PROJECT_DESCRIPTION.pdf

PDF 17 KB Posted

Attached to
WA NPS NOCA 20(1), Skagit River Bridge Repair
Solicitation number
DTFH7017B00019
Issued by

View the file

Other files

File Type Posted
BidSum_Skagit.pdf PDF
A001.pdf PDF
Plan_Request_form_Skagit.pdf PDF
9470-015P.pdf PDF
GM_40-15_Skagit_River_Bridge__WA_NPS_NOCA_20(1)_Final_Geotechnical_Recommendations_9Dec2015.pdf PDF
NOCA02001_Plan_Set.pdf PDF
IFB__Skagit.pdf PDF
9470-015P_Skagit_River_Bridge_2014.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA NPS NOCA 20(1), Skagit River Bridge Repair, North Cascades National Park, Whatcom County, Washington

The work consists of bridge overlay (thin epoxy layer), grading, subexcavation, base, paving and other small items of work. The bridge work consists of preparing the bridge deck, repairing any deteriorated areas on the deck as required and applying a thin epoxy overlay.

Project length: .06 Miles

Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: Less than $150,000

Location: 60 Miles East of Burlington, Washington

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O ne

S ch ed ul e C li ck h er e to e nt er te xt

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) No 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) 157 Plastic Lining 200 SQYD 157 Silt Fence 100 LNFT 157 Inlet Protection 2 EACH DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (Curb and Gutter) 50 LNFT 204 Subexcavation 50 CUYD 204 Roadway Excavation 12 CUYD 204 Select Borrow 35 CUYD 207 Separation-Stabilization Geotextile, Class 1, Type A 250 SQYD DIVISION 300 – Aggregate and Base Courses 302 Roadway Aggregate, Method 2 14 TON DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete Pavement, Type 1 7 TON DIVISION 550 – Bridge Construction 575 Minor Bridge Work (Thin Epoxy Overlay) LPSM DIVISION 600 – Incidental Construction 605 Standard Underdrain System 35 LNFT

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O ne

S ch ed ul e C li ck h er e to e nt er te xt

609 Curb & Gutter, Concrete, 13-inch Depth 50 LNFT 617 Guardrail (Remove and Reset, Terminal Section) 2 EACH 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (Placing Conserved) 30 SQYD 635 Temporary Traffic Control – Barricade Type 3 4 EACH 635 Temporary Traffic Control – Construction Sign 40 SQFT

File details come from the government source that posted it. Updated .