U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
MT STILLWATER 207(1)
WEST ROSEBUD CREEK ROAD RECONSTRUCTION
GEOPAK EARTHWORK DATA LISTING
MARCH 2016
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
18+35.67 RDWYEXC
Excavation 94.72 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 41.83 0 0 0.00 0 0
18+65.45 RDWYEXC
Excavation 36.32 73 62 0.85 73 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.73 0 0 1.00 62 0
TOPSOIL
Excavation 1.24 1 0 0.00 1 Subsoil Exc 0.73 0 0 0.00 0 Fill 0.00 0 0 0.00 62 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.97 34 0 0.00 62 34
19+00.00 RDWYEXC
Excavation 23.21 38 33 0.85 111 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.01 1 1 1.00 94 1
TOPSOIL
Excavation 15.94 11 0 0.00 12 Subsoil Exc 1.01 1 0 0.00 1 Fill 0.00 0 0 0.00 94 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 29.41 31 0 0.00 94 65
19+50.00 RDWYEXC
Excavation 15.48 36 31 0.85 147 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.16 6 6 1.00 119 7
TOPSOIL
Excavation 24.87 38 0 0.00 50 Subsoil Exc 4.99 6 0 0.00 7 Fill 0.00 0 0 0.00 119 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 44.53 68 0 0.00 119 133
20+00.00 RDWYEXC
Excavation 20.52 33 29 0.85 180 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.21 8 8 1.00 140 15
TOPSOIL
Excavation 12.19 34 0 0.00 84 Subsoil Exc 3.21 8 0 0.00 15
Fill 0.00 0 0 0.00 140 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 59 0 0.00 140 192
20+50.00 RDWYEXC
Excavation 24.85 42 36 0.85 222 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.46 15 15 1.00 161 30
TOPSOIL
Excavation 11.48 22 0 0.00 106 Subsoil Exc 8.93 11 0 0.00 26 Fill 0.00 0 0 0.00 161 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 37 0 0.00 161 229
21+00.00 RDWYEXC
Excavation 29.35 50 42 0.85 272 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.60 14 14 1.00 189 44
TOPSOIL
Excavation 15.56 25 0 0.00 131 Subsoil Exc 1.60 10 0 0.00 36 Fill 0.00 0 0 0.00 189 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 37 0 0.00 189 266
21+25.00 RDWYEXC
Excavation 54.88 39 33 0.85 311 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.12 1 1 1.00 221 45
TOPSOIL
Excavation 17.74 15 0 0.00 146 Subsoil Exc 1.12 1 0 0.00 37 Fill 0.00 0 0 0.00 221 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 18 0 0.00 221 284
21+50.00 RDWYEXC
Excavation 69.02 57 48 0.85 368 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 1 1 1.00 268 46
TOPSOIL
Excavation 0.00 8 0 0.00 154 Subsoil Exc 0.00 1 0 0.00 38 Fill 0.00 0 0 0.00 268 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 18 0 0.00 268 302
21+75.00 RDWYEXC
Excavation 56.61 58 50 0.85 426 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.75 0 0 1.00 318 46
TOPSOIL
Excavation 3.21 1 0 0.00 155 Subsoil Exc 0.75 0 0 0.00 38 Fill 0.00 0 0 0.00 318 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 18 0 0.00 318 320
22+00.00 RDWYEXC
Excavation 37.93 44 37 0.85 470 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.52 1 1 1.00 354 47
TOPSOIL
Excavation 6.46 4 0 0.00 159 Subsoil Exc 1.52 1 0 0.00 39 Fill 0.00 0 0 0.00 354 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.71 18 0 0.00 354 338
22+25.00 RDWYEXC
Excavation 28.82 30 26 0.85 500 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.20 3 3 1.00 377 50
TOPSOIL
Excavation 6.23 6 0 0.00 165 Subsoil Exc 4.20 3 0 0.00 42 Fill 0.00 0 0 0.00 377 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.73 18 0 0.00 377 356
22+50.00 RDWYEXC
Excavation 18.18 22 19 0.85 522 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.41 4 4 1.00 392 54
TOPSOIL
Excavation 5.44 5 0 0.00 170 Subsoil Exc 5.40 4 0 0.00 46 Fill 0.00 0 0 0.00 392 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.76 18 0 0.00 392 374
23+00.00 RDWYEXC
Excavation 0.83 18 15 0.85 540 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.24 12 12 1.00 395 66
TOPSOIL
Excavation 0.18 5 0 0.00 175 Subsoil Exc 5.80 10 0 0.00 56
Fill 0.00 0 0 0.00 395 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.59 36 0 0.00 395 410
23+50.00 RDWYEXC
Excavation 0.00 1 1 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.23 34 34 1.00 362 100
TOPSOIL
Excavation 0.00 0 0 0.00 175 Subsoil Exc 8.69 13 0 0.00 69 Fill 0.00 0 0 0.00 362 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.89 37 0 0.00 362 447
24+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 51.96 75 75 1.00 287 175
TOPSOIL
Excavation 0.00 0 0 0.00 175 Subsoil Exc 11.27 18 0 0.00 87 Fill 0.00 0 0 0.00 287 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 287 484
24+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 61.86 105 105 1.00 182 280
TOPSOIL
Excavation 0.00 0 0 0.00 175 Subsoil Exc 14.11 24 0 0.00 111 Fill 0.00 0 0 0.00 182 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 182 521
25+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 51.78 105 105 1.00 77 385
TOPSOIL
Excavation 0.00 0 0 0.00 175 Subsoil Exc 13.36 25 0 0.00 136 Fill 0.00 0 0 0.00 77 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0
Fill 19.92 37 0 0.00 77 558
25+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.03 81 81 1.00 -4 466
TOPSOIL
Excavation 0.00 0 0 0.00 175 Subsoil Exc 12.28 24 0 0.00 160 Fill 0.00 0 0 0.00 -4 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 -4 595
26+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 541 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.59 57 57 1.00 -61 523
TOPSOIL
Excavation 0.00 0 0 0.00 175 Subsoil Exc 11.39 22 0 0.00 182 Fill 0.00 0 0 0.00 -61 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 -61 632
26+50.00 RDWYEXC
Excavation 1.18 1 1 0.85 542 Subsoil Exc 0.00 0 0 1.00 0 Fill 16.91 39 39 1.00 -99 562
TOPSOIL
Excavation 0.13 0 0 0.00 175 Subsoil Exc 10.02 20 0 0.00 202 Fill 0.00 0 0 0.00 -99 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.91 37 0 0.00 -99 669
27+00.00 RDWYEXC
Excavation 6.73 7 6 0.85 549 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.94 23 23 1.00 -116 585
TOPSOIL
Excavation 1.42 2 0 0.00 177 Subsoil Exc 7.31 16 0 0.00 218 Fill 0.00 0 0 0.00 -116 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 -116 706
27+50.00 RDWYEXC
Excavation 16.96 22 19 0.85 571 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.20 9 9 1.00 -106 594
TOPSOIL
Excavation 5.42 6 0 0.00 183 Subsoil Exc 2.20 9 0 0.00 227
Fill 0.00 0 0 0.00 -106 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 -106 743
28+00.00 RDWYEXC
Excavation 20.61 35 30 0.85 606 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.38 4 4 1.00 -80 598
TOPSOIL
Excavation 7.23 11 0 0.00 194 Subsoil Exc 2.38 4 0 0.00 231 Fill 0.00 0 0 0.00 -80 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.96 37 0 0.00 -80 780
28+50.00 RDWYEXC
Excavation 26.70 44 37 0.85 650 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.24 3 3 1.00 -46 601
TOPSOIL
Excavation 9.59 15 0 0.00 209 Subsoil Exc 1.24 3 0 0.00 234 Fill 0.00 0 0 0.00 -46 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.93 37 0 0.00 -46 817
29+00.00 RDWYEXC
Excavation 22.67 46 38 0.85 696 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.60 4 4 1.00 -12 605
TOPSOIL
Excavation 9.69 18 0 0.00 227 Subsoil Exc 2.60 4 0 0.00 238 Fill 0.00 0 0 0.00 -12 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.10 37 0 0.00 -12 854
29+50.00 RDWYEXC
Excavation 16.03 36 30 0.85 732 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.51 6 6 1.00 12 611
TOPSOIL
Excavation 10.88 19 0 0.00 246 Subsoil Exc 3.51 6 0 0.00 244 Fill 0.00 0 0 0.00 12 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0
Fill 19.92 37 0 0.00 12 891
30+00.00 RDWYEXC
Excavation 10.80 25 21 0.85 757 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.12 8 8 1.00 25 619
TOPSOIL
Excavation 5.27 15 0 0.00 261 Subsoil Exc 5.12 8 0 0.00 252 Fill 0.00 0 0 0.00 25 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.92 37 0 0.00 25 928
30+50.00 RDWYEXC
Excavation 21.14 29 25 0.85 786 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.71 5 5 1.00 45 624
TOPSOIL
Excavation 6.02 11 0 0.00 272 Subsoil Exc 0.71 5 0 0.00 257 Fill 0.00 0 0 0.00 45 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.96 36 0 0.00 45 964
SKIP STATION RANGE = 30+50.00 to 33+50.00
33+50.00 RDWYEXC
Excavation 8.73 0 0 0.85 786 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.59 0 0 1.00 45 624
TOPSOIL
Excavation 7.30 0 0 0.00 272 Subsoil Exc 2.59 0 0 0.00 257 Fill 0.00 0 0 0.00 45 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 0 0 0.00 45 964
33+78.00 RDWYEXC
Excavation 8.71 9 7 0.85 795 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.85 2 2 1.00 50 626
TOPSOIL
Excavation 4.51 6 0 0.00 278 Subsoil Exc 0.85 2 0 0.00 259 Fill 0.00 0 0 0.00 50 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 17 0 0.00 50 981
34+00.00 RDWYEXC
Excavation 6.99 6 5 0.85 801 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.31 2 2 1.00 53 628
TOPSOIL
Excavation 5.93 4 0 0.00 282
Subsoil Exc 3.31 2 0 0.00 261 Fill 0.00 0 0 0.00 53 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.89 13 0 0.00 53 994
34+50.00 RDWYEXC
Excavation 0.62 7 6 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.28 12 12 1.00 47 640
TOPSOIL
Excavation 2.45 8 0 0.00 290 Subsoil Exc 4.42 7 0 0.00 268 Fill 0.00 0 0 0.00 47 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 47 1025
34+98.00 RDWYEXC
Excavation 0.15 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.15 15 15 1.00 32 655
TOPSOIL
Excavation 1.55 4 0 0.00 294 Subsoil Exc 1.96 6 0 0.00 274 Fill 0.00 0 0 0.00 32 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 29 0 0.00 32 1054
35+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.62 1 1 1.00 31 656
TOPSOIL
Excavation 0.00 0 0 0.00 294 Subsoil Exc 0.00 0 0 0.00 274 Fill 0.00 0 0 0.00 31 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 1 0 0.00 31 1055
35+38.00 RDWYEXC
Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.00 12 12 1.00 19 668
TOPSOIL
Excavation 0.00 0 0 0.00 294 Subsoil Exc 0.28 0 0 0.00 274 Fill 0.00 0 0 0.00 19 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0
Fill 15.96 22 0 0.00 19 1077
35+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.93 5 5 1.00 14 673
TOPSOIL
Excavation 0.00 0 0 0.00 294 Subsoil Exc 0.26 0 0 0.00 274 Fill 0.00 0 0 0.00 14 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 7 0 0.00 14 1084
36+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.94 20 20 1.00 -6 693
TOPSOIL
Excavation 0.00 0 0 0.00 294 Subsoil Exc 1.67 2 0 0.00 276 Fill 0.00 0 0 0.00 -6 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 30 0 0.00 -6 1114
36+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.13 28 28 1.00 -34 721
TOPSOIL
Excavation 0.00 0 0 0.00 294 Subsoil Exc 7.13 8 0 0.00 284 Fill 0.00 0 0 0.00 -34 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -34 1145
37+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.31 34 34 1.00 -68 755
TOPSOIL
Excavation 0.79 1 0 0.00 295 Subsoil Exc 7.39 13 0 0.00 297 Fill 0.00 0 0 0.00 -68 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -68 1176
37+26.00 RDWYEXC
Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.08 11 11 1.00 -79 766
Excavation 0.00 0 0 0.00 295
Subsoil Exc 0.13 4 0 0.00 301 Fill 0.00 0 0 0.00 -79 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 16 0 0.00 -79 1192
37+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.16 7 7 1.00 -86 773
TOPSOIL
Excavation 0.89 0 0 0.00 295 Subsoil Exc 3.36 2 0 0.00 303 Fill 0.00 0 0 0.00 -86 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 15 0 0.00 -86 1207
38+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.93 20 20 1.00 -106 793
TOPSOIL
Excavation 0.21 1 0 0.00 296 Subsoil Exc 3.67 7 0 0.00 310 Fill 0.00 0 0 0.00 -106 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -106 1238
38+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.27 19 19 1.00 -125 812
TOPSOIL
Excavation 0.20 0 0 0.00 296 Subsoil Exc 3.61 7 0 0.00 317 Fill 0.00 0 0 0.00 -125 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -125 1269
39+00.00 RDWYEXC
Excavation 0.64 1 0 0.85 809 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.31 13 13 1.00 -138 825
TOPSOIL
Excavation 2.21 2 0 0.00 298 Subsoil Exc 3.55 7 0 0.00 324 Fill 0.00 0 0 0.00 -138 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0
Fill 16.92 31 0 0.00 -138 1300
39+50.00 RDWYEXC
Excavation 0.64 1 1 0.85 810 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.35 15 15 1.00 -152 840
TOPSOIL
Excavation 4.05 6 0 0.00 304 Subsoil Exc 8.48 11 0 0.00 335 Fill 0.00 0 0 0.00 -152 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -152 1331
39+83.00 RDWYEXC
Excavation 0.66 1 1 0.85 811 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.71 10 10 1.00 -161 850
TOPSOIL
Excavation 1.82 4 0 0.00 308 Subsoil Exc 3.43 7 0 0.00 342 Fill 0.00 0 0 0.00 -161 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 20 0 0.00 -161 1351
40+00.00 RDWYEXC
Excavation 1.96 1 1 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.10 4 4 1.00 -164 854
TOPSOIL
Excavation 4.01 2 0 0.00 310 Subsoil Exc 1.31 1 0 0.00 343 Fill 0.00 0 0 0.00 -164 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 10 0 0.00 -164 1361
40+07.00 RDWYEXC
Excavation 0.17 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.81 2 2 1.00 -166 856
TOPSOIL
Excavation 3.34 1 0 0.00 311 Subsoil Exc 1.62 0 0 0.00 343 Fill 0.00 0 0 0.00 -166 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 4 0 0.00 -166 1365
40+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.11 21 21 1.00 -187 877
Excavation 0.95 3 0 0.00 314
Subsoil Exc 6.16 6 0 0.00 349 Fill 0.00 0 0 0.00 -187 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 26 0 0.00 -187 1391
41+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.80 50 50 1.00 -237 927
TOPSOIL
Excavation 0.00 1 0 0.00 315 Subsoil Exc 8.33 13 0 0.00 362 Fill 0.00 0 0 0.00 -237 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -237 1422
41+27.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 28.74 32 32 1.00 -269 959
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 4.31 6 0 0.00 368 Fill 0.00 0 0 0.00 -269 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 16 0 0.00 -269 1438
41+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 26.89 24 24 1.00 -293 983
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 6.14 4 0 0.00 372 Fill 0.00 0 0 0.00 -293 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 14 0 0.00 -293 1452
41+52.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 26.16 2 2 1.00 -295 985
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 5.99 0 0 0.00 372 Fill 0.00 0 0 0.00 -295 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0
Fill 15.96 1 0 0.00 -295 1453
42+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.05 38 38 1.00 -333 1023
TOPSOIL
Excavation 0.34 0 0 0.00 315 Subsoil Exc 9.45 14 0 0.00 386 Fill 0.00 0 0 0.00 -333 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 29 0 0.00 -333 1482
42+16.83 RDWYEXC
Excavation 0.21 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 18.76 11 11 1.00 -344 1034
TOPSOIL
Excavation 0.05 0 0 0.00 315 Subsoil Exc 10.03 6 0 0.00 392 Fill 0.00 0 0 0.00 -344 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 11 0 0.00 -344 1493
42+27.69 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 44.76 13 13 1.00 -357 1047
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 16.61 5 0 0.00 397 Fill 0.00 0 0 0.00 -357 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.05 7 0 0.00 -357 1500
42+38.36 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 47.75 18 18 1.00 -375 1065
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 18.14 7 0 0.00 404 Fill 0.00 0 0 0.00 -375 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 7 0 0.00 -375 1507
42+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 46.69 20 20 1.00 -395 1085
Excavation 0.00 0 0 0.00 315
Subsoil Exc 14.94 7 0 0.00 411 Fill 0.00 0 0 0.00 -395 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 7 0 0.00 -395 1514
43+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 57.93 97 97 1.00 -492 1182
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 14.06 27 0 0.00 438 Fill 0.00 0 0 0.00 -492 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -492 1545
43+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.80 103 103 1.00 -595 1285
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 11.57 24 0 0.00 462 Fill 0.00 0 0 0.00 -595 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -595 1576
44+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 44.45 91 91 1.00 -686 1376
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 12.33 22 0 0.00 484 Fill 0.00 0 0 0.00 -686 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -686 1607
44+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 33.96 73 73 1.00 -759 1449
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 10.08 21 0 0.00 505 Fill 0.00 0 0 0.00 -759 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0
Fill 16.92 31 0 0.00 -759 1638
45+00.00 RDWYEXC
Subsoil Exc 0.00 0 0 1.00 0 Fill 23.63 53 53 1.00 -812 1502
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 7.59 16 0 0.00 521 Fill 0.00 0 0 0.00 -812 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -812 1669
45+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.01 38 38 1.00 -850 1540
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 2.95 10 0 0.00 531 Fill 0.00 0 0 0.00 -850 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 30 0 0.00 -850 1699
45+51.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.11 1 1 1.00 -851 1541
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 2.92 0 0 0.00 531 Fill 0.00 0 0 0.00 -851 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.96 1 0 0.00 -851 1700
46+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.94 35 35 1.00 -886 1576
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 6.26 8 0 0.00 539 Fill 0.00 0 0 0.00 -886 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 30 0 0.00 -886 1730
46+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.29 36 36 1.00 -922 1612
Excavation 0.00 0 0 0.00 315
Subsoil Exc 6.01 11 0 0.00 550 Fill 0.00 0 0 0.00 -922 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -922 1761
47+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.15 27 27 1.00 -949 1639
TOPSOIL
Excavation 0.00 0 0 0.00 315 Subsoil Exc 4.18 9 0 0.00 559 Fill 0.00 0 0 0.00 -949 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -949 1792
47+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.95 24 24 1.00 -973 1663
TOPSOIL
Excavation 0.19 0 0 0.00 315 Subsoil Exc 7.45 11 0 0.00 570 Fill 0.00 0 0 0.00 -973 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -973 1823
48+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 16.57 28 28 1.00 -1001 1691
TOPSOIL
Excavation 0.76 1 0 0.00 316 Subsoil Exc 9.20 15 0 0.00 585 Fill 0.00 0 0 0.00 -1001 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1001 1854
48+50.00 RDWYEXC
Excavation 0.09 0 0 0.85 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.78 26 26 1.00 -1027 1717
TOPSOIL
Excavation 2.16 3 0 0.00 319 Subsoil Exc 6.50 15 0 0.00 600 Fill 0.00 0 0 0.00 -1027 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0
Fill 16.92 31 0 0.00 -1027 1885
49+00.00 RDWYEXC
Subsoil Exc 0.00 0 0 1.00 0 Fill 8.04 18 18 1.00 -1045 1735
TOPSOIL
Excavation 0.00 2 0 0.00 321 Subsoil Exc 4.56 10 0 0.00 610 Fill 0.00 0 0 0.00 -1045 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1045 1916
49+50.00 RDWYEXC
Excavation 1.24 1 1 0.85 813 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.41 13 13 1.00 -1057 1748
TOPSOIL
Excavation 3.63 3 0 0.00 324 Subsoil Exc 4.83 9 0 0.00 619 Fill 0.00 0 0 0.00 -1057 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1057 1947
50+00.00 RDWYEXC
Excavation 0.00 1 1 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.28 15 15 1.00 -1071 1763
TOPSOIL
Excavation 3.04 6 0 0.00 330 Subsoil Exc 7.09 11 0 0.00 630 Fill 0.00 0 0 0.00 -1071 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1071 1978
50+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.76 20 20 1.00 -1091 1783
TOPSOIL
Excavation 0.29 3 0 0.00 333 Subsoil Exc 6.83 13 0 0.00 643 Fill 0.00 0 0 0.00 -1091 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1091 2009
51+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 15.49 25 25 1.00 -1116 1808
Excavation 0.00 0 0 0.00 333
Subsoil Exc 6.75 13 0 0.00 656 Fill 0.00 0 0 0.00 -1116 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1116 2040
51+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.67 33 33 1.00 -1149 1841
TOPSOIL
Excavation 0.00 0 0 0.00 333 Subsoil Exc 7.18 13 0 0.00 669 Fill 0.00 0 0 0.00 -1149 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1149 2071
52+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.56 40 40 1.00 -1189 1881
TOPSOIL
Excavation 0.00 0 0 0.00 333 Subsoil Exc 8.06 14 0 0.00 683 Fill 0.00 0 0 0.00 -1189 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1189 2102
52+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.34 43 43 1.00 -1232 1924
TOPSOIL
Excavation 0.00 0 0 0.00 333 Subsoil Exc 8.23 15 0 0.00 698 Fill 0.00 0 0 0.00 -1232 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1232 2133
53+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.33 22 22 1.00 -1254 1946
SUBEXCAVATION
Excavation 39.74 37 37 1.00 37 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1254 0 Mass ordinate for SUBEXCAVATION = 37
TOPSOIL
Excavation 7.65 7 0 0.00 340 Subsoil Exc 0.33 8 0 0.00 706 Fill 0.00 0 0 0.00 -1254 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1254 2164
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.84 55 0 0.00 -1254 55
53+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 814 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1254 1946
SUBEXCAVATION
Excavation 42.25 76 76 1.00 113 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1254 0 Mass ordinate for SUBEXCAVATION = 113
TOPSOIL
Excavation 6.00 13 0 0.00 353 Subsoil Exc 0.00 0 0 0.00 706 Fill 0.00 0 0 0.00 -1254 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1254 2195
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 54.85 106 0 0.00 -1254 161
54+00.00 RDWYEXC
Excavation 1.74 1 1 0.85 815 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.16 0 0 1.00 -1253 1946
SUBEXCAVATION
Excavation 45.59 81 81 1.00 194 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1253 0 Mass ordinate for SUBEXCAVATION = 194
TOPSOIL
Excavation 9.78 15 0 0.00 368 Subsoil Exc 0.16 0 0 0.00 706 Fill 0.00 0 0 0.00 -1253 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1253 2226
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.81 106 0 0.00 -1253 267
54+50.00 RDWYEXC
Excavation 1.15 3 3 0.85 818 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.32 1 1 1.00 -1251 1947
SUBEXCAVATION
Excavation 43.37 82 82 1.00 276 Subsoil Exc 0.00 0 0 1.00 0
Fill 0.00 0 0 1.00 -1251 0 Mass ordinate for SUBEXCAVATION = 276
TOPSOIL
Excavation 9.43 18 0 0.00 386 Subsoil Exc 1.32 1 0 0.00 707 Fill 0.00 0 0 0.00 -1251 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 31 0 0.00 -1251 2257
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.63 112 0 0.00 -1251 379
54+99.38 RDWYEXC
Excavation 0.73 2 2 0.85 820 Subsoil Exc 0.00 0 0 1.00 0 Fill 35.50 34 34 1.00 -1283 1981
SUBEXCAVATION
Excavation 37.81 74 74 1.00 350 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1283 0 Mass ordinate for SUBEXCAVATION = 350
TOPSOIL
Excavation 7.61 15 0 0.00 401 Subsoil Exc 13.75 14 0 0.00 721 Fill 0.00 0 0 0.00 -1283 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.98 31 0 0.00 -1283 2288
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.11 110 0 0.00 -1283 489
55+00.00 RDWYEXC
Excavation 0.72 0 0 0.85 820 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.09 1 1 1.00 -1284 1982
SUBEXCAVATION
Excavation 40.52 1 1 1.00 351 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1284 0 Mass ordinate for SUBEXCAVATION = 351
TOPSOIL
Excavation 3.46 0 0 0.00 401 Subsoil Exc 11.96 0 0 0.00 721 Fill 0.00 0 0 0.00 -1284 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 0 0 0.00 -1284 2288
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.92 1 0 0.00 -1284 490
55+25.00 RDWYEXC
Excavation 0.47 1 0 0.85 821
Fill 11.23 18 18 1.00 -1302 2000
SUBEXCAVATION
Excavation 37.08 36 36 1.00 387 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1302 0 Mass ordinate for SUBEXCAVATION = 387
TOPSOIL
Excavation 8.35 5 0 0.00 406 Subsoil Exc 7.76 9 0 0.00 730 Fill 0.00 0 0 0.00 -1302 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.87 16 0 0.00 -1302 2304
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.97 55 0 0.00 -1302 545
55+50.00 RDWYEXC
Excavation 0.22 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.99 12 12 1.00 -1314 2012
SUBEXCAVATION
Excavation 37.97 35 35 1.00 422 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1314 0 Mass ordinate for SUBEXCAVATION = 422
TOPSOIL
Excavation 8.31 8 0 0.00 414 Subsoil Exc 9.43 8 0 0.00 738 Fill 0.00 0 0 0.00 -1314 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.87 16 0 0.00 -1314 2320
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.98 55 0 0.00 -1314 600
55+58.53 RDWYEXC
Excavation 0.66 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 52.47 11 11 1.00 -1325 2023
SUBEXCAVATION
Excavation 37.45 12 12 1.00 434 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1325 0 Mass ordinate for SUBEXCAVATION = 434
TOPSOIL
Excavation 7.04 2 0 0.00 416 Subsoil Exc 15.78 4 0 0.00 742 Fill 0.00 0 0 0.00 -1325 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0
Fill 16.96 5 0 0.00 -1325 2325
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.07 19 0 0.00 -1325 619
55+75.00 RDWYEXC
Excavation 0.31 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.24 21 21 1.00 -1346 2044
SUBEXCAVATION
Excavation 39.56 23 23 1.00 457 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1346 0 Mass ordinate for SUBEXCAVATION = 457
TOPSOIL
Excavation 8.52 5 0 0.00 421 Subsoil Exc 9.17 8 0 0.00 750 Fill 0.00 0 0 0.00 -1346 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 10 0 0.00 -1346 2335
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.92 36 0 0.00 -1346 655
56+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.44 11 11 1.00 -1357 2055
SUBEXCAVATION
Excavation 43.33 38 38 1.00 495 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1357 0 Mass ordinate for SUBEXCAVATION = 495
TOPSOIL
Excavation 4.26 6 0 0.00 427 Subsoil Exc 5.73 7 0 0.00 757 Fill 0.00 0 0 0.00 -1357 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1357 2351
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.92 55 0 0.00 -1357 710
56+25.00 RDWYEXC
Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.15 4 4 1.00 -1361 2059
SUBEXCAVATION
Excavation 37.20 37 37 1.00 532 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1361 0 Mass ordinate for SUBEXCAVATION = 532
TOPSOIL
Excavation 7.21 5 0 0.00 432 Subsoil Exc 2.74 4 0 0.00 761
Fill 0.00 0 0 0.00 -1361 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1361 2367
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 57.60 54 0 0.00 -1361 764
56+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 1 1 1.00 -1362 2060
SUBEXCAVATION
Excavation 40.25 36 36 1.00 568 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1362 0 Mass ordinate for SUBEXCAVATION = 568
TOPSOIL
Excavation 6.69 6 0 0.00 438 Subsoil Exc 0.00 1 0 0.00 762 Fill 0.00 0 0 0.00 -1362 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1362 2383
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 55.19 52 0 0.00 -1362 816
56+75.00 RDWYEXC
Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.78 0 0 1.00 -1362 2060
SUBEXCAVATION
Excavation 40.08 37 37 1.00 605 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1362 0 Mass ordinate for SUBEXCAVATION = 605
TOPSOIL
Excavation 9.16 7 0 0.00 445 Subsoil Exc 0.78 0 0 0.00 762 Fill 0.00 0 0 0.00 -1362 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1362 2399
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.43 53 0 0.00 -1362 869
56+89.14 RDWYEXC
Excavation 0.12 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.42 10 10 1.00 -1372 2070
SUBEXCAVATION
Excavation 36.12 20 20 1.00 625
Fill 0.00 0 0 1.00 -1372 0 Mass ordinate for SUBEXCAVATION = 625
TOPSOIL
Excavation 4.36 4 0 0.00 449 Subsoil Exc 15.86 4 0 0.00 766 Fill 0.00 0 0 0.00 -1372 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.01 9 0 0.00 -1372 2408
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.23 31 0 0.00 -1372 900
57+00.00 RDWYEXC
Excavation 0.02 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.53 9 9 1.00 -1381 2079
SUBEXCAVATION
Excavation 37.96 15 15 1.00 640 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1381 0 Mass ordinate for SUBEXCAVATION = 640
TOPSOIL
Excavation 7.91 2 0 0.00 451 Subsoil Exc 6.73 5 0 0.00 771 Fill 0.00 0 0 0.00 -1381 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 7 0 0.00 -1381 2415
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.92 24 0 0.00 -1381 924
57+25.00 RDWYEXC
Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 5 5 1.00 -1386 2084
SUBEXCAVATION
Excavation 40.85 36 36 1.00 676 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1386 0 Mass ordinate for SUBEXCAVATION = 676
TOPSOIL
Excavation 9.72 8 0 0.00 459 Subsoil Exc 0.00 3 0 0.00 774 Fill 0.00 0 0 0.00 -1386 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1386 2431
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 58.95 55 0 0.00 -1386 979
57+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.16 1 1 1.00 -1387 2085
SUBEXCAVATION
Excavation 35.97 36 36 1.00 712 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1387 0 Mass ordinate for SUBEXCAVATION = 712
TOPSOIL
Excavation 10.71 9 0 0.00 468 Subsoil Exc 1.16 1 0 0.00 775 Fill 0.00 0 0 0.00 -1387 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.92 16 0 0.00 -1387 2447
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.11 56 0 0.00 -1387 1035
57+75.00 RDWYEXC
Excavation 0.00 0 0 0.85 821 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.06 3 3 1.00 -1390 2088
SUBEXCAVATION
Excavation 33.20 32 32 1.00 744 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1390 0 Mass ordinate for SUBEXCAVATION = 744
TOPSOIL
Excavation 8.24 9 0 0.00 477 Subsoil Exc 4.10 2 0 0.00 777 Fill 0.00 0 0 0.00 -1390 0 Mass ordinate for TOPSOIL = 0
SURF_AGG
Excavation