PROJECT_DESCRIPTION.pdf
PDF 39 KB Posted
- Attached to
- MT DAR 2017(2), 2017 By Mile Fergus Area
- Solicitation number
- DTFH7017B00030
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary._MT_DAR_2017(2),_2017_By_Mile_-_Fergus_Area.pdf | ||
| Amendment_000008.pdf | ||
| fp14.pdf | ||
| SF30_A7.pdf | ||
| SF30_A6.pdf | ||
| SF30_A6.pdf | ||
| SF30_A5.pdf | ||
| SF30amd.pdf | ||
| SF-30.pdf | ||
| SF-30.pdf | ||
| IFB_Fergus.pdf | ||
| Plan_Request_form_Fergus_Area.pdf | ||
| mt-d201702_DAR2017(2)_Plans_Sign_Stamped.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT DAR 2017(2), 2017 By Mile.
The work consists of Roadway reconditioning, aggregate surfacing, aggregate stabilization, grading, drainage and other small items of work.
Project length: Varies
Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $500,000 to $1,000,000.00
Location: E-10 Road is located approximately 12 miles north of Hilger, MT off of Montana 236.
M-10 Road is located at Moccasin, MT off of US 87 and Montana 200 on Montana 426 (North Kolin Road). N-10 and N-11 Roads are located approximately 7 miles east of Lewiston, on US 87 and Montana 200 at Gilt Edge Road and Black Butte Road. O-07 Road is located South of Roy, MT off of US 191, on Black Butte Road. O-11 Road is located approximately 7 miles West of Roy, MT off of US 191 on Irish Road and Horse Ranch Road.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) 1,770 lnft 158 Watering for Dust Control 4,330 mgal
DIVISION 250 – Slope Reinforcement and Retaining Walls 25101-0200 Placed Riprap, Method A, Class 2 14 cuyd 25101-0300 Placed Riprap, Method A, Class 3 116 cuyd DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 1,205 ton 303 Road Reconditioning 234,063 lnft 311 Stabilized Aggregate Surface Course 96,007 ton 311 Calcium Chloride 1,968 ton
On e S ch ed ul e
DIVISION 600 – Incidental Construction 602 Culverts 260 lnft 607 Cleaning, Relaying, & Repairing Existing Drainage Structures 27 each 619 Remove and Reset Fence 20 lnft 621 Monument (Section Corner) 1 each 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) 0.5 ac 635 Temporary Traffic Control – Flagger 2,520 hr 635 Temporary Traffic Control – Railroad Flagger 1 CTSM 635 Temporary Traffic Control – LPSM Yes