Amendment 001 - Bid Opening Date remains November 17 2009.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ARRA Sign Pictographs.pdf | ||
| FP03 Errata.pdf | ||
| ADV_Bidder's Qualifications Form.doc | DOC document | |
| REV__SB subcontract plan revised.doc | DOC document | |
| Plans.pdf | ||
| FP03_Eng .pdf | ||
| IFB Solicitation.pdf | ||
| Pavement Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable debbie debbie pschaad Line
Amendment No. 001 Page 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 001 Project RRP-PED 10(1)
Pee Dee National Wildlife Refuge Solicitation: DTFH71-10-B-00006
The purpose of this Amendment is to:
1) Revise the Special Contract Requirements (J-pages) as follows:
a. Section 602 to add culvert requirements.
2) Provide a summary of responses to questions/clarifications asked by potential bidders.
Special Contract Requirement Changes
1. Add the following to the Special Contract Requirements, page J-27:
Section 602.—CULVERTS AND DRAINS
602.03. Add the following:
Furnish aluminum-alloy corrugated culvert pipe, Type I or II, 16 gage minimum.
Questions/Clarifications
The following are responses to questions/clarifications asked by potential bidders which were received via email at eflhd.contracts@dot.gov.
1. Are all pipe culverts required to be aluminum?
Response: Yes, aluminum pipe culverts will be required. Subsection 602.03 will be amended to clarify the requirements.
2. Is there a place within the construction limits or somewhere in the general site vicinity that can be utilized for a borrow site and/or a cut/waste burial pit? (Based on section 105.02 and section 204.08 - it refers to a government provided borrow site.) If so - where is it located? And can you assure us that the dirt will be suitable for roadway construction and embankment material?
Response: There is no Government-provided material sources or cut/waste burial pits.
If there were Government-provided sources identified, the Contractor is responsible for mailto:eflhd.contracts@dot.gov
Amendment No. 001 Page 2 of 2 determining the quality of the material according to the last sentence of the third paragraph of Subsection 105.02(a).
3. If we chip the trees instead of burning or burying them, can the chipped material be broadcast back onto the site?
Response: Chipped trees may not be broadcast back onto the site. Dispose of material according to Subsection 203.05(a). Recycle or dispose of material legally off the project.
4. Is there a designated location for the job trailer? If we locate the job trailer next to the existing office - can we tie into their electrical lines and water lines if we provide separate meters?
Response: The field office location will be determined at the Pre-construction meeting.
The location of the field office is subject to approval by the CO in accordance with Subsection 637.02 of the SCR’s. The Contractor will be required to coordinate with the Refuge and CO for site preparation, power lines, water lines, etc.
5. In regards to the pavement structure on the project. What is specified is 4” of SF9.5A.
Which is the closet NC Mix design that comes to matching was is in the documents.
Installing 4” of SF9.5A is not recommended by the North Carolina Department of Transporation. Is this what you want priced on the project or can we adjust the pavement structure to 2” of binder mix (I19.0B) and 2” of surface mix (S9.5B). Also will the testing be held to NCDOT requirements or Federal Requirements?
Response: The proposed pavement structure on the project is 2 equal lifts of 2” Superpave Asphalt Concrete Pavement (SACP) 12.5mm (1/2”) Nominal Maximum Size Aggregate (NMSA); it is not 9.5mm (3/8”) as the bidder notes. Please refer to the Typical Sections, Plan Sheets B1 and B2. If the North Carolina DOT does not have an acceptable 12.5mm (1/2”) NMSA mix, the Government will consider the alternative of a 1” 9.5mm (3/8”) surface course placed over a 3” 19.0mm (3/4”) NMSA binder mix.
This alternative will not be considered during advertisement, but can be submitted to the CO during construction. Please refer to Section 401 of the FP and SCR’s for Superpave requirements; Subsection 401.03 discusses the requirements for the composition of the mix and submittals, and Subsection 401.17 and Table 401-6 discuss the acceptance and testing requirements.
mailto:eflhd.contracts@dot.gov
| Amendment 1.pdf |
| Amendment No. 1 |
| Fire Island National Seashore |
| J Pages.pdf |
| Special Contract Requirements |
| Division 100 |
| Division 150 |
| Division 200 |
| Division 301 |
| Division 600 |
| Division 700 |
| Amendment #2.pdf |
| Amendment No. 2 |
| Natchez Trace Parkway |
| Amendment #1.pdf |
| Amendment No. 1 |
| Great Smoky Mountains National Park |
| Solicitation Provision changes |
| Special Contract Requirements changes |
| Amendment 2_Final (4).pdf |
| Section 705.—ROCK |
| Amendment 001_Final.pdf |
| June 3, 2008 Pre-Proposal Meeting and Field Review |
| Part 5. Add the following to the Special Contract Requirements: |
| 109.06. Delete Price Form 02A, 02B, 02C, and 02D of the Special Contract Requirements and substitute the attached forms (See attached files). |
| BK_1442 for VI John 001.pdf |
| Amendment 001 A-1 |
| AND AWARD |
| DTFH71-09-B-00017 |
| Amendment 1.pdf |
| Section 602.—CULVERTS AND DRAINS |
| IDCode: |
| Page: 1 |
| Pages: 3 |
| AmendNo: 001 |
| EffDate: 11/13/09 |
| ReqNo: |
| ProjNo: RRP PED 10(1) |
| IssCode: |
| IssuedBy: Eastern Federal Lands Highway Division |
21400 Ridgetop Circle Sterling, VA 20166
| AdmCode: |
| AdminBy: |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolAmdNo: DTFH71-10-B-00006 |
| AmendDate: 10/01/09 |
| ModNo: |
| ModDate: |
| NoCopies: |
| Amended: Off |
| ApprData: |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: |
The purpose of this Amendment is to:
1) Revise the Special Contract Requirements (J-pages) as follows:
a. Section 602 to add culvert requirements.
2) Provide a summary of responses to questions/clarifications asked by potential bidders.
3) The Bid Opening Date remains the same, November 17, 2009.
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| SolChgYs: Yes |
| SolChgNo: Off |
| OffrExt: Off |
| OffrNoEx: No |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Yes |
| Text1: |
| Text2: |
File details come from the government source that posted it. Updated .