A002.pdf

PDF 28 KB Posted

Attached to
OR PFH 146(4), Palmer Junction MP 0. 0 to 15. 1
Solicitation number
DTFH70-15-B-00020
Issued by

About this file

Amendment A002

View the file

Other files

File Type Posted
BidSum_Palmer_Junction.pdf PDF
A003.pdf PDF
Q A_4-27.pdf PDF
A001_Palmer.pdf PDF
Palmer_Jct_Final_Geotechnical_Report__Recommedations_GR_05-15_(8_13_15).pdf PDF
SWPPP_OR_PFH_146(4)_Palmer_Junction.pdf PDF
Plan_Request_form_Palmer_Junction.pdf PDF
Palmer_Plan_Set.pdf PDF
IFB__Palmer_Junction.pdf PDF
PROJECT_DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 04/21/2016 N/A OR PFH 146(4)

Palmer Junction – MP 0.0 to 15.1

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-15-B-00020

9B. DATED (SEE ITEM 11)

04/04/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OR PFH 146(4), Palmer Junction – MP 0.0 to 15.1

See page 2 for revisions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A002, dated 04/21/2016 OR PFH 146(4) Solicitation No. DTFH70-15-B-00020 Palmer Junction – MP 0.0 to 15.1

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page Section/Table Revision E-15 108.01 Commencement, Prosecution, and

Completion of Work Deletes (g)

ENCLOSURES

Pages:

E-15

E-15 DIVISION 100

Special Contract Requirements Project: OR PFH 146(4), Palmer Junction - MP 0.0 to 15.1

Section 108. — PROSECUTION AND PROGRESS

12/14/15– FP-14

108.01 Commencement, Prosecution, and Completion of Work. Add the following:

Furnish at least 48 hours advance notice before changing the current work schedule. Work schedule changes that include additional shifts require 14 days notice.

Perform work under this contract according to the following:

(a) Do not perform construction operations between 6:00 p.m. Friday and 6:00 a.m. the following Tuesday of the Memorial Day and Labor Day weekends.

(b) Do not perform construction operations on legal holidays.

(c) Complete all Sections 414, 602, and 603 work in 2016.

(d) Complete all Sections 401 work in 2017.

(e) Limit work as provided for in Subsections 156.03 and 156.06.

(f) Limit work as provided in Subsections 105.02 and 107.10.

(g) No ground disturbing work prior to August 1, 2016 unless otherwise approved by the CO at the following locations:

Gordon Creek

South Fork Cabin Creek

(h) Suspend all work for winter shutdown from October 31 of any year through May 1st of the succeeding year, both dates inclusive, unless otherwise approved by the CO.

108.01A Labor. (Added Subsection).

Follow the requirements of FAR Clause 52.222-6 Construction Wage Rate Requirements.

Adjacent or virtually adjacent work sites, as used in FAR Clause 52.222-6, are defined to be work sites within ½ mile of the project. Application of Construction Wage Rate Requirements (Davis-Bacon Act) for work sites beyond ½ mile of the project will be determined by the CO.

108.02 Subcontracting. Amend as follows:

Delete the first paragraph and substitute the following:

Follow the requirements of FAR clauses 52.219-3, Notice of HUBZone Set-Aside or Sole Source Award, and 52.222-11 Subcontracts (Labor Standards).

Revised by Amendment A002

SF30amd_WORD
Amd_Page_2_A002
E15

File details come from the government source that posted it. Updated .