PeavineRoad-Plans.pdf
PDF 4 MB Posted
- Attached to
- OR BLM ERFO 151-3202 Peavine Road Repair
- Solicitation number
- DTFH70-15-B-00013
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Peavine.pdf | ||
| Q A_8-10-2015.pdf | ||
| A002_Peavine.pdf | ||
| A001_Peavine.pdf | ||
| Q A_7-17-2015.pdf | ||
| IFB__Peavine.pdf | ||
| Physical_Data_GM23-15_Peavine.pdf | ||
| Plan_Request_form_Peavine.pdf | ||
| OR_BLM_ERFO_151-3202_PEAVINE_ROAD_REPAIR_PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material A
M
J u n e
U
S C c m y fi le s p w p r o d u c ti o n d o r b u r a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 BLM ERFO 151-3202 OR
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
A.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D m y fi le s p w p r o d u c ti o n d o r b u r a c .d g n
OR BLM ERFO 151-3202
J u ly
W it u c k i
C h e c k e d b y
D e s ig n e d b y
PROJECT LOCATION
VICINITY MAP
M ile s T o G ran ts
Pa ss
SCALE IN MILES
0 4 1 2
G a lic e
C re e k
Rocky
Gulch
Or eg onGa lic e, Peavine Rd.
P e a v in e R d
Galic e Cre ek R d.
G al ic e
Cr ee k Rd
Galice Rd.
G a lic e R d
R o c k y R iffle
R d
R o g u e R iv e r
Rogue River
Sheet and Description
SECTION C SECTION D SECTION E
TYPICAL
SECTIONS
PLAN &
PROFILE
REINFORCED
SOIL SLOPE ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0140 20103-0000 CLEARING AND GRUBBING SQYD 496 4 500
A0160 20401-0000 ROADWAY EXCAVATION CUYD 21 4 25
A0180 26101-0000 REINFORCED SOIL SLOPE SQFT 1,536 14 1,550
A0200 30201-1000 ROADWAY AGGREGATE, METHOD 1 CUYD 63 2 65
A0220 30302-1000 DITCH RECONDITIONING LNFT 375 25 400
A0240 40301-0200 ASPHALT CONCRETE PAVEMENT,
TYPE 2 TON 41 4 45
A0260 41202-0000 TACK COAT GAL 19 1 20
A0280 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 20
A0300 62201-0700 BACKHOE LOADER, 1 CUBIC YARD
MINIMUM CAPACITY FRONTEND
BUCKET, 10 CUBIC FOOT MINIMUM
CAPACITY BACKHOE BUCKET, 90
HP MINIMUM FLYWHEEL HOUR 20
A0320 62301-0000 GENERAL LABOR HOUR 40
A0340 62516-3000 MULCHING, HYDRAULIC METHOD,
BONDED FIBER MATRIX SQYD 496 4 500
A0360 62901-1100 ROLLED EROSION CONTROL
PRODUCT, TYPE 4 SQYD 496 4 500
A0380 63401-0100 PAVEMENT MARKINGS, TYPE A,
SOLID (WHITE) LNFT 400 400
A0400 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
MileStone: 100% Date Completed: In Progress Report Date: 06/25/15
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-J un
-2
:1
A M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Pe av in eR oa d-
SO
Q .x ls m
]S he et
STATE PROJECT
B.1BLM ERFO 151-3202OR
NUMBER
LC
Profile grade
3:1
NO SCALE
T y p
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
PEAVINE ROAD
Travel Way
14'-0" min. 1.5' 1.5'
Shd. Shd.
3:1
C.1
STATE PROJECT
OR BLM ERFO 151-3202
u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c a .d g n
W it u c k i
M M Y
Y Y
Y
C h e c k e d b y
D e s ig n e d b y
12" compacted depth
Roadway aggregate, method 1, equal lifts. Place tack coat between lifts
4" compacted depth placed in two
Asphalt concrete pavement, type 2
TYPICAL SECTION
PEAVINE ROAD
Ditch
Reconditioning
C le a r in g l im it s
5'
5'
C le a r in g l im it s
1:1.5
See Sheet E.2
Reinforced soil slope
D.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d O
R B
L M
E R
F O d a .d g n
OR BLM ERFO 151-3202
P u ly
W it u c
C h e c k e d b y
D e s ig n e d b y
LEGEND:
Reinforced Soil Slope
Edge of road
Top of bank
Toe of slope
NO SCALE
existing fog lines solid (white) best-fit to match the
Place pavement markings, type A vertical alignment
Provide horizontal and
Begin access ramp
PLAN SHEET
PEAVINE ROAD
'03
Existing Pipe
FOOTNOTE:
Salvage pipe in existing ditch as directed by CO.1 gnin oitid nocer hctid fo noi tacol .xorppA to existing culvert
Continue ditch reconditioning
QUANTITIES
REINFORCED SOIL SLOPE
TABULATION OF
E.1
STATE PROJECT
OR
OR BLM ERFO 151-3202
u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d O
R B
L M
E R
F O e a .d
W it u c
C h e c k e d b y
D e s ig n e d b y
NOTES:
FOOTNOTES:
1.
2.
Structural backfill
3.
4.
2% min.
Granular backfill
UNDERDRAIN SYSTEM
4" PERFORATED PIPE
Perforated pipe 4" dia.
connect outlet and collector pipes
Provide applicable fittings to
4"
12"
12"
TOPSOIL DETAIL
Geogrid reinforcement
4" dia. Solid outlet drain pipe.
TYPICAL SECTION
REINFORCED SOIL SLOPE
type C, nonwoven
Geotextile filter, class 1, REINFORCED SOIL SLOPE
NO SCALE
E.2
STATE PROJECT
OR
BLM ERFO 151-3202
u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d O
R B
L M
E R
F O e b .d
W it u c
C h e c k e d b y
D e s ig n e d b y
6" typ.
of temporary excavation for top course only
Top embedment overlap to extend to the back
Placed riprap, class 1, 2' depth
Existing ground
Granular backfill
4" Perforated collector pipe leveling course structural backfill 6-Inch minimum this sheet.
depth (typ.), see detail
Topsoil, 8-inch
Mulching, hydraulic method, bonded fiber matrix.
overlap (typ)
6' embedment
Reinforcement geogrid
H
Toe elevation
1.5
C o n s tr u c ti o n L im it s
LC
for pavement structure details See "C" sheet typical sections
C o n s tr u c ti o n L im it s
Reinforced embankment
L
R e in fo r c e d S o il S lo p e P a y L im it s
Structural backfill (all courses)
1:3
Existing roadway pavement
Saw cut
1:2 pavement
Saw cut
Reinforcement geogrid
Reinforced soil slope
REINFORCE SOIL SLOPE PROFILE
(PAY LIMITS)
30'
4'
4'
Unclassified Borrow
Saw cut is subsidiary to Reinforced Soil Slope.
reinforcements.
Back of temporary excavation to extend 1' behind back of in place with standard coupling bands or other approved means.
screen according to Subsection 605.03. Hold the screen securely slopes as directed by the CO. Cover the end of outlet pipes with Bevel ends of outlet pipes to match the surrounding finish of structural backfill.
spacing. Cover the outlet drain pipes with a minimum of 12" Provide solid outlet drain pipe 20-feet center-to-center maximum as reinforced soil slope construction proceeds.
Extend each course of reinforcements into access ramp areas
5.
Toe elevation riprap with granular backfill before placing 4" Solid outlet drain pipe, protect
1.5 type 4 Rolled erosion control product, Access ramp
1.5 type 1 both sides drain
Geocomposite drain, 1.5 of the end of the pipes.
embedment, or other suitable marker. Place post within 12"
Mark the outlet of the outlet pipes with a 6' long post with 2' entering the connection joints.
unobstructed flow to the outlet and prevent soil from drains and the 4-inch collector pipe that allow
Provide connections between the geocomposite center spacing.
Place 24-inch wide geocomposite drains 10-feet center to
12"
2"
2" type 1 both sides of drain
Geocomposite drain, Approx. location of outlet drain white, plastic Object marker post, A p p r o x .5
Placed riprap, class 1, 2' depth
Drive stakes at each end and at 4' spacing
(ft)
(ft)
Excavate trench 2"
REVISED:
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2014
FIBER ROLL
W157-21
119.5'
3' min.
3' min. or m in
M in t o
1" x 1" Wood stake
3" to 5"
J u n e
U
C m y fi le s p w p r o d u c ti o n d D e t.
W .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
F.1 BLM ERFO 151-3202 OR
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow
PLAN
Spacing Slope
STAKES REQUIRED
disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
2.
1.
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACINGStep 2: Backfill soil against fiber rolls and install fiber rolls
Step 1: Excavate trench
FIBER ROLL STAKING DETAIL
conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
NO SCALE
Fiber roll larger than fiber roll
Existing ground (typ.)
Stagger joints (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction to end, without overlapping the ends
Abut adjacent fiber rolls tightly, end
Install fiber rolls snugly into trench.
soil to ground level
Backfilled and compacted
Slope
Stake and entrench fiber roll water from flowing around the fiber roll
Provide sufficient length to prevent sp ac in g ch ar t
S ee f ib er r ol l
Direction of runof f from distur bed area s