Preliminary_Plans_Nisqually_to_Paradise _Phase_II_Utilities_Part2.pdf

PDF 5 MB Posted

Attached to
WA NPS MORA 14(8), Nisqually to Paradise, Phase II Utilities
Solicitation number
DTFH70-14-B-00016
Issued by

About this file

Preliminary Plans 2 of 2

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

705+00 to 735+00

PLAN

N

N

Turnout, LT

NPS PMIS No. ______ NPS Drwg. No. ______

Proposed utility conduit

Proposed utility conduit

C.15

STATE PROJECT

NUMBER

SHEET

WA

NPS MORA 14(8)

A

M

S e p te m b e r

U

S S u r

D c m y fi le s p w p r o d u c ti o n d m o r a u o .d g n

C h e c k e d b y

D e s ig n e d b y vault location

Proposed power and communication

PRELIM

IN

ARY

Not For

Con str uc tio

735+00 to 760+00

PLAN

N

N

Turnout, RT

Turnout, RT

Turnout, LT

Turnout, RT

Turnout, RT

NPS PMIS No. ______ NPS Drwg. No. ______

Proposed utility conduit

Proposed utility conduit

C.16

STATE PROJECT

S e p te m b e r

U

S S u r

D c m y fi le s p w p r o d u c ti o n d m o r a u p .d

C h e c k e d b y

D e s ig n e d b y vault location

Proposed power and communication vault location

Proposed power and communication

PRELIM

IN

ARY

Not For

Con str uc

760+00 to 785+00

PLAN

N

N

Turnout, RT

PARKING AREA

NARADA FALLS

NPS PMIS No. ______ NPS Drwg. No. ______

Proposed utility conduit

Proposed utility conduit

C.17

STATE PROJECT

S e p te m b e r

U

S S u r

D c m y fi le s p w p r o d u c ti o n d m o r a u q .d

C h e c k e d b y

D e s ig n e d b y vault location

Proposed power and communication vault location

Proposed power and communication

Connect to existing power vault

PRELIM

IN

ARY

Not For

Con str uc

785+00 to 835+00

PLAN

N

N

Turnout, LT

Turnout, LT

Turnout, LT

Turnout, RT

STEVENS CANYON

NPS PMIS No. ______ NPS Drwg. No. ______

Proposed utility conduit

Proposed utility conduit

C.18

STATE PROJECT

S e p te m b e r

U

S S u r

D c m y fi le s p w p r o d u c ti o n d m o r a u r .d

C h e c k e d b y

D e s ig n e d b y vault location

Proposed power and communication vault location

Proposed power and communication vault location

Proposed power and communication

PRELIM

IN

ARY

Not For

Con str uc

835+00 to 860+00

PLAN

N

NPS PMIS No. ______ NPS Drwg. No. ______ Turnout, LT

Proposed utility conduit

Proposed utility conduit

C.19

STATE PROJECT

S e p te m b e r

U

S S u r

D c m y fi le s p w p r o d u c ti o n d m o r a u s .d

C h e c k e d b y

D e s ig n e d b y vault location

Proposed power and communication vault location

Proposed power and communication

PRELIM

IN

ARY

Not For

Con str uc

860+00 to 890+00

PLAN

N

Turnout, LT

Turnout, LT

Turnout, RT

NPS PMIS No. ______ NPS Drwg. No. ______

Proposed utility conduit

C.20

STATE PROJECT

S e p te m b e r

U

S S u r

D c m y fi le s p w p r o d u c ti o n d m o r a u t.

d

C h e c k e d b y

D e s ig n e d b y vault location

Proposed power and communication vault location

Proposed power and communication

Connect to existing power vault

PRELIM

IN

ARY

Not For

Con str uc

890+00 to 915+00

PLAN

N

N

NPS PMIS No. ______ NPS Drwg. No. ______

Turnout, RT

Proposed utility conduit

Proposed utility conduit

C.21

STATE PROJECT

S e p te m b e r

U

S S u r

D c m y fi le s p w p r o d u c ti o n d m o r a u u .d

C h e c k e d b y

D e s ig n e d b y vault location

Proposed power and communication vault location

Proposed power and communication vault location

Proposed power and communication

PRELIM

IN

ARY

Not For

Con str uc

915+00 to 935+00

PLAN

N

N

NPS PMIS No. ______ NPS Drwg. No. ______

PARADISE COMPLEX

C.22

STATE PROJECT

S e p te m b e r

U

S S u r

D c m y fi le s p w p r o d u c ti o n d m o r a u v .d

C h e c k e d b y

D e s ig n e d b y

Proposed utility conduit communications vault

Connect to existing power vault

Connect to existing communication vault

Connect to existing power vault

Connect to existing communication vault

Connect to existing to replace existing cabinet

Proposed vault location vault location

Proposed power and communication

PRELIM

IN

ARY

Not For

Con str uc

NOTE:

DETAILS

UTILITY VAULT

NPS PMIS No. 082112 NPS Drwg. No. 105/100683

LOADBREAK VAULT LID

ring and lock (typ.)

Recessed lifting m in ty p

BB

6'-10"

C C

5'-0"

2" Ø drain hole

6" Ø sump with knockout

Ground rod

(4 required)

1 @ each corner

Galvanized pulling iron rack (typ.)

Hardware mounting

8 each wall

8" Ø knockout (typ.)

Existing ground m in m a x surface

Top of paved

3'-0"

3'-0"

SECTION C-C

SECTION A-A

SPLICE VAULT LID

cover and ductile iron locking

38 1/2" ø Cast iron ring

6"

6'-10"

AA

System identification

5/8" Ø Threaded insert (typ.)

Diamond pattern

Diamond pattern

System identification

Ground stud

1-2" Ø

Lift hole (typ.), 12" 12"

30"

PLAN VIEW

Concrete collar

6'-0" 4'-0"

SECTION B-B

(SHOWN WITH LOADBREAK LID)

SPLICE VAULT and LOADBREAK VAULT BASE

Apply emulsified asphalt to exposed concrete surfaces after final paving.

Paint vault lids with flat black epoxy coating.

and the actual arrangement.

to the approved manufacturer's shop drawings for all dimensions shown. Each manufacturer's Cable Vault assembly will vary. Refer

This drawing depicts a typical Vault assembly. Reinforcing not

Final vault location to be approved by CO.

Place concrete collar around manhole rim.

-inch below final top of pavement.2 1Set vault so that top of cover is

6.

5.

4.

3.

2.

1.

C.23

STATE PROJECT

m o r a u w .d g n

U

S S u r ft

D

C h e c k e d b y

D e s ig n e d b y

PRELIM

IN

ARY

Not For

Con str uc

NO SCALE

NPS PMIS No. 082112 NPS Drwg. No. 105/100683

C.24

STATE PROJECT

m o r a u x .d g n

U

S I n t2

D

B r ia n M in o e c k e d b y a r ty M a r ti n z s ig n e d b y

PLAN

PLAN

(3) Separable splice with overall jacket

EPR insulationwith overall jacket

EPR insulation insulated protective cap with bracket, ground lead and with insulated standoff bushing

Loadbreak elbow and junction, END VIEW

(GOVERNMENT FURNISHED)

TELEPHONE VAULT

SECTION

"2 145'-10""2

1 each side, 2 sides

" Ø Lift hole,2

Galvanized "C" channel 6"

6"

2 each end, 2 ends 6" x 8" Knockout, FOOTNOTE:

NOTE:

2" PVC conduit (4)2" PVC conduit (4)

" ground rod with clamps4 3 " ground rod with clamps4 electrical vault

Precast concrete electrical vault

Precast concrete

2" Conduit (4) 2" Conduit (4)

3'-1"

LOADBREAK VAULT WIRING DIAGRAM

SPLICE VAULT WIRING DIAGRAM

3.

2.

1.

placed.

Provide temporary 20:1 pavement taper until final pavement is

-inch below final pavement elevation.2 1Set elevation of vault lids to

Top of vault to match existing slope.

All vault locations are to be approved by the CO prior to excavating.

See sheet K.5 for splice vault and loadbreak vault details.

VAULT DETAILS

PRELIM

IN

ARY

Not For

Con str uc

Existing ground

5'

5' Existing ground

5'

C.25

STATE PROJECT

m o r a u y .d g n

U

S I n t2

D ia n M in e c k e d b y r ty M a r ti n s ig n e d b y

3' LC

LC

LC

LC

Finish grade

Reconstructed roadwayFinish grade

Finish grade

Existing ground

TYPICAL MAINLINE UTILITY SECTION

SUBEXCAVATION AREA UTILITY SECTION

TYPICAL SECTIONS

ROADWAY UTILITY TRENCH

6' Lap (typ) ty p

2 LAYER DEEP PATCH UTILITY SECTION

Utility trench

Utility trench

Utility trench

Utility trench

5'

LC

Finish grade

Utility trench

BASE REINFORCEMENT UTILITY SECTION

3 LAYER DEEP PATCH SECTION UTILITY SECTION

PRELIM

IN

ARY

Not For

Con str uc

C.26

STATE PROJECT

m o r a u z .d g n

U

S I n t2

D ia n M in e c k e d b y r ty M a r ti n s ig n e d b y

DETAILS

UTILITY TRENCH

24"

6" min.

Saw cut

Existing finished grade

Saw cut

Backfill material

Undisturbed native material

Power marker tape

Bedding material

2" PVC conduit (6)

Existing pavement concrete 5" compacted depth

Minor hot asphalt marker tape Telecom

3"

6" min.

24"

6" min.

Saw cut

Existing finished grade

Saw cut

Bedding material

Existing pavement concrete 5" compacted depth

Minor hot asphalt

6"

6" min.

UTILITY TRENCH TYPE A

UTILITY TRENCH TYPE C

UTILITY TRENCH TYPE D

4" compacted depth

Aggregate base, 4" compacted depth

Aggregate base, 6"

Direct burial cable

Undisturbed native material

Power marker tape

2" PVC conduit (6) m in

Existing pavement

2" min.

Existing finished grade marker tape Telecom concrete 5" compacted depth

Minor hot asphalt

Bedding material

Bedding material

Aggregate base, 4" compacted depth

Sawcut

2" min.

36"

12"

Bedding material

2" PVC conduit (2) marker tape Telecom

UTILITY TRENCH TYPE B

4" compacted depth

Aggregate base, compacted depth concrete 5"

Minor hot asphalt native material

Undisturbed native material

Undisturbed material Backfill material

Backfill backfill

Lean conrete

FOOTNOTE:

2 Use Type C utility trench when making temporary power runs.

be met, use Type D utility trench.

When a minimum 36" burial depth for power conduit cannot

NOTE:

top 6" and use as the final lift during backfilling.

When trenching is in a non paved location, conserve the

CO approval is required for All trench locations and types.

Saw cut pavement at all trench locations.

3.

2.

1.

Sawcut

Sawcut Sawcut

24"

PRELIM

IN

ARY

Not For

Con str uc

File details come from the government source that posted it. Updated .