About this file

Amendment A001

View the file

Other files for this federal contract opportunity

Other files attached to WA NPS MORA 123(1), Rockfall Mitigation at SR123, newest first.
File Type Posted
BidSum_Rockfall.pdf PDF
Plan_Request_form_Rockfall_Mitigation.pdf PDF
IFB_Rockfall.pdf PDF
GM_17-16.pdf PDF
GM_04-14.pdf PDF
Rockfall_SR123_FINAL_SET.pdf PDF
PROJECT_DESCRIPTION_WA_NPS_MORA_123(1).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 06/13/2016 N/A WA MORA 123(1)

Rockfall Mitigation at SR 123

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-16-B-00010

9B. DATED (SEE ITEM 11)

06/07/2013

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA MORA 123(1), Rockfall Mitigation at SR 123

See page 2 for revisions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

WA MORA 129(1)

Rockfall Mitigation at SR 123

Amendment No. A001, dated 6/13/16 Solicitation No. DTFH70-16-B-00010

REVISIONS ARE AS FOLLOWS:

PLANS

Plan sheet #E.3 Adds sheet

ENCLOSURES

Plan Sheets:

E.3

NO SCALE

LENGTH AND SPACING TABLE

SPEED*

APPROACH

AREA

TAPER

SPACE

BUFFER

SPACE

WORK

CHANNELIZING DEVICE

not the advisory speed.

Approach speed based on the regulatory posted speed, *

SIGN SPACING TABLE

ROAD TYPE

DISTANCE BETWEEN

A B C

STOP

HERE ON

RED

ROAD WORK

END

ROAD WORK

END STOP

HERE ON

RED

LENGTH

BUFFER SPACE

Expressway / Freeway xx

MPH

ONE LANE

ROAD

AHEAD

WORK

ROAD

AHEAD

(optional) light warning

Type B

See Note 5

STOP LINE

Channelizing devices

See Note 5

STOP LINE

See Note 2

Temporary traffic signal to provide access to work space downstream taper if necessary

Reduce or eliminate drums in

See Note 2

Temporary traffic signal

NPS Drwg. No. _______

NPS PMIS No. 216994

635-9

STANDARD APPROVED FOR USE 6/2005

DRAFT: 9/2014

REVISED:

MPH FEET

SPACING IN FEET

Rural greater than 50 MPH

Urban and Rural 35 MPH to 50 MPH

Urban and Rural 30 MPH and less

SIGNS IN FEET

it has two signal faces that are at least 8 feet apart and meets the other

500-800’

See Note 7

10’ min.

40’ - 180’

50’ - 100’ 50’ - 100’ (optional)

40’ - 180’

(WITH SIGNALS)

SINGLE LANE CLOSURE LAYOUT

TEMPORARY TRAFFIC CONTROL

STATE PROJECT

NUMBER

SHEET

E.3

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

NPS MORA 123 (1)WA

P

M

M a r c h

U

S C c m y fi le s p w p r o d u c ti o n d m o r a e c .d g n

FEDERAL LANDS HIGHWAY

U.S. CUSTOMARY STANDARD

STANDARD

(optional)

W1-4

(optional) (optional)

WORK SPACE

Traffic flow

Traffic flow

W3-3

R10-6

See Note 6

G20-2

See Note 6

G20-2

Spacing Table)

(See Length andSee Note 5

8.

7.

6.

5.

4.

3.

2.

1.

See Note 6

W20-1 W20-4

(optional)

W13-1P

R10-6

NOTE:

A single signal installation is acceptable, on the right-hand side of the road, if depicted for the opposite direction of travel.

Signs are shown for one direction of travel only. Place devices similar to those the buffer space.

Do not allow equipment, materials, or vehicles to be parked or stored in

Section 156.

For project specific minimum width, refer to Special Contract Requirements, AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.

If closure is completely within the project limits, eliminate the "ROAD WORK pavement markings.

Removeable pavement markings may be used for stop lines and no-passing advance of the stop line that comply with Section 3B.02 of the MUTCD.

markers between the work space and the stop line. Add no-passing lines in of the MUTCD. Remove existing conflicting pavement markings and raised

If the roadway surface is paved, install stop lines that comply with Section 3B.16 must be determined by a qualified engineer.

conditions as approved by the CO. If signals are moved, revised signal timing

Final location and spacing of signs and devices may be changed to fit field automatically, ensure red signal indications are flashed to both approaches.

engineer. When the signal is changed to the flashing mode either manually or provisions of the MUTCD, Part 4. Signal timing shall be established by a qualified

Install and operate temporary traffic control signals in accordance with the requirements of Part 4 of the MUTCD.

ADVANCE WARNING AREA (See Sign Spacing Table)

ABC

(See Length and Spacing Table) VARIABLE TERMINATION AREA

BUFFER SPACETAPER AREA BUFFER SPACE TAPER AREA A

Device spacing

Revised by Amendment A001