Construction General Permit infiltration, including any natural buffers established under Part 2.1 .2.1, unless infeasible. Use velocity dissipation devices if necessary to prevent erosion when directing stormwater to vegetated areas.
2.1.1 .3 Installation Requirements.
a. Complete installation of stormwater controls by the time each phase of earth-disturbance has begun, unless infeasible. By the time earth-disturbing activities in any given portion of your site have begun, unless infeasible, you must install and make operational any downgradient sediment controls (e.g., buffers or equivalent sediment controls, perimeter controls, exit point controls, storm drain inlet protection) that control discharges from the initial site clearing, grading, excavating, and other land-disturbing activities.
Note: Where it is infeasible to install stormwater controls prior to the initiol eorth disturbance, it is EPA 's that it will be a rare circumstance that will the operotor from such controls the initial earth disturbance.
Following the installation of these initial controls, all other stormwater controls planned for this portion of your site and described in your SW PPP must be installed and made operational as soon as conditions on the site allow.
Note: The requirement to install stormwater controls to earth-disturbance for each phase of the project does not apply to the earth disturbance associated with the actual installation of these controls.
b. Use good engineering practices and follow manufacturer's specifications.
You must install all stormwater controls in accordance with good engineering practices, including applicable design specifications.
Note: specifications may be found in manufacturer en"'""'" and/or in erosion and sediment control monuals or
2.1 .1 .4 Maintenance Requirements.
must reflect in your SWPPP.
a. You must ensure that all erosion and sediment controls required in this Part remain in effective operating condition during permit coverage and are protected from activities that would reduce their effectiveness.
b. You must inspect all erosion and sediment controls in accordance with the applicable requirements in Part 4.1, and document your findings in accordance with Part 4.1.7. If you find a problem (e.g., erosion and sediment controls need to be replaced, repaired, or maintained), you must make the necessary repairs or modifications in accordance with the following schedule:
i. Initiate work to fix the problem immediately after discovering the problem, and complete such work by the close of the next work day, if the problem does not require significant repair or replacement, or if the problem can be corrected through routine maintenance.
ii. When installation of a new erosion or sediment control or a significant repair is needed, you must install the new or modified control and make it operational, or complete the repair, by no later than 7 calendar days from the tirne of discovery where feasible. If it
7.2.7.2 For each pollutant-generating activity, an inventory of pollutants or pollutant constituents (e.g., sediment, fertilizers and/or pesticides, paints, solvents, fuels) associated with that activity, which could be exposed to rainfall, or snowmelt, and could be discharged from your construction site. You must take into account where potential spills and leaks could occur that contribute pollutants to stormwater discharges. You must also document any departures from the manufacturer's specifications for applying fertilizers containing nitrogen and phosphorus, as required in Part 2.3.5. l .
7.2.8. Non-Stormwater Discharges.
The SW PPP must also identify all sources of allowable non-stormwater discharges listed in Part 1.3.d.
7 .2. 9. Buffer Documentation.
If you are required to comply with Part 2.1.2.1 because a surface water is located within 50 feet of your project's earth disturbances, you must describe which compliance alternative you have selected for your site, and comply with any additional requirements to provide documentation in Part 2.1.2.1.
7.2.10. Description of Stormwater Control Measures.
7 .2.10.1 Stormwater Control Measures to be Used During Construction Activity. The SW PPP must describe all stormwater control measures that are or will be installed and maintained at your site to meet the requirements of Part 2. For each stormwater control measure, you must document:
a. Information on the type of stormwater control measure to be installed and maintained, including design information;
b. What specific sediment controls will be installed and made operational prior to conducting earth-disturbing activities in any given portion of your site to meet the requirement of Part 2. l .2.2a;
c. For exit points on your site, document stabilization techniques you will use and any additional controls that are planned to remove sediment prior to vehicle exit consistent with Part 2.1.2.3; and
d. For linear projects, where you have determined that the use of perimeter controls in portions of the site is impracticable, document why you believe this to be the case (see Part 2. l .2.2a).
7 .2.10.2 Use of Treatment Chemicals. If you will use polymers, flocculants, or other treatment chemicals at your site, the SW PPP must include:
a. A listing of all soil types23 that are expected to be exposed during construction and that will be discharged to locations where chemicals will be applied. Also include a listing of soil types expected to be found in fill material to be used in these same areas, to the extent you have this information prior to construction.
b. A listing of all treatment chemicals to be used at the site, and why the selection of these chemicals is suited to the soil characteristics of your site;
(ELG's) and new source performance standards (NSPS) for controlling the discharge of pollutants from construction sites.
"Construction Site" - the land or water area where construction activities will occur and where stormwater controls will be installed and maintained. The construction site includes construction support activities, which may be located at a different part of the property from where the primary construction activity will take place, or on a different piece of property altogether. The construction site is often a smaller subset of the lot or parcel within which the project is taking place.
"Construction Support Activities" - a construction-related activity that specifically supports the construction activity and involves earth disturbance or pollutant-generating activities of its own, and can include activities associated with concrete or asphalt batch plants, equipment staging yards, materials storage areas, excavated material disposal areas, and borrow areas.
"Construction Waste" - discarded material (such as packaging materials, scrap construction materials, masonry products, timber, steel, pipe, and electrical cuttings, plastics, and styrofoam).
"Conveyance Channel" - a temporary or permanent waterway designed and installed to safely convey stormwater flow within and out of a construction site.
"Corrective Action" - for the purposes of the permit, any action taken to (1) repair, modify, or replace any stormwater control used at the site; (2) clean up and dispose of spills, releases, or other deposits found on the site; and (3) remedy a permit violation.
"Critical Habitat" - as defined in the Endangered Species Act at 16 U.S.C. 1531 for a threatened or endangered species, (i) the specific areas within the geographical area occupied by the species, at the time it is listed in accordance with the provisions of section 4 of the Endangered Species Act, on which are found those physical or biological features essential to the conservation of the species and which may require special management considerations or protection; and (ii) specific areas outside the geographical area occupied by the species at the time it is listed in accordance with the provisions of section 4 of the Endangered Species Act, upon a determination by the Secretary that such areas are essential for the conservation of the species.
"CWA" - the Clean Water Act or the Federal Water Pollution Control Act, 33 U.S.C. section 1251 et seq.
"Dewatering" - the act of draining rainwater and/or groundwater from building foundations, vaults, and trenches.
"Discharge" -when used without qualification, means the "discharge of a pollutant."
"Discharge of a Pollutant" - any addition of any "pollutant" or combination of pollutants to "waters of the United States" from any "point source," or any addition of any pollutant or combination of pollutants to the waters of the "contiguous zone" or the ocean from any point source other than a vessel or other floating craft which is being used as a means of transportation. This includes additions of pollutants into waters of the United States from: surface runoff which is collected or channeled by man; discharges through pipes, sewers, or other conveyances, leading into privately owned treatment works. See 40 CFR 122.2.
"Discharge Point" - for the purposes of this permit, the location where collected and concentrated stormwater flows are discharged from the construction site.
Page A-3 of 13
"National Pollutant Discharge Elimination System" (NPDES) - defined at 40CFR§122.2 as the national program for issuing, modifying, revoking and reissuing, terminating, monitoring and enforcing permits, and imposing and enforcing pretreatment requirements, under sections 307, 402, 318, and 405 of CWA. The term includes an 'approved program.'
"Native Topsoil" - the uppermost layer of naturally occurring soil for a particular area, and is often rich in organic matter, biological activity, and nutrients.
"Native Vegetation" - the species of plants that have developed for a particular region or ecosystem and are considered endemic to that region or ecosystem.
"Natural Buffer" - for the purposes of this permit, an area of undisturbed natural cover surrounding surface waters within which construction activities are restricted. Natural cover includes the vegetation, exposed rock, or barren ground that exists prior to commencement of earth-disturbing activities.
"Natural Vegetation" - vegetation that occurs spontaneously without regular management, maintenance or species introductions, removals, and that generally has a strong component of native species.
"New Operator of a New or Existing Project" - an operator that through transfer of ownership and/or operation replaces the operator of an already permitted construction project.
"New Project" - a construction project that commences construction activities on or after February 15.
"New Source" - for the purpose of this permit, a construction project that commenced construction activities after February l, 2010.
"New Source Performance Standards (NSPS)" - for the purposes of this permit, NSPS are technology-based standards that apply to construction sites that are new sources under 40 CFR 450.24.
"Non-Stormwater Discharges" - discharges that do not originate from storm events. They can include, but are not limited to, discharges of process water, air conditioner condensate, non contact cooling water, vehicle wash water, sanitary wastes, concrete washout water, paint wash water, irrigation water, or pipe testing water.
"Non-Turbid" - a discharge that does not cause or contribute to an exceedence of turbidity related water quality standards.
"Notice of Intent" (NOi) - the form (electronic or paper) required for authorization of coverage under the Construction General Permit.
"Notice of Termination" (NOT) - the form (electronic or paper) required for terminating coverage under the Construction General Permit.
"Operational" - for the purpose of this permit, stormwater controls are made "operational" when they have been installed and implemented, are functioning as designed, and are properly maintained.
Page A-7 of 13 discharges from the construction site; and (3) identifies procedures the operator will implement to comply with the terms and conditions of this general permit.
"Temporary Stabilization" - a condition where exposed soils or disturbed areas are provided a temporary vegetative and/or non-vegetative protective cover to prevent erosion and sediment loss. Temporary stabilization may include temporary seeding, geotextiles, mulches, and other techniques to reduce or eliminate erosion until either final stabilization can be achieved or until further construction activities take place to re-disturb this area.
"Thawing Conditions" - for the purposes of this permit, thawing conditions are expected based on the historical likelihood of two or more days with daytime temperatures greater than 32'F. This date can be determined by looking at historical weather data. Note: the estimation of thawing conditions is for planning purposes only. During construction the permittee will be required to conduct site inspections based upon actual conditions (i.e., if thawing conditions occur sooner than expected, the permittee will be required to conduct inspections at the regular frequency).
"Threatened Species" - defined in the Endangered Species Act at 16 U.S.C. 1531 as any species which is likely to become an endangered species within the foreseeable future throughout all or a significant portion of its range.
"Tier 2 Waters" - for antidegradation purposes, pursuant to 40 CFR 131. l 2(a) (2), those waters thatare characterized as having water quality that exceeds the levels necessary to support propagation of fish. shellfish, and wildlife and recreation in and on the water.
"Tier 2.5 Waters" - for antidegradation purposes, those waters designated by States or Tribes as requiring a level of protection equal to and above that given to Tier 2 waters, but less than that given Tier 3 waters. Some States have special requirements for these waters.
"Tier 3 Waters" - for antidegradation purposes. pursuant to 40 CFR 131. l 2(a) (3), Tier 3 waters are identified by states as having high quality waters constituting an Outstanding Natural Resource Water (ONRW), such as waters of National Parks and State Parks, wildlife refuges, and waters of exceptional recreational or ecological significance.
"Total Maximum Daily Load" or "TMDL" - the sum of the individual wasteload allocations (WLAs) for point sources and load allocations (LAs) for nonpoint sources and natural background. If receiving water has only one point source discharger, the TMDL is the sum of that point source WLA plus the LAs for any nonpoint sources of pollution and natural background sources, tributaries, or adjacent segments. TMDLs can be expressed in terms of either mass per time, toxicity, or other appropriate measure.
"Toxic Waste" - see "Hazardous Materials."
"Turbidity" - a condition of water quality characterized by the presence of suspended solids and/or organic material.
"Uncontaminated Discharge" - a discharge that does not cause or contribute to an exceedence of applicable water quality standards.
"Upland" - the dry land area above and 'landward' of the ordinary high water mark.
"Upset" - Upset means an exceptional incident in which there is unintentional and temporary noncompliance with technology based permit effluent limitations because of factors beyond your reasonable control. An upset does not include noncompliance to the extent caused by
Page A-11 of 13
Page H-3 of 4
| Table of Contents |
| Tab 1 |
| Tab 2 |
| Tab 3 |
| Tab 4 |
| Tab 5 |
| Tab 6 |
| Tab 7 |
| Tab 8 |
| Tab 9 |
| Tab 10 |
| Tab 11 |
| Tab 12 |
| Tab 13 |
| Tab 14 |
| Tab 15 |
| Tab 16 |
| Tab 17 |
| Tab 18 |
File details come from the government source that posted it. Updated .