SF 30 - Amendment 001.pdf

PDF 4 MB Posted

Attached to
RECOVERY - Appalachian National Scenic Trail, APPA - Lehigh Gap
Solicitation number
DTFH71-10-R-00011
Issued by

About this file

The Bid Opening Date remains April 22 2010 at 2 00 pm EST.

View the file

Other files

File Type Posted
FBO Synopsis Notice - Corrected.doc DOC document
FP03 Errata.pdf PDF
Removal Site Evaluation Report.pdf PDF
FP03_Eng .pdf PDF
ARRA Sign Pictographs.pdf PDF
Plans.pdf PDF
Solicitation APPA - Lehigh Gap.pdf PDF
Offeror's Qualifications Form.doc DOC document
ARRA Sign Placement Guidance NPS.pdf PDF
SB subcontract plan.doc DOC document
Soils and Foundation Report.pdf PDF
FBO Synopsis Notice.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable debbie debbie pschaad Line

AMENDMENT 0001

B- 1

Bid Schedule A

Project:APPA-LEHIGH GAP

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15101-0000 MOBILIZATION

ALL Lump Sum $___________________

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

15501-0000 CONSTRUCTION SCHEDULE

ALL Lump Sum $___________________

15705-0100 SOIL EROSION CONTROL, SILT FENCE

LNFT $_______________ $___________________

15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A

EACH $_______________ $___________________

15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE

EACH $_______________ $___________________

20421-0000 ROCK EXCAVATION (REGULATED)

CUYD $_______________ $___________________

20421-0000 ROCK EXCAVATION (HAZARDOUS)

CUYD $_______________ $___________________

20442-0000 SLOPE SCALING

1,000

CUYD $_______________ $___________________

20701-0100 EARTHWORK GEOTEXTILE, TYPE I-A

SQYD $_______________ $___________________

Project: APPA-LEHIGH GAP

Estimated Quantity Unit Bid Price Amount Bid

B- 2 AMENDMENT 0001

25126-0000 REMOVE AND RESET BOULDER

EACH $_______________ $___________________

25302-2000 GABIONS, POLYVINYL CHLORIDE COATED

CUYD $_______________ $___________________

26001-0000 ROCK BOLT

1,500

LNFT $_______________ $___________________

27001-0000 GROUT -GLUE

CUYD $_______________ $___________________

30111-5000 AGGREGATE SURFACE COURSE, 12-INCH DEPTH

SQYD $_______________ $___________________

56506-0000 CORING/PRESSURE GROUTING

1,800

LNFT $_______________ $___________________

56604-0000 REINFORCED SHOTCRETE

CUYD $_______________ $___________________

60201-0400 12-INCH PIPE CULVERT

LNFT $_______________ $___________________

61001-0000 HORIZONTAL DRAIN PIPE

LNFT $_______________ $___________________

61901-2000 FENCE, CHAIN LINK, 72-INCH HEIGHT

LNFT $_______________ $___________________

61902-3300 GATE, CHAIN LINK, 12 FEET WIDTH

EACH $_______________ $___________________

63502-0300 TEMPORARY TRAFFIC CONTROL, ADVANCE WARNING ARROW PANEL,

TYPE C

EACH $_______________ $___________________

Estimated Quantity Unit Bid Price Amount Bid

B- 3 AMENDMENT 0001

63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

EACH $_______________ $___________________

63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

EACH $_______________ $___________________

63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

LNFT $_______________ $___________________

63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

LNFT $_______________ $___________________

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SQFT $_______________ $___________________

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN (NPS)

SQFT $_______________ $___________________

63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

HOUR $_______________ $___________________

63701-0000 FIELD OFFICE

EACH $_______________ $___________________

65101-1000 DRAPED ROCKFALL PROTECTION, WIRE MESH

4,000

SQYD $_______________ $___________________

65102-0000 ROCKFALL PROTECTION FENCE (PERMANENT 2000 KJ ROCKFALL

BARRIER)

LNFT $_______________ $___________________

65102-0000 ROCKFALL PROTECTION FENCE (PERMANENT 3000 KJ ROCKFALL

BARRIER)

LNFT $____________ $___________________

TOTAL $_____________________

Sumbitted by : _________________________________________________________ Name of Bidder

C1

TABULATION OF

QUANTITIES

Õ˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝‚

‡ PLAN SHEET SECTION -------->>‡ ‡ ESTIMATED QUANTITIES ‡

‡˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜‡ ‡ ‡ BID ‡

‡ ITEM ‡ DESCRIPTION ‡ UNIT ‡ ‡ PLAN ‡ SCHEDULE ‡

‡15101-0000‡MOBILIZATION ‡ LPSM ‡ ‡ ALL ‡ ALL ‡

‡15201-0000‡CONSTRUCTION SURVEY AND STAKING ‡ LPSM ‡ ‡ ALL ‡ ALL ‡

‡15401-0000‡CONTRACTOR TESTING ‡ LPSM ‡ ‡ ALL ‡ ALL ‡

‡15501-0000‡CONSTRUCTION SCHEDULE ‡ LPSM ‡ ‡ ALL ‡ ALL ‡

‡15705-0100‡SOIL EROSION CONTROL, SILT FENCE ‡ LNFT ‡ 640. ‡ 640 ‡ 640 ‡

‡15706-1100‡SOIL EROSION CONTROL, INLET PROTECTION TYPE A ‡ EACH ‡ 7.0 ‡ 7 ‡ 7 ‡

‡15706-1600‡SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ‡ ‡ ‡ ‡ ‡

‡ ‡ENTRANCE ‡ EACH ‡ 1 ‡ 1 ‡ 1 ‡

‡20421-0000‡ROCK EXCAVATION (REGULATED) ‡ CUYD ‡ 400.0 ‡ 400 ‡ 400 ‡

‡20421-0000‡ROCK EXCAVATION (HAZARDOUS) ‡ CUYD ‡ 40 ‡ 40 ‡ 40 ‡

‡20442-0000‡SLOPE SCALING ‡ CUYD ‡ 1000 ‡ 1000 ‡ 1,000 ‡

‡20701-0100‡EARTHWORK GEOTEXTILE, TYPE I-A ‡ SQYD ‡ 45 ‡ 45 ‡ 50 ‡

‡25126-0000‡REMOVE AND RESET BOULDER ‡ EACH ‡ 7 ‡ 7 ‡ 7 ‡

‡25302-2000‡GABIONS, POLYVINYL CHLORIDE COATED ‡ CUYD ‡ 100 ‡ 100 ‡ 100 ‡

‡26001-0000‡ROCK BOLT ‡ LNFT ‡ 1500 ‡ 1500 ‡ 1,500 ‡

‡27001-0000‡GROUT -GLUE ‡ CUYD ‡ 26 ‡ 26 ‡ 26 ‡

‡30111-5000‡AGGREGATE SURFACE COURSE, 12-INCH DEPTH ‡ SQYD ‡ 136 ‡ 136 ‡ 150 ‡

‡56506-0000‡CORING/PRESSURE GROUTING ‡ LNFT ‡ 1800 ‡ 1800 ‡ 1,800 ‡

‡56604-0000‡REINFORCED SHOTCRETE ‡ CUYD ‡ 50 ‡ 50 ‡ 50 ‡

‡60201-0400‡12-INCH PIPE CULVERT ‡ LNFT ‡ 22.0 ‡ 22 ‡ 22 ‡

‡61001-0000‡HORIZONTAL DRAIN PIPE ‡ LNFT ‡ 900 ‡ 900 ‡ 900 ‡

‡61901-2000‡FENCE, CHAIN LINK, 72-INCH HEIGHT ‡ LNFT ‡ 610 ‡ 610 ‡ 610 ‡

‡61902-3300‡GATE, CHAIN LINK, 12 FEET WIDTH ‡ EACH ‡ 2 ‡ 2 ‡ 2 ‡

‡63502-0300‡TEMPORARY TRAFFIC CONTROL, ADVANCE WARNING ARROW ‡ ‡ ‡ ‡ ‡

‡ ‡PANEL, TYPE C ‡ EACH ‡ 1 ‡ 1 ‡ 1 ‡

‡63502-1300‡TEMPORARY TRAFFIC CONTROL, DRUM ‡ EACH ‡ 47 ‡ 47 ‡ 55 ‡

‡63502-1600‡TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B ‡ EACH ‡ 2.0 ‡ 2 ‡ 2 ‡

‡63503-0300‡TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 ‡ LNFT ‡ 16 ‡ 16 ‡ 16 ‡

‡63503-1000‡TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE ‡ LNFT ‡ 220 ‡ 220 ‡ 220 ‡

‡63504-1000‡TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN ‡ SQFT ‡ 224 ‡ 224 ‡ 250 ‡

‡63504-1000‡TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN (NPS) ‡ SQFT ‡ 88 ‡ 88 ‡ 88 ‡

‡63506-0500‡TEMPORARY TRAFFIC CONTROL, FLAGGER ‡ HOUR ‡ 80.0 ‡ 80 ‡ 80 ‡

‡63701-0000‡FIELD OFFICE ‡ EACH ‡ 1 ‡ 1 ‡ 1 ‡

‡65101-1000‡DRAPED ROCKFALL PROTECTION, WIRE MESH ‡ SQYD ‡ 4000. ‡ 4000 ‡ 4,000 ‡

‡65102-0000‡ROCKFALL PROTECTION FENCE (PERMANENT 2000 KJ ‡ ‡ ‡ ‡ ‡

‡ ‡ROCKFALL BARRIER) ‡ LNFT ‡ 431 ‡ 431 ‡ 440 ‡

‡65102-0000‡ROCKFALL PROTECTION FENCE (PERMANENT 3000 KJ ‡ ‡ ‡ ‡ ‡

‡ ‡ROCKFALL BARRIER) ‡ LNFT ‡ 901 ‡ 901 ‡ 910 ‡

04/15/10JAP1

NO. DESCRIPTION BY DATE

REVISIONS

JAP 04/15/102 Quantity changed

Item added.

TITLE

M

P ro je c ts

\a p p a \l e h ig h g a p p a \p ro j_ d e v \C

A D

D \C

-A

P P

A q n t.

d g n

:2

:4

P

M /1

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

NPS

NO.

100933 151254

NO.

PMIS

PA APPA-LEHIGH GAP

APPALACHIAN TRAIL-LEHIGH GAP

WASO

SCALE IN FEET

0 100 200

SCALE IN FEET

0 100 200

E1

SEQUENCE OF

CONSTRUCTION

04/15/10JAP1

NO. DESCRIPTION BY DATE

REVISIONS

1 1

Revised Wording.

TITLE

P ro je c ts

\a p p a \l e h ig h g a p p a

\p ro j_ d e v

\C A

D D

\E

-A

P P

A p ln .d g n

:4

:4

P

M /1

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

NPS

NO.

100933 151254

NO.

PMIS

PA APPA-LEHIGH GAP

04/15/10JAP1

NO. DESCRIPTION BY DATE

REVISIONS

L e h ig h R iv e r

Timberline Rd.

W in te r T ra il

N1

Entire Plan Sheet Replaced

AHEAD

ENTRANCE

CONSTRUCTION

AHEAD

WORK

ROAD

BE

PREPARED

TO STOP

ROAD WORK

END

CLOSED

LEFT LANE

AHEAD

Parking Area

Existing Traffic Light

Existing Traffic Light

Existing Centerline Striping (typ)

Existing Edge of Pavement (typ)

Existing Mountable Concrete Median (typ)

TEMPORARY TRAFFIC CONTROLTITLE

P ro je c ts

\a p p a \l e h ig h g a p p a \p ro j_ d e v \C

A D

D \N

-A

P P

A tc p .d g n

:2

:1

P

M /1

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

NPS

NO.

100933 151254

NO.

PMIS

PA APPA-LEHIGH GAP

Amendment No. 001 Pre-Bid Meeting Minutes

Amendment No. 001 Project APPA – Lehigh Gap

Appalachian National Scenic Trail Solicitation No.: DTFH71-10-R-00011

Pre-Bid Meeting Minutes Questions/Clarifications

Date: April 9, 2010 Time: 9:00 a.m. to 11:30 p.m.

Place: Palmerton Borough Town Hall

Council Chambers 443 Delaware Ave.

Palmerton, PA 18071

Attendees: See attendance list.

I. Project Overview. FHWA began the meeting with introductions and a brief project overview was given by the FHWA Program Assistant. The pre-bid meeting included a question and answer session as well as an on-site field visit.

The following is a description of the project and solicitation for informational purposes discussed directly or indirectly at the meeting.

Project Scope: The project consists of slope stabilization and rockfall mitigation of the slide area at Lehigh Gap along the Appalachian National Scenic Trail. The work includes rock excavation, slope scaling, rock bolting, grouting, shotcrete, rockfall protection, drainage improvements, and other miscellaneous work. The project is expected to fall within the price range of $4,000,000 to $7,000,000.

Proposal Information: The Bid Documents [Plans, Special Contract Requirements (SCR’s), Specification Book FP-03, Checklist for Offeror Submission, etc.,] are available on the following websites:

Use Internet addresses http://www.efl.fhwa.dot.gov/contracting/Documents.aspx or https://www.fbo.gov/ (at QUICK SEARCH, type "EFLHD" and all available projects will be listed) to check for availability of bid documents.

Bidders are reminded to sign up for automatic email notification for any changes to the Bid Documents and Solicitation on the FBO website above.

http://www.efl.fhwa.dot.gov/contracting/Documents.aspx� https://www.fbo.gov/�

Amendment No. 001 Pre-Bid Meeting Minutes

The Proposal Due Date is currently scheduled for April 22, 2010. Proposals are due by 2:00 p.m. local time, and are to be delivered to:

Federal Highway Administration Eastern Federal Lands Highway Division Loudoun Tech Center, Room 105 21400 Ridgetop Circle Sterling, Virginia 20166-6511

Bidders can send written questions or inquiries for clarification to:

eflhd.contracts@dot.gov.

II. Questions/Clarifications. The following questions and issues were either asked or discussed by potential bidders at the Pre-Bid Meeting; the Government response or clarification is provided. The questions/clarifications are not a transcript of actual words spoken; they have been edited to provide a clearer representation of the actual issues discussed; any follow-up action or clarification not discussed at the meeting is also included.

1. Is it a requirement to use all of or a portion of the enclosed example safety plan?

Response: It is the Contractors responsibility to provide their own Health and Safety Plan (HASP) for the protection of workers that describes the procedures for handling and disposing of hazardous material. Use the sample plan in Appendix of the Special Contract Requirements as an example only.

Please see the Questions/Clarifications document found elsewhere in this amendment for questions received via email after the Pre-Bid Meeting.

mailto:eflhd.contracts@dot.gov�

Amendment No. 001 Questions/Clarifications Page 1 of 4

Questions/Clarifications

The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.

1. For pay item number 27001-0000 Grout-Glue. This is a chemical product and I am wondering has it every been used is areas with concentrations of heavy metals (lead, zinc, cadmium) and what, if any, type of adverse effect on the product might be?

Response: There is no indication of any high concentration of heavy metals at this site or in the areas where Polyurethan Resin (PUR) is planned for injection. Since PUR is planned for injection into drilled holes and is expected to fill in any cracks, the probability of mixing with heavy metals is minimal. It is not documented in the literature that these types of chemicals have any effect on the PUR material.

2. This product is to be injected into a minimum 15 foot drilled hole. Will the product bond rocks together if there are soils present in cracks deep beneath the surface?

Response: PUR works similar to cement grout for bonding rock but with higher strength properties. It has the property for bonding material similar to grout cement with the advantage for penetrating smaller cracks and joints. In addition, rock bolts are included for added stability in glued rock mass zones.

3. In regards to the (Remove Talus Piles 1) this is an enormous amount of large boulders in the 6' to 10' diameter range and removal of this pile is a serious safety concern to the workers, roadway and railroad. based on our vast experience. Could these piles possibly be covered with a netting and pinned also? If not there are no provisions for any protective measures in the specifications for the roadway below, how would this be handled? Also nothing in regards to the closing of the highway below or traffic control during this work, how is this to be dealt with?

Response: The Contractor is responsible for safe removal of the large talus pile. The Contractor is to provide a QA/QC Plan describing General Safety and process for excavating and removing the large talus pile as noted on Plan Sheet D3, Notes 2 through

4. Plan Sheet E1 (Sequence of Construction) graphically shows the suggested sequence of construction. The Contractor’s proposed sequence, procedures and safety plans are to be submitted to the CO for approval prior to beginning work. If the Contractor wants to close Route 248 below, he must propose his own traffic control maintenance and obtain his own PENNDOT permit.

Amendment No. 001 Questions/Clarifications Page 2 of 4

4. There is conflicting info in the specifications regarding the trail. Is it closed during operations or must it be kept open? Obviously during all rock removal work the trail has to be closed to the public and in our opinion should be closed for the duration of the project.

Response: The Appalachian Trail must be kept open during the time the detour is in use. However, the Winter Trail will be closed to the public during the project (entrance to the Winter Trail is located between Sta. 22+50 and 23+00 as shown on Plan Sheet D2).

5. Can we have access to the site from the North end where the trail/bench goes down towards the roadway just at the corner and several hundred feet past where the project ends?

Do we know who owns that property? This is very important as we need to get equipment and lots of materials for the Gabion wall on the North end of the project and can not access this area from the South due to the wetland area.

Response: Access to NPS lands from the north-west via Red Hill Drive is through private property, including the privately owned bridge over Aquashicola Creek. The NPS does not have any legal access using this route. However, if the Contractor can obtain permission from the land owner, then access via this route to NPS lands and the project site will be permitted.

7. I have a clarification question on the design of the rock bolts, mesh, and fences. Our interpretation of the specification and plans is that the designer will be required to submit a set of stamped plans and details as well as calculations for the bolts, individual pinned mesh systems (4 in total) and individual rockfall fences (6 in total), for approval. Also, the way I read the specification is that designer will be required to determine the layout and plan for the Rock Gluing and to direct the activities in the field. I want to make sure these interpretations are correct as they will be used as a basis for the design costs provided to contractors.

Response: As indicated in SCR Subsection 651.03, the Contractor is required to submit complete design and detail drawings for rockfall fence systems and rock bolts stamped by a Registered Professional Geologist or Registered Professional Engineer.

Per SCR Subsection 270.07(a), the layout and plan for rock gluing (as shown on Plan Sheets D7 through D12) would have to be incorporated by the Contractor’s designer in their submittal. Locations may be slightly adjusted at the approval of the CO during construction.

8. I can find no reference for the shotcrete mix design in the plans and specifications or any qualification requirements. Can you please point me in the right direction?

Response: Please refer to Subsection 566.03 of the FP which describes the requirements for the shotcrete mix design and qualifications.

Amendment No. 001 Questions/Clarifications Page 3 of 4

9. On Plan Sheet E-1 “Sequence of Construction”. The rock fall protection fences are to be installed before the scaling task occurs. Is there a mechanism in place to compensate the contractor when the fences are damaged during the scaling activity?

Response: No additional payment will be made for replacing damaged rockfall protection fencing during construction operations.

10. On Plan Sheet D-3 and D-4: Is the talus removal part of the slope scaling’s 1000 cubic yards or does it fall under the regulated rock excavation item?

Response: Talus removal is included under rock excavation pay item 20421-0000.

Please refer to Subsection 109.05 of the FP for further information regarding scope of payment for direct and indirect work.

11. In the Evaluation Factors: Factor 3: PUR Experience – a) submit a contractor or subcontractor references with the bid proposal that cite satisfactory completion of at least 3 PUR injection or grouting projects within the last 5 years. As a contractor we have installed tens of thousands bags of grout on rock bolting projects in the last 5 years but have not worked with the polyurethane resin since it is fairly new to slope stabilization. Would we qualify under factor 3 a.?

Response: A Contractor or subcontractor who can show in their bid proposal that they are capable of injecting and installing Polyurethane Resin (PUR) or cement grout into rock and can meet the requirements of SCR Subsection 270.03 would qualify.

12. Is the bid item “coring/pressure grouting” 1800 LF the drilling of the 1.5” holes for the rock gluing?

Response: Yes; the bid item quantity for 1.5-inch coring diameter is only for rock glue.

Quantities shown on the Plans and Bid Schedule are estimated and the Contractor will be paid for the amount of work ordered by the CO, completed and accepted per the specifications. See the last paragraph of Subsection 109.05.

13. In the bid item “Draped Rockfall Protection” you mention on plan sheet S17, you have pinned ring net & pinned net drape. First is there 2 different type of systems stated and you have only 1 item on bid sheet. Second the word pinned system does this mean a bolting pattern through out the whole system because if it does you would have to give a dimensions for each location and a what pattern you would like in the system in each of the 5 locations.

It is unclear what you are looking for and it is priced very differently.

Response: Provide an Active Rockfall Protection system at the specified locations to prevent rock sliding and fall. The system should meet SCR Section 651 requirements and Notes 1 through 3 on Detail E651-03A (Sheet S17).

Amendment No. 001 Questions/Clarifications Page 4 of 4

As of 12:00noon EST on Friday, April 16, 2010, all questions received via email at eflhd.contracts@dot.gov have either been included above, have been addressed in the previous amendments issued to date, or have been answered directly to the sender. Any questions received after this time will be answered on an individual response basis, unless another amendment is required.

Amendment 1.pdf
Amendment No. 1
Fire Island National Seashore
J Pages.pdf
Special Contract Requirements
Division 100
Division 150
Division 200
Division 301
Division 600
Division 700
Amendment #2.pdf
Amendment No. 2
Natchez Trace Parkway
Amendment #1.pdf
Amendment No. 1
Great Smoky Mountains National Park
Solicitation Provision changes
Special Contract Requirements changes
Amendment 2_Final (4).pdf
Section 705.—ROCK
Amendment 001_Final.pdf
June 3, 2008 Pre-Proposal Meeting and Field Review
Part 5. Add the following to the Special Contract Requirements:
109.06. Delete Price Form 02A, 02B, 02C, and 02D of the Special Contract Requirements and substitute the attached forms (See attached files).
BK_1442 for VI John 001.pdf
Amendment 001 A-1
AND AWARD
DTFH71-09-B-00017
PreBid_Meeting_Minutes.pdf
Amendment No. 001
Project APPA – Lehigh Gap
Appalachian National Scenic Trail
Solicitation No.: DTFH71-10-R-00011
IDCode:
Page: 1
Pages: 18
AmendNo: 001
EffDate: 04/16/10
ReqNo:
ProjNo: APPA -Lehigh Gap
IssCode:
IssuedBy: Eastern Federal Lands Highway Division

21400 Ridgetop Circle Sterling, VA 20166

AdmCode:
AdminBy:
ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolAmdNo:
AmendDate: 03/09/10
ModNo:
ModDate:
NoCopies:
Amended: Off
ApprData:
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: The purpose of this Amendment is to:

1) Replace the Solicitation B Pages to modify and add temporary traffic control bid items.

2) Revise the Special Contract Requirements (J-pages) as follows.

a) Section 103 to remove rock blasting from the design elements.

b) Section 651 to add general site safety/monitoring requirements.

3) Revise the Plans to modify several plan sheets.

4) Provide Pre-bid Meeting Minutes.

5) Provide a summary of responses to questions/clarifications asked by potential bidders.

SignName:
SignTitl:
ContDate:
CoName:
CoTitle:
CODate:
SolChgYs: Yes
SolChgNo: Off
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off
Text1:
Text2:

File details come from the government source that posted it. Updated .