SF-30.pdf

PDF 169 KB Posted

Attached to
MT DAR 2017(2), 2017 By Mile Fergus Area
Solicitation number
DTFH7017B00030
Issued by

About this file

Amendment A00001

View the file

Other files

File Type Posted
Bid_Opening_Summary._MT_DAR_2017(2),_2017_By_Mile_-_Fergus_Area.pdf PDF
Amendment_000008.pdf PDF
fp14.pdf PDF
SF30_A7.pdf PDF
SF30_A6.pdf PDF
SF30_A6.pdf PDF
SF30_A5.pdf PDF
SF30amd.pdf PDF
SF-30.pdf PDF
IFB_Fergus.pdf PDF
Plan_Request_form_Fergus_Area.pdf PDF
mt-d201702_DAR2017(2)_Plans_Sign_Stamped.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7017B00030

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

WFLHD

Vancouver WA 98661-3801 610 East Fifth Street Western Federal Lands Highway Div.

Federal Highway Administration

SEE BLOCK 1410/31/17000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/13/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MT DAR 2017(2), 2017 By Mile - Fergus Area

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Angy Liljedahl

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Working Copy

Amendment A000001 is to answer questions that were submitted in response to this bid. See page 2 for questions and answers.

MT DAR 2017(2)

2017 By Mile – Fergus Area

# General Technical Question Answer Date 1 X I have been looking thru the Standard specifications and did not come across 303‐ (specifically Road reconditioning) and 311‐ Stabilized Aggregate Surface Corse / Calcium Chloride. Do you know where I could find some clarification on those specifications?

This solicitation cites the FP‐14, which can be viewed at https://flh.fhwa.dot.gov/resources/specs/ However, both Section 303 and 311 are replaced by Special Contract Requirements.

The SCR’s are included in the Invitation for Bids (IFB) posted at https://www.fbo.gov/index?s=opportunity &mode=form&id=749de7509b96a3455909 71f8667bacb7&tab=core&_cview=1

10/30/17

X Is a SWPPP permit required and who pays for it? There is no SWPPP required for this project. 10/31/17

Check General or Technical