Plans.pdf

PDF 41 MB Posted

Attached to
RECOVERY - PEE DEE NATIONAL WILDLIFE REFUGE, RRP-PED 10(1)
Solicitation number
DTFH71-10-B-00006
Issued by

About this file

Plans

View the file

Other files

File Type Posted
Amendment 001.pdf PDF
ARRA Sign Pictographs.pdf PDF
FP03 Errata.pdf PDF
ADV_Bidder's Qualifications Form.doc DOC document
REV__SB subcontract plan revised.doc DOC document
FP03_Eng .pdf PDF
IFB Solicitation.pdf PDF
Pavement Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R/W R/W

R/W R/W

P/E C/E

No Symbol

TB or TP

P P or

UD UD

W W

P/E C/E

No Symbol

TB or TP

P P or or

UD UD

W W

FOUND

36 31

6 1

36 31

6 1

No Symbol

No Symbol

FOUND

36 31

6 1

36 31

6 1

400 No Symbol x 99.9

T-45

2,645.9

T-3 x 99.9

T-45

2,645.9

T-3

26 25 69426 25 694 c

Abutment Abut.

Aggregate aggr.

Ahead AH

Alternate alt.

Average daily traffic ADT

Back BK

Balance point BP

Bearing brg.

Begining beg.

Bench mark BM

Finish fin.

Flange flg.

Footing ftg.

Inside diameter ID

West W

Centerline

Center to center cc, c-c or c. to c.

Centers ctrs.

Clear clr.

Column col.

Connection conn.

Construction joint Constr. jt.

Continuous cont.

Corrugated metal pipe CMP

Culvert culv.

Curve centeral angle

(spiral curve transitions)

Curve total angle

(curve delta or deflection)

Design hourly volume DHV

Design speed V

Diagonal diag.

Diameter D, dia., or

Diaphragm diaph.

Distance dist.

Drawing(s) dwg(s), or drwg(s)

Drop Inlet DI

East E

Edge of pavement EP or EOP

Elevation elev.

Elevation with number El. 94.161

[El. 94.16]

Embankment emb.

End section ES

Equation EQ or eq.

Excavation exc.

Expansion joint exp. jt.

Galvanized galv.

Gage(gauge) ga.

Headwall hdwl.

Hexagon hex.

High water HW

Joint jt.

Lamination lam.

Latitude lat.

Left lt., Lt. or LT

Length of curve(simple curve) L

Length of curve Lc

(spiral curve transision)

Length of spiral Ls

Longitudinal(longitude) long.

Low water LW

Original groung OG

Out to out o. to o.

Outside diameter OD

On centers o. c.

Normal crown NC or NCR

North N

Radius R

Range R.

Reinforcement (reinforced) reinf.

Required reqd.

Right Rt., rt.or RT

Right-of-way R/W

Roadway Rdwy.

Route Rte.

Section Sec.

South S

Spacing, spaces or spaced spa.

Spiral central angle s

Standard std.

Station Sta.

Stiffener stiff.

Stringer stgr.

Structure struc.

Superelevation rate e

Symmetrical sym.

Tangent distance T

(tangent length)

Tangent distance Ts

(spiral curve transision)

Temporary benchmark TBM

Temporary construction TCE easement

Thread thd.

Township T.

Typical typ.

Vehicle per hour vph

Vertical point of intersection VPI

PAVEMENT REMOVAL/ROADWAY OBLITERATION

LAKE, POND or RESERVOIR; MARSHLAND

SLOPE STAKE

INTERSTATE U.S. STATE

AREA PATTERN

TREELINE; TREE

BUILDING

UNDERDRAIN

BOX CULVERT

CULVERT with DROP INLET

PIPE CULVERT with HEADWALL

PIPE CULVERT with END SECTION

PIPE CULVERT (arrow shows flow)

BRIDGE

STREET LIGHT

TELEPHONE BOOTH or PEDESTAL

SUPPORT POLE with ANCHOR

RETAINING WALL

SIGNS

PORTABLE

POST MOUNTED

GUARDRAIL

CATTLEGUARD

GATE with FENCE

FENCE

MATERIAL SOURCE

NORTH ARROW

wall facewall face

TB or TP or

P/LP/L

MEDIAN & SIDE (CONCRETE) BARRIER

NATIONAL PARK or

FOREST BOUNDARY

116 SECTION LINE

14 SECTION LINE

SECTION LINE

COUNTY BOUNDARY

CITY BOUNDARYCITY BOUNDARY

NATIONAL BOUNDARY

STATE BOUNDARY

TOWNSHIP or RANGE LINE

PROPERTY LINE

BRASS CAP

STEEL PIN

TRAVERSE POINT (Horizontal & Vertical)

Top of Triangle Points North

TRAVERSE POINT (Horizontal)

COORDINATE GRID TICK

SPOT ELEVATION

HUB & TACK

BORING LOCATION

RIPRAP/CULVERT RIPRAP

CHECK DAM

DIVERSION BERM

SILT FENCE

MILL AND OVERLAY

SIDEWALK ASPHALT/CONCRETE

FULL DEPTH PAVEMENT

OVERLAY

SECTION CORNER

14 SECTION CORNER

116 SECTION

PROPERTY CORNER

PARCEL NUMBER

EASEMENT (Permanent - Construction)

ROUTE NUMBERS

RIGHT-OF-WAY LINE

RIGHT-OF-WAY LINE

with MONUMENT

TOP OF CUT

TOE OF FILL

TRANSITION

SINGLE TRACK

ROADWAY, EXISTING

INTERMITTENT DRAINAGE/ SMALL CREEK

SPRING

LARGE CREEK/RIVER

RAILROAD

TRAIL

MULTIPLE TRACK

N

OVERHEAD(POWER POLE) UTILITIES

P=Electrical for transmission line

E=Electrical for distribution line

T=Telephone, E&T=Joint Electrical and Telephone

FO=Fibre optics

UNDERGROUND UTILITIES

G=gas, O=oil, P=power, SA=sanitary sewer, SS=storm sewer, T=telephone, W=water E=electrical, FO=fibre optics

PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:-

DIVERSION CHANNEL

TEST PIT

B-1

TP-1

SYMBOLS AND

ABBREVIATIONS

SFDB

EOP

EOG

Mainline M.L.

Material matl.

Maximum max.

Mile[Kilometer] post M.P[K.P.]

Minimum min.

Monument mon. or MON

Mechanically stabilized MSE embankment

Pavement pvmt.

Photo monument PHT

Plate pl.

Point of compound curve PCC

Point of curve PC

Point of curve to spiral PCS or CS

Point of intersection PI

Point of spiral to curve PSC or SC

Point of spiral to reverse SRS spiral

Point of spiral to tangent PST or ST

Point of tangent PT

Point of tangent to spiral PS or TS

Point on curve POC

Point on spiral POS

Point on tangent POT

A2

UNDERGROUND INTERNET LINE

II

SPECIAL DITCH PATTERN

SE RRP-PED 10(1)

PEE DEE NATIONAL WILDLIFE REFUGE

M

P ro je c ts

\r e fu g e \n c \P

E D

(1 p ro j_ d e v \C

A D

D \A

-P

E D

(1 s y m

.d g n

:0

:1

P

M

/2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

NC

R/W

R/W

No Symbol

TB or TP

P or

UD

W

No Symbol

TB or TP

P or

UD

W

SUMMARIES AND SCHEDULES

C3SE RRP-PED 10(1)

PEE DEE NATIONAL WILDLIFE REFUGE

M

P ro je c ts

\r e fu g e \n c \P

E D

(1 p ro j_ d e v

\C A

D D

\C

-P

E D

(1 q n t.

d g n

:2

:2

P

M

/2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

NC

C5SE RRP-PED 10(1)

PEE DEE NATIONAL WILDLIFE REFUGE

M

P ro je c ts

\r e fu g e \n c \P

E D

(1 p ro j_ d e v

\C A

D D

\C

-P

E D

(1 q n t.

d g n

:0

:0

P

M

/2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

C6SE RRP-PED 10(1)

PEE DEE NATIONAL WILDLIFE REFUGE

M

P ro je c ts

\r e fu g e \n c \P

E D

(1 p ro j_ d e v

\C A

D D

\C

-P

E D

(1 q n t.

d g n

:0

:3

P

M

/2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

Pee Dee National Wildlife Refuge

M5SE NC RRP-PED 10(1)

SCALE IN FEET

0 20 40

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT

SHEET

NO.

EROSION & SEDIMENT

CONTROL PLAN

http://www.fhwa.dot.gov/economicrecovery/arrasigndetail.pdf http://www.fhwa.dot.gov/economicrecovery/arrasigndetail.pdf

A1
A2
A3
A-C
C1
planprofile.pdf
M1
ECP
S2
S3
S7
S8
S9
standards
S10
S16
S17
S18
x-section

File details come from the government source that posted it. Updated .