PROJECT_DESCRIPTION.pdf

PDF 39 KB Posted

Attached to
MT DAR 2017(2), 2017 By Mile Fergus Area
Solicitation number
DTFH7017B00030
Issued by

View the file

Other files

File Type Posted
Bid_Opening_Summary._MT_DAR_2017(2),_2017_By_Mile_-_Fergus_Area.pdf PDF
Amendment_000008.pdf PDF
fp14.pdf PDF
SF30_A7.pdf PDF
SF30_A6.pdf PDF
SF30_A6.pdf PDF
SF30_A5.pdf PDF
SF30amd.pdf PDF
SF-30.pdf PDF
SF-30.pdf PDF
IFB_Fergus.pdf PDF
Plan_Request_form_Fergus_Area.pdf PDF
mt-d201702_DAR2017(2)_Plans_Sign_Stamped.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT DAR 2017(2), 2017 By Mile.

The work consists of Roadway reconditioning, aggregate surfacing, aggregate stabilization, grading, drainage and other small items of work.

Project length: Varies

Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $500,000 to $1,000,000.00

Location: E-10 Road is located approximately 12 miles north of Hilger, MT off of Montana 236.

M-10 Road is located at Moccasin, MT off of US 87 and Montana 200 on Montana 426 (North Kolin Road). N-10 and N-11 Roads are located approximately 7 miles east of Lewiston, on US 87 and Montana 200 at Gilt Edge Road and Black Butte Road. O-07 Road is located South of Roy, MT off of US 191, on Black Butte Road. O-11 Road is located approximately 7 miles West of Roy, MT off of US 191 on Irish Road and Horse Ranch Road.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) 1,770 lnft 158 Watering for Dust Control 4,330 mgal

DIVISION 250 – Slope Reinforcement and Retaining Walls 25101-0200 Placed Riprap, Method A, Class 2 14 cuyd 25101-0300 Placed Riprap, Method A, Class 3 116 cuyd DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 1,205 ton 303 Road Reconditioning 234,063 lnft 311 Stabilized Aggregate Surface Course 96,007 ton 311 Calcium Chloride 1,968 ton

On e S ch ed ul e

DIVISION 600 – Incidental Construction 602 Culverts 260 lnft 607 Cleaning, Relaying, & Repairing Existing Drainage Structures 27 each 619 Remove and Reset Fence 20 lnft 621 Monument (Section Corner) 1 each 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) 0.5 ac 635 Temporary Traffic Control – Flagger 2,520 hr 635 Temporary Traffic Control – Railroad Flagger 1 CTSM 635 Temporary Traffic Control – LPSM Yes

DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses

File details come from the government source that posted it. Updated .