUGH HOV-3 WERE DRILLED BY FROEHLING AND ROBERTSON, INC. IN OCTOBER 2008. THE LOCATION OF THESE TEST BORINGS WERE TRANSPOSED FROM THE DRAWING ENTITLED "BORING LOCATION PLAN", DATED 1 JANUARY 2009, WHICH IS INCLUDED IN THE APPENDIX B OF THIS REPORT. LOGS OF THESE BORINGS ARE ALSO INCLUDED IN APPENDIX B.

6. BORINGS B661-2 THROUGH B661-5 WERE DRILLED IN 1990 FOR THE DESIGN OF THE EXISTING HOV RAMP. THE LOCATION OF THESE TEST BORINGS WERE TRANSPOSED FROM THE DRAWING ENTITLED "PROPOSED BRIDGE. RAMP H-N OVER RTE. 95 NBL" DATED MAY 1990, WHICH IS INCLUDED IN APPENDIX B OF THIS REPORT. LOGS OF THESE TEST BORINGS ARE ALSO INCLUDED IN APPENDIX B.

LEGEND

APPROXIMATE LOCATION, DESIGNATION, AND GROUND SURFACE ELEVATION OF

CONE PENETRATION TESTS PERFORMED BY IN-SITU TESTING, L.C. OF LANDCASTER,

VA ON 21 DECEMBER 2009.

09BH-08

EL. 216.9

APPROXIMATE LOCATION, DESIGNATION, AND GROUND SURFACE ELEVATION OF

TEST BORINGS PERFORMED BY GEOSERVICES CORP. OF FORESTVILLE, MD

BETWEEN 1 AND 28 APRIL, AND BETWEEN 21 AND 29 DECEMBER 2009.

APPROXIMATE LOCATION, DESIGNATION, AND GROUND SURFACE ELEVATION OF TEST

BORINGS PERFORMED BY GEOSERVICES CORP. OF FORESVILLE, MD ON 22 AND 28 APRIL

2009 FOR THE PURPOSE OF RETRIEVING A TYPE U SAMPLE. THESE BORINGS WERE

OFFSET APPROXIMATELY 3 FT FROM THE ADJACENT TEST BORINGS 09BH-08 AND 09BH-05.

09CP-01

APPROXIMATE LOCATION AND DESIGNATION, OF TEST BORINGS PERFORMED IN

1990 FOR THE DESIGN OF THE EXISTING HOV RAMP.

B661-3

I-95 RAMP FROM FBNA

G :\3

F H

W A

\0

\D R

A W

IN

G

S \3

-0

_0

B _B

LP

F

IG

-1

.D

W G

EXPLORATION LOCATION PLAN

N

E

S

0 50 100

SCALE IN FEET

09BH-14

EL. 191.0

NOTES

1. BASE MAP BASED ON ELECTRONIC DRAWING ENTITLED "HOR_I95DAR_01.DGN" PREPARED BY PARSONS TRANSPORTATION GROUP

PROFESSIONAL OF WASHINGTON D.C., AS PROVIDED ON 10 FEBRUARY 2009.

2. LOCATIONS OF SUBSURFACE EXPLORATIONS WERE DETERMINED BY HALEY & ALDRICH USING A TRIMBLE GEOXT GPS. GROUND SURFACE ELEVATIONS WERE INTERPOLATED BY HALEY & ALDRICH FROM THE TOPOGRAPHIC BASE MAP.

3. ELEVATIONS SHOWN ARE BASED ON NAVD 1988 (CONUS) VERTICAL DATUM.

4. TEST BORINGS 09BH-01 THROUGH 09BH-14 WERE DRILLED BETWEEN 1 APRIL AND 28 APRIL 2009. TESTS BORINGS 09BH-6A, 09BH-11A, 09BH-13A AND 09BH-15 WERE DRILLED DURING THE PERIOD OF 21 DECEMBER THROUGH 29 DECEMBER 2009. CONE PENETRATION TESTS 09CP-01 AND 09CP-02 WERE ALSO PERFORMED ON 21 DECEMBER 2009. TEST BORING 09BH-12 WAS ELIMINATED FROM THE

PROPOSED EXPLORATION DUE TO ACCESSIBILITY ISSUES.

5. BORINGS HOV-1 THROUGH HOV-3 WERE DRILLED BY FROEHLING AND ROBERTSON, INC. IN OCTOBER 2008. THE LOCATION OF THESE TEST BORINGS WERE TRANSPOSED FROM THE DRAWING ENTITLED "BORING LOCATION PLAN", DATED 1 JANUARY 2009, WHICH IS INCLUDED IN THE APPENDIX B OF THIS REPORT. LOGS OF THESE BORINGS ARE ALSO INCLUDED IN APPENDIX B.

6. BORINGS B661-2 THROUGH B661-5 WERE DRILLED IN 1990 FOR THE DESIGN OF THE EXISTING HOV RAMP. THE LOCATION OF THESE TEST BORINGS WERE TRANSPOSED FROM THE DRAWING ENTITLED "PROPOSED BRIDGE. RAMP H-N OVER RTE. 95 NBL" DATED MAY 1990, WHICH IS INCLUDED IN APPENDIX B OF THIS REPORT. LOGS OF THESE TEST BORINGS ARE ALSO INCLUDED IN APPENDIX B.

LEGEND

APPROXIMATE LOCATION, DESIGNATION, AND GROUND SURFACE ELEVATION OF

CONE PENETRATION TESTS PERFORMED BY IN-SITU TESTING, L.C. OF LANDCASTER,

VA ON 21 DECEMBER 2009.

APPROXIMATE LOCATION, DESIGNATION, AND GROUND SURFACE ELEVATION OF

TEST BORINGS PERFORMED BY GEOSERVICES CORP. OF FORESTVILLE, MD

BETWEEN 1 AND 28 APRIL, AND BETWEEN 21 AND 29 DECEMBER 2009.

09CP-02

APPROXIMATE LOCATION AND DESIGNATION, OF TEST BORINGS PERFORMED BY

FROEHLING AND ROBERTSON, INC. IN OCTOBER 2008.

HOV-3

I-95 RAMP FROM FBNA

G :\3

F H

W A

\0

\D R

A W

IN

G

S \3

-0

_0

B _B

LP

F

IG

-1

.D

W

EXPLORATION LOCATION PLAN

I-95 RAMP FROM FBNA

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

ENGINEERING GEOLOGY

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

G :\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

CPT LOGS

:\3

F H

W A

\0

\D R

A W

IN

G

S \3

_0

-0

9- B

O R

E L

O G

S .D

W

CPT LOGS

S01

Index & Summary Sheet-1

INDEX TO STANDARD AND SPECIFIC DETAILS SHEETS

Sheet

No.

VDOT St’d Detail

VDOT St’d

Section/ Page Description

S01 Index & Summary Sheet-1

S02 Index & Summary Sheet-2

S03 PF-2 & PP-1 1302.30 & 107.23 Pedestal Pole and Foundation & Detail for Backfilling Abandoned Culverts

S04 EW-1, 1A, & EW-1, 1APC 101.01 & 101.02 Standard Endwall For Pipe Culverts & Precast Endwall For Pipe Culverts

S05 EW-12&ES-1 101.32 & 102.01 Standard Endwall for Pipe Underdrain & Flared End Section

S06 ES-3 103.01 & 103.02 Precast Unit Assembly Diagram & General Notes - Precast

S07 T-DI-1 & T-DI-2 103.03 & 103.04 Standard Precast Top Units

S08 T-MH-2 & R-1,2,3 103.09 & 103.10 Standard Precast Manhole Top Units & Standard Precast Reducer and Riser Units

S09 B-1, B-2 & B-3 103.11 & 103.12 Standard Precast Base Units

S10 DI-2A, 2B, 2C 104.03 &104.04 Standard Curb Drop Inlet

S11 DI-12,12A 104.30 & 104.31 Multigrate Drop Inlet

S12 DI-12,12A & MH-1 104.32 &106.01 Multigrate Drop Inlet & Manhole for 12" to 48" Pipe Culverts

S13 MH-1 106.02 & 106.03 Standard Manhole Frame and Cover

S14 MH-1 106.04 & 106.05 Standard Manhole Frame and Cover

S15 MH-1A & MH-2 106.06 & 106.07 Standard Manhole Frame and Cover & Precast Manhole

S16 IS-1 & ST-1 106.08 & 106.09 Standard Method of Shaping Manhole And Inlet Inverts & Standard Step

S17 SL-1 & DSB-1 106.14 & 106.15 Typical Concrete Safety Slab & Drainage Structure Bedding For DI, MH, And JB

S18 PB-1 107.00 & 107.01 Installation of Pipe Culverts and Storm Sewers - General Notes & Circ. Pipe Bedding And Backfill - Method "A"

S19 PC-1 & CD-1 107.05 & 108.04 Concrete Pipe Height of Cover Table For H-20 Live Load & Standard Combination Underdrain

S20 CD-2 & UD-4 108.05 & 108.06 Standard Combination Underdrain & Standard Pavement Edgedrain

S21 UD-4 & PG-3 108.07 & 109.02 Standard Pavement Edgedrain & Standard Rip Rap Ditch and Slope Protection PG-3

S22 EC-1 & EC-3 113.01 & 113.04 Culvert Outlet Protection & Soil Stabilization Mat Culvert Outlet Protection Installation

S23 EC-3 & EC-4 113.05 & 113.06 Soil Stabilization Mat-Slope Installation Type C & Rock Check Dams Type I & II

S24 EC-5 113.07 & 113.08 Temporary Silt Barriers

S25 EC-6 113.09 & 113.10 Inlet Protection (Type A and B) & Inlet Protection (Type C)

S26 EC-7 & EC-9 113.11 & 113.13 Typical Sediment Trap & Temporary Diversion Dike

S27 EC -11 & EC-14 113.15 & 113.18 Stabilized construction Entrance & Temporary Berm And slope Drian

S28 CG-3 & CG-6 201.02 & 201.03 Standard 4" Curb & Combination 6" Curb And Gutter

S29 CG-7 & WP-2 201.04 & 303.02 Combination 4" Curb And Gutter & Pavement Widening

S30 GR-HDW 501.01 & 501.02 Standard Guardrail Hardware & W-Beam Guardrail Hardware

S31 GR-2, 2A 501.04 & 501.05 Standard Blocked-out W-Beam Guardrail

S32 GR-FOA-2 501.28 & 501.29 W-Beam Guardrail-Fixed Object Attachment

S33 GR-FOA-2 &4 & GR-INS 501.30 & 501.36 W-Beam Guardrail-Fixed Object Attachment & W-Beam Guardrail Installation Criteria

S34 GR-INS & MB-7D, 7E, 7F 501.39 & 502.04 W-Beam Guardrail Installation Criteria & Concrete Median Barrier

S35 MB-11A 502.13 & 502.14 Traffic Barrier Service Concrete Parapet

S36 MB-11A & MB-INS 502.15 & 502.20 Traffic Barrier Service Concrete Parapet & Precast Concrete Median Barrier

S37 MB-INS 502.21 & 502.22 Precast Concrete Median Barrier

S38 MB-INS 502.23 & 502.24 Butting traffic Barrier Service to Single Face Parapet Service

S39 FE-CL 503.01 & 503.04 Standard Fence

S40 FE-G & FE-4 503.05 & 503.06 Standard Fence Gates & Water Gates in Fence Lines

S41 FE-6 & RM-2 503.07 & 504.02 Standard Method of Fence And Handrail Grounding & Standard Plan And Method of Setting R/W Monuments

S42 SP-1 & CF-2 601.07 & 1301.20 Settlement Plate & Control Center Cabinet Foundation

S43 LF-1 & LP-1, 2 1310.20 & 1311.10 Lighting Pole Foundation & Lighting Pole

/7

/2

:0

:0

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

T

O C

.D G

N

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

By Resolution of Commonwealth Transportation Board dated July 14, 2010.LIMITED ACCESS HIGHWAY

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

FHWA PROJECT VDOT PROJECT

0095-029-888, RW201

S02

INDEX TO STANDARD AND SPECIFIC DETAILS SHEETS

Index & Summary Sheet-2

Sheet

No.

VDOT St’d Detail

VDOT St’d

Section/ Page Description

S44 SE-9 & CCW-1 1312.91 & 1314.10 Electrical Service & Control Center Wiring

S45 JB-S1, S2, S3 & ECI-1 1317.20 & 1318.10 Junctioin Box & Electrical Conduit and Conductor Cable

S46 WSP-1 1320.10 & 1320.11 Wood Post Sign Structures

S47 WSP-1 & STP-1 1320.12 & 1321.10 Wood Post Sign Structures & Square Tube Post

S48 STP-1 1321.11 & 1321.12 Square Tube Sign Post

S49 SSP-VA 1322.10 & 1322.11 VA Sign Structure

S50 SSP-VA 1322.12 & 1322.13 VA Sign Structure

S51 SSP-VIA 1323.10 & 1323.11 Interstate Sign Structure

S52 SSP-VIA 1323.12 & 1323.13 Interstate Sign Structure

S53 SSP-VIA 1323.14 & 1323.15 Interstate Sign Structure

S54 SSP-VIA 1323.16 & 1323.17 Interstate Sign Structure

S55 SSP-VIA 1323.18 & 1323.19 Interstate Sign Structure

S56 OSS-1 1324.10 & 1324.11 Overhead Sign Structure

S57 OSS-1 1324.12 & 1324.13 Overhead Sign Structure

S58 OSS-1 1324.14 & 1324.15 Overhead Sign Structure

S59 OSS-1 & SPD-1 1324.16 & 1325.10 Overhead Sign Structure & Sign Panel Design

S60 SPD-1 & SPD-1 1325.11 & 1325.10 Sign Panel Design

S61 SPD-7 1325.71 & 1325.72 Sign Panel Design

S62 PRS-1 1326.10 & 1325.11 Punching Requirements For Sign Panels

S63 ED-3 & PM-1 1327.20 & 1330.10 Interstate Road Edge Delineators & Typical Pavement Marking Interchange

S64 PM-2 & UB-1 1330.20 & 1401.01 Typical Pavement Marking Limited Access Lane Drop & Utility Bedding and Protection

S65 DPW-14 & SMH-1 FFXCO-PFM & 1411.01 Steel Casing Pipe Tunnel Detail & Sanitary Sewer Manhole

S66 SMH-1 & WF&C-1, F&C-1 1411.02 & 1412.01 Sanitary Sewer Manholes & Water And Sanitary Sewer Facilities

S67 JB-R1 & R2 1317.10 & 1317.11 Junction Box

S68 CS-4 & CG-9D 701.07 & 203.03 Typical Method of Grading Side Slopes & Standard Entrance Gutter

S69 MB-7D PC 502.5 & 502.6 Precast Traffic Barrier Service Concrete

S70 MB-10A 502.11 & 502.12 Traffic Barrier Service Concrete Parapet (Single Face)

S71 DPW-17 & DPW-21A Fairfax Co. Public Facilty Man. Precast Concrete Manhole Doghouse Base & Standard Roadway Manhole Cover

S72 10-10 & DPW-6 Fairfax Co. Public Facilty Man. Watertight/Locking Manhole Frame & Typical Trench Construction Pipe Bedding - Alternate "B"

S73 E626-50 EFLHD Trees and Shrubs Planting Methods

S74 R12-1(1) (Mod) Sign Detail

/7

/2

:0

:1

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

T

O C

.D G

N

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

By Resolution of Commonwealth Transportation Board dated July 14, 2010.LIMITED ACCESS HIGHWAY

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S03

PEDESTAL POLE AND FOUNDATION

/7

/2

:0

:2

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

P

F -2

P P

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S04

STANDARD ENDWALL FOR

PIPE CULVERTS &

PRECAST ENDWALL FOR

PIPE CULVERTS

/7

/2

:0

:2

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

E

W -1

-E W

-1 A

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S05

STANDARD ENDWALL FOR

PIPE UNDERDRAIN &

FLARED END-SECTION

/7

/2

:0

:2

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

E

W -1

-E

S -1

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S06

PRECAST UNIT ASSEMBLY

DIAGRAM &

GENERAL NOTES - PRECAST

/7

/2

:0

:2

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

P

R E

C A

S T

-G E

N O

T E

S .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S07

STANDARD PRECAST TOP UNITS

/7

/2

:0

:3

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

T

-D I-

-T

D I-

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S08

STANDARD PRECAST MANHOLE

TOP UNITS &

STANDARD PRECAST

REDUCER AND RISER UNITS

/7

/2

:0

:3

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

T

-M H

-2 -R

-1

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S09

STANDARD PRECAST

BASE UNITS

/7

/2

:0

:3

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

B

-2

-B -3

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S10

STANDARD CURB

DROP INLET

/7

/2

:0

:4

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

D

I-

A -2

B -2

C .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S11

MULTIGRATE DROP INLET

/7

/2

:0

:4

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

D

I1 -1

A

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S12

MULTIGRATE DROP INLET &

MANHOLE FOR 12" TO 48"

PIPE CULVERTS

/7

/2

:0

:4

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

D

I1

-1

A -M

H -1

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S13

STANDARD MANHOLE

FRAME AND COVER

/7

/2

:0

:5

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

M

H -1

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S14

FRAME AND COVER

/7

/2

:0

:5

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

M

H -1

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S15

FRAME AND COVER &

PRECAST MANHOLE

/7

/2

:0

:5

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

M

H -1

A -M

H -2

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S16

STANDARD METHOD OF SHAPING

MANHOLE AND INLET INVERTS &

STANDARD STEP

/7

/2

:0

:5

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

IS

-1 -S

T -1

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S17

TYPICAL CONCRETE SAFETY SLAB

& DRAINAGE STRUCTURE

BEDDING FOR DI,

MH, AND JB

/7

/2

:0

:0

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

S

L -1

-D S

B -1

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S18

INSTALL. OF PIPE

CULVERTS AND STORM SEWERS

GENERAL NOTES & CIRC. PIPE

BEDDING AND BACKFILL

/7

/2

:0

:0

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

P

B

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S19

CONCRETE PIPE HEIGHT OF COVER

TABLE FOR H-20 LIVE LOAD &

STANDARD COMBINATION

UNDERDRAINS

/7

/2

:0

:0

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

P

C -1

-C D

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S20

STANDARD COMBINATION

UNDERDRAIN &

STANDARD PAVEMENT

EDGEDRAIN

/7

/2

:0

:0

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

C

D -2

-U D

-4 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S21

STANDARD PAVEMENT

EDGEDRAIN &

STANDARD RIP RAP DITCH

AND SLOPE PROTECTION PG-3

/7

/2

:0

:1

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

U

D -4

-P G

-3 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S22

CULVERT OUTLET PROTECTION

& SOIL STABILIZATION MAT

CULVERT OUTLET PROTECTION

INSTALLATION3

/7

/2

:0

:1

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

E

C -1

-E C

-3 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S23

SOIL STABILIZATION MAT

SLOPE INSTALLATION TYPE C &

ROCK CHECK DAMS TYPE I & II

/7

/2

:0

:1

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

E

C -3

-E C

-4 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S24

TEMPORARY SILT BARRIERS

/7

/2

:0

:2

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

E

C -5

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S25

INLET PROTECTION

TYPE A, B AND C

/7

/2

:0

:2

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

E

C -6

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S26

TYPICAL SEDIMENT TRAP

TEMPORARY DIVERSION DIKE

/7

/2

:0

:2

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

E

C -7

-E C

-9 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S27

TEMPORARY VEHICULAR

WATERCOURSE CROSSING &

STABILIZED CONSTRUCTION

ENTRANCE

/7

/2

:0

:3

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

E

C -1

-E

C -1

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S28

STANDARD 4" CURB &

CONBINATION 6"

CURB AND GUTTER

/7

/2

:0

:3

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

C

G -3

-C G

-6 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S29

COMBINATION 4" CURB

AND GUTTER &

PAVEMENT WIDENING

/7

/2

:0

:3

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

C

G -7

-W P

-2 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S30

STANDARD GUARDRAIL

HARDWARE &

W-BEAM GUARDRAIL

HARDWARE

/7

/2

:0

:3

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

G

R -F

O A

-2 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S31

STANDARD BLOCKED-OUT

W-BEAM GUARDRAIL

/7

/2

:0

:4

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

G

R -2

-2 A

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S32

W-BEAM GUARDRAIL

FIXED OBJECT ATTACHMENT

/7

/2

:0

:4

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

G

R -F

O A

-2 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S33

FIXED OBJECT ATTACHMENT &

W BEAM GUARDRAIL

INSTALLATION CRITERIA

/7

/2

:0

:4

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

G

R -F

O A

-2

-G

R -I

N S

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S34

INSTALLATION CRITERIA &

CONCRETE MEDIAN BARRIER

/7

/2

:0

:5

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

G

R -I

N S

-M B

-7 D

-7 F

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S35

TRAFFIC BARRIER SERVICE

CONCRETE PARAPET

/7

/2

:0

:5

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

M

B -1

A

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S36

TRAFFIC BARRIER SERVICE

CONCRETE PARAPET &

PRECAST CONCRETE MEDIAN

BARRIER

/7

/2

:0

:5

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

M

B -1

A

-M B

-I N

S .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S37

PRECAST CONCRETE MEDIAN

BARRIER

/7

/2

:0

:0

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

M

B -I

N S

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S38

BUTTING TRAFFIC BARRIER

SERVICE TO SINGLE FACE

PARAPET SERVICE

/7

/2

:0

:0

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

M

B -I

N S

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S39

STANDARD FENCE

/7

/2

:0

:0

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

M

B -I

N S

-F E

-C L

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S40

STANDARD FENCE GATES &

WATER GATES IN FENCE LINES

/7

/2

:0

:0

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

F

E -G

-F E

-4 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S41

STANDARD METHOD OF FENCE

& HANDRAIL GROUNDING &

STD. PLAN AND METHOD OF

SETTING R/W MONUMENTS

/7

/2

:0

:1

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

F

E -6

-R M

-2 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S42

SETTLEMENT PLATE &

CONTROL CENTER

CABINET FOUNDATION

/7

/2

:0

:1

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

S

P -1

-C F

-2 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S43

LIGHTING POLE

FOUNDATION &

LIGHTING POLE

/7

/2

:0

:1

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

L

P -1

-L P

-2 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S44

ELECTRICAL SERVICE &

CONTROL CENTER WIRING

/7

/2

:0

:2

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

S

E -9

-C C

W -1

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S45

JUNCTION BOX &

ELECTRICAL CONDUIT AND

CONDUCTOR CABLE

/7

/2

:0

:2

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

)O S

S -1

-J B

-S

S

S

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S46

WOOD POST SIGN STRUCTURES

/7

/2

:0

:2

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

W

S P

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S47

WOOD POST SIGN STRUCTURES

SQUARE TUBE SIGN POST

/7

/2

:0

:2

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

W

S P

-1 -S

T P

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S48

SQUARE TUBE SIGN POST

/7

/2

:0

:3

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

S

T P

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S49

VA SIGN STRUCTURE

/7

/2

:0

:3

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

S

S P

-V A

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S50

VA SIGN STRUCTURE

/7

/2

:0

:3

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

S

S P

-V A

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S51

INTERSTATE SIGN

STRUCTURE

/7

/2

:0

:4

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

S

S P

-V I-

A .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S52

STRUCTURE

/7

/2

:0

:4

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

S

S P

-V I-

A .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S53

STRUCTURE

/7

/2

:0

:4

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

S

S P

-V I-

A .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S54

STRUCTURE

/7

/2

:0

:4

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

S

S P

-V I-

A .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S55

STRUCTURE

/7

/2

:0

:5

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

S

S P

-V I-

A .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S56

OVERHEAD SIGN STRUCTURE

/7

/2

:0

:5

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

O

S S

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S57

/7

/2

:0

:5

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

O

S S

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S58

/7

/2

:0

:0

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

O

S S

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S59

OVERHEAD SIGN STRUCTURE &

SIGN PANEL DESIGN

/7

/2

:0

:0

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

O

S S

-1 -S

P D

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S60

SIGN PANEL DESIGN

/7

/2

:0

:0

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

S

P D

-1 -S

P D

-7 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S61

SIGN PANEL DESIGN

/7

/2

:0

:0

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

S

P D

-7 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S62

PUNCHING REQUIREMENTS

FOR SIGN PANELS

/7

/2

:0

:1

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

P

R S

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S63

INTERSTATE ROAD EDGE

DELINEATORS &

TYPICAL PAVEMENT

MARKING INTERCHANGE

/7

/2

:0

:1

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

E

D -3

-P M

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S64

TYPICAL PAVEMENT MARKING

LIMITED ACCESS LANE DROP &

UTILITY BEDDING AND

PROTECTION

/7

/2

:3

:2

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

P

M -2

-U B

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S65

STEEL CASING PIPE TUNNEL

DETAIL & SANITARY SEWER

MANHOLE

/7

/2

:0

:2

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

D

P W

-1 -S

M H

-1 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S66

SANITARY SEWER MANHOLE &

WATER AND SANITARY

SEWER FACILITIES

/7

/2

:0

:2

A

M I:

\6

I

-9

D A

R t o E

P G

\R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

S

M H

-1 -W

F

C -1

-F

C -1

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S67

JUNCTION BOX

/7

/2

:0

:2

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

J B

-R -R

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S68

TYPICAL METHODS OF

GRADING SIDE SLOPES &

STANDARD ENTRANCE GUTTER

/7

/2

:0

:2

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

C

S -4

C

G -9

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S69

PRECAST TRAFFIC BARRIER

SERVICE CONCRETE

/7

/2

:0

:3

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

M

B -7

D P

C .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S70

TRAFFIC BARRIER

SERVICE CONCRETE

PARAPET (SINGLE FACE)

/7

/2

:0

:3

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

M

B -1

A

.d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S71

PRECAST CONCRETE MANHOLE

DOGHOUSE BASE &

STANDARD ROADWAY

MANHOLE COVER

/7

/2

:0

:3

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

D

P W

-1 -2 a .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

S72

WATERTIGHT/LOCKING

MANHOLE FRAME &

TYPICAL TRENCH CONSTRUCTION

PIPE BEDDING ALT. "B"

/7

/2

:0

:4

A

M I:

\6 I

-9 D

A R t o E

P G

\R o a d w a y \S h e e ts

\S -S td D e ta il s \S

-A

A D

V A

(1

-1

-D

P W

-6 .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

E626-50

U.S. CUSTOMARY DETAIL

DETAILDETAIL APPROVED FOR USE

TREES AND SHRUBS

PLANTING METHODS

APPROVED : MAY 2011

I:

\6

I

-9

D A

R t o E

P G

\R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

S

T

.d g n

:0

:4

A M

/7

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STATE FHWA PROJECT VDOT PROJECT

SHEET

NO.

TOTAL

SHEETS

VA AAD-VA 95(1) 0095-029-888, RW201 S73 306

S74

RESTRICTED BRIDGE SIGN

/7

/2

:0

:5

A

M I:

\6

I -9

D

A R t o

E P

G \R o a d w a y

\S h e e ts

\S -S td D e ta il s \S

-A A

D V

A

(1

S ig n

D e ta il .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

NOTE:

The contractor shall be governed by the standards and requirements from the Virginia Department of Transportation’s 2008 Road and Bridge Standards and it’s subsequent revisions.

I-95 RAMP FROM FBNA

STATE

TOTAL

SHEETS

VA 309

SHEET

NO.

AAD-VA 95(1)

Robert G Reed

2011.08.22 08:48:42 -04'00'

David A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .