Project_Description_YellPP.pdf
PDF 12 KB Posted
- Solicitation number
- DTFH7017R00007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_6-16-17.pdf | ||
| Q&A_6-14-17.pdf | ||
| A001.pdf | ||
| YELL_C5_RipReport.pdf | ||
| Plan_Request_form_PP_Yellowstone.pdf | ||
| RFP_PP_Yellowstone.pdf | ||
| _All_Plans_YELL_17(1)_4-27-17.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WY NPS PRES 17(1), Pavement Preservation Yellowstone 2017, Yellowstone National Park, Teton County, Wyoming
The work consists of micro surfacing, pavement patching, pavement markings, temporary traffic control, and other small items of work.
Project length: 21.58 miles
Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Tentative Advertisement Date: May/June 2017
Estimated Price Range: Between $2 and $3 million
Location: Approximately 60 miles north of Jackson Wyoming on the South Entrance Road in Yellowstone National Park
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14 Base Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking No 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes
DIVISION 400 – Asphalt Pavements & Surface Treatments 409 Micro Surfacing – 420,000 sq yds 414 Asphalt Pavement Crack Sealing & Filling 21.58 miles 418 Asphalt Concrete Pavement Patching 250 sq yds
DIVISION 600 – Incidental Construction 622 Rental Equipment Yes 623 General Labor Yes 634 Permanent Pavement Markings (traffic pavement markings) 930,000 ln ft 635 Temporary Traffic Control – Flagger 600 hr 635 Temporary Traffic Control – Pilot Car 150 hr
DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 Base Schedule
635 Temporary Traffic Control – Cones 220 ea 635 Temporary Traffic Control – Variable message sign 2 ea 635 Temporary Traffic Control – temporary pavement markings 85,000 ln ft 635 Temporary Traffic Control – Const. Sign 300 sq ft 635 Temporary Traffic Control – Traffic Control Supv. 30 days
File details come from the government source that posted it. Updated .