Rockfall_SR123_FINAL_SET.pdf
PDF 5 MB Posted
- Attached to
- WA NPS MORA 123(1), Rockfall Mitigation at SR123 Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00010
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Rockfall.pdf | ||
| WA_MORA_123(1)_Amendment_A001.pdf | ||
| Plan_Request_form_Rockfall_Mitigation.pdf | ||
| IFB_Rockfall.pdf | ||
| GM_04-14.pdf | ||
| GM_17-16.pdf | ||
| PROJECT_DESCRIPTION_WA_NPS_MORA_123(1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Randy King 4/14/16
Patricia Neubacher 4/20/16
/s/
/s/
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS1
A
M
M a r c h
U
S C c m y fi le s p w p r o d u c ti o n d D e t.
W .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 NPS MORA 123(1) WA
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
NPS Drwg. No. _______
NPS PMIS No. 216994
VICINITY MAP
SCALE IN MILES
1 0 1 2 3 4
A.3
STATE PROJECT
NUMBER
SHEET
WA
NPS MORA 123(1)
a y
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m o r a a c .d g n o u g a r T e a m
C h e c k e d b y
D e s ig n e d b y
Entrance Nisqually Longmire
Ohanapecosh
Entrance White River
White River
M O U N T R A I N I E R
C O W L I T
Z
D I V I D
E
N A T I O N A L F O R E S T
G I F F O R D P I N C H O T
F O R E S T
N A T I O N A L
S N O Q U A L M I E
Canyon Box
Lake Tipsoo
.5
R.9.E R.10.E
M O U N T R A I N I E R N A T I O N A L P A R K T.15.N
T .1
.N m ile s
To Y ak am a m il e s
T o P a ck w o o d
14 miles
To Elbe
ESIRNUS
KR
AP
DA
OR
M O U N T R A I N
I E R N A T I O
N A L P A R K
N A T I O N A L F O R E S T
G I F F O R D P I N C H O T
N A T I O N A L
P A R K
M O U N T
R A I N I E R
Pyramid Park m il e s
T o E n u m c la w
Gate Entrance Canyon Stevens
T.14.N
R .9 .E
R .1
.E
R .9 .E
R .1
.E
T.15.N
T.14.N
Stevens Canyon Road
WESTSIDE
Paradise
Message Sign
Changeable
Place Portable
Message Sign
Changeable
Place Portable
PROJECT LOCATION
North Portal: mp 13.63
South Portal: MP 13.58
M O U N T
B A K E R
S N O Q U A L M E
N A T I O N A L
F O R E S T
Sheet and Description
Section C Section D Section E
Typical Section
Plan & Profile
Temporary Traffic Control
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL ALL
A0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL ALL
A0060 15401-0000 CONTRACTOR TESTING LPSM ALL ALL
A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL ALL
A0100 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 200 200
A0120 26001-0000 ROCK BOLT LNFT 680 680
A0140 26002-0000 ROCK DOWEL LNFT 110 110
A0160 62003-0000 STONE MASONRY LPSM ALL ALL
A0180 62301-0000 GENERAL LABOR HOUR 50 50
A0200 62302-0100 SPECIAL LABOR, SLOPE SCALING HOUR 120 120
A0220 63316-1000 REMOVE AND RESET SIGN EACH 1 1
A0240 63502-1000 TEMPORARY TRAFFIC CONTROL,
CONE, TYPE 36-INCH EACH 25 15 40
A0260 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 35 15 50
A0280 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 4 4
A0300 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 2 2
A0320 63502-3100 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM EACH 1 1
A0340 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 500 500
A0360 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 80 10 90
A0380 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 500 50 550
A0400 65105-0000 TEMPORARY ROCKFALL PROTECTION LPSM ALL ALL
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A pr -2
2:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Su m m ar yo fQ ua nt iti es .x ls x]
S he et
STATE PROJECT
B.1NPS MORA 123(1)WA
SHEET
NUMBER
TYPICAL SECTION
PROTECTION
TEMPORARY ROADWAY
Existing
C.1
STATE PROJECT
NUMBER
SHEET
WA NPS MORA 123(1)
A p r il
U
S S u r ft
D m y fi le s p w p r o d u c ti o n d m o r a c a .d g
R J o h n s o
O
U G
A R T
E A
M
C h e c k e d b y
D e s ig n e d b y
NO SCALE
Rock slope
LC
Unclassified borrow
Total paved width varies, 22' typicalVaries
Varies Varies 11'-0" Min.
barrier, temporary
Precast concrete
WITH UNCLASSIFIED BORROW
TEMPORARY ROADWAY PROTECTION
LEGEND:
AT SR123, WASHINGTON
ROCKFALL MITIGATION
Sheet 1 of 315-FT LONG ROCK BOLT
10-FT LONG ROCK DOWEL
SR 123/106 North Tunnel Portal
APPROX 100 FT
SLOPE LENGTH
TOTALNOTE:
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d m o r a d a .d g n
WA NPS MORA 123(1)
P
A p r il
C h e c k e d b y
D e s ig n e d b y
PRESERVE VEGETATION
INTENSIVE SLOPE SCALING AREAS
GENERAL SLOPE SCALING LIMITS
scaling operations.
located on the slope by the CO following and 70 linear feet of rock dowels will be
An additional 185 linear feet of rock bolts removed as directed by the CO.
within general slope scaling limits may be
Unless shown to preserve, any vegetation
2.
1.
Stone masonry, repair
FOOTNOTE:
included in repair.
Replacement of stone
INTENSIVE SLOPE SCALING AREAS
GENERAL SLOPE SCALING LIMITS
15-FT LONG ROCK BOLT
10-FT LONG ROCK DOWEL
SR 123/106 North Tunnel Portal
AT SR123, WASHINGTON
ROCKFALL MITIGATION
APPROX 100 FT
SLOPE LENGTH
TOTAL
Sheet 2 of 3 scaling operations.
located on the slope by the CO following and 70 linear feet of rock dowels will be
An additional 185 linear feet of rock bolts removed as directed by the CO.
within general slope scaling limits may be
Unless shown to preserve, any vegetation
2.
1.
NOTE:
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d m o r a d b .d g n
WA NPS MORA 123(1)
A p r il
C h e c k e d b y
D e s ig n e d b y
AT SR123, WASHINGTON
ROCKFALL MITIGATION
Sheet 3 of 315-FT LONG ROCK BOLT
10-FT LONG ROCK DOWEL
SR 123/106 South Tunnel Portal
APPROX 125 FT
SLOPE LENGTH
TOTAL
PRESERVE VEGETATION AREAS
GENERAL SLOPE SCALING LIMITS
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d m o r a d c .d g n
WA NPS MORA 123(1)
A p r il
C h e c k e d b y
D e s ig n e d b y scaling operations.
located on the slope by the CO following and 70 linear feet of rock dowels will be
An additional 185 linear feet of rock bolts removed as directed by the CO.
within general slope scaling limits may be
Unless shown to preserve, any vegetation
2.
1.
NOTE:
DETAILS
ROCK DOWEL
ROCK BOLT AND
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d m o r a d d .d g n
WA NPS MORA 123(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
NO SCALE
FOOTNOTE:
Drilled rock bolt hole
Rock face
Hex nut
Stable rock Unstable block
Centralizer
Centralizer
De-air/grout tube
20° max.
Free stressing length (varies)
Minimum total rock bolt length
ROCK BOLT
ROCK DOWEL
Unstable block Stable rock
Centralizer Centralizer with keyhole and de-air/grout tube
" (nom.) bearing plate4 38" x 8" x
Minimum total rock dowel length
Rock face threaded steel bar continuously
Deformed
Hex nut
Flat or beveled washers max.
20°
De-air/grout tube with keyhole and de-air/grout tube
" (nom.) bearing plate4 38" x 8" x non-shrink cement grout
High, early strength, Drilled rock dowel hole threaded steel bar
Deformed continuously
Flat or beveled washer
(to be designed by contractor)
Minimum bond zone length
NOTE:
orientations shown in the plans or as directed by the CO.
Install rock dowels and rock bolts at the locations and
2.
1.
non-shrink cement grout
High, early strength, outcrop.
cement grout matching the color of the surrounding rock flush with rock face. Cover grout and bolt end with a nut, washer, and bearing plate. Cut protruding bolt end
After bolts and dowels are strength tested, remove hex bar. Place additional centralizers on 10-foot centers.
Place lowest centralizer within 12-inches of the distal end of the cement grout.
Fully encapsulate bar in high, early strength, non-shrink to be determined by rock bolt contractor.
Drill hole diameter, bar size, and minimum bond zone length
Rock bolt design load is 25 Kips.
(ft)
(ft)
REVISED:
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2014
FIBER ROLL
W157-21
M a r c h
U
S m y fi le s p w p r o d u c ti o n d m o r a d e .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
D.5 NPS MORA 123(1) WA
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACING
NO SCALE
Drive stakes at each end and at 4' spacing
Excavate trench 2"
3' min.
3' min. or m in
M in t o
1" x 1" Wood stake
3" to 5"
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow
PLAN
disturbed areas
Runoff from as specified in plans
2.
1.
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Step 2: Backfill soil against fiber rolls and install fiber rolls
Step 1: Excavate trench
FIBER ROLL STAKING DETAIL
conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
Fiber roll larger than fiber roll
Existing ground (typ.)
Stagger joints (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction to end, without overlapping the ends
Abut adjacent fiber rolls tightly, end
Install fiber rolls snugly into trench.
soil to ground level
Backfilled and compacted
Slope
Stake and entrench fiber roll water from flowing around the fiber roll
Provide sufficient length to prevent sp ac in g ch ar t
S ee f ib er r ol l
Direction of runof f from distur bed area s
South Staging Area (Pullout)
NO SCALE
S e e S h e e t D .7
S e c tio n L in e
D.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d m o r a d f.
d g n
WA NPS MORA 123 (1)
A p r il
C h e c k e d b y
D e s ig n e d b y
See Sheets E.2-E.5 for Temporary Traffic Control layout.
See Sheet C.1 for Temporary Roadway Protection typical.2.
1.
NOTE:
(SOUTH PORTAL)
PROTECTION
TEMPORARY ROCKFALL
South Tunnel Portal
LC
Temporary Concrete Barrier (Pre-Cast)
Unclassified Borrow
Fiber Roll. See Sheet D.5
Soil Erosion Control, Traffic Control, Drums
Temporary tunnel for single lane closure
Control, Drums within
Place Temporary Traffic
Slope Scaling Limits (Approximate)
Remove tree
Temporary Traffic Control, Concrete barrier
TUNNEL CROWN
North Staging Area (Pullout)
N
NO SCALE
s e e S h e e t
D .6
S e c ti o n L in e
D.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d m o r a d g .d g n
WA NPS MORA 123 (1)
A p r il
C h e c k e d b y
D e s ig n e d b y
See Sheets E.2-E.5 for Temporary Traffic Control layout.
See Sheet C.1 for Temporary Roadway Protection typical.
(NORTH PORTAL)
PROTECTION
TEMPORARY ROCKFALL
Unclassified Borrow
LC
North Tunnel Portal
W1-2, W13-1P (35MPH)
Remove and Reset Sign
Barrier (Pre-Cast)
Concrete
Temporary
Traffic Control, Drums
Temporary tunnel for single lane closure
Control, Drums within
Place Temporary Traffic
2.
1.
NOTE:
Slope Scaling Limits (Approximate)
Temporary Traffic Control, Concrete barrier
See Sheet D.5
Control, Fiber Roll.
Soil Erosion
NUMBER
SIGN
NUMBER
MUTCD
LEGEND
(IN. X IN.)
SIGN SIZE
QUANTITYSQFT SQFT
36 x 36W20-1 9.001
W20-4 36 x 36
18 x 18
9.00
2.25
CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL
ITEM 63504-1000
ROAD WORK AHEAD
ONE LANE ROAD AHEAD
ADVISORY SPEED 15 MPH
2PW13-1 4.50
18.00
18.00
G20-2 36 x 18 4.50END ROAD WORK
W3-3
R10-6 STOP HERE ON RED
36 x 36
24 x 36
SIGNAL AHEAD 9.00
6.00
12.00
18.00
9.00
TOTAL 80.00
QUANTITIES
TEMPORARY TRAFFIC CONTROL
TABULATION OF
QUANTITY
TEMPORARY TRAFFIC CONTROL DEVICES
ITEM NO. DESCRIPTION
63503-0400
63502-2000 2 EACH
63502-1300
63502-3100 1 EACH
63509-1000
63502-1000
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
63502-1600
25 EACH
35 EACH
4 EACH
500 LNFT
500 FXHR
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d m o r a e a .d g n
WA NPS MORA 123(1)
a y
C h e c k e d b y
D e s ig n e d b y
NO SCALE
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
635-6
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
SPACING IN FEET
STATE PROJECT
NUMBER
SHEET
E.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS MORA 123 (1)WA
U S
C c m y fi le s p w p r o d u c ti o n d m o r a e b .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
NOTE:
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
Channelizing devices
Flagger location
Flagger location
NPS Drwg. No. _______
NPS PMIS No. 216994
50' - 100' 50' - 100' (optional)
See Note 6
10' min.
NO SCALE
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2015
REVISED:
635-13
(WITH TEMPORARY BARRIER)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
E.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS MORA 123 (1)WA
U S
C c m y fi le s p w p r o d u c ti o n d m o r a e d .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
RATE
FLARE
BARRIER
CONCRETE
1:16
1:16
1:16
1:16
1:14
1:12
1:10
1:9
1:8
1:8
1:8
LENGTH
BUFFER SPACE
Approach speed based on the regulatory posted speed, not the advisory speed.*
WIDTH
CLEAR ZONE
WORK ZONE
FEETSPACING IN FEETFEETMPH
NPS Drwg. No. _______
NPS PMIS No. 216994
Traffic flow
Traffic flow
Install signs and other devices for single lane closure according to
6.
5.
4.
3.
2.
1.
NOTE:
barrier ends outside the work zone clear zone or protect the barrier ends
Place barrier according to the AASHTO Roadside Design Guide. Terminate devices may be changed to fit field conditions as approved by the CO.
to provide access to work space.
Reduce or eliminate drums and barrier in downstream taper if necessary the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in when access is not needed.
Place channelizing devices at downstream taper during non-work hours or
Section 156.
For project specific minimum width, refer to Special Contract Requirements, spacing
Device pavement markings
Remove conflicting
Channelizing devices
See Note 2
Temporary concrete barrier.
See Note 4
TAPER AREA (
(optional)
BUFFER SPACE
VARIABLE WORK SPACE
(See Length and Spacing Table)
(optional)
BUFFER SPACE
TAPER AREA
50' - 100')
(50' - 100') with a crash cushion. Include reflectors on barrier at 25' intervals.
Standard 635-6, 7, 8, or 9. Final location and spacing of signs and
See Note 3
10' min.
See Note 2
See Note 2
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
NO SCALE
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
E.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS MORA 123 (1)WA
U S
C c m y fi le s p w p r o d u c ti o n d m o r a e e .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
NPS Drwg. No. _______
NPS PMIS No. 216994
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, 200' m in m in
6' - 12'
" dia. bolts 4 1Attach sign panels with a minimum of 2 - 1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
File details come from the government source that posted it. Updated .