Q A_8-10-2015.pdf
PDF 75 KB Posted
- Attached to
- OR BLM ERFO 151-3202 Peavine Road Repair
- Solicitation number
- DTFH70-15-B-00013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Peavine.pdf | ||
| A002_Peavine.pdf | ||
| A001_Peavine.pdf | ||
| Q A_7-17-2015.pdf | ||
| IFB__Peavine.pdf | ||
| Physical_Data_GM23-15_Peavine.pdf | ||
| Plan_Request_form_Peavine.pdf | ||
| PeavineRoad-Plans.pdf | ||
| OR_BLM_ERFO_151-3202_PEAVINE_ROAD_REPAIR_PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# General Technical Question Answer
1 X
The forest that this project is in is at a level III fire threat. What will happen if BLM closes down the forest? Will there still be access to the project for a site visit?
The BLM has confirmed that they are not at level III fire threat. There is currently access to the project for a site visit.
2 X
The Oregon Department of Forestry has issued a Power Equipment Shutdown Starting August 1 on ODF‐Protected Lands in SW Oregon. What effect will this have on the project?
If the restrictions have not been lifted, the awarded contractor must abide by the shutdown rules without any further compensation subject to obtaining a waiver.
Check General or Technical
OR BLM ERFO 151‐3202
PEAVINE ROAD REPAIR