Amendment 002 - New bid opening date of 04/30/2009 at 2:00 PM EST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 - Amendment 1.pdf | ||
| Plans.pdf | ||
| PavementRpt.pdf | ||
| FP03_Eng .pdf | ||
| ADV_Bidder's Qualifications Form.doc | DOC document | |
| IFB Solicitation.pdf | ||
| REV__SB subcontract plan revised.doc | DOC document | |
| FP03 Errata.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable debbie debbie pschaad Line
Amendment No. 0002
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project RRP-SNT 10(1)
Santee National Wildlife Refuge Solicitation: DTFH71-09-B-00010
The purpose of this Amendment is to:
1) Revise the Special Contract Requirements (J-pages) as follows:
a) Section 703 to delete the base course aggregate clarifications added under amendment 0001.
b) Section 703 to clarify the surface course aggregate gradation requirements.
2) Revise the Plans to replace timber bulkhead and flashboard riser details.
Special Contract Requirement changes
1. Delete Subsection 703.05(b)(1) of the SCR’s, page J-27, which was added under Amendment
0001.
2. Add the following to Section 703 of the Special Contract Requirements, page J-27:
703.05(c)(1). Add the following:
At the option of the Contractor, the gradation only of surface course aggregate may conform to the requirements of the following materials as specified in 2007 edition of the Standard Specifications for Highway Construction of the South Carolina Department of Transportation:
- Macadam Base Course of Section 305, page 161 and
- Coarse Aggregate No. CR-14 of Appendix A-4.
Plan Sheet changes
1. Delete Plan Sheets T6, and T15, and substitute amended Plan Sheets T6, and T15.
Questions/Clarifications
The following questions and issues were asked by potential bidders via email; the Government response or clarification is provided.
1. Does the construction testing for this project, require the testing company to have a South
Carolina DOT Certification or South Carolina DOT Certified Personnel conducting the testing procedures?
Qualifications for personnel performing construction testing can be found in Subsection 153.02(d). Some type of recognized certification that indicates testing proficiency is required; it can be a State DOT certification, NICET, ACI, etc.
Qualification documentation is to be submitted as part of the Quality Control Plan (QCP) and is reviewed by the CO for adequacy.
2. Drawing T6 – Timber Bulkhead Detail: General Note #1 states “use polyurethane foam for filling gaps between lumber and pilings”. Can you clarify this requirement? Does this mean that the entire void between the new timber bulkhead and the existing sheetpiling is to be backfilled with polyurethane foam?
Use polyurethane foam for filling gaps that occur between lumber and pilings on the proposed timber bulkhead. Do not fill gaps on the existing timber bulkhead.
3. Special Contract Requirements, Page J-5, 104.05: Is there any way to relax the weight restrictions on the roadways within the NWR?
No. When hauling on National Wildlife Refuge roads, do not exceed load restrictions listed in Subsection 104.05 of the SCR’s.
4. Would recycled material that meets SCDOT specs for base material (CR-14) get approved for the aforementioned project?
Material provided for surface course aggregate must meet the requirements of Subsection 703.05 of the FP, SCR’s, and the changes in this amendment.
| Amendment 1.pdf |
| Amendment No. 1 |
| Fire Island National Seashore |
| J Pages.pdf |
| Special Contract Requirements |
| Division 100 |
| Division 150 |
| Division 200 |
| Division 301 |
| Division 600 |
| Division 700 |
| Amendment #2.pdf |
| Amendment No. 2 |
| Natchez Trace Parkway |
| Amendment #1.pdf |
| Amendment No. 1 |
| Great Smoky Mountains National Park |
| Solicitation Provision changes |
| Special Contract Requirements changes |
| Amendment 2_Final (4).pdf |
| Section 705.—ROCK |
| Amendment 001_Final.pdf |
| June 3, 2008 Pre-Proposal Meeting and Field Review |
| Part 5. Add the following to the Special Contract Requirements: |
| 109.06. Delete Price Form 02A, 02B, 02C, and 02D of the Special Contract Requirements and substitute the attached forms (See attached files). |
| IDCode: |
| Page: 1 |
| Pages: 5 |
| AmendNo: 002 |
| EffDate: 04/24/09 |
| ReqNo: |
| ProjNo: |
| IssCode: |
| IssuedBy: Eastern Federal Lands Highway Division |
21400 Ridgetop Circle Sterling, VA 20166
| AdmCode: |
| AdminBy: |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolAmdNo: DTFH71-09-B-00010 |
| AmendDate: 03/27/09 |
| ModNo: |
| ModDate: |
| NoCopies: |
| Amended: Yes |
| ApprData: |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: The purpose of this Amendment is to: |
1) Revise the Special Contract Requirements (J-pages) as follows:
a) Section 703 to delete the base course aggregate clarifications added under amendment 0001.
b) Section 703 to clarify the surface course aggregate gradation requirements.
2) Revise the Plans to replace timber bulkhead and flashboard riser details.
3) Bid opening date has been extended from 04/28/2009 to 04/30/2009 at 2:00 PM EST.
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| SolChgYs: Yes |
| SolChgNo: Off |
| OffrExt: Yes |
| OffrNoEx: Off |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Off |
| Text1: |