WY PRA YELL 10(17) Grand Loop Road, Norris to Golden Gate, Phase 1, Yellowstone National Park, Park County, Wyoming
The work consists of grading, subexcavation, base, paving, drainage, and structure and other small items of work.
Schedule B and D includes construction of a single span, 92-foot long precast girder bridge with cast-in- place concrete deck. Abutments are founded on spread footing. Piers are supported on spread footing. The work includes demolition of the existing concrete bridge upon completion of the new structure.
Project length: Schedule A – 4.55 Miles
Schedule B – 4.85 Miles Schedule C – 6.54 Miles Schedule D – 6.84 Miles
Tentative Fixed Completion Date: Exp. Fall 2015 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: More than 20 million
Location: 21 Miles S of Gardiner, Montana
DESCRIPTION OF WORK in US CUSTOMARY UNITS
Sc h
N am e
_A
N am e
B
Sc h
N am e
_C
N am e
_D
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes Yes 157 Soil Erosion Control Devices (erosion control devices) 1,000 LNFT 1,200 LNFT 1,700 LNFT 1,900 LNFT 158 Watering for Dust Control 7,000 MGAL 7,200 MGAL 10,000 MGAL 10,200 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 20 ACRE 20 ACRE 25 ACRE 25 ACRE 203 Removal of Structures & Obstructions (structures, demolition) 1 EACH 1 EACH
N am e
_A
N am e
B
Sc h
N am e
_C
N am e
_D
204 Excavation & Embankment 132,000
CUYD
132,000
CUYD
165,000
CUYD
165,000
CUYD
207 Earthwork Geotextiles (geotextiles) 12,000 SQYD 12,000 SQYD 15,000 SQYD 15,000 SQYD 208 Structure Excavation 1,000 CUYD 1,000 CUYD 211 Roadway Obliteration 14,000 SQYD 14,000 SQYD 14,000 SQYD 14,000 SQYD
DIVISION 300 – Aggregate Courses 301 Untreated Aggregate Courses (crushed aggregate) 26,000 TON 26,000 TON 32,000 Ton 32,000 TON
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement 19,000 TON 19,000 TON 23,000 TON 23,000TON 411 Asphalt Prime Coat (asphalt surface treatment) 650 TON 650 TON 800 TON 800 TON 412 Asphalt Tack Coat (asphalt surface treatment) 35 TON 35 TON 40 TON 40 TON
DIVISION 550 – Bridge Construction 552 Structural Concrete (concrete – major structures) 270 CUYD 270 CUYD 553 Precasted Concrete Slabs 48” voided ( 465 LNFT 465 LNFT 554 Reinforcing Steel 35,000 LB 35,000 LB 559 Waterproofing (concrete – major structures) 200 SQYD 200 SQYD
DIVISION 600 – Incidental Construction 602 Culverts & Drains 3,000 LNFT 3,000 LNFT 4,000 LNFT 4,000 LNFT 603 Structural Plate Structures (culverts & drains) 615 Sidewalks, Drive Pads & Paved Medians (concrete – minor structures) 20 SQYD 20 SQYD 20 SQYD 20 SQYD 621 Monuments & Markers (construction survey & staking) (yes/no) Yes Yes Yes Yes 622 Rental Equipment (yes/no) Yes Yes Yes Yes 624 Topsoil (landscaping & related items) 20 ACRE 20 ACRE 25 ACRE 25 ACRE 625 Turf Establishment (indicate seeding or mulching separately) 20 ACRE 20 ACRE 25 ACRE 25 ACRE 633 Permanent Traffic Control Devices (traffic control devices) 400 SQFT 400 SQFT 500 SQFT 500 SQFT 634 Permanent Pavement Markings (traffic pavement markings) 95,000 LNFT 95,000 LNFT 140,000 LNFT 140,000 LNFT 635 Temporary Traffic Control – Flagger 7,000 HRS. 7,200 HRS. 8,000 HRS. 8,000 HRS.
N am e
_A
N am e
B
Sc h
N am e
_C
N am e
_D
635 Temporary Traffic Control – Pilot Car 1,000 HRS. 1,000 HRS 1,000 HRS 1,000 HRS 650 Temporary Diversions 10 EACH 10 EACH 15 EACH 15 EACH