Q A_4-27.pdf

PDF 72 KB Posted

Attached to
OR PFH 146(4), Palmer Junction MP 0. 0 to 15. 1
Solicitation number
DTFH70-15-B-00020
Issued by

View the file

Other files

File Type Posted
BidSum_Palmer_Junction.pdf PDF
A003.pdf PDF
A002.pdf PDF
A001_Palmer.pdf PDF
Palmer_Jct_Final_Geotechnical_Report__Recommedations_GR_05-15_(8_13_15).pdf PDF
SWPPP_OR_PFH_146(4)_Palmer_Junction.pdf PDF
Plan_Request_form_Palmer_Junction.pdf PDF
Palmer_Plan_Set.pdf PDF
IFB__Palmer_Junction.pdf PDF
PROJECT_DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR PFH 146(4)

Palmer Junction

# General Technical Question Answer Date 1 x Specifically the plans refer to ASTM 796 for the structures. Technically this specification applies to structures 26’ and less. The Gordon Creek crossing therefore cannot be designed to this specification.

Use ASTM A761 4/27/16

Check General or Technical

File details come from the government source that posted it. Updated .