ID_PFH_26(3) _Project_Description.pdf

PDF 24 KB Posted

Attached to
ID PFH 26(3), Ketchum Challis Highway (Pebble Beach Section) Federal contract opportunity
Solicitation number
DTFH70-15-B-00017
Issued by
Department of Transportation Federal Highway Administration

About this file

Project Description

View the file

Other files for this federal contract opportunity

Other files attached to ID PFH 26(3), Ketchum Challis Highway (Pebble Beach Section), newest first.
File Type Posted
BidSum_Ketchum.pdf PDF
Q A_5-13.pdf PDF
Q A_05-02.pdf PDF
A001.pdf PDF
Skewed-Pipe_X-sections.pdf PDF
if02603-V8_EARTHWORK.pdf PDF
if02603-V8_EW_Harrison.pdf PDF
IFB_ID_PFH_26(3).pdf PDF
SWPPP_Ketchum-Challis_Pebble_Beach _ID_PFH_26(3) _Custer_County_ID.pdf PDF
GR07-15_Ketchum-Challis_FINAL.pdf PDF
if02603_100_Plan_set.pdf PDF
Plan_Request_Ketchum_Challis.pdf PDF
Harrison_Driveway_X-Sections.pdf PDF
Mainline_X-Sections.pdf PDF
ID_PFH_26(3) _Preliminary_Letter.pdf PDF
ID_PFH_26(3) _95__Planset-Preliminary.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID PFH 26(3), Ketchum-Challis Highway (Pebble Beach Section), Custer, Idaho

The work consists of clearing, grading, slope reinforcement, drainage, base and paving, guardrail, permanent signing and striping and other small items of work.

Project length: 1.216 Miles

Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $5 million to $7 million

Location: Approximately 16.8 Miles NE of Stanley, Idaho

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O ne

S ch ed ul e Sc h N am e

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices)

Silt Fence 5,000 LNFT Fiber Roll 7,500 LNFT

Stabilized Construction Exit 3 Each 158 Watering for Dust Control 1,500 MGAL

DIVISION 200 – Earthwork 201 Clearing & Grubbing 29 ACRE 203 Removal of Structures & Obstructions (structures, demolition)

Removal of Headwall 8 Each Removal of Pipe Culver 1 Each

Removal of Signs 7 Each Removal of Fence 1,158 LNFT

Removal of Concrete Barrier 270 LNFT 204 Excavation & Embankment Roadway Excavation 125,510 CUYD

Ditch Excavation 140 CUYD Conserve and Stockpile Topsoil 9,518 CUYD

207 Earthwork Geosynthetics Geotextile Filter, Class 1, Type A 263 SQYD Geotextile Filter, Class 1, Type C 2,112 SQYD

S ch ed ul e Sc h N

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Place Riprap, Class 2 180 CUYD

Riprap Ditch, Class 1 825 LNFT 252 Rockery, Special Rock Embankment, and Rock Buttress

Special Rock Embankment, Mechanically Placed

1,600 CUYD

DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) Aggregate Base Grading C or D 12,960 TON

DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method

Asphalt Pavement, Gyratory Mix 5,090 TON Antistrip Additive 50 TON

403 Asphalt Concrete Asphalt Concrete Pavement 2,570 TON 411 Asphalt Prime Coat (asphalt surface treatment) Prime Coat 26 Ton

Blotter 186 TON 412 Asphalt Tack Coat (asphalt surface treatment) Tack Coat 13 TON

DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 24-Inch Culvert 913 LNFT

End Section 24-Inch Culvert 9 EACH Elbow 24-Inch Culver 5 EACH

609 Curb & Gutter (concrete – minor structures) (indicate which) Curb, Asphalt, 6-Inch Depth 803 LNFT 617 Guardrail Guardrail, Type 4, Class B Wood Posts 2,125 LNFT

Terminal Section Type Tangent 2 Each 619 Fences, Gates, Cattle Guards & Bollard Posts Fence, Barbwire 3,762 LNFT 621 Monuments & Markers (construction survey & staking) (yes/no) Yes 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) Placing Conserved Topsoil 10,307 CUYD 625 Turf Establishment (indicate seeding or mulching separately) Turf Establishment 25 ACRE 629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment)

Rolled Erosion Control Product, Type 5.C 32,300

SQYD

633 Permanent Traffic Control (traffic control devices) Sign System 57 SQFT Delineator, Type 4 - 80 EACH

S ch ed ul e Sc h N

634 Permanent Pavement Markings (traffic pavement markings) Pavement Markings 42,620 LNFT 635 Temporary Traffic Control – Flagger Flagger 5,904 FXHR

Traffic Control Supervisor 164 DAY 635 Temporary Traffic Control – Pilot Car 1,968 HOUR 635 Temporary Traffic Control – Barricade Type 3 – 24 EACH

Cone, 36-Inch 144 EACH Traffic Drum 29 EACH

Warning Light 29 EACH Portable Changeable Message Sign 4 EACH

Crash Cushion 2 EACH Traffic Signal System 1 EACH Concrete Barrier 2,304 LNFT

Concrete Barrier w/Rock Protection 1,600 LNFT Pavement Markings 49,469 LNFT

Construction Sign 33 SQFT 646 Roadside Development (use pay item description) Remove and Reset Mailbox 1 EACH

Stone Stairs 4 SQYD

File details come from the government source that posted it. Updated .