U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

MT STILLWATER 207(1)

WEST ROSEBUD CREEK ROAD RECONSTRUCTION

GEOPAK EARTHWORK DATA LISTING

MARCH 2016

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

18+35.67 RDWYEXC

Excavation 94.72 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 41.83 0 0 0.00 0 0

18+65.45 RDWYEXC

Excavation 36.32 73 62 0.85 73 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.73 0 0 1.00 62 0

TOPSOIL

Excavation 1.24 1 0 0.00 1 Subsoil Exc 0.73 0 0 0.00 0 Fill 0.00 0 0 0.00 62 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.97 34 0 0.00 62 34

19+00.00 RDWYEXC

Excavation 23.21 38 33 0.85 111 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.01 1 1 1.00 94 1

TOPSOIL

Excavation 15.94 11 0 0.00 12 Subsoil Exc 1.01 1 0 0.00 1 Fill 0.00 0 0 0.00 94 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 29.41 31 0 0.00 94 65

19+50.00 RDWYEXC

Excavation 15.48 36 31 0.85 147 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.16 6 6 1.00 119 7

TOPSOIL

Excavation 24.87 38 0 0.00 50 Subsoil Exc 4.99 6 0 0.00 7 Fill 0.00 0 0 0.00 119 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 44.53 68 0 0.00 119 133

20+00.00 RDWYEXC

Excavation 20.52 33 29 0.85 180 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.21 8 8 1.00 140 15

TOPSOIL

Excavation 12.19 34 0 0.00 84 Subsoil Exc 3.21 8 0 0.00 15

Fill 0.00 0 0 0.00 140 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 59 0 0.00 140 192

20+50.00 RDWYEXC

Excavation 24.85 42 36 0.85 222 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.46 15 15 1.00 161 30

TOPSOIL

Excavation 11.48 22 0 0.00 106 Subsoil Exc 8.93 11 0 0.00 26 Fill 0.00 0 0 0.00 161 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 37 0 0.00 161 229

21+00.00 RDWYEXC

Excavation 29.35 50 42 0.85 272 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.60 14 14 1.00 189 44

TOPSOIL

Excavation 15.56 25 0 0.00 131 Subsoil Exc 1.60 10 0 0.00 36 Fill 0.00 0 0 0.00 189 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 37 0 0.00 189 266

21+25.00 RDWYEXC

Excavation 54.88 39 33 0.85 311 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.12 1 1 1.00 221 45

TOPSOIL

Excavation 17.74 15 0 0.00 146 Subsoil Exc 1.12 1 0 0.00 37 Fill 0.00 0 0 0.00 221 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 18 0 0.00 221 284

21+50.00 RDWYEXC

Excavation 69.02 57 48 0.85 368 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 1 1 1.00 268 46

TOPSOIL

Excavation 0.00 8 0 0.00 154 Subsoil Exc 0.00 1 0 0.00 38 Fill 0.00 0 0 0.00 268 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 18 0 0.00 268 302

21+75.00 RDWYEXC

Excavation 56.61 58 50 0.85 426 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.75 0 0 1.00 318 46

TOPSOIL

Excavation 3.21 1 0 0.00 155 Subsoil Exc 0.75 0 0 0.00 38 Fill 0.00 0 0 0.00 318 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 18 0 0.00 318 320

22+00.00 RDWYEXC

Excavation 37.93 44 37 0.85 470 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.52 1 1 1.00 354 47

TOPSOIL

Excavation 6.46 4 0 0.00 159 Subsoil Exc 1.52 1 0 0.00 39 Fill 0.00 0 0 0.00 354 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 18 0 0.00 354 338

22+25.00 RDWYEXC

Excavation 28.82 30 26 0.85 500 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.20 3 3 1.00 377 50

TOPSOIL

Excavation 6.23 6 0 0.00 165 Subsoil Exc 4.20 3 0 0.00 42 Fill 0.00 0 0 0.00 377 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.73 18 0 0.00 377 356

22+50.00 RDWYEXC

Excavation 18.18 22 19 0.85 522 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.41 4 4 1.00 392 54

TOPSOIL

Excavation 5.44 5 0 0.00 170 Subsoil Exc 5.40 4 0 0.00 46 Fill 0.00 0 0 0.00 392 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.76 18 0 0.00 392 374

23+00.00 RDWYEXC

Excavation 0.83 18 15 0.85 540 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.24 12 12 1.00 395 66

TOPSOIL

Excavation 0.18 5 0 0.00 175 Subsoil Exc 5.80 10 0 0.00 56

Fill 0.00 0 0 0.00 395 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.59 36 0 0.00 395 410

23+50.00 RDWYEXC

Excavation 0.00 1 1 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.23 34 34 1.00 362 100

TOPSOIL

Excavation 0.00 0 0 0.00 175 Subsoil Exc 8.69 13 0 0.00 69 Fill 0.00 0 0 0.00 362 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.89 37 0 0.00 362 447

24+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 51.96 75 75 1.00 287 175

TOPSOIL

Excavation 0.00 0 0 0.00 175 Subsoil Exc 11.27 18 0 0.00 87 Fill 0.00 0 0 0.00 287 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 287 484

24+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 61.86 105 105 1.00 182 280

TOPSOIL

Excavation 0.00 0 0 0.00 175 Subsoil Exc 14.11 24 0 0.00 111 Fill 0.00 0 0 0.00 182 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 182 521

25+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 51.78 105 105 1.00 77 385

TOPSOIL

Excavation 0.00 0 0 0.00 175 Subsoil Exc 13.36 25 0 0.00 136 Fill 0.00 0 0 0.00 77 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0

Fill 19.92 37 0 0.00 77 558

25+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.03 81 81 1.00 -4 466

TOPSOIL

Excavation 0.00 0 0 0.00 175 Subsoil Exc 12.28 24 0 0.00 160 Fill 0.00 0 0 0.00 -4 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 -4 595

26+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.59 57 57 1.00 -61 523

TOPSOIL

Excavation 0.00 0 0 0.00 175 Subsoil Exc 11.39 22 0 0.00 182 Fill 0.00 0 0 0.00 -61 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 -61 632

26+50.00 RDWYEXC

Excavation 1.18 1 1 0.85 542 Subsoil Exc 0.00 0 0 1.00 0 Fill 16.91 39 39 1.00 -99 562

TOPSOIL

Excavation 0.13 0 0 0.00 175 Subsoil Exc 10.02 20 0 0.00 202 Fill 0.00 0 0 0.00 -99 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.91 37 0 0.00 -99 669

27+00.00 RDWYEXC

Excavation 6.73 7 6 0.85 549 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.94 23 23 1.00 -116 585

TOPSOIL

Excavation 1.42 2 0 0.00 177 Subsoil Exc 7.31 16 0 0.00 218 Fill 0.00 0 0 0.00 -116 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 -116 706

27+50.00 RDWYEXC

Excavation 16.96 22 19 0.85 571 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.20 9 9 1.00 -106 594

TOPSOIL

Excavation 5.42 6 0 0.00 183 Subsoil Exc 2.20 9 0 0.00 227

Fill 0.00 0 0 0.00 -106 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 -106 743

28+00.00 RDWYEXC

Excavation 20.61 35 30 0.85 606 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.38 4 4 1.00 -80 598

TOPSOIL

Excavation 7.23 11 0 0.00 194 Subsoil Exc 2.38 4 0 0.00 231 Fill 0.00 0 0 0.00 -80 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.96 37 0 0.00 -80 780

28+50.00 RDWYEXC

Excavation 26.70 44 37 0.85 650 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.24 3 3 1.00 -46 601

TOPSOIL

Excavation 9.59 15 0 0.00 209 Subsoil Exc 1.24 3 0 0.00 234 Fill 0.00 0 0 0.00 -46 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.93 37 0 0.00 -46 817

29+00.00 RDWYEXC

Excavation 22.67 46 38 0.85 696 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.60 4 4 1.00 -12 605

TOPSOIL

Excavation 9.69 18 0 0.00 227 Subsoil Exc 2.60 4 0 0.00 238 Fill 0.00 0 0 0.00 -12 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.10 37 0 0.00 -12 854

29+50.00 RDWYEXC

Excavation 16.03 36 30 0.85 732 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.51 6 6 1.00 12 611

TOPSOIL

Excavation 10.88 19 0 0.00 246 Subsoil Exc 3.51 6 0 0.00 244 Fill 0.00 0 0 0.00 12 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0

Fill 19.92 37 0 0.00 12 891

30+00.00 RDWYEXC

Excavation 10.80 25 21 0.85 757 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.12 8 8 1.00 25 619

TOPSOIL

Excavation 5.27 15 0 0.00 261 Subsoil Exc 5.12 8 0 0.00 252 Fill 0.00 0 0 0.00 25 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 25 928

30+50.00 RDWYEXC

Excavation 21.14 29 25 0.85 786 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.71 5 5 1.00 45 624

TOPSOIL

Excavation 6.02 11 0 0.00 272 Subsoil Exc 0.71 5 0 0.00 257 Fill 0.00 0 0 0.00 45 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.96 36 0 0.00 45 964

SKIP STATION RANGE = 30+50.00 to 33+50.00

33+50.00 RDWYEXC

Excavation 8.73 0 0 0.85 786 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.59 0 0 1.00 45 624

TOPSOIL

Excavation 7.30 0 0 0.00 272 Subsoil Exc 2.59 0 0 0.00 257 Fill 0.00 0 0 0.00 45 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 0 0 0.00 45 964

33+78.00 RDWYEXC

Excavation 8.71 9 7 0.85 795 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.85 2 2 1.00 50 626

TOPSOIL

Excavation 4.51 6 0 0.00 278 Subsoil Exc 0.85 2 0 0.00 259 Fill 0.00 0 0 0.00 50 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 17 0 0.00 50 981

34+00.00 RDWYEXC

Excavation 6.99 6 5 0.85 801 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.31 2 2 1.00 53 628

TOPSOIL

Excavation 5.93 4 0 0.00 282

Subsoil Exc 3.31 2 0 0.00 261 Fill 0.00 0 0 0.00 53 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.89 13 0 0.00 53 994

34+50.00 RDWYEXC

Excavation 0.62 7 6 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.28 12 12 1.00 47 640

TOPSOIL

Excavation 2.45 8 0 0.00 290 Subsoil Exc 4.42 7 0 0.00 268 Fill 0.00 0 0 0.00 47 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 47 1025

34+98.00 RDWYEXC

Excavation 0.15 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.15 15 15 1.00 32 655

TOPSOIL

Excavation 1.55 4 0 0.00 294 Subsoil Exc 1.96 6 0 0.00 274 Fill 0.00 0 0 0.00 32 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 29 0 0.00 32 1054

35+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.62 1 1 1.00 31 656

TOPSOIL

Excavation 0.00 0 0 0.00 294 Subsoil Exc 0.00 0 0 0.00 274 Fill 0.00 0 0 0.00 31 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 1 0 0.00 31 1055

35+38.00 RDWYEXC

Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.00 12 12 1.00 19 668

TOPSOIL

Excavation 0.00 0 0 0.00 294 Subsoil Exc 0.28 0 0 0.00 274 Fill 0.00 0 0 0.00 19 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0

Fill 15.96 22 0 0.00 19 1077

35+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.93 5 5 1.00 14 673

TOPSOIL

Excavation 0.00 0 0 0.00 294 Subsoil Exc 0.26 0 0 0.00 274 Fill 0.00 0 0 0.00 14 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 7 0 0.00 14 1084

36+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.94 20 20 1.00 -6 693

TOPSOIL

Excavation 0.00 0 0 0.00 294 Subsoil Exc 1.67 2 0 0.00 276 Fill 0.00 0 0 0.00 -6 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 30 0 0.00 -6 1114

36+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.13 28 28 1.00 -34 721

TOPSOIL

Excavation 0.00 0 0 0.00 294 Subsoil Exc 7.13 8 0 0.00 284 Fill 0.00 0 0 0.00 -34 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -34 1145

37+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.31 34 34 1.00 -68 755

TOPSOIL

Excavation 0.79 1 0 0.00 295 Subsoil Exc 7.39 13 0 0.00 297 Fill 0.00 0 0 0.00 -68 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -68 1176

37+26.00 RDWYEXC

Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.08 11 11 1.00 -79 766

Excavation 0.00 0 0 0.00 295

Subsoil Exc 0.13 4 0 0.00 301 Fill 0.00 0 0 0.00 -79 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 16 0 0.00 -79 1192

37+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.16 7 7 1.00 -86 773

TOPSOIL

Excavation 0.89 0 0 0.00 295 Subsoil Exc 3.36 2 0 0.00 303 Fill 0.00 0 0 0.00 -86 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 15 0 0.00 -86 1207

38+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.93 20 20 1.00 -106 793

TOPSOIL

Excavation 0.21 1 0 0.00 296 Subsoil Exc 3.67 7 0 0.00 310 Fill 0.00 0 0 0.00 -106 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -106 1238

38+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.27 19 19 1.00 -125 812

TOPSOIL

Excavation 0.20 0 0 0.00 296 Subsoil Exc 3.61 7 0 0.00 317 Fill 0.00 0 0 0.00 -125 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -125 1269

39+00.00 RDWYEXC

Excavation 0.64 1 0 0.85 809 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.31 13 13 1.00 -138 825

TOPSOIL

Excavation 2.21 2 0 0.00 298 Subsoil Exc 3.55 7 0 0.00 324 Fill 0.00 0 0 0.00 -138 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0

Fill 16.92 31 0 0.00 -138 1300

39+50.00 RDWYEXC

Excavation 0.64 1 1 0.85 810 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.35 15 15 1.00 -152 840

TOPSOIL

Excavation 4.05 6 0 0.00 304 Subsoil Exc 8.48 11 0 0.00 335 Fill 0.00 0 0 0.00 -152 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -152 1331

39+83.00 RDWYEXC

Excavation 0.66 1 1 0.85 811 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.71 10 10 1.00 -161 850

TOPSOIL

Excavation 1.82 4 0 0.00 308 Subsoil Exc 3.43 7 0 0.00 342 Fill 0.00 0 0 0.00 -161 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 20 0 0.00 -161 1351

40+00.00 RDWYEXC

Excavation 1.96 1 1 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.10 4 4 1.00 -164 854

TOPSOIL

Excavation 4.01 2 0 0.00 310 Subsoil Exc 1.31 1 0 0.00 343 Fill 0.00 0 0 0.00 -164 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 10 0 0.00 -164 1361

40+07.00 RDWYEXC

Excavation 0.17 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.81 2 2 1.00 -166 856

TOPSOIL

Excavation 3.34 1 0 0.00 311 Subsoil Exc 1.62 0 0 0.00 343 Fill 0.00 0 0 0.00 -166 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 4 0 0.00 -166 1365

40+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.11 21 21 1.00 -187 877

Excavation 0.95 3 0 0.00 314

Subsoil Exc 6.16 6 0 0.00 349 Fill 0.00 0 0 0.00 -187 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 26 0 0.00 -187 1391

41+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.80 50 50 1.00 -237 927

TOPSOIL

Excavation 0.00 1 0 0.00 315 Subsoil Exc 8.33 13 0 0.00 362 Fill 0.00 0 0 0.00 -237 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -237 1422

41+27.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 28.74 32 32 1.00 -269 959

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 4.31 6 0 0.00 368 Fill 0.00 0 0 0.00 -269 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 16 0 0.00 -269 1438

41+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 26.89 24 24 1.00 -293 983

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 6.14 4 0 0.00 372 Fill 0.00 0 0 0.00 -293 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 14 0 0.00 -293 1452

41+52.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 26.16 2 2 1.00 -295 985

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 5.99 0 0 0.00 372 Fill 0.00 0 0 0.00 -295 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0

Fill 15.96 1 0 0.00 -295 1453

42+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.05 38 38 1.00 -333 1023

TOPSOIL

Excavation 0.34 0 0 0.00 315 Subsoil Exc 9.45 14 0 0.00 386 Fill 0.00 0 0 0.00 -333 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 29 0 0.00 -333 1482

42+16.83 RDWYEXC

Excavation 0.21 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 18.76 11 11 1.00 -344 1034

TOPSOIL

Excavation 0.05 0 0 0.00 315 Subsoil Exc 10.03 6 0 0.00 392 Fill 0.00 0 0 0.00 -344 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 11 0 0.00 -344 1493

42+27.69 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 44.76 13 13 1.00 -357 1047

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 16.61 5 0 0.00 397 Fill 0.00 0 0 0.00 -357 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.05 7 0 0.00 -357 1500

42+38.36 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 47.75 18 18 1.00 -375 1065

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 18.14 7 0 0.00 404 Fill 0.00 0 0 0.00 -375 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 7 0 0.00 -375 1507

42+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 46.69 20 20 1.00 -395 1085

Excavation 0.00 0 0 0.00 315

Subsoil Exc 14.94 7 0 0.00 411 Fill 0.00 0 0 0.00 -395 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 7 0 0.00 -395 1514

43+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 57.93 97 97 1.00 -492 1182

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 14.06 27 0 0.00 438 Fill 0.00 0 0 0.00 -492 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -492 1545

43+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.80 103 103 1.00 -595 1285

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 11.57 24 0 0.00 462 Fill 0.00 0 0 0.00 -595 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -595 1576

44+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 44.45 91 91 1.00 -686 1376

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 12.33 22 0 0.00 484 Fill 0.00 0 0 0.00 -686 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -686 1607

44+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 33.96 73 73 1.00 -759 1449

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 10.08 21 0 0.00 505 Fill 0.00 0 0 0.00 -759 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0

Fill 16.92 31 0 0.00 -759 1638

45+00.00 RDWYEXC

Subsoil Exc 0.00 0 0 1.00 0 Fill 23.63 53 53 1.00 -812 1502

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 7.59 16 0 0.00 521 Fill 0.00 0 0 0.00 -812 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -812 1669

45+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.01 38 38 1.00 -850 1540

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 2.95 10 0 0.00 531 Fill 0.00 0 0 0.00 -850 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 30 0 0.00 -850 1699

45+51.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.11 1 1 1.00 -851 1541

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 2.92 0 0 0.00 531 Fill 0.00 0 0 0.00 -851 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 1 0 0.00 -851 1700

46+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.94 35 35 1.00 -886 1576

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 6.26 8 0 0.00 539 Fill 0.00 0 0 0.00 -886 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 30 0 0.00 -886 1730

46+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.29 36 36 1.00 -922 1612

Excavation 0.00 0 0 0.00 315

Subsoil Exc 6.01 11 0 0.00 550 Fill 0.00 0 0 0.00 -922 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -922 1761

47+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.15 27 27 1.00 -949 1639

TOPSOIL

Excavation 0.00 0 0 0.00 315 Subsoil Exc 4.18 9 0 0.00 559 Fill 0.00 0 0 0.00 -949 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -949 1792

47+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.95 24 24 1.00 -973 1663

TOPSOIL

Excavation 0.19 0 0 0.00 315 Subsoil Exc 7.45 11 0 0.00 570 Fill 0.00 0 0 0.00 -973 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -973 1823

48+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 16.57 28 28 1.00 -1001 1691

TOPSOIL

Excavation 0.76 1 0 0.00 316 Subsoil Exc 9.20 15 0 0.00 585 Fill 0.00 0 0 0.00 -1001 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1001 1854

48+50.00 RDWYEXC

Excavation 0.09 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.78 26 26 1.00 -1027 1717

TOPSOIL

Excavation 2.16 3 0 0.00 319 Subsoil Exc 6.50 15 0 0.00 600 Fill 0.00 0 0 0.00 -1027 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0

Fill 16.92 31 0 0.00 -1027 1885

49+00.00 RDWYEXC

Subsoil Exc 0.00 0 0 1.00 0 Fill 8.04 18 18 1.00 -1045 1735

TOPSOIL

Excavation 0.00 2 0 0.00 321 Subsoil Exc 4.56 10 0 0.00 610 Fill 0.00 0 0 0.00 -1045 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1045 1916

49+50.00 RDWYEXC

Excavation 1.24 1 1 0.85 813 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.41 13 13 1.00 -1057 1748

TOPSOIL

Excavation 3.63 3 0 0.00 324 Subsoil Exc 4.83 9 0 0.00 619 Fill 0.00 0 0 0.00 -1057 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1057 1947

50+00.00 RDWYEXC

Excavation 0.00 1 1 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.28 15 15 1.00 -1071 1763

TOPSOIL

Excavation 3.04 6 0 0.00 330 Subsoil Exc 7.09 11 0 0.00 630 Fill 0.00 0 0 0.00 -1071 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1071 1978

50+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.76 20 20 1.00 -1091 1783

TOPSOIL

Excavation 0.29 3 0 0.00 333 Subsoil Exc 6.83 13 0 0.00 643 Fill 0.00 0 0 0.00 -1091 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1091 2009

51+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 15.49 25 25 1.00 -1116 1808

Excavation 0.00 0 0 0.00 333

Subsoil Exc 6.75 13 0 0.00 656 Fill 0.00 0 0 0.00 -1116 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1116 2040

51+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.67 33 33 1.00 -1149 1841

TOPSOIL

Excavation 0.00 0 0 0.00 333 Subsoil Exc 7.18 13 0 0.00 669 Fill 0.00 0 0 0.00 -1149 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1149 2071

52+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.56 40 40 1.00 -1189 1881

TOPSOIL

Excavation 0.00 0 0 0.00 333 Subsoil Exc 8.06 14 0 0.00 683 Fill 0.00 0 0 0.00 -1189 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1189 2102

52+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.34 43 43 1.00 -1232 1924

TOPSOIL

Excavation 0.00 0 0 0.00 333 Subsoil Exc 8.23 15 0 0.00 698 Fill 0.00 0 0 0.00 -1232 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1232 2133

53+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.33 22 22 1.00 -1254 1946

SUBEXCAVATION

Excavation 39.74 37 37 1.00 37 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1254 0 Mass ordinate for SUBEXCAVATION = 37

TOPSOIL

Excavation 7.65 7 0 0.00 340 Subsoil Exc 0.33 8 0 0.00 706 Fill 0.00 0 0 0.00 -1254 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1254 2164

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.84 55 0 0.00 -1254 55

53+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1254 1946

SUBEXCAVATION

Excavation 42.25 76 76 1.00 113 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1254 0 Mass ordinate for SUBEXCAVATION = 113

TOPSOIL

Excavation 6.00 13 0 0.00 353 Subsoil Exc 0.00 0 0 0.00 706 Fill 0.00 0 0 0.00 -1254 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1254 2195

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 54.85 106 0 0.00 -1254 161

54+00.00 RDWYEXC

Excavation 1.74 1 1 0.85 815 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.16 0 0 1.00 -1253 1946

SUBEXCAVATION

Excavation 45.59 81 81 1.00 194 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1253 0 Mass ordinate for SUBEXCAVATION = 194

TOPSOIL

Excavation 9.78 15 0 0.00 368 Subsoil Exc 0.16 0 0 0.00 706 Fill 0.00 0 0 0.00 -1253 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1253 2226

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.81 106 0 0.00 -1253 267

54+50.00 RDWYEXC

Excavation 1.15 3 3 0.85 818 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.32 1 1 1.00 -1251 1947

SUBEXCAVATION

Excavation 43.37 82 82 1.00 276 Subsoil Exc 0.00 0 0 1.00 0

Fill 0.00 0 0 1.00 -1251 0 Mass ordinate for SUBEXCAVATION = 276

TOPSOIL

Excavation 9.43 18 0 0.00 386 Subsoil Exc 1.32 1 0 0.00 707 Fill 0.00 0 0 0.00 -1251 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1251 2257

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.63 112 0 0.00 -1251 379

54+99.38 RDWYEXC

Excavation 0.73 2 2 0.85 820 Subsoil Exc 0.00 0 0 1.00 0 Fill 35.50 34 34 1.00 -1283 1981

SUBEXCAVATION

Excavation 37.81 74 74 1.00 350 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1283 0 Mass ordinate for SUBEXCAVATION = 350

TOPSOIL

Excavation 7.61 15 0 0.00 401 Subsoil Exc 13.75 14 0 0.00 721 Fill 0.00 0 0 0.00 -1283 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.98 31 0 0.00 -1283 2288

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.11 110 0 0.00 -1283 489

55+00.00 RDWYEXC

Excavation 0.72 0 0 0.85 820 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.09 1 1 1.00 -1284 1982

SUBEXCAVATION

Excavation 40.52 1 1 1.00 351 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1284 0 Mass ordinate for SUBEXCAVATION = 351

TOPSOIL

Excavation 3.46 0 0 0.00 401 Subsoil Exc 11.96 0 0 0.00 721 Fill 0.00 0 0 0.00 -1284 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 0 0 0.00 -1284 2288

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.92 1 0 0.00 -1284 490

55+25.00 RDWYEXC

Excavation 0.47 1 0 0.85 821

Fill 11.23 18 18 1.00 -1302 2000

SUBEXCAVATION

Excavation 37.08 36 36 1.00 387 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1302 0 Mass ordinate for SUBEXCAVATION = 387

TOPSOIL

Excavation 8.35 5 0 0.00 406 Subsoil Exc 7.76 9 0 0.00 730 Fill 0.00 0 0 0.00 -1302 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.87 16 0 0.00 -1302 2304

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.97 55 0 0.00 -1302 545

55+50.00 RDWYEXC

Excavation 0.22 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.99 12 12 1.00 -1314 2012

SUBEXCAVATION

Excavation 37.97 35 35 1.00 422 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1314 0 Mass ordinate for SUBEXCAVATION = 422

TOPSOIL

Excavation 8.31 8 0 0.00 414 Subsoil Exc 9.43 8 0 0.00 738 Fill 0.00 0 0 0.00 -1314 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.87 16 0 0.00 -1314 2320

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.98 55 0 0.00 -1314 600

55+58.53 RDWYEXC

Excavation 0.66 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 52.47 11 11 1.00 -1325 2023

SUBEXCAVATION

Excavation 37.45 12 12 1.00 434 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1325 0 Mass ordinate for SUBEXCAVATION = 434

TOPSOIL

Excavation 7.04 2 0 0.00 416 Subsoil Exc 15.78 4 0 0.00 742 Fill 0.00 0 0 0.00 -1325 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0

Fill 16.96 5 0 0.00 -1325 2325

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.07 19 0 0.00 -1325 619

55+75.00 RDWYEXC

Excavation 0.31 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.24 21 21 1.00 -1346 2044

SUBEXCAVATION

Excavation 39.56 23 23 1.00 457 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1346 0 Mass ordinate for SUBEXCAVATION = 457

TOPSOIL

Excavation 8.52 5 0 0.00 421 Subsoil Exc 9.17 8 0 0.00 750 Fill 0.00 0 0 0.00 -1346 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 10 0 0.00 -1346 2335

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.92 36 0 0.00 -1346 655

56+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.44 11 11 1.00 -1357 2055

SUBEXCAVATION

Excavation 43.33 38 38 1.00 495 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1357 0 Mass ordinate for SUBEXCAVATION = 495

TOPSOIL

Excavation 4.26 6 0 0.00 427 Subsoil Exc 5.73 7 0 0.00 757 Fill 0.00 0 0 0.00 -1357 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1357 2351

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.92 55 0 0.00 -1357 710

56+25.00 RDWYEXC

Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.15 4 4 1.00 -1361 2059

SUBEXCAVATION

Excavation 37.20 37 37 1.00 532 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1361 0 Mass ordinate for SUBEXCAVATION = 532

TOPSOIL

Excavation 7.21 5 0 0.00 432 Subsoil Exc 2.74 4 0 0.00 761

Fill 0.00 0 0 0.00 -1361 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1361 2367

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 57.60 54 0 0.00 -1361 764

56+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 1 1 1.00 -1362 2060

SUBEXCAVATION

Excavation 40.25 36 36 1.00 568 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1362 0 Mass ordinate for SUBEXCAVATION = 568

TOPSOIL

Excavation 6.69 6 0 0.00 438 Subsoil Exc 0.00 1 0 0.00 762 Fill 0.00 0 0 0.00 -1362 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1362 2383

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 55.19 52 0 0.00 -1362 816

56+75.00 RDWYEXC

Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.78 0 0 1.00 -1362 2060

SUBEXCAVATION

Excavation 40.08 37 37 1.00 605 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1362 0 Mass ordinate for SUBEXCAVATION = 605

TOPSOIL

Excavation 9.16 7 0 0.00 445 Subsoil Exc 0.78 0 0 0.00 762 Fill 0.00 0 0 0.00 -1362 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1362 2399

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.43 53 0 0.00 -1362 869

56+89.14 RDWYEXC

Excavation 0.12 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.42 10 10 1.00 -1372 2070

SUBEXCAVATION

Excavation 36.12 20 20 1.00 625

Fill 0.00 0 0 1.00 -1372 0 Mass ordinate for SUBEXCAVATION = 625

TOPSOIL

Excavation 4.36 4 0 0.00 449 Subsoil Exc 15.86 4 0 0.00 766 Fill 0.00 0 0 0.00 -1372 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.01 9 0 0.00 -1372 2408

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.23 31 0 0.00 -1372 900

57+00.00 RDWYEXC

Excavation 0.02 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.53 9 9 1.00 -1381 2079

SUBEXCAVATION

Excavation 37.96 15 15 1.00 640 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1381 0 Mass ordinate for SUBEXCAVATION = 640

TOPSOIL

Excavation 7.91 2 0 0.00 451 Subsoil Exc 6.73 5 0 0.00 771 Fill 0.00 0 0 0.00 -1381 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 7 0 0.00 -1381 2415

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.92 24 0 0.00 -1381 924

57+25.00 RDWYEXC

Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 5 5 1.00 -1386 2084

SUBEXCAVATION

Excavation 40.85 36 36 1.00 676 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1386 0 Mass ordinate for SUBEXCAVATION = 676

TOPSOIL

Excavation 9.72 8 0 0.00 459 Subsoil Exc 0.00 3 0 0.00 774 Fill 0.00 0 0 0.00 -1386 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1386 2431

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0

Fill 58.95 55 0 0.00 -1386 979

57+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.16 1 1 1.00 -1387 2085

SUBEXCAVATION

Excavation 35.97 36 36 1.00 712 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1387 0 Mass ordinate for SUBEXCAVATION = 712

TOPSOIL

Excavation 10.71 9 0 0.00 468 Subsoil Exc 1.16 1 0 0.00 775 Fill 0.00 0 0 0.00 -1387 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1387 2447

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.11 56 0 0.00 -1387 1035

57+75.00 RDWYEXC

Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.06 3 3 1.00 -1390 2088

SUBEXCAVATION

Excavation 33.20 32 32 1.00 744 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1390 0 Mass ordinate for SUBEXCAVATION = 744

TOPSOIL

Excavation 8.24 9 0 0.00 477 Subsoil Exc 4.10 2 0 0.00 777 Fill 0.00 0 0 0.00 -1390 0 Mass ordinate for TOPSOIL = 0

SURF_AGG

Excavation

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .