AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 4/19/17 N/A See Block 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH7017B00019

9B. DATED (SEE ITEM 11)

04/19/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA NPS NOCA 20(1) SKAGIT RIVER BRIDGE REPAIR

Amendment A001 is being issued to replace Plan Sheet A.1 removing the UNESCO World Heritage Site Symbol. The Amendment also adds additional Physical Data not listed in FAR Clause 52.236-4 that was not included with the original solicitation.

See attached

- Plan Sheet A.1

- Skagit River Bridge, 2016 Inspection Report 9470-015P

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Glenn.Kutzera Rectangle

BRIDGE INSPECTION REPORT

SKAGIT RIVER BRIDGE

NEWHALEM CAMPGROUND ACCESS RD OVER SKAGIT RIVER

NORTH CASCADES NATIONAL PARK

LN

STRUCTURE NO. 9470-015P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 8/4/16

Report prepared by: WD

Federal Highway Administration FLH Office of Bridges and Structures 21400 Ridgetop Circle Sterling, VA 20166 703-404-6201 https://bridge.flhd.fhwa.dot.gov http:https://bridge.flhd.fhwa.dot.gov

STRUCTURE NO. 9470 015P

SKAGIT RIVER BRIDGE INSPECTION DATE: 8/4/16

STRUCTURE SUMMARY

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL:

MAIN SPAN TYPE:

# OF BEAMS, MAIN SPAN: ..

DECK TYPE:

WEARING SURFACE:

ABUT. FOUNDATIONS:

PIER FOUNDATION(S):

ABUTMENT / PIER MAT'L: ...

PROJ./PLAN REF. NO:

NPS ROAD CLASS:

STRUCTURE HISTORY:

CONCRETE CONTINUOUS

BOX GIRDER - SINGLE or SPREAD

CONCRETE CAST-IN-PLACE

NONE

N/A

SPREAD FTG ON BEARING MAT'L

N/A / CONCRETE

UNKNOWN / RG1412

2 - CONNECTOR ROAD

LOCATION

NO. OF MAIN SPANS:

NO. OF APPR. SPANS:

STRUCT. TOTAL LENGTH: ..

MAX. SPAN LENGTH:

DECK WIDTH:

CURB TO CURB WIDTH:

YEAR BUILT:

YEAR RECONSTRUCTED: ..

SKEW ANGLE:

FRACTURE CRITICAL:

314.0 FT (95.7 M)

100.0 FT (30.5 M)

18.5 FT (5.6 M)

14.0 FT (4.3 M)

N/A

0 °

NO

NORTH CASCADES NATIONAL PARK MILE POINT: ..................... 0.04 (KM PT 0.06)

STATE: ................................. WASHINGTON LOCATION: 100 feet South of Highway 20 (MP 119.9).

FACILITY CARRIED: ............ NEWHALEM CAMPGROUND ACCESS RD

FEATURE INTERSECTED: .. SKAGIT RIVER

STRUCTURE EVALUATION SUMMARY

This "bobtail" cantilever concrete box girder bridge is in generally good structural condition, but exhibits some problems that require attention. These problems include widespread minor deterioration of the deck concrete, which can allow water to penetrate into the box girder; and an ongoing loss of approach embankment under the end of the bridge. The deteriorated concrete deck should be removed, and the deck protected with a concrete overlay. Some erosion control measures have been installed under the bridge ends, however the erosion and the embankment loss continues and will be monitored during future inspection cycles. Consideration should be given to construction of concrete slabs at the approaches to better distribute traffic loads.

The bridge is scheduled for rehabilitation under Project WA NPS NOCA 20(1). Work will include sealing the concrete deck, replacing the south approach pavement, and repairing undermining at the approach.

Other minor problems include debris and embankment against the side of the concrete box girder at the northeast corner and minor erosion of the approach shoulder at the northwest end.

It should be noted that replacement of this one-lane bridge with a two-lane structure has been under consideration for some time. Replacement is warranted based on the expected increase in traffic due to the newly constructed visitor center, as well as future improvements and additions to the Newhalem campground facility. If the replacement bridge is not constructed, however, corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems.

INSPECTION TEAM: E. MILTNER, S. LOFTUS

CONDITION ASSESSMENT:

ED MILTNER, P.E., FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/3/17

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

STRUCTURE SUMMARY

STRUCTURE EVALUATION SUMMARY CONTINUED

It should also be noted that this structure has been designated as being "scour-critical". However, appraisal of actual scour conditions was inhibited by swift current and debris present at the upstream face of piers. It is recommended that the piers be periodically inspected by the NPS for scour during periods of minimal flow discharge from the dam located upstream.

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 9470 015P

226 PRIORITY OF IMPROVEMENT C

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

PRELIM. MAINTENANCE TOTAL :

ITEM

REHABILITATION/RECONSTRUCTION

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

NO (TYPICALLY NEEDED WITHIN 5 YEARS)

REHAB. RECONSTR.

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.

Bridge may be replaced in the near future; recommendations only apply if bridge is not replaced.

FIELD INSPECTION REPORT STRUCTURE NO. 9470 015P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 5

DECK SLAB1. F

EXPANSION JOINTS2. G

WEARING SURFACE3. N

RIDEABILITY4. G

CURBS, SIDEWALKS, AND MEDIAN5. F

PARAPETS AND/OR RAILINGS6. G

DRAINS AND DRAINAGE7. F

UTILITIES8. G

DEFLECTION AND/OR VIBRATION9. G

OTHER10. N

59. SUPERSTRUCTURE 7

BEARING DEVICES1. F

GIRDERS OR BEAMS2. G

ARCH(ES) OR SLAB(S)3. N

FLOOR BEAMS AND STRINGERS4. N

TRUSSES5. N

DIAPHRAGMS AND BRACING6. N

7. PAINT N

FASCIA(E)8. N

DEFLECTION AND/OR VIBRATION9. G

ALIGNMENT10. G

OTHER11. (DEBRIS) F

60. SUBSTRUCTURE 7

ITEM REFERENCE AND REMARKS

ABUTMENTS

58.1 WIDESPREAD MINOR SCALING AND ABRASION OF DECK SURFACE;

MODERATE IN CURBLINES AT NORTH END OF BRIDGE.

WIDESPREAD SHRINKAGE CRACKING OF DECK SURFACE IN SOUTH

HALF OF BRIDGE. MINOR POPOUTS IN DECK AT SOUTH END OF

SPAN #3. MAP CRACKING AT DECK ENDS.

MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON

UNDERSIDE OF DECK OVERHANGS; MODERATE RUST STAINING

FROM STEEL SIDEWALK DRAINS ON DOWNSTREAM OVERHANG,

SPANS #3 AND #4. MODERATE SCALING OF EDGES OF

OVERHANGS.

SEVERAL 4" DIAMETER HOLES IN DECK; HOLES HAVE BEEN FILLED

WITH CONCRETE; MOST APPEAR TO HAVE BEEN FORMED AND ARE

SLEEVED.

5" DRAIN HOLE CUT IN DECK, SPAN #4, DIRECTLY OVER SIMILAR

HOLE IN BOTTOM SLAB OF BOX GIRDER.

58.5 MINOR TRANSVERSE CRACKING AND SCALING OF CURB AND

SIDEWALK; MINOR EFFLORESCENCE FROM CRACKS IN VERTICAL

FACES. MINOR SPALLING WITH EXPOSED REBAR AT ENDS OF

SIDEWALK. CURBS ALONG SOUTH APPROACH ARE FRACTURED

AND SPALLED DUE TO SETTLEMENT (SEE 222.6).

58.6 GALVANIZED THRIE-BEAM RAILINGS; PEDESTRIAN RAILING

EXTENSION ATTACHED TO WEST RAILING. TOP RAIL CAP MISSING

AT BOTH ENDS AND RUSTED MIDDLE RAIL OF WEST RAILING.

58.7 MINOR TO MODERATE DEBRIS ACCUMULATION IN CURBLINES;

MINOR MOSS GROWTH ON CURB AND SIDEWALK AT ENDS.

SEVERAL SCUPPERS CLOGGED, CAUSING WIDESPREAD

MODERATE PONDING IN CURBLINES. SEE ALSO 58.1,8.

58.8 UPSTREAM SIDE DECK DRAINS EMPTY DIRECTLY ONTO WATER

LINE MOUNTED ON UPSTREAM WEB OF BOX GIRDER. ELECTRIC

LINES ON DOWNSTREAM SIDE OF STRUCTURE.

59 CONCRETE CANTILEVER BOX GIRDER SUPERSTRUCTURE.

1. BREASTWALLS OR COLUMNS N

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS N

4. BACKWALLS AND/OR BULKHEADS G

5. FOUNDATIONS N

6. WINGWALLS N

7. WEEP HOLES N

8. EXPANSION JOINTS N

9. EROSION AND/OR SCOUR F

10. SETTLEMENT OR DEFLECTION G

11. SLOPE PROTECTION G

12. OTHER N

PIER(S)

G13. WALLS AND/OR COLUMNS

N14. PILE BENTS

G15. CAPS AND/OR BEARING SEATS

G16. FOUNDATIONS (BURIED)

F17. EROSION AND/OR SCOUR

G18. SETTLEMENT OR DEFLECTION

N19. OTHER

AND REMARKSITEM REFERENCE

61. CHANNEL 6

G 1. ALIGNMENT

F2. EROSION AND/OR SCOUR

G 3. CHANNEL PROTECTION

F 4. WATERWAY OBSTRUCTIONS

N 5. OTHER

SUFF ADEQUACY OF OPENING 6.

7. HIGHNORMAL VELOCITY

30 FT. 8. AVERAGE CLEAR OPENING

9. STREAM BED COMPOSITION :

GRAVEL, COBBLES

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT6.

EROSION5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

APPROACH SLABS 1. N

N

N

F

F

F

G

G

N

223. RETAINING WALL 7

OTHER6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

WALL1. G

N

N

G

G

N

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 1

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

59.1 ROCKER BEARINGS AT PIER #1 TILTED 5 DEGREES TOWARD FILL;

BEARINGS AT PIER #4 TILTED APPROXIMATELY 10 DEGREES

TOWARD FILL.

59.2 REBAR CHAIRS EXPOSED AND RUSTED IN SOME LOCATIONS ON

UNDERSIDE OF BOX GIRDER. PIECES OF WOOD WEDGED IN DRAIN

HOLES OVER PIER #4 AND BETWEEN BOX GIRDER AND BEARING

SEAT AT PIERS #1, #2, AND #3. ONE HOLE IN SPAN #3 BOX

UNDERSIDE. SEE ALSO 58.1.

59.11 EMBANKMENT AND DEBRIS AGAINST SIDEWALL OF BOX GIRDER AT

NORTHEAST END OF BRIDGE, SPAN 1.

60.1 RATING FOR 60.1 IS "N"

60.9 GABION BASKET SLOPE PROTECTION UNDER SOUTH ENDWALL

(SEE 223.1); MODERATE EROSION AT DOWNSTREAM SIDE WITH

FULL-DEPTH UNDERMINING OF ENDWALL FOR 2' WIDTH; NO

UNDERMINING OF GABION WALL.

MODERATE UNDERMINING (UP TO 6' LENGTH) AT NORTH END OF

CANTILEVER SUPERSTRUCTURE, DOWNSTREAM SIDE, BEHIND

ENDWALL.

60.13 MODERATE SCALING OF PIERS #2 AND #3 AT WATERLINE.

60.15 FORM TIES REMAIN IN CONCRETE AT TOP OF PIERS.

60.17, 61.4 SCOUR ALONG PIERS NOT VERIFIED DUE TO RAPID AND DEEP

CURRENT DURING INSPECTION. HYDRAULIC JUMP UNDER SPAN #2

NEAR PIER #2 AND WATER FLOW CONDITION MIGHT BE INDICATION

OF SCOUR ALONG PIERS. THIS CONDITION SHOULD BE VERIFIED

DURING LOW CURRENT.

DEBRIS PILED AGAINST UPSTREAM EDGE OF PIER 3.

222.4,6 UP TO 1" SETTLEMENT OF APPROACH PAVEMENT ALONG BOTH

BRIDGE JOINTS. MINOR TRANSVERSE CRACKING OF ASPHALT

PAVEMENT AT BOTH APPROACHES.

222.5 MINOR EROSION OF SHOULDER AT NORTHWEST BRIDGE END.

222.7 "ONE LANE BRIDGE" PASSAGE CONTROLLED BY SIGNAL LIGHT AT

EACH END; SIGNALS WERE FUNCTIONING AT TIME OF INSPECTION.

"ROAD CLOSED" ON OPEN GATE AT NORTH END OF BRIDGE; GATE

IS OPEN.

ADDITIONAL ITEM REFERENCE AND REMARKS

223.1 WIRE BASKET RETAINING SYSTEM AT SOUTH END OF BRIDGE IN LIEU OF ABUTMENT.

UPSTREAM CORNER OF SOUTH ENDWALL.

STACKED ROCK WALL AT

36.B,C,D GALVANIZED W-BEAM APPROACH RAILINGS PRESENT; TERMINATORS AT ENDS.

INSPECTION DATE: 8/4/16

TRUCK TYPE

TONS

INVENTORY RATING (NORMAL TRAFFIC)

METRIC TONS METRIC TONSTONS

OPERATING RATING (MAXIMUM LOAD)

H

HS

TYPE 3

TYPE 3S2

TYPE 3-3

DESIGN LOADING:

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS:

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

WEB1

8/16

X

X

STRUCTURE LOAD RATING

SKAGIT RIVER BRIDGE

HS20 (MS18)

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9470 015P

STRUCTURE IDENTIFICATION

(201) PARK: NORTH CASCADES NATIONAL PARK (1) STATE: ....................................... 530 - WASHINGTON (WA)

(202) STRUCTURE NAME: .......... SKAGIT RIVER BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 073 - WHATCOM

(4) CITY/PLACE CODE:

(204) STRUCTURE NUMBER: ..... 9470-015P

(205) NPS REGION: .................... 6 - PACIFIC WEST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 202 (6) FEATURES INTERSECTED:....... SKAGIT RIVER

(207) ROAD SECTION NO: ..........015P (7) FACILITY CARRIED: .................. NEWHALEM CAMPGROUND A

(208) NPS ROAD CLASS: ............ 2 - CONNECTOR ROAD (8) STATE STRUCTURE NO: .......... 9470015P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 100 feet South of Highway

(210) OPERATING UNIT: ............. SKAGIT (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ UNKNOWN (11) MILE POINT: ............................. 0.04 (KM PT 0.06)

(212) DRAWING NUMBERS: ....... RG1412 (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

06 - BOX GIRDER - SINGLE or SPREAD

100.0 FT (30.5 M)

314.0 FT (95.7 M)

6 - N/A

6 - N/A

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 0 - NONE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION:

0 - NONE

NO(218) IS SALT USED?:

LOAD RATING AND POSTING

(31) DESIGN LOAD:

5 - HS20 (MS18) (41) LOAD RESTRICTION:

A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 50.0 TONS (45.4 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 83.0 TONS (75.3 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 8/16 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. YES

(221) SPECIAL STUDY DATE: INSP. EVERY: 60 MONTHS - LAST INSP. : 8/16

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9470 015P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 48°40'19.00" (51) CURB TO CURB WIDTH: ........... 14.0 FT (4.3 M)

(17) LONGITUDE: ......................... 121°15'45.40" (52) DECK WIDTH: ............................ 18.5 FT (5.6 M)

(19) DETOUR LENGTH: ............... 199 MI (199 KM) (32) APPR. ROADWAY WIDTH: ........ 20.0 FT (6.1 M)

(28A) LANES ON STRUCT: .......... 01 (213) APPR. PAVEMENT WIDTH: ..... 14.0 FT (4.3 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 4.0 FT (1.2 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 2.0 FT (0.6 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 200 (34) SKEW ANGLE: ............................ 0 °

(30) YEAR OF ADT: ...................... 2010 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 500 (47) TOTAL HORIZ. CLEARANCE: .... 14.0 FT (4.3 M)

(115) YEAR OF FUTURE ADT: ..... 2030 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 3.3 FT (1.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

(111) ABUT. OR PIER PROT: ....... 1 - NAV PROTECTION NOT REQUIRED MATERIAL: .............................. 4 - STEEL

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 3.08 FT (0.94 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL:

(36) TRAFFIC SAFETY FEAT: ... 1111

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

3 - Scour critical; foundations un

2 - REHAB/RECONSTRUCTION

C - MODERATE

$6,500

$565,000

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

SPANS #1 & #5 = 36'. SPANS #2 & #4 = 87'. SPAN #3 = 100'.

http:121�15'45.40 http:48�40'19.00

APPENDIX STRUCTURE NO. 9470 015P

PHOTOGRAPHS STRUCTURE NO. 9470 015P

FLOW

PHOTO #1 - LOOKING SOUTH TOWARDS VISITOR CENTER

PHOTO #2 - EAST (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW OF DECK LOOKING NORTH

PHOTO #4 - TYPICAL WEARING OF DECK SURFACE

PHOTO #5 - CORING HOLE IN DECK NEAR SOUTH END

PHOTO #6 - GENERAL VIEW OF RAIL AND CURB ON UPSTREAM SIDE

LOOKING NORTH

PHOTO #7 - GENERAL UNDERSIDE VIEW, SPAN 1 SHOWN

PHOTO #8 - TYPICAL TILT ON SEGMENTAL ROCKER BEARINGS ON PIER

#4, UPSTREAM BEARING SHOWN

PHOTO #9 - GENERAL VIEW OF NORTH ENDWALL; NOTE UNDERMINING

PHOTO #10 - GENERAL VIEW OF NORTH FACE OF PIER #1

STRUCTURE NO. 9470 015PPHOTOGRAPHS

PHOTO #11 - GENERAL VIEW OF SOUTH FACE OF PIER #3

PHOTO #12 - VIEW OF SOUTH FACE OF PIER # NOTE HYDRAULIC2;

JUMP

PHOTO #13 - CLOSE-UP OF HYDRAULIC JUMP AT NORTH FACE OF PIER

#2

PHOTO #14 - VIEW OF PIER #3 LOOKING NORTH; NOTE DEBRIS

ACCUMULATION ON UPSTREAM SIDE

PHOTO #15 - CLOSE-UP OF DEBRIS ACCUMULATION AT PIER #3 FROM

BRIDGE

PHOTO #16 - GENERAL VIEW OF PIER #4 LOOKING NORTH

PHOTO #17 - GABIONS AT SOUTH ENDWALL (APPROACH FILL

STABILIZATION MEASURE)

PHOTO #18 - VIEW FROM BRIDGE LOOKING UPSTREAM

PHOTO #19 - VIEW FROM BRIDGE LOOKING DOWNSTREAM

SF30amd
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001
Sheet A.1
Skagit River Bridge, 2016 Inspection Report 9470-015P

File details come from the government source that posted it. Updated .