AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 04/19/2018 N/A See Block 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X DTFH7017B00035

9B. DATED (SEE ITEM 11)

03/22/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A D OTHER (Specify type of modification and authority)

N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA FS ERFO 2016(1)-20(1), MT. Baker Emergency Repairs 2016.

Amendment A001 is issued to correct Plan Sheet Page A.1.

ENCLOSURES: Plan Sheet A.1

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

INDEX TO SHEETS

PROJECT MANAGER

R

E N

O R

A I

N

N

ST F

R

I

D

D E P A

T

NTOFT A SP

T T

O

U

TE

ATESO

AM

E R

IC

A

M

SCALE IN MILES

0 5 105

Samish

Bay

S U M A S

M O U N T A I N

F. TEMPORARY TRAFFIC CONTROL

E. DRAINAGE

D. EROSION CONTROL

AND PROFILE(S)

C. TYPICAL SECTION(S), QUANTITIES, PLAN(S)

B. SUMMARIES

A. GENERAL INFORMATION

B. CHON

FOREST

NATIONAL

MT. BAKER

BRITISH COLUMBIA

I D

A H

O

OREGON

UNITED STATES

CANADA

P A

C I F I C

O C

A E

N tS rait ofJuan deFuca

OC

LU

MBIA R

IV

ER

A

SN

KE

R

VERI

M

COLU B

I A

V R I

E R

Lakes

Banks

Lakes

Moses

Reservoir

Potholes

OLYMPIC

NATIONAL

PARK

MOUNT

RAINIER

N.P.

MOUNT

ST. HELENS

NAT'L VOLC.

MON.

NORTH

CASCADES

NATIONAL

PARK

BELLINGHAM

Forks

Aberdeen

Chehalis

Longview

OLYMPIA

TACOMA

SEATTLE

EVERETT

Wenatchee

Lake

Moses

SPOKANE

Pullman

Pasco

RICHLAND

Kennewick Walla Walla

ANGELES

PORT

Townsend

Port Vernon

Mt.

VANCOUVER

WASHINGTON KEY MAP

YAKIMA

u n d o S t e g u

P

Noo ks ac k River

N

STANDARD DRAWINGS

AND DETAILS

TEMPORARY TRAFFIC CONTROL QUANTITIES

STANDARD DRAWINGS

RIPRAP HEADWALL DETAILS

ROCK WEIR DETAIL

CULVERT SEDIMENT RETENTION SILL DETAILS

SIMULATED STREAM CULVERT TREATMENT

BOX CULVERT DETAILS

FSE 1050 MP 1.7 AOP CULVERT

TABULATION OF DRAINAGE QUANTITIES

STANDARD DRAWINGS

SURVEY CONTROL

FSR 1050 MP 1.7

FSR 1130 MP 4.1 & 1144 MP 0.1

FSR 3140 MP 0.5

FSR 31 MP 6.7

TABULATION OF QUANTITIES

SUMMARY OF QUANTITIES

VICINITY MAPS

PLAN SYMBOLS AND ABBREVIATIONS

TITLE SHEET

F.2-5

F.1

E.10-13

E.9

E.8

E.7

E.6

E.3-5

E.2

E.1

D.1-3

C.13

C.11-12

C.8-10

C.5-7

C.2-4

C.1

B.1-2

A.3

A.2

A.1

A.1

STATE PROJECT

NUMBER

SHEET

S u r F t

D c m y fi le s p w p r o d u c ti o n d w a e f1 a a S ig n a tu r e .d g n

WA FS ERFO 2016(1)-20(1)

A

M

M a r c h

K

H a r r is o n

R

M e a d o w s

C h e c k e d b y

D e s ig n e d b y

FEDERAL HIGHWAY ADMINISTRATION

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DESIGN DESIGNATION:

SPECIFICATION:

VANCOUVER, WASHINGTON

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PLANS PREPARED BY

PLANS FOR PROPOSED PROJECT

Western Federal Lands Highway Division

Chief of Engineering, WA FS ERFO 2016(1)-20(1)

MT. BAKER EMERGENCY REPAIRS 2016

Lake

Samish

Bay

Bellingham

LENGTH 0.136 MILES

TYPE OF CONSTRUCTION:

WASHINGTON

WHATCOM COUNTY AND SKAGIT COUNTY

MT. BAKER-SNOQUALMIE NATIONAL FOREST

W I L D E R N E S S

M T . B A K E R

Project Location

DATE

MT. BAKER

Lake Baker

MP 1.7

FSR 1050

Bellingham

Samish

Shannon Lake

Lakes Twin

SKAGIT CO.

WHATCOM CO.

Lake Whatcom

Lake Wiser

MP 4.1

FSR 1130

MP 0.1

FSR 1144

FSR 3140

MP 0.5

MP 6.7

FSR 31

drainage and special rock embankment

Grading, aggregate, asphalt paving, e (max)

V

ADT (2038)

ADT (2018)

N/A

VARIES

<100

<100 on Federal Highway Projects, FP-14

Construction of Roads and Bridges

Standard Specifications for

APPROVED:

/s/ Edward S. Hammontree 02/28/2018 david.l.mariman Polygon david.l.mariman Polygonal Line david.l.mariman Typewritten Text david.l.mariman Typewritten Text Revised by Amendment A001