PROJECT_DESCRIPTION.pdf

PDF 35 KB Posted

Attached to
WA FS ERFO 2016(1)-20(1), MT. Baker Emergency Repairs 2016.
Solicitation number
DTFH7017B00035
Issued by

About this file

Project Description

View the file

Other files

File Type Posted
Bid_Opening_Summary_MT_Baker.pdf PDF
A001.pdf PDF
XS_FSR_31_MP6.7.pdf PDF
AOP_Hydraulics_Report_FSR_1050_MP_1.7.pdf PDF
100__Mt_Baker_Emergency_Repairs_Plan_Set.pdf PDF
GM_05-17_Mt_Baker_NF_ERFO_Drilling_Plan.pdf PDF
FSR_1144_1130_EARTHWORK.pdf PDF
XS_FSR_3140_MP0p5.pdf PDF
FSR_3140_MP05_EARTHWORK.pdf PDF
FSR_31_MP6p7_EARTHWORK.pdf PDF
XS_FSR_1050_MP_1.7.pdf PDF
GM_05-18_Design_&_Construction_Recommendations.pdf PDF
Plan_Request_Mt_Baker.pdf PDF
XS_FSR_1144-1130.pdf PDF
FSR_1050_AOP_EARTHWORK.pdf PDF
SWPPP_WA_ERFO_2016(1)-20(1).pdf PDF
IFB_MT_Baker.pdf PDF
Mt_Baker_Plan_Preliminary.pdf PDF
Preliminary-Letter-Mt_Baker.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA FS ERFO 2016(1)-20(1), MT. Baker Emergency Repairs 2016, Whatcom and Skagit County, WA.

The work consists of Grading, aggregate, asphalt paving, drainage, MSE walls, special rock embankment for 8 intermittent damaged sites, and other small items of work.

Project length: .25 Miles

Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: 1 million to $2 million

Location: 35 Miles SE of Bellingham, WA

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

Sc h

Na m e

A_

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (Silt Fence) 1350 LNFT 157 Soil Erosion & Sediment Control (Temporary Diversion Channel) LPSM

DIVISION 200 – Earthwork 20102-0000 Clearing & Grubbing LPSM 20301-1900 Removal of Pipe Culvert 2 EACH 20301-2800 Removal of Structures and Obstructions (Concrete Barrier) 20 Each 20304-9000 Removal of Stream Debris LPSM

20401-0000 Roadway Excavation 820 CUYD 20401-0000 Unclassified Borrow 30 CUYD 20701-1000 Separation-Stabilization Geotextile, Class 2, Type E 360 SQYD 20702-0300 Geotextile Filter, Class 1, Type C 980 SQYD

On e S ch ed ul e

Sc h

Na m e

A_

DIVISION 250 – Slope Reinforcement and Retaining Walls 25101-0100 Placed Riprap, Method A, Class 1 30 CUYD 25101-0300 Placed Riprap, Method A, Class 3 50 CUYD 25101-0500 Placed Riprap, Method A, Class 5 820 CUYD 25101-0600 Placed Riprap, Method A, Class 6 120 CUYD 25201-1000 Special Rock Embankment, Mechanically Placed 1600 CUYD 25201-1000 Mechanically Stabilized Earth Wall, Welded Wire Face 1230 SQYD

DIVISION 300 – Aggregate and Base Courses 30202-2000 Roadway Aggregate, Method 2 780 CUYD 30302-1000 Ditch Reconditioning 200 LNFT

DIVISION 400 – Asphalt Pavements & Surface Treatments 40301-0100 Asphalt Concrete Pavement, Type

1 120 TONS

41202-0000 Tack Coat 33 GAL

DIVISION 600 – Incidental Construction 601 Minor Concrete Structures (concrete – minor structures) 60201-0800 24” Culvert 30 LNFT 60302-0000 Structural Plate Pipe Arch (16’-3 Inch X 10’-10-Inch) 85 LNFT 60705-0000 Repairing Drainage Structures (30- Inch Diameter) 1 EACH 60706-0000 Cleaning Drainage Structure 4 EACH 61805-0000 Reset Barrier 70 LNFT 62407-0000 Placing Conserved Top Soil 21 CUYD 62501-0000 Turf Establishment 0.5 ACRE 63501-0000 Temporary Traffic Control LPSM 64703-5000 Mitigation, Root Wad 11 EACH 64703-6000 Mitigation, Fish Passage Boulder (28 – 39 Inch Diameter) 140 EACH 64704-1000 Mitigation, Streambed Material 160 CUYD

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments

File details come from the government source that posted it. Updated .